SlideShare a Scribd company logo
1 of 19
Weekly Presentation
Week 41 2022
(10 Okto – 16 Okto 2022)
SHE Department
Safety
Performance Contents :
• Kebijakan
• Struktur Organisasi (Departemen, Bagian K3-KO, Komite KP)
• Safety Performance
• Matrix Kompetensi
• SPIP
• Informasi Insiden (If any)
• Penegakan Disiplin Golden Rules (If any)
• SHE Activities (Actual)
• SHE Activities (Plan)
• Safety Accountability Program Achievement
• Monitoring Proggres Plant & Workshop (Layout) All Kontraktor
• ISU critical
• Informasi Healthy Disease dan Covid
• Informasi Limbah
• Dokumentasi Kegiatan
Kebijakan
Perusahaan
Struktur
Organisasi
Safety
Performance
Safety Performance PT. AJA MEGA PERKASA
WEEK 38 PERIOD SEPTEMBER
Uraian Manpower & Manhours : WTD MTD YTD
Jumlah Karyawan 142 152 152
Jumlah karyawan masuk 0 2
Jumlah karyawan Keluar 7 12 31
Hari Kerja Aman Days Days
Jam Kerja aman 10.934 jam 34.342 jam 166.518 jam
Uraian Incident: Threeshold WTD MTD YTD
Fatality 0 0 0
LTI (Lost Time Injury) 0 0 1
MTC (Medical Treatment Case) 0 0 0
FAC (First Aid Case) 0 0 0
PD (Property Damage) 10 0 0 13
Near Miss 10 0 0 2
Fire case 0 0 1
Enviroment Incident 0 0 0
FR (Frequency Rate) 0 0 0
SR (Severity Rate) 0 0 0
PDFR (Property Damage Freq.
Rate)
0 0 0
TIFR (Total Incidenf Freq. Rate) 0 0
List Of
Certificate
No Jenis Pelatihan Nama Karyawan Jabatan No. register Masa Berlaku
1 POU - - - -
2 POM MUH. YUSUF PJO TAM. 613. 00785 2017 SEUMUR HIDUP
3 POM SUMARJI HEAD. DEPT. PLANT P.4906/37.04/DBT/2016
4 POP MUH. SOLIKIN Spv. HSE 05100-3121-4-0003720-2021 05 DESEMBER 2026
5 POP ANDI DEDI. A Spv. Produksi MBP.1375.00558 2022 11 MEI 2027
6 POP ADE TRI ELEKTRIK 4764 / 47 DTL / 2006 SEUMUR HIDUP
7 TOT MUH. YUSUF PJO 09898 / PTIC / TOT VI / 2011 SEUMUR HIDUP
8 TOT NUR KHOLIS TRAINER MENUNGGU NOMOR REGISTRASI
9 JURU LAS DEPPASULE WELDER - -
10 JURU LAS SULTAN WELDER - -
11 JURU LAS ASMUNI WELDER - -
SPIP
N Jenis SPIP Merk / Spesifikasi Jumlah Periode Perawatan Legalitas
SARANA
1 Light Vehlcle Mitshubishi Triton HDX 4x4 6 By HM/KM STNK
2 Microbus Hino 1 Per 3 Bulan STNK
3 Dumptruck Cap 40 Ton Mercy Axor 4843 K 26 By HM/KM Manual Book
Dumptruck Cap 30 Ton Mercy Axor 2528 CH 20 By HM/KM Manual Book
PRASARANA
1 Container 20 Feet 2 Bulanan
2 Container 40 Feet 1 Bulanan
