Created By Anang T
 Outline :
 PengenaIan OEE
 OEE Manufacturing
 Resep rahasia: I x F x A
 Studi kasus: OEE Improvement
2
Created By Anang T
3
Created By Anang T
 OEE (Overall Equipment Effectiveness)
adalah cara "best practice" untuk
memonitor dan mengimprove effectiveness
dari manufacturing processes (i.e.
machines, manufacturing cells, assembly
lines).
 • OEE adalah metriks terpadu yang
mengukur tingkat yang dihasilkan dari
suatu proses
Masurement adalah dasar dari improvement"
4
Body Mass Index Kategori
> 30 OBESITAS
25,0 - 29,9 OVERWEIGHT
18,5 - 24,9 NOMAL
< 18,5 UNDERWEIGHT
mass(kg)
BMI =
(height(m))2
5
Created By Anang T
Losses Due To
Machine Breakdown
Losses Due To Set Up,
Change Over
Losses Due To
Deffect
Losses Due To
Rework
Speed Loss Minor Stopage
“Berapa Resources Yang Terbuang”
Input :
 Machine
 Man Power
 Material
 Energy
6
Created By Anang T
7
Created By Anang T
8
Created By Anang T
Company OEE
Awal Untuk OEE Umum 30% - 50%
World Class OEE 85% - 95%
9
Created By Anang T
 OEE = Availability x Performance x Quality
OEE
Availability Performance Quality
Breakdown Losses Minor Stoppage Scrap/Rework
Setup & Adjustment Speed Losses Start Up
Six Big Losses
10
11
Created By Anang T
Business Result
Return Of Stageholder Equity
Operating Margin, Cash Flow
Operating Excellence
Continous
Improvement
OEE – Operational Stability
5R Stadndart Work, Maintenant Management
People Lean Processes
12
13
 OEE = Availability x Performance x Quality
14
Perusahaan Manufacturing
Running Time = 8 Jam
Beakdown Mesin = 60 menit
Setup Adjustment = 30 menit
Availability = (Actual Running Time / Planed Running Time) x 100%
= (8 Jam – (60+30 Menit) / (8 Jam)) x 100%
= 81 %
15
Created By Anang T
Avaiability Time = 8 Jam – 1,5 Jam = 6,5 Jam
Theoritical Speed = 120 Pcs / Jam
Actual Output = 580 Pcs (Good+Reject)
Performance = (Actual Output/Theoritical OutPut) x 100%
= (580 Pcs/(120 Pcs/Jam x 6,5 Jam)) x 100%
= 74%
16
Created By Anang T
Actual Output = 580 Pcs (Good+Reject)
Good = 500 Pcs
Reject/Rework = 80 Pcs
Quality = (Actual Good / Actual Output) x 100%
= (500 Pcs/580 Pcs) x 100%
= 86%
17
Created By Anang T
Availability = 81%
Performance = 74%
Quality = 86%
OEE = Availability x Performance x Quality
= 81% x 745 x 86%
= 52%
18
Created By Anang T
19
Created By Anang T
20
Diketahui :
 Total Time = 7 Jam
 Breakdown Mesin = 45 Menit
 Setup Adjustment = 45 Menit
 Theoritical Speed =2.000 Botol/Jam
 Actual Output = 6.300 Botol (Good & Reject)
 Good Product = 5.900 Botol; Reject = 400 Botol
Hitung : Availability, Performance, Quality dan OEE ?
21
Created By Anang T
 Availability : (7 x 60) – (45 x 2) / (7 x 60)
: 330 / 420
: 78,57 %
 Performance : 6.300 / ((330/60) x 2.000)
: 6.300 / 11.000
: 57,27 %
 Quality : 5.900 / 6.300
: 93,65 %
 OEE : 78,57 % x 57,27 % x 93,65 %
: 42,14 %
22
Diketahui :
 Running Time = 7 Jam
 Breakdown Mesin = 45 Menit
 Setup Adjustment = 45 Menit
 Cleaning Mesin = 20 Menit
 Theoritical Speed =2.000 Botol/Jam
 Idle menunggu Kemasan = 15 Menit
 Actual Output = 6.300 Botol (Good & Reject)
 Good Product = 5.900 Botol; Reject = 400 Botol
 Jumlah Yang Bisa di Rework = 200 Botol
Hitung : Availability, Performance, Quality dan OEE ?
23
Created By Anang T
24
Created By Anang T
Information x Focus x Action
 Terlalu Banyak Data, Tetapi Tidak Banyak Informasi
 Tidak ada Informasi Dapat Berarti Keputusan dibuat Berdasarkan Insting.
 Ketiadaan Informasi menyebabkan tidak ada focus di perusahaan
 Tidak ada Fokus utama untuk Improvment.effisiensi hanya menjadi
sakah satu performance Indikator, tetapi belum menjadi sasaran
satu perusahaan.
 Tidak ada nya fokus menjadi penyebab tidak adanya alasan nyata untuk
aksi.
 Tidak ada aksi untuk mencapai sasaran bersama.
Semua menjalankan bisnis as ussual (seperti biasanya)
25
Accurate Data
 As Close to real time as you can get it
 Focusing On what caused you to be off track
 Review regularly and act !!!
26
 Collect Data pada banyak mesin, masalah
produkstivitas,Tidak ada waktu - terlalu sibuk
 Data tidak akurat :
Tidak merekan minor Stop
Membulatkan angka
Budget Time
 Karena data idak akurat, maka data tidak
dipakai, sehingga operator tidak mengisi
dengan benar.
 Hasilnya : Tidak ada improvement
27
Manual System - Reaktif Automated System - Proaktif
Slow Reaktion Rapid Reaction
Historical Information Real Time
Snap Shot Audit Continous Visualization
Inaccurate data Accurate Data
Perceived Losses On Critical Machine Real Losses on Critical Machine
28
Created By Anang T
29
Created By Anang T

