SlideShare a Scribd company logo
1 of 14
Download to read offline
PACKAGE A & PACKAGE B
MONTHLY PROGRESS
REPORT
AUGUST 2023
APPROVE BY :
HSE PROMOTER
NUR AINNA MARDHIYAH BT MOHD AZMI
010-5469129
MUHAMMAD IZZUDDIN
NDT ASSISTANT
MUHAMMAD HAZMI
NDT MULTITECH
NUR HILMI
LEAD NDT MULTITECH
PIONEER ENGINEERING SDN BHD (JOHOR)
012-206 5680
MOHD AZMI SHUKRI
CHIEF OPERATION OFFICER
CHIEF EXECUTIVE OFFICER
KHAIRUL RIDZWAN (KIWI)
012-686 2802
NDT ASSISTANT
PUTRA NIK ZULKARNAIN
ADMIN & YARD SUPERVISOR
MUHAMMAD NAZRI BIN ISA
017-739 5323
PROJECT ENGINEER 1
SHANMUGAM A/L MUTHUSAMY
NDT ASSISTANT
LUQMAN AL HAKIM
LEAD NDT MULTITECH
LUKMAN NUL HAKIM
NDT MULTITECH
NASRULHAQ
MUHAMMAD MUHAQQIQIN
NDT ASSISTANT
MOHD RIDZWAN
NDT ASSISTANT
NUR HAYAT
MOHD YASHER
NDT ASSISTANT
KAMARUL
RT OPERATOR 1
QAISTALAL BIN MD DAUD
RT OPERATOR 2
MOHD HAFIZ BIN AHMAD
LEAD NDT MULTITECH
SHAHADAN
NDT MULTITECH
MOHD SAMZURAIEN BIN ABU SAMAH
012-398 8294
019-4881596
SAFETY OFFICER (SSS)
LOKMAN HAKIM BIN ISMAIL
014-2425260
ASNT LEVEL 3
IDRIS BIN ALIAS
013-624 8830
HSE MANAGER
OPERATION ENGINEER 2
011-5411 7822
EIZAT AUDI BIN IBRAHIM
017-286 0037
OPERATION ENGINEER 1
MOHD HAIRUL HEZWAN BIN HARIS
QA/QC MANAGER
PROJECT ENGINEER 2
MUHAMAD IQBAL BIN FAZLI HAZAMI
019-9686680
013-7701535
CONTENT
Health Safety Environment (HSE Statistics)
HSE Plan Implementation
CoVID-19 Dashboard
HSE Program
ManpowerAnd Equipment Loading
PO/Invoice Status
1
2
3
4
5
6
NoA Description
AUGUST
Year to Date
ITD
Indirect Direct Total Indirect Direct Total
1 Total No. of Manpower
8 82 90
2 Total Man-hours 1097 14010 15107 95050 8444 86608 95052
3 Total Safe Man-hours from last LTI 1097 14010 15107 95050 8444 86608 95052
4 Total Overall Man-hours 15107 95050 95052
5 Total Unsafe Act Unsafe Condition 53 270 270
6 Number of Fatality (FAT) 0 0 0 0 0 0 0
7 Number of Permanent Total Disability (PTD) 0 0 0 0 0 0 0
8 Number of Permanent Partial Disability (PPD) 0 0 0 0 0 0 0
9 Number of Lost Workday Case(LWC) 0 0 0 0 0 0 0
10 Number of Restricted Work Cases (RWC) 0 0 0 0 0 0 0
11 Medical Treatment Case (MTC) 0 0 0 0 0 0 0
12 Number of First Aid Cases (FAC) 0 0 0 0 0 0 0
13 Number of Near-Misses (HiPo and Normal) 0 0 0 0 0 0 0
14 Number of Fire Incidents 0 0 0 0 0 0 0
15 Number of Occupational Illness 0 0 0 0 0 0 0
16 Number of Vehicle Accidents 0 0 0 0 0 0 0
17 Number of Property Damage 0 0 0 0 0 0 0
18 Number of Environmental Incident 0 0 0 0 0 0 0
19 Number of Drug / Alcohol Testing 0 0
20 Number of Days Without Lost Time Incident (LTI) 31 165 165
21 Number of Days Without Recordable Incident 31 165 165
HSEStatistics
Fatality
LostTimeAccident
Restricted Work Case
MedicalTreatmentCase
Occupational Illness
FirstAid Case
HIPO Near Miss
Near Miss (excluding HIPOs)
MotorVehicleAccident
Environment
Property Damage
Fire
Security/TrafficViolation/CMP
Man Hours
0
0
0
0
0
0
0
0
0
0
0
0
0
95050
0
0
0
0
0
0
0
0
0
0
0
0
0
95050
0
0
0
0
0
0
0
0
0
0
0
0
0
15107
AUGUST 2023 2023 YTD ITD
HSSE Performance Indicator
PIONEER ENGINEERING MANHOUR STATISTICS
MONTHLY
MANHOURS
(AUGUST 2023)
15107
YTD 2023
MANHOURS
95050
ITD 95050
MARCH APRIL MAY JUNE JULY AUGUST
MONTHLY MAN HOUR 23486 13632 15083 12188 15554 15107
ITD MANHOURS 23486 37118 52201 64389 79943 95050