3 TPS LB3 Bulanan Perizinan
4 Workshop Bulanan
Instalasi
1 Penyalur Petir 0,2 Ohm 1 Per 6 Bulan Sertifikasi
2
PERALATAN
1 Bejana Tekan Compressor (Super Shape 160 Bar) 1 Perbulan Sertifikasi
2 Stand Jack Hydraulic Jack 4 Perbulan Sertifikas
3 Mesin Las RII 400 (Ryu) 2 Perbulan Manual Book
4 Hand Tools Gerinda (Makita) 1 Perbulan Manual Book
5 Hand Tools Bor (Makita) 1 Perbulan Manual Book
6 Hand Tools Mesin Impact Baut (Krisbow) 1 Perbulan Manual Book
Informasi Insiden PT. AJA MEGA PERKASA
No Tanggal/Jam/
lokasi
Nama
Pelaku/Korban
Nama
Atasan/Saksi
SPIP Jenis
Insiden
Rincian Kerusakan Kronologi Kejadian Biaya Kerusakan Rekomendasi dan
Tindakan perbaikan
Tindakan Perbaikan
dan Pencegahan
Foto kejadian
1
2
TOTAL N I H I L
Penegakan Golden Rules PT. AJA MEGA PERKASA
No Tanggal/Jam/lokasi Nama Pelaku/Korban SPIP Rincian Pelanggaran Tindakan Perbaikan dan Pencegahan Evidance
1
2
TOTAL
N I H I L
SafetyActivity
& Project
No Kegiatan Week 41 Target
MK/Week
Tanggal
Total
Follow
Up
10 11 12 13 14 15 16
1 Safety Talk 1 - - - - - - - 0
2 P5M 14 2 1 1 1 2 1 1 9
3 Inspeksi PIT 2 - - 1 - - - 1
4 Inspeksi Hauling 2 1 - 1 - - 1 - 2
5 Inspeksi
Kelengkapan
2 - 1 - - 1 - 2
6 Inspeksi Speed
Gun
4 1 - 1 - 1 - 1 4
7 Inspeksi Fatigue 1 - - 1 - - - - 1
8 Defensive Driving 4 1 - - - 1 - - 2
9 Hazzard Report 28 4 2 5 2 2 4 5 24
10 Induksi Karyawan 2
- - 1 - - 1 - 2
N
o
Project Safety
Week 41
Tanggal
Total
10 11 12 13 14 15 16
1 Commissioning - 1 - - - 1 - 2
2 Healthy talk Kesehatan - - 1 - - - - 1
3 Pembuatan Manual
Traffic Book
4 Pemasangan Velcro
Scotlight pada unit
- - 2 - 2 - - 4
5 Pemeriksaan Ergonomi
Kerja
6 Pemasangan
Sign/Stiker Emergency
Stop Di Unit
3 - 2 - - - - 5
SafetyActivity
& ProjectPlan
Safety Plan Activity Week 42 Safety Plan Project Activity Week 42
N
o
Project Safety
Week 34
Tanggal
Total
10 11 12 13 14 15 16
1 Pemasangan stiker
Senam anti Fatigue di
Unit
5 5 5 5 5 5 5 5
2 Pembuatan Manual
Traffic Book
5 5 5 5 5 5 5 35
3 Pemasangan Velcro
Scotlight pada unit
5 5 5 5 5 5 5 35
4 Pemeriksaan Ergonomi
Kerja
5 5 5 5 5 5 5 35
5 Pemasangan
Sign/Stiker Emergency
Stop Di Unit
5 5 5 5 5 5 5 35
6 Pembuatan
Safety/Healthy
Campaign
1 1 1 3
No Kegiatan Week 34 Target
MK/Week
Tanggal
Total
Follow
Up
10 11 12 13 14 15 16
1 Safety Talk 1 1 1
2 P5M 14 2 2 2 2 2 2 2 14