More Related Content

What's hot

6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
Webseology
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
Operational Excellence Consulting
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
Operational Excellence Consulting
 

What's hot (20)

16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
OEE
OEEOEE
OEE
 
OEE
OEEOEE
OEE
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
5 days TPM Workshop/Implementation Strategies at F&N
5 days TPM Workshop/Implementation Strategies at F&N5 days TPM Workshop/Implementation Strategies at F&N
5 days TPM Workshop/Implementation Strategies at F&N
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
OEE for Process Improvement
OEE for Process ImprovementOEE for Process Improvement
OEE for Process Improvement
 
01 - Initiating a Lean Six Sigma Project - ESTIEM Lean Six Sigma Green Belt C...
01 - Initiating a Lean Six Sigma Project - ESTIEM Lean Six Sigma Green Belt C...01 - Initiating a Lean Six Sigma Project - ESTIEM Lean Six Sigma Green Belt C...
01 - Initiating a Lean Six Sigma Project - ESTIEM Lean Six Sigma Green Belt C...
 
Tpm
TpmTpm
Tpm
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 

Viewers also liked

benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
ahmed_shimi
 

Viewers also liked (14)

Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
 
Oee guide
Oee guideOee guide
Oee guide
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Preso: The OEE Story
Preso: The OEE StoryPreso: The OEE Story
Preso: The OEE Story
 
OEE Target - ¿What is the basis for your current OEE goal?
OEE Target - ¿What is the basis for your current OEE goal?OEE Target - ¿What is the basis for your current OEE goal?
OEE Target - ¿What is the basis for your current OEE goal?
 
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICASIDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 

Similar to OEE IMPLEMENTATION part 1

Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
jsgerges
 

Similar to OEE IMPLEMENTATION part 1 (20)

Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
OEE Webinar
OEE WebinarOEE Webinar
OEE Webinar
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Production & Operarions Management Compre Review
Production & Operarions Management Compre ReviewProduction & Operarions Management Compre Review
Production & Operarions Management Compre Review
 
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Oee and its Application
Oee and its ApplicationOee and its Application
Oee and its Application
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
 
Productivity
ProductivityProductivity
Productivity
 
Productivity.ppt
Productivity.pptProductivity.ppt
Productivity.ppt
 
Productivity (1)
 Productivity (1) Productivity (1)
Productivity (1)
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuff
 
Productivity
ProductivityProductivity
Productivity
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