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
0
5000
10000
15000
20000
25000
AXIS
TITLE
MONTHLY MAN HOUR
PIONEER ENGINEERING SDN BHD . HEALTH, SAFETY AND ENVIRONMENT (HSE) PLAN 2023( PACKAGE A & PACKAGE B)
YEAR
MONTH
WEEK W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3W4 W1 W2 W3 W4
A.
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
B.
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
No
PMT/HSE
As required
First Aider Training
First Aid Kit Inspection
Vehicle Inspection
Yearly
1
7
10
Fire Extinguisher Insoection
Activities Frequency
Action Party
C. PREPARENESS AND TRAINING
JANUARY 2023-DECEMBER 2023
HSE/Management
2 Twice year
Nominated staff
DECEMBER
Consistenly
Client/Authority
JULY
All Staff
5
HSE/PMT
Management site visit
JUNE
3
Emergency drill
Monthly
Monthly
Quarterly
JANUARY
Accident Investigation & Report
9
All site personnel
6
PMT/HSE
HSE Campaingn
2
Quarterly
Site Staff
All
HSE/PMT
HSE
Monthly
Body Harness Inspection
HSE Walkabout
HSE
HSE/Scaffoldder Inspector
Quarterly
Weekly
11
HSE
First Party Audit
IMPLEMENTATION AND MONITORING
Updating Notice Board
Second Party Audit
1 HSE Monthly Report
As required
2
1
Twice year
12
MAY
Monthly
4
LEADERSHIP AND COMMITMENT
Monthly
AUGUST
Quartely
OCTOBER
REMARKS
NOVEMBER
8
HSE Committee Member
Competency
4
MARCH
FEBRUARY APRIL
5
UAUC submission
Equipment and tool Inspection
SEPTEMBER
Frequently
HSE/Driver
3
HSE Committe Meeting
Monthly
HSE/PMT
All staff
Toolboxtalk
CoVID-19 Dashboard
Company Statistic as of 31May2023
Confirmed cases
Workers completed quarantine
HSE PROGRAM
1.WeeklyToolbox meeting – Operator &Assistant
(04-08-2023)
• Brief about Safety Ladder
• Submission UCUA
• Check all PPE for technician & assistant
2.WeeklyToolbox meeting – Operator Assistant
(10-08-2023)
• Brief about Heat Stroke
• Submission UCUA
• Vehicle inspection all transport
• Update details in ACMS system
3.WeeklyToolbox meeting – Operator &Assistant
(18-08-2023)
• Brief about Head Protection
• Check condition of gas badge
• Submission UCUA – Every week
4.– Body Harness Inspection (11-08-2023)
• Inspect by Zuaib ( Scaffolding Inspector)
• Witness by Faizal (HSE area 1)
5. MassToolbox & Gotong –Royong at Lot 153 – Organized byTA
Village safety (19-08-2023)
• All tenants in Lot 153 involved
• Gotong-royong around Lot 154
• Brief about the activities
Man Power Loading
No Role Area Company Quantity
1. Technical Clerk Engineering
Building
Pioneer
Engineering
21
2. Inspection Coordinator Engineering
Building/Site
Pioneer
Engineering
7
3. API Inspector Engineering
Building/Site
Pioneer
Engineering 32
4. NDTTechnician Site Pioneer
Engineering
12
5. AssistantTechnician Site Pioneer
Engineering
8
6. GI Level 3 Engineering
Building/Site
Pioneer
Engineering
1
7. Welding Inspector Site Pioneer
Engineering
1
DIRECT MANPOWER
Man Power Loading
NO ROLE AREA COMPANY QUANTITY
1. DRIVER PIONEER
OFFICE/ENGINEERING
BUILDING/SITE
PIONEER
2
2. PROJECT ENGINEER PIONEER OFFICE PIONEER 1
3. OPERATION ENGINEER PIONEER OFFICE PIONEER 2
4 SAFETY OFFICE (SSS) PIONEER OFFICE/SITE PIONEER 1
5. HSE PROMOTER PIONEER OFFICE/SITE PIONEER 1
6. ADMIN AND MATERIAL
CONTROLLER
PIONEER YARD PIONEER 1
INDIRECT MANPOWER
Package A & B MONTHLY REPORT AUGUST 2023.pdf