3 Inspeksi PIT 7 1 2 2
4 Inspeksi Hauling 4 1 1 1 1 4
5 Inspeksi
Kelengkapan
3 1 1 2
6 Inspeksi Speed
Gun
2 2 4
7 Inspeksi Fatigue 4 1
8 Defensive Driving 5 1 1 2
9 Hazzard Report 8 8 8 8 8 8 8 56
10 Induksi Karyawan 3 1 1 1 3
SAP
no NAMA JABATAN PLAN ACT. WTD ACT. MTD ACH
INSPEKSI DAN OBSERVASI
Departement : General
1. M. Yusuf PJO 4 0 12 ( MASSA CUTI )
Departement : Produksi
1. Andi Dedi. A Spv. Produksi 8 3 18 40 %
2. Arbain Foreman 8 4 17 50 %
3. Irwandy Foreman 8 5 19 60 %
Departement : HSE & Trainer
1. Muh. Solikin Spv. HSE 8 6 23 75 %
2. Tommy Safety Patrol 8 6 21 75 %
3. Ari Putra. P Safety Patrol 8 4 19 50 %
4. Ade Surono Safety Patrol 8 6 38 75 %
5. Umar Safety Patrol 8 6 40 75 %
6. M. Hidayat Admin HSE 8 6 24 75 %
7. Nur Kholis Trainer 8 7 36 85 %
8. Fatahuddin Trainer 8 5 24 60 %
COACHING DAN COUNSELING
SAP
no NAMA JABATAN PLAN ACT. WTD ACT. MTD ACH
INSPEKSI DAN OBSERVASI
Departement : Plant
1. Sumarji Dept. Head Plant 4 3 12 75 %
2. Asriadi Spv. Mekanik 8 4 15 50 %
3. Dimas Foreman Mekanik 8 3 13 40 %
4. Nurmianto Foreman Mekanik 8 4 14 50 %
5. Hery Logistik 8 3 9 40 %
Departement : HRGA
1. Asep Iwan Suwandi Head. HRGA 4 2 2 50 %
2. Wawan Spv. HRGA 4 1 1 25 %
3. Desy Purnama Sari Admin HRGA 4 3 3 75 %
COACHING DAN COUNSELING
ISU CRITICAL
 Commissioning Bus Karyawan ( Close )
 Re-commissioning DT 707 ( Close )
Informasi
Kesehatan
LAPORAN MONITORING KESEHATAN & COVID-19 PT. AMP site BSSR
No Kondisi Karyawan Jumlah Keterangan
1 Fit to Work 146 -
2 Unfit 0 -
3 Sembuh 0
TOTAL 150
No 5 TOP Disease Jumlah Keterangan
1
2
3
TOTAL
No Tes Rapid Antigen Jumlah Keterangan
1 Antigen (-) 0 -
2 Antigen (+) 0 -
TOTAL 0
No Tes PCR Jumlah Keterangan
1 PCR (-) 0 -
2 PCR (+) 0 -
TOTAL 0
NO Isolasi Jumlah Keterangan
1 Isolasi di Mess 0 -
2 Isolasi di Rumah 0 -
TOTAL 0
NERACA
lIMBAH
LAPORAN LIMBAH KONTRAKTOR
N
o
JENIS LIMBAH JUMLAH MASUK Keterangan
1 OLI 40 L Baru
2 GREASE 40 Kg Baru
3 MAJUN 5 Kg -
TOTAL
DOKUMENTASI KEGIATAN SAFETY (WEEK 41)
Monitoring Haul-road
Commisioning & Re-Commissioning
Fatigue Ceck
P5M Kontraktor
Monitoring Speed
Monitoring PIT
DOKUMENTASI KEGIATAN SAFETY (WEEK 41)
Inspeksi Rambu Pembagian APD
Inspeksi Kelengkapan unit Induction & Re-Induction
Inspeksi
Workshop & TPS
Safety Kordinasi
Never Give Up
TERIMA KASIH

