What is OEE ?
OEE
Overall Equipment
Effectiveness
Why is a high OEE
important for the
depa...
KANZEN INSTITUTE
ASIA PACIFIC
2
Overall Equipment Effectiveness
Total time
e.g. 480 min. (1 shift)
Available time
Running ...
KANZEN INSTITUTE
ASIA PACIFIC
3
Calculation of LOSSES
Total time
e.g. 480 min. (1 shift)
Running time
340 min.
Productive ...
KANZEN INSTITUTE
ASIA PACIFIC
4
Calculation of OEE
Productive Performance=
Running time - Performance loss
Running time
=
...
KANZEN INSTITUTE
ASIA PACIFIC
5
How to increase OEE ?
Data collection is the very important basis to increase OEE
Collect ...
KANZEN INSTITUTE
ASIA PACIFIC
6
Making OEE visible
Analysis
5
10
15
20
25
30
35
Repairs ChgeoverTool chg. Scrap Min.Stop.
...
KANZEN INSTITUTE
ASIA PACIFIC
7
2003 2004
Measures
t
Date
.
Departmentcompany
Structured matrix sheet
Effects of OEE impro...
KANZEN INSTITUTE
ASIA PACIFIC
8
Fundamental concept of plant effectiveness
5 productivity losses 3 production/ cost losses...
Upcoming SlideShare
Loading in …5
×

Overall Equipment efficiency

524 views

Published on

OEE

Published in: Automotive
  • Be the first to comment

  • Be the first to like this

Overall Equipment efficiency

  1. 1. KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How can i influence the OEE ? Making OEE part of Visual Management OEE Definition
  2. 2. KANZEN INSTITUTE ASIA PACIFIC 2 Overall Equipment Effectiveness Total time e.g. 480 min. (1 shift) Available time Running time Productive time Effective time OEE is the way to measure how effectively machine / equipment hours are used (Value Adding) Planned Downtime Downtime Performance Losses Quality Losses OEE is loss due to: Depending on definition TPM® knows 6-16 different losses - breakdowns, repairs - changeover - adjustment - start up - machine speed - short stoppages - lower yield - scrap - reject - rework - breaks, planned maintenance, training
  3. 3. KANZEN INSTITUTE ASIA PACIFIC 3 Calculation of LOSSES Total time e.g. 480 min. (1 shift) Running time 340 min. Productive time 270 min. Effective time 250 min. Planned Downtime Downtime Performance Losses Quality Losses - breakdowns, repairs - changeover - adjustment - start up - long cycle time - minor stoppages - reduced yield - scrap - rework - rejects - breaks, planned maintenance, training Total losses = 170 min / shift Available time 420 min.
  4. 4. KANZEN INSTITUTE ASIA PACIFIC 4 Calculation of OEE Productive Performance= Running time - Performance loss Running time = 340 min – 70 min 340 min Quality = Productive time - Quality loss time Productive time = 270 min - 20 min 270 min Running Efficiency = Available time - Downtime Availability = 420 min - 80 min 420 min factor 81% factor 79.4% factor 92.6% X X = 59.6% OEE (in %) = Overall Equipment EffectivenessOverall Equipment Effectiveness
  5. 5. KANZEN INSTITUTE ASIA PACIFIC 5 How to increase OEE ? Data collection is the very important basis to increase OEE Collect data for all downtime and losses on the machine Data analysis and visible measure Make improvements visible and implement J F M A M J J A S O N D OEE Trend Target 2003 Analysis 5 10 15 20 25 30 35 Repair ChangeoverTool change Scrap Minor Stopp. 33 26 16 7 3 Repairs Change over, Adjustm. Tool change Minor stoppages Scrap, rework Autonomous Mainten. Preventive Maintenance Changeover reduction Standardize tooling Improved machine reliability Standardisation Kaizen
  6. 6. KANZEN INSTITUTE ASIA PACIFIC 6 Making OEE visible Analysis 5 10 15 20 25 30 35 Repairs ChgeoverTool chg. Scrap Min.Stop. 33 26 16 7 3 J F M A M J J A S O N D OEE trend machine 01 Target 2003 J F M A M J J A S O N D OEE trend Machine 01 Target 2003 J F M A M J J A S O N D OEE trend Machine 02 Target 2003 J F M A M J J A S O N D OEE trend Machine 03 Target 2003 J FMAMJ JASOND J FMAMJ JASOND J FMAMJ JASOND J FMAMJ JASOND J FMAMJ JASOND J FMAMJ JASOND Data OEE other Produktivity Machine Information Departement Information Company Information shows the current situation of the machine or plant shows the machine in the area shows developement, trends and links beween targets and achievements
  7. 7. KANZEN INSTITUTE ASIA PACIFIC 7 2003 2004 Measures t Date . Departmentcompany Structured matrix sheet Effects of OEE improvement activities effect of improvement project OEE in % target introduction training removal of defects elimination of defects standards / check lists improvement projects
  8. 8. KANZEN INSTITUTE ASIA PACIFIC 8 Fundamental concept of plant effectiveness 5 productivity losses 3 production/ cost losses – not part of OEE - Machine failure Set up & adjustments Tool changes Start-up losses Minor stoppages Speed Losses Defects and Rework Shutdown Management losses Motion Line organization Logistics Adjustments 8 availability losses Loss of energy Die, Jig and tool losses Yield losses 16 Kinds of loss

×