OEE IMPLEMENTATION part 1

  • 2.  Outline :  PengenaIan OEE  OEE Manufacturing  Resep rahasia: I x F x A  Studi kasus: OEE Improvement 2 Created By Anang T
  • 4.  OEE (Overall Equipment Effectiveness) adalah cara "best practice" untuk memonitor dan mengimprove effectiveness dari manufacturing processes (i.e. machines, manufacturing cells, assembly lines).  • OEE adalah metriks terpadu yang mengukur tingkat yang dihasilkan dari suatu proses Masurement adalah dasar dari improvement" 4
  • 5. Body Mass Index Kategori > 30 OBESITAS 25,0 - 29,9 OVERWEIGHT 18,5 - 24,9 NOMAL < 18,5 UNDERWEIGHT mass(kg) BMI = (height(m))2 5 Created By Anang T
  • 6. Losses Due To Machine Breakdown Losses Due To Set Up, Change Over Losses Due To Deffect Losses Due To Rework Speed Loss Minor Stopage “Berapa Resources Yang Terbuang” Input :  Machine  Man Power  Material  Energy 6 Created By Anang T
  • 9. Company OEE Awal Untuk OEE Umum 30% - 50% World Class OEE 85% - 95% 9 Created By Anang T
  • 10.  OEE = Availability x Performance x Quality OEE Availability Performance Quality Breakdown Losses Minor Stoppage Scrap/Rework Setup & Adjustment Speed Losses Start Up Six Big Losses 10
  • 12. Business Result Return Of Stageholder Equity Operating Margin, Cash Flow Operating Excellence Continous Improvement OEE – Operational Stability 5R Stadndart Work, Maintenant Management People Lean Processes 12
  • 13. 13
  • 14.  OEE = Availability x Performance x Quality 14
  • 15. Perusahaan Manufacturing Running Time = 8 Jam Beakdown Mesin = 60 menit Setup Adjustment = 30 menit Availability = (Actual Running Time / Planed Running Time) x 100% = (8 Jam – (60+30 Menit) / (8 Jam)) x 100% = 81 % 15 Created By Anang T
  • 16. Avaiability Time = 8 Jam – 1,5 Jam = 6,5 Jam Theoritical Speed = 120 Pcs / Jam Actual Output = 580 Pcs (Good+Reject) Performance = (Actual Output/Theoritical OutPut) x 100% = (580 Pcs/(120 Pcs/Jam x 6,5 Jam)) x 100% = 74% 16 Created By Anang T
  • 17. Actual Output = 580 Pcs (Good+Reject) Good = 500 Pcs Reject/Rework = 80 Pcs Quality = (Actual Good / Actual Output) x 100% = (500 Pcs/580 Pcs) x 100% = 86% 17 Created By Anang T
  • 18. Availability = 81% Performance = 74% Quality = 86% OEE = Availability x Performance x Quality = 81% x 745 x 86% = 52% 18 Created By Anang T
  • 20. 20
  • 21. Diketahui :  Total Time = 7 Jam  Breakdown Mesin = 45 Menit  Setup Adjustment = 45 Menit  Theoritical Speed =2.000 Botol/Jam  Actual Output = 6.300 Botol (Good & Reject)  Good Product = 5.900 Botol; Reject = 400 Botol Hitung : Availability, Performance, Quality dan OEE ? 21 Created By Anang T
  • 22.  Availability : (7 x 60) – (45 x 2) / (7 x 60) : 330 / 420 : 78,57 %  Performance : 6.300 / ((330/60) x 2.000) : 6.300 / 11.000 : 57,27 %  Quality : 5.900 / 6.300 : 93,65 %  OEE : 78,57 % x 57,27 % x 93,65 % : 42,14 % 22
  • 23. Diketahui :  Running Time = 7 Jam  Breakdown Mesin = 45 Menit  Setup Adjustment = 45 Menit  Cleaning Mesin = 20 Menit  Theoritical Speed =2.000 Botol/Jam  Idle menunggu Kemasan = 15 Menit  Actual Output = 6.300 Botol (Good & Reject)  Good Product = 5.900 Botol; Reject = 400 Botol  Jumlah Yang Bisa di Rework = 200 Botol Hitung : Availability, Performance, Quality dan OEE ? 23 Created By Anang T
  • 25. Information x Focus x Action  Terlalu Banyak Data, Tetapi Tidak Banyak Informasi  Tidak ada Informasi Dapat Berarti Keputusan dibuat Berdasarkan Insting.  Ketiadaan Informasi menyebabkan tidak ada focus di perusahaan  Tidak ada Fokus utama untuk Improvment.effisiensi hanya menjadi sakah satu performance Indikator, tetapi belum menjadi sasaran satu perusahaan.  Tidak ada nya fokus menjadi penyebab tidak adanya alasan nyata untuk aksi.  Tidak ada aksi untuk mencapai sasaran bersama. Semua menjalankan bisnis as ussual (seperti biasanya) 25
  • 26. Accurate Data  As Close to real time as you can get it  Focusing On what caused you to be off track  Review regularly and act !!! 26
  • 27.  Collect Data pada banyak mesin, masalah produkstivitas,Tidak ada waktu - terlalu sibuk  Data tidak akurat : Tidak merekan minor Stop Membulatkan angka Budget Time  Karena data idak akurat, maka data tidak dipakai, sehingga operator tidak mengisi dengan benar.  Hasilnya : Tidak ada improvement 27
  • 28. Manual System - Reaktif Automated System - Proaktif Slow Reaktion Rapid Reaction Historical Information Real Time Snap Shot Audit Continous Visualization Inaccurate data Accurate Data Perceived Losses On Critical Machine Real Losses on Critical Machine 28 Created By Anang T