More Related Content

What's hot

Safety Induction new.pptx
Safety Induction new.pptxSafety Induction new.pptx
Safety Induction new.pptxReniMutiaraSari
 
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTX
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTXPENGENALAN K3 PERTAMBANGAN Safety Induction.PPTX
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTXTimothyTekniko
 
Principles manual handling
Principles manual handling Principles manual handling
Principles manual handling Winarso Arso
 
Form HIRADC (2).docx
Form HIRADC (2).docxForm HIRADC (2).docx
Form HIRADC (2).docxDangkosAja
 
Defensive Driving Training
Defensive Driving TrainingDefensive Driving Training
Defensive Driving TrainingEly Yudha
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi BangunganAl Marson
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfSintaMarlina3
 
Materi k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahayaMateri k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahayaSyaifi Al-Mahfudzi
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead craneWina Indah
 
Apol.fom.jpr hse.17 daftar periksa safety induction
Apol.fom.jpr hse.17 daftar periksa safety inductionApol.fom.jpr hse.17 daftar periksa safety induction
Apol.fom.jpr hse.17 daftar periksa safety inductionDwi Yulianto
 
CONTOH JSA (JOB SAFETY ANALYSIS) K3
CONTOH JSA (JOB SAFETY ANALYSIS) K3CONTOH JSA (JOB SAFETY ANALYSIS) K3
CONTOH JSA (JOB SAFETY ANALYSIS) K3aji indras
 
Unsafe act and condition
Unsafe act and conditionUnsafe act and condition
Unsafe act and conditionJulita Anggrek
 
11. statistik & pelaporan kecelakaan
11. statistik & pelaporan kecelakaan11. statistik & pelaporan kecelakaan
11. statistik & pelaporan kecelakaanWinarso Arso
 
Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Al Marson
 

What's hot (20)

Presentasi K3 Proyek.
Presentasi K3 Proyek.Presentasi K3 Proyek.
Presentasi K3 Proyek.
 
Safety Induction new.pptx
Safety Induction new.pptxSafety Induction new.pptx
Safety Induction new.pptx
 
Materi Training Safety
Materi Training SafetyMateri Training Safety
Materi Training Safety
 
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTX
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTXPENGENALAN K3 PERTAMBANGAN Safety Induction.PPTX
PENGENALAN K3 PERTAMBANGAN Safety Induction.PPTX
 
K3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap DaruratK3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap Darurat
 
Principles manual handling
Principles manual handling Principles manual handling
Principles manual handling
 
Safety induction
Safety inductionSafety induction
Safety induction
 
Form HIRADC (2).docx
Form HIRADC (2).docxForm HIRADC (2).docx
Form HIRADC (2).docx
 
Defensive Driving Training
Defensive Driving TrainingDefensive Driving Training
Defensive Driving Training
 
materi induksi.pptx
materi induksi.pptxmateri induksi.pptx
materi induksi.pptx
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi Bangungan
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
 
Materi k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahayaMateri k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahaya
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Apol.fom.jpr hse.17 daftar periksa safety induction
Apol.fom.jpr hse.17 daftar periksa safety inductionApol.fom.jpr hse.17 daftar periksa safety induction
Apol.fom.jpr hse.17 daftar periksa safety induction
 
CONTOH JSA (JOB SAFETY ANALYSIS) K3
CONTOH JSA (JOB SAFETY ANALYSIS) K3CONTOH JSA (JOB SAFETY ANALYSIS) K3
CONTOH JSA (JOB SAFETY ANALYSIS) K3
 
Unsafe act and condition
Unsafe act and conditionUnsafe act and condition
Unsafe act and condition
 
A draft simulasi kebakaran 2021
A draft simulasi kebakaran 2021A draft simulasi kebakaran 2021
A draft simulasi kebakaran 2021
 
11. statistik & pelaporan kecelakaan
11. statistik & pelaporan kecelakaan11. statistik & pelaporan kecelakaan
11. statistik & pelaporan kecelakaan
 
Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Alat Pelindung Diri - K3
Alat Pelindung Diri - K3
 

Similar to Contoh Presentasi Laporan.pptx

KPOC BPR Q2 - 2023.pptx
KPOC BPR Q2 - 2023.pptxKPOC BPR Q2 - 2023.pptx
KPOC BPR Q2 - 2023.pptxMaritimeMine
 
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptxREVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptxHarristioAdam2
 
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptx
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptxREVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptx
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptxachmadtaufiq25
 
Package A & B MONTHLY REPORT AUGUST 2023.pdf
Package A & B MONTHLY REPORT AUGUST 2023.pdfPackage A & B MONTHLY REPORT AUGUST 2023.pdf
Package A & B MONTHLY REPORT AUGUST 2023.pdfshan55760
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectTapas Das
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxnoelmanroe1
 
HSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo EnergiHSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo Energifachroe84
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - ProgressIssa Alshaikh
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxMohHElkomy
 
Report HRGA Meeting Report Ops Mei 2022 W2.pptx
Report HRGA Meeting Report Ops Mei 2022 W2.pptxReport HRGA Meeting Report Ops Mei 2022 W2.pptx
Report HRGA Meeting Report Ops Mei 2022 W2.pptxNazarFahrizal1
 
Planning fundamentals
Planning fundamentalsPlanning fundamentals
Planning fundamentalsRoger Hobson
 