More Related Content

Similar to Package A & B MONTHLY REPORT AUGUST 2023.pdf

97029 incident report
97029   incident report97029   incident report
97029 incident report
Jessica Saba
 
MSHEQ_Company Profile_E-mail
MSHEQ_Company Profile_E-mailMSHEQ_Company Profile_E-mail
MSHEQ_Company Profile_E-mail
Charne Matthews
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_Jul
ChinaHarbour
 
20150220_Infoday H2020_Transporte_Juan Francisco Reyes
20150220_Infoday H2020_Transporte_Juan Francisco Reyes20150220_Infoday H2020_Transporte_Juan Francisco Reyes
20150220_Infoday H2020_Transporte_Juan Francisco Reyes
Redit
 
2015-06 HSE Culture Program
2015-06 HSE Culture Program2015-06 HSE Culture Program
2015-06 HSE Culture Program
??? Markus Dong
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04
ChinaHarbour
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_Jun
ChinaHarbour
 

Similar to Package A & B MONTHLY REPORT AUGUST 2023.pdf (20)

DCR 08-10-2015
DCR 08-10-2015DCR 08-10-2015
DCR 08-10-2015
 
4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
Product Safety Policy in Japan
Product Safety Policy in JapanProduct Safety Policy in Japan
Product Safety Policy in Japan
 
97029 incident report
97029   incident report97029   incident report
97029 incident report
 
Competent person
Competent person Competent person
Competent person
 
MSHEQ_Company Profile_E-mail
MSHEQ_Company Profile_E-mailMSHEQ_Company Profile_E-mail
MSHEQ_Company Profile_E-mail
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_Jul
 
European MDR - Understanding Safety and Performance Requirements
European MDR - Understanding Safety and Performance RequirementsEuropean MDR - Understanding Safety and Performance Requirements
European MDR - Understanding Safety and Performance Requirements
 
July Monthly Report
July Monthly ReportJuly Monthly Report
July Monthly Report
 
Benchmarking risk againt national data
Benchmarking risk againt national data   Benchmarking risk againt national data
Benchmarking risk againt national data
 
hggggg
hggggghggggg
hggggg
 
CV-ALFREDO
CV-ALFREDOCV-ALFREDO
CV-ALFREDO
 
Road transport safety managemet system
Road transport safety managemet system Road transport safety managemet system
Road transport safety managemet system
 
20150220_Infoday H2020_Transporte_Juan Francisco Reyes
20150220_Infoday H2020_Transporte_Juan Francisco Reyes20150220_Infoday H2020_Transporte_Juan Francisco Reyes
20150220_Infoday H2020_Transporte_Juan Francisco Reyes
 
Safe in India - Report
Safe in India - ReportSafe in India - Report
Safe in India - Report
 
2015-06 HSE Culture Program
2015-06 HSE Culture Program2015-06 HSE Culture Program
2015-06 HSE Culture Program
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_Jun
 
Paper 8 - SoHELP presentation SMI 2017 2.pdf
Paper 8 - SoHELP  presentation SMI  2017 2.pdfPaper 8 - SoHELP  presentation SMI  2017 2.pdf
Paper 8 - SoHELP presentation SMI 2017 2.pdf
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Package A & B MONTHLY REPORT AUGUST 2023.pdf