Similar to Contoh Presentasi Laporan.pptx (20)

DCR 08-10-2015
DCR 08-10-2015DCR 08-10-2015
DCR 08-10-2015
 
BRD KP W 17 2023.pptx
BRD KP W 17 2023.pptxBRD KP W 17 2023.pptx
BRD KP W 17 2023.pptx
 
KPOC BPR Q2 - 2023.pptx
KPOC BPR Q2 - 2023.pptxKPOC BPR Q2 - 2023.pptx
KPOC BPR Q2 - 2023.pptx
 
July Monthly Report
July Monthly ReportJuly Monthly Report
July Monthly Report
 
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptxREVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx
REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx
 
8_TPM.pdf
8_TPM.pdf8_TPM.pdf
8_TPM.pdf
 
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptx
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptxREVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptx
REVIEW PRODUCTION WEEK 11 10-16 MARET 2023.pptx
 
Qp nos-list-april
Qp nos-list-april Qp nos-list-april
Qp nos-list-april
 
TPM ppt.pptx
TPM ppt.pptxTPM ppt.pptx
TPM ppt.pptx
 
Package A & B MONTHLY REPORT AUGUST 2023.pdf
Package A & B MONTHLY REPORT AUGUST 2023.pdfPackage A & B MONTHLY REPORT AUGUST 2023.pdf
Package A & B MONTHLY REPORT AUGUST 2023.pdf
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
HSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo EnergiHSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo Energi
 
Internship Report
Internship ReportInternship Report
Internship Report
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
 
Report HRGA Meeting Report Ops Mei 2022 W2.pptx
Report HRGA Meeting Report Ops Mei 2022 W2.pptxReport HRGA Meeting Report Ops Mei 2022 W2.pptx
Report HRGA Meeting Report Ops Mei 2022 W2.pptx
 
Planning fundamentals
Planning fundamentalsPlanning fundamentals
Planning fundamentals
 
Lean Manufacturing Project
Lean Manufacturing ProjectLean Manufacturing Project
Lean Manufacturing Project
 

Recently uploaded

办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一fhwihughh
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAmazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAbdelrhman abooda
 
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一F La
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]📊 Markus Baersch
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDRafezzaman
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxBoston Institute of Analytics
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhijennyeacort
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 

Recently uploaded (20)

办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptxAmazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
Amazon TQM (2) Amazon TQM (2)Amazon TQM (2).pptx
 
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 

Contoh Presentasi Laporan.pptx

  • 1. Weekly Presentation Week 41 2022 (10 Okto – 16 Okto 2022) SHE Department
  • 2. Safety Performance Contents : • Kebijakan • Struktur Organisasi (Departemen, Bagian K3-KO, Komite KP) • Safety Performance • Matrix Kompetensi • SPIP • Informasi Insiden (If any) • Penegakan Disiplin Golden Rules (If any) • SHE Activities (Actual) • SHE Activities (Plan) • Safety Accountability Program Achievement • Monitoring Proggres Plant & Workshop (Layout) All Kontraktor • ISU critical • Informasi Healthy Disease dan Covid • Informasi Limbah • Dokumentasi Kegiatan
  • 5. Safety Performance Safety Performance PT. AJA MEGA PERKASA WEEK 38 PERIOD SEPTEMBER Uraian Manpower & Manhours : WTD MTD YTD Jumlah Karyawan 142 152 152 Jumlah karyawan masuk 0 2 Jumlah karyawan Keluar 7 12 31 Hari Kerja Aman Days Days Jam Kerja aman 10.934 jam 34.342 jam 166.518 jam Uraian Incident: Threeshold WTD MTD YTD Fatality 0 0 0 LTI (Lost Time Injury) 0 0 1 MTC (Medical Treatment Case) 0 0 0 FAC (First Aid Case) 0 0 0 PD (Property Damage) 10 0 0 13 Near Miss 10 0 0 2 Fire case 0 0 1 Enviroment Incident 0 0 0 FR (Frequency Rate) 0 0 0 SR (Severity Rate) 0 0 0 PDFR (Property Damage Freq. Rate) 0 0 0 TIFR (Total Incidenf Freq. Rate) 0 0
  • 6. List Of Certificate No Jenis Pelatihan Nama Karyawan Jabatan No. register Masa Berlaku 1 POU - - - - 2 POM MUH. YUSUF PJO TAM. 613. 00785 2017 SEUMUR HIDUP 3 POM SUMARJI HEAD. DEPT. PLANT P.4906/37.04/DBT/2016 4 POP MUH. SOLIKIN Spv. HSE 05100-3121-4-0003720-2021 05 DESEMBER 2026 5 POP ANDI DEDI. A Spv. Produksi MBP.1375.00558 2022 11 MEI 2027 6 POP ADE TRI ELEKTRIK 4764 / 47 DTL / 2006 SEUMUR HIDUP 7 TOT MUH. YUSUF PJO 09898 / PTIC / TOT VI / 2011 SEUMUR HIDUP 8 TOT NUR KHOLIS TRAINER MENUNGGU NOMOR REGISTRASI 9 JURU LAS DEPPASULE WELDER - - 10 JURU LAS SULTAN WELDER - - 11 JURU LAS ASMUNI WELDER - -
  • 7. SPIP N Jenis SPIP Merk / Spesifikasi Jumlah Periode Perawatan Legalitas SARANA 1 Light Vehlcle Mitshubishi Triton HDX 4x4 6 By HM/KM STNK 2 Microbus Hino 1 Per 3 Bulan STNK 3 Dumptruck Cap 40 Ton Mercy Axor 4843 K 26 By HM/KM Manual Book Dumptruck Cap 30 Ton Mercy Axor 2528 CH 20 By HM/KM Manual Book PRASARANA 1 Container 20 Feet 2 Bulanan 2 Container 40 Feet 1 Bulanan 3 TPS LB3 Bulanan Perizinan 4 Workshop Bulanan Instalasi 1 Penyalur Petir 0,2 Ohm 1 Per 6 Bulan Sertifikasi 2 PERALATAN 1 Bejana Tekan Compressor (Super Shape 160 Bar) 1 Perbulan Sertifikasi 2 Stand Jack Hydraulic Jack 4 Perbulan Sertifikas 3 Mesin Las RII 400 (Ryu) 2 Perbulan Manual Book 4 Hand Tools Gerinda (Makita) 1 Perbulan Manual Book 5 Hand Tools Bor (Makita) 1 Perbulan Manual Book 6 Hand Tools Mesin Impact Baut (Krisbow) 1 Perbulan Manual Book
  • 8. Informasi Insiden PT. AJA MEGA PERKASA No Tanggal/Jam/ lokasi Nama Pelaku/Korban Nama Atasan/Saksi SPIP Jenis Insiden Rincian Kerusakan Kronologi Kejadian Biaya Kerusakan Rekomendasi dan Tindakan perbaikan Tindakan Perbaikan dan Pencegahan Foto kejadian 1 2 TOTAL N I H I L
  • 9. Penegakan Golden Rules PT. AJA MEGA PERKASA No Tanggal/Jam/lokasi Nama Pelaku/Korban SPIP Rincian Pelanggaran Tindakan Perbaikan dan Pencegahan Evidance 1 2 TOTAL N I H I L