  • 1. PACKAGE A & PACKAGE B MONTHLY PROGRESS REPORT AUGUST 2023
  • 2. APPROVE BY : HSE PROMOTER NUR AINNA MARDHIYAH BT MOHD AZMI 010-5469129 MUHAMMAD IZZUDDIN NDT ASSISTANT MUHAMMAD HAZMI NDT MULTITECH NUR HILMI LEAD NDT MULTITECH PIONEER ENGINEERING SDN BHD (JOHOR) 012-206 5680 MOHD AZMI SHUKRI CHIEF OPERATION OFFICER CHIEF EXECUTIVE OFFICER KHAIRUL RIDZWAN (KIWI) 012-686 2802 NDT ASSISTANT PUTRA NIK ZULKARNAIN ADMIN & YARD SUPERVISOR MUHAMMAD NAZRI BIN ISA 017-739 5323 PROJECT ENGINEER 1 SHANMUGAM A/L MUTHUSAMY NDT ASSISTANT LUQMAN AL HAKIM LEAD NDT MULTITECH LUKMAN NUL HAKIM NDT MULTITECH NASRULHAQ MUHAMMAD MUHAQQIQIN NDT ASSISTANT MOHD RIDZWAN NDT ASSISTANT NUR HAYAT MOHD YASHER NDT ASSISTANT KAMARUL RT OPERATOR 1 QAISTALAL BIN MD DAUD RT OPERATOR 2 MOHD HAFIZ BIN AHMAD LEAD NDT MULTITECH SHAHADAN NDT MULTITECH MOHD SAMZURAIEN BIN ABU SAMAH 012-398 8294 019-4881596 SAFETY OFFICER (SSS) LOKMAN HAKIM BIN ISMAIL 014-2425260 ASNT LEVEL 3 IDRIS BIN ALIAS 013-624 8830 HSE MANAGER OPERATION ENGINEER 2 011-5411 7822 EIZAT AUDI BIN IBRAHIM 017-286 0037 OPERATION ENGINEER 1 MOHD HAIRUL HEZWAN BIN HARIS QA/QC MANAGER PROJECT ENGINEER 2 MUHAMAD IQBAL BIN FAZLI HAZAMI 019-9686680 013-7701535
  • 3. CONTENT Health Safety Environment (HSE Statistics) HSE Plan Implementation CoVID-19 Dashboard HSE Program ManpowerAnd Equipment Loading PO/Invoice Status 1 2 3 4 5 6
  • 4. NoA Description AUGUST Year to Date ITD Indirect Direct Total Indirect Direct Total 1 Total No. of Manpower 8 82 90 2 Total Man-hours 1097 14010 15107 95050 8444 86608 95052 3 Total Safe Man-hours from last LTI 1097 14010 15107 95050 8444 86608 95052 4 Total Overall Man-hours 15107 95050 95052 5 Total Unsafe Act Unsafe Condition 53 270 270 6 Number of Fatality (FAT) 0 0 0 0 0 0 0 7 Number of Permanent Total Disability (PTD) 0 0 0 0 0 0 0 8 Number of Permanent Partial Disability (PPD) 0 0 0 0 0 0 0 9 Number of Lost Workday Case(LWC) 0 0 0 0 0 0 0 10 Number of Restricted Work Cases (RWC) 0 0 0 0 0 0 0 11 Medical Treatment Case (MTC) 0 0 0 0 0 0 0 12 Number of First Aid Cases (FAC) 0 0 0 0 0 0 0 13 Number of Near-Misses (HiPo and Normal) 0 0 0 0 0 0 0 14 Number of Fire Incidents 0 0 0 0 0 0 0 15 Number of Occupational Illness 0 0 0 0 0 0 0 16 Number of Vehicle Accidents 0 0 0 0 0 0 0 17 Number of Property Damage 0 0 0 0 0 0 0 18 Number of Environmental Incident 0 0 0 0 0 0 0 19 Number of Drug / Alcohol Testing 0 0 20 Number of Days Without Lost Time Incident (LTI) 31 165 165 21 Number of Days Without Recordable Incident 31 165 165 HSEStatistics
  • 5. Fatality LostTimeAccident Restricted Work Case MedicalTreatmentCase Occupational Illness FirstAid Case HIPO Near Miss Near Miss (excluding HIPOs) MotorVehicleAccident Environment Property Damage Fire Security/TrafficViolation/CMP Man Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 95050 0 0 0 0 0 0 0 0 0 0 0 0 0 95050 0 0 0 0 0 0 0 0 0 0 0 0 0 15107 AUGUST 2023 2023 YTD ITD HSSE Performance Indicator
  • 6. PIONEER ENGINEERING MANHOUR STATISTICS MONTHLY MANHOURS (AUGUST 2023) 15107 YTD 2023 MANHOURS 95050 ITD 95050 MARCH APRIL MAY JUNE JULY AUGUST MONTHLY MAN HOUR 23486 13632 15083 12188 15554 15107 ITD MANHOURS 23486 37118 52201 64389 79943 95050 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 0 5000 10000 15000 20000 25000 AXIS TITLE MONTHLY MAN HOUR