  • 10. SafetyActivity & Project No Kegiatan Week 41 Target MK/Week Tanggal Total Follow Up 10 11 12 13 14 15 16 1 Safety Talk 1 - - - - - - - 0 2 P5M 14 2 1 1 1 2 1 1 9 3 Inspeksi PIT 2 - - 1 - - - 1 4 Inspeksi Hauling 2 1 - 1 - - 1 - 2 5 Inspeksi Kelengkapan 2 - 1 - - 1 - 2 6 Inspeksi Speed Gun 4 1 - 1 - 1 - 1 4 7 Inspeksi Fatigue 1 - - 1 - - - - 1 8 Defensive Driving 4 1 - - - 1 - - 2 9 Hazzard Report 28 4 2 5 2 2 4 5 24 10 Induksi Karyawan 2 - - 1 - - 1 - 2 N o Project Safety Week 41 Tanggal Total 10 11 12 13 14 15 16 1 Commissioning - 1 - - - 1 - 2 2 Healthy talk Kesehatan - - 1 - - - - 1 3 Pembuatan Manual Traffic Book 4 Pemasangan Velcro Scotlight pada unit - - 2 - 2 - - 4 5 Pemeriksaan Ergonomi Kerja 6 Pemasangan Sign/Stiker Emergency Stop Di Unit 3 - 2 - - - - 5
  • 11. SafetyActivity & ProjectPlan Safety Plan Activity Week 42 Safety Plan Project Activity Week 42 N o Project Safety Week 34 Tanggal Total 10 11 12 13 14 15 16 1 Pemasangan stiker Senam anti Fatigue di Unit 5 5 5 5 5 5 5 5 2 Pembuatan Manual Traffic Book 5 5 5 5 5 5 5 35 3 Pemasangan Velcro Scotlight pada unit 5 5 5 5 5 5 5 35 4 Pemeriksaan Ergonomi Kerja 5 5 5 5 5 5 5 35 5 Pemasangan Sign/Stiker Emergency Stop Di Unit 5 5 5 5 5 5 5 35 6 Pembuatan Safety/Healthy Campaign 1 1 1 3 No Kegiatan Week 34 Target MK/Week Tanggal Total Follow Up 10 11 12 13 14 15 16 1 Safety Talk 1 1 1 2 P5M 14 2 2 2 2 2 2 2 14 3 Inspeksi PIT 7 1 2 2 4 Inspeksi Hauling 4 1 1 1 1 4 5 Inspeksi Kelengkapan 3 1 1 2 6 Inspeksi Speed Gun 2 2 4 7 Inspeksi Fatigue 4 1 8 Defensive Driving 5 1 1 2 9 Hazzard Report 8 8 8 8 8 8 8 56 10 Induksi Karyawan 3 1 1 1 3
  • 12. SAP no NAMA JABATAN PLAN ACT. WTD ACT. MTD ACH INSPEKSI DAN OBSERVASI Departement : General 1. M. Yusuf PJO 4 0 12 ( MASSA CUTI ) Departement : Produksi 1. Andi Dedi. A Spv. Produksi 8 3 18 40 % 2. Arbain Foreman 8 4 17 50 % 3. Irwandy Foreman 8 5 19 60 % Departement : HSE & Trainer 1. Muh. Solikin Spv. HSE 8 6 23 75 % 2. Tommy Safety Patrol 8 6 21 75 % 3. Ari Putra. P Safety Patrol 8 4 19 50 % 4. Ade Surono Safety Patrol 8 6 38 75 % 5. Umar Safety Patrol 8 6 40 75 % 6. M. Hidayat Admin HSE 8 6 24 75 % 7. Nur Kholis Trainer 8 7 36 85 % 8. Fatahuddin Trainer 8 5 24 60 % COACHING DAN COUNSELING
  • 13. SAP no NAMA JABATAN PLAN ACT. WTD ACT. MTD ACH INSPEKSI DAN OBSERVASI Departement : Plant 1. Sumarji Dept. Head Plant 4 3 12 75 % 2. Asriadi Spv. Mekanik 8 4 15 50 % 3. Dimas Foreman Mekanik 8 3 13 40 % 4. Nurmianto Foreman Mekanik 8 4 14 50 % 5. Hery Logistik 8 3 9 40 % Departement : HRGA 1. Asep Iwan Suwandi Head. HRGA 4 2 2 50 % 2. Wawan Spv. HRGA 4 1 1 25 % 3. Desy Purnama Sari Admin HRGA 4 3 3 75 % COACHING DAN COUNSELING
  • 14. ISU CRITICAL  Commissioning Bus Karyawan ( Close )  Re-commissioning DT 707 ( Close )
  • 15. Informasi Kesehatan LAPORAN MONITORING KESEHATAN & COVID-19 PT. AMP site BSSR No Kondisi Karyawan Jumlah Keterangan 1 Fit to Work 146 - 2 Unfit 0 - 3 Sembuh 0 TOTAL 150 No 5 TOP Disease Jumlah Keterangan 1 2 3 TOTAL No Tes Rapid Antigen Jumlah Keterangan 1 Antigen (-) 0 - 2 Antigen (+) 0 - TOTAL 0 No Tes PCR Jumlah Keterangan 1 PCR (-) 0 - 2 PCR (+) 0 - TOTAL 0 NO Isolasi Jumlah Keterangan 1 Isolasi di Mess 0 - 2 Isolasi di Rumah 0 - TOTAL 0
  • 16. NERACA lIMBAH LAPORAN LIMBAH KONTRAKTOR N o JENIS LIMBAH JUMLAH MASUK Keterangan 1 OLI 40 L Baru 2 GREASE 40 Kg Baru 3 MAJUN 5 Kg - TOTAL
  • 17. DOKUMENTASI KEGIATAN SAFETY (WEEK 41) Monitoring Haul-road Commisioning & Re-Commissioning Fatigue Ceck P5M Kontraktor Monitoring Speed Monitoring PIT
  • 18. DOKUMENTASI KEGIATAN SAFETY (WEEK 41) Inspeksi Rambu Pembagian APD Inspeksi Kelengkapan unit Induction & Re-Induction Inspeksi Workshop & TPS Safety Kordinasi

Editor's Notes

  1. CONTOH SPIP BISA DISESUAIKAN MITRA KERJA
  2. INFORMASI INSIDEN DICATAT SESUAI BULAN BERJALAN DAN FOTO KEJADIAN BSA DITAMPILKAN DI SLIDE SELANJUTNYA
  3. INFORMASI INSIDEN DICATAT SESUAI BULAN BERJALAN
  4. SAFETY ACTIVITY DAN PRJOCET MINGGUAN SESUAI DENGAN AKTIVITAS YANG DILAKSANAKAN UNTUK ACTIVITY SESUAI ADA DI TABEL EXCEL APABILA ADA TAMBAHAN BISA DTAMBHKN SEPERTI COMMISIONING, INSPEKSI WORKSHOP, INSPEKSI MAKANAN DSB. UNTUK PROJECT SAFETY ADALAH KEGIATAN YANG SIFAT UNTUK MELENGKAPI KEPERLUAN KESELAMATAN SEPERTI CAMPAIGN ATAU TEMPLATE IMBAUAN KE PEKERJA MAUPUN TRAINING. UNTUK AKTIVITAS TARGET BISA DISESUAIKAN DARI MITRA KERJA UNTUK ACTIVTY TARGET DISESUAIKAN UNTUK MANPOWER MASH DIBAWAH 50 ORANG. DAN HARI START MULAI JUM’AT- KAMIS
  5. KEGIATAN SAFETY MINGGU BERIKUTNYA DENGAN ACTIVITY DAN PROJECT DARI MITRA KERJA HARAP DIISI DENGAN TARGET YANG DIRENCANAKAN
  6. SAP DIBUAT SESUAI JABATAN PERLEVEL TARGET DISESUAIKAN TIAP LEVEL JABATAN DAN UPDATE PERMINGGU
  7. SAP DIBUAT SESUAI JABATAN PERLEVEL TARGET DISESUAIKAN TIAP LEVEL JABATAN DAN UPDATE PERMINGGU
  8. ISU CRITICAL APABILA ADA DEVIASI/TEMUAN DIAREA KERJA MASING-MASING TIAP KERJA YANG MANA HARUS SEGERA DIPERBAIKI SESUAI CONTOH TABEL
  9. LAPORAN KESEHATAN BERUPA ADA KUNJUNGAN DI RUANGAN P3K (PERUSAHAAN YG MEMILIKI MANPOWER PARAMEDIC) TERMASUK LAPORAN FASILITAS KESEHATAN, BISA DISESUAIKAN DENGAN MANPOWER TIAP PERUSAHAAN
  10. LAPORAN LIMBAH UPDATE PENGELUARAN TIAP MINGGU
  11. DOKUMENTASI BISA DITAMBHKAN MAKSIMAL DUA SLIDE UNTUK DOKUMENTASI MENYESUAIKAN DR PERUSAHAAN MAX 2 Slide
  12. DOKUMENTASI BISA DITAMBHKAN MAKSIMAL DUA SLIDE UNTUK DOKUMENTASI MENYESUAIKAN DR PERUSAHAAN MAX 2 Slide