  • 7. PIONEER ENGINEERING SDN BHD . HEALTH, SAFETY AND ENVIRONMENT (HSE) PLAN 2023( PACKAGE A & PACKAGE B) YEAR MONTH WEEK W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3W4 W1 W2 W3 W4 A. Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual B. Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual No PMT/HSE As required First Aider Training First Aid Kit Inspection Vehicle Inspection Yearly 1 7 10 Fire Extinguisher Insoection Activities Frequency Action Party C. PREPARENESS AND TRAINING JANUARY 2023-DECEMBER 2023 HSE/Management 2 Twice year Nominated staff DECEMBER Consistenly Client/Authority JULY All Staff 5 HSE/PMT Management site visit JUNE 3 Emergency drill Monthly Monthly Quarterly JANUARY Accident Investigation & Report 9 All site personnel 6 PMT/HSE HSE Campaingn 2 Quarterly Site Staff All HSE/PMT HSE Monthly Body Harness Inspection HSE Walkabout HSE HSE/Scaffoldder Inspector Quarterly Weekly 11 HSE First Party Audit IMPLEMENTATION AND MONITORING Updating Notice Board Second Party Audit 1 HSE Monthly Report As required 2 1 Twice year 12 MAY Monthly 4 LEADERSHIP AND COMMITMENT Monthly AUGUST Quartely OCTOBER REMARKS NOVEMBER 8 HSE Committee Member Competency 4 MARCH FEBRUARY APRIL 5 UAUC submission Equipment and tool Inspection SEPTEMBER Frequently HSE/Driver 3 HSE Committe Meeting Monthly HSE/PMT All staff Toolboxtalk
  • 8. CoVID-19 Dashboard Company Statistic as of 31May2023 Confirmed cases Workers completed quarantine
  • 9. HSE PROGRAM 1.WeeklyToolbox meeting – Operator &Assistant (04-08-2023) • Brief about Safety Ladder • Submission UCUA • Check all PPE for technician & assistant 2.WeeklyToolbox meeting – Operator Assistant (10-08-2023) • Brief about Heat Stroke • Submission UCUA • Vehicle inspection all transport • Update details in ACMS system
  • 10. 3.WeeklyToolbox meeting – Operator &Assistant (18-08-2023) • Brief about Head Protection • Check condition of gas badge • Submission UCUA – Every week 4.– Body Harness Inspection (11-08-2023) • Inspect by Zuaib ( Scaffolding Inspector) • Witness by Faizal (HSE area 1)
  • 11. 5. MassToolbox & Gotong –Royong at Lot 153 – Organized byTA Village safety (19-08-2023) • All tenants in Lot 153 involved • Gotong-royong around Lot 154 • Brief about the activities
  • 12. Man Power Loading No Role Area Company Quantity 1. Technical Clerk Engineering Building Pioneer Engineering 21 2. Inspection Coordinator Engineering Building/Site Pioneer Engineering 7 3. API Inspector Engineering Building/Site Pioneer Engineering 32 4. NDTTechnician Site Pioneer Engineering 12 5. AssistantTechnician Site Pioneer Engineering 8 6. GI Level 3 Engineering Building/Site Pioneer Engineering 1 7. Welding Inspector Site Pioneer Engineering 1 DIRECT MANPOWER
  • 13. Man Power Loading NO ROLE AREA COMPANY QUANTITY 1. DRIVER PIONEER OFFICE/ENGINEERING BUILDING/SITE PIONEER 2 2. PROJECT ENGINEER PIONEER OFFICE PIONEER 1 3. OPERATION ENGINEER PIONEER OFFICE PIONEER 2 4 SAFETY OFFICE (SSS) PIONEER OFFICE/SITE PIONEER 1 5. HSE PROMOTER PIONEER OFFICE/SITE PIONEER 1 6. ADMIN AND MATERIAL CONTROLLER PIONEER YARD PIONEER 1 INDIRECT MANPOWER