OEE and its Application
Thilanka Hettiarachchi
Availability
loss
Performance
loss
Working Time (hrs)
Total time in one week, month, period
or year
Loading Time (hrs)
The total shift pattern times per week, month,
period or year
Nett Operating Time (hrs)
The amount of time the equipment operates at
rated speed also accounting for minor stops
Value Added Operating Time (hrs)
The amount of time the equipment operates
producing sellable product
Operating Time (hrs)
The amount of time the equipment actually runs,
totalled for a week, month, period or year
Shutdown
loss
Quality
loss
Changeover Losses
Set- ups and adjustments
Minor stoppages
Speed losses
Start- up and shutdown
Failure Losses
Availability loss
Performance loss
Holidays, planned shutdowns
Shut downs loss
Rework and scrap
Quality losses
The 8 Major Loss against Equipment
The 16 Major Losses
Calendar Time
Working/Loading Time
Operating Time
Nett Operating Time
Value adding Operating
Time
Manned Time
Loading Time
Working Time
Effective Time
Value-added Time
EquipmentManpower
MaterialsEnergy
Breakdowns
Set- ups and adjustments
Minor stoppages
Speed losses
Rework and scrap
Start- up and shutdown
Material Input
In Process Material
Final Product
Energy Input
Effective EnergyEnergy Losses Material Losses
Product yield Losses
Management Losses
Motion Losses
Measurement Losses
Changeovers
Availability loss
Performance loss
Quality losses
Holidays, planned shutdowns
Shut downs loss
OEE = Availability x Performance x Quality
The 8 Equipment Losses
The 3 Energy/Yield Losses
The 5 Manpower Losses
Line Organisation Losses
Logistic Losses
Shut downs loss
Short Break - 30 min
Meal Break - 30 min
Availability/ Downtime loss
Downtime - 47 min
Nett Operating Time
(min)
Value Added
Operating Time
(min)
Working Time ( 480 min )
Loading Time
Working Time -Shot Down Loss
480 min - 60 min
Operating Time
Loading Time -Down Time Loss
420 min - 47min
Quality
loss
52
min
60
min
420
min
47
min
373
min
Operating Time
Rate
( Availability )
Loading time - Downtime
Loading Time
= × 100
Operating Time
Rate
( Availability )
420 - 47
420
=
× 100 = 88.81 %
Performance
Rate
Std. cycle time No. of Produced unit
OperatingTime
= × 100
×
Performance Rate
( Performance)
1/60 19,271
373
=
× 100
×
= 86.11 %
Quality Product
Rate
( Quality)
No. of Produced unit - No. of Defective unit
No. of Produced unit
= × 100
Quality Product
Rate
( Quality)
19,271 - 423
19,271
=
× 100 = 97.80 %
OEE = Availability x Performance x Quality
OEE = 0.87x 0.50x 0.98x100
= 74.79 %
Example OEE Calculation 01
321
min
Example OEE Calculation 02
OEE = Availability x Performance x Quality
OEE = 0.75x 0.89x 0.99
OEE = 67 %
480 min. - 120 min.
480 min.
= .75 = 75%Operating Time Rate
( Availability )
=
19325 cans x 1/60 min.
360 min.
= .894 = 89%Performance Rate =
(19325 cans - 125 cans)
19325 cans
= .993 = 99%
Quality Product
Rate
=
10/3/2019

More Related Content

What's hot (20)

Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Lead time takt time cycle time and throughput
Lead time takt time cycle time and throughputLead time takt time cycle time and throughput
Lead time takt time cycle time and throughput
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
OEE
OEEOEE
OEE
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
SMED Final
SMED FinalSMED Final
SMED Final
 

Similar to Oee and its Application

OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)mechanicalinventors
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementLean Teams USA
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Anang Tristianto
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that lossesdrneerajbhandari
 
Pamco oleh Bagoes Soehariadji.ppt.pptx
Pamco  oleh Bagoes Soehariadji.ppt.pptxPamco  oleh Bagoes Soehariadji.ppt.pptx
Pamco oleh Bagoes Soehariadji.ppt.pptxAGSI1
 
Maintenance
Maintenance Maintenance
Maintenance NsbmUcd
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...Saleh211376
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 

Similar to Oee and its Application (20)

OEE workshop v5.pptx
OEE workshop v5.pptxOEE workshop v5.pptx
OEE workshop v5.pptx
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
OEE.pptx
OEE.pptxOEE.pptx
OEE.pptx
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 
Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses
 
OEE vs TEEP.pdf
OEE vs TEEP.pdfOEE vs TEEP.pdf
OEE vs TEEP.pdf
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Pamco oleh Bagoes Soehariadji.ppt.pptx
Pamco  oleh Bagoes Soehariadji.ppt.pptxPamco  oleh Bagoes Soehariadji.ppt.pptx
Pamco oleh Bagoes Soehariadji.ppt.pptx
 
OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1
 
Maintenance
Maintenance Maintenance
Maintenance
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
 
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...
dokumen.tips_me6703-computer-integrated-manufacturing-systems-2018-12-21-comp...
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 

Recently uploaded

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

Oee and its Application

  • 1. OEE and its Application Thilanka Hettiarachchi
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Availability loss Performance loss Working Time (hrs) Total time in one week, month, period or year Loading Time (hrs) The total shift pattern times per week, month, period or year Nett Operating Time (hrs) The amount of time the equipment operates at rated speed also accounting for minor stops Value Added Operating Time (hrs) The amount of time the equipment operates producing sellable product Operating Time (hrs) The amount of time the equipment actually runs, totalled for a week, month, period or year Shutdown loss Quality loss Changeover Losses Set- ups and adjustments Minor stoppages Speed losses Start- up and shutdown Failure Losses Availability loss Performance loss Holidays, planned shutdowns Shut downs loss Rework and scrap Quality losses The 8 Major Loss against Equipment
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. The 16 Major Losses Calendar Time Working/Loading Time Operating Time Nett Operating Time Value adding Operating Time Manned Time Loading Time Working Time Effective Time Value-added Time EquipmentManpower MaterialsEnergy Breakdowns Set- ups and adjustments Minor stoppages Speed losses Rework and scrap Start- up and shutdown Material Input In Process Material Final Product Energy Input Effective EnergyEnergy Losses Material Losses Product yield Losses Management Losses Motion Losses Measurement Losses Changeovers Availability loss Performance loss Quality losses Holidays, planned shutdowns Shut downs loss OEE = Availability x Performance x Quality The 8 Equipment Losses The 3 Energy/Yield Losses The 5 Manpower Losses Line Organisation Losses Logistic Losses
  • 18.
  • 19.
  • 20.
  • 21. Shut downs loss Short Break - 30 min Meal Break - 30 min Availability/ Downtime loss Downtime - 47 min Nett Operating Time (min) Value Added Operating Time (min) Working Time ( 480 min ) Loading Time Working Time -Shot Down Loss 480 min - 60 min Operating Time Loading Time -Down Time Loss 420 min - 47min Quality loss 52 min 60 min 420 min 47 min 373 min Operating Time Rate ( Availability ) Loading time - Downtime Loading Time = × 100 Operating Time Rate ( Availability ) 420 - 47 420 = × 100 = 88.81 % Performance Rate Std. cycle time No. of Produced unit OperatingTime = × 100 × Performance Rate ( Performance) 1/60 19,271 373 = × 100 × = 86.11 % Quality Product Rate ( Quality) No. of Produced unit - No. of Defective unit No. of Produced unit = × 100 Quality Product Rate ( Quality) 19,271 - 423 19,271 = × 100 = 97.80 % OEE = Availability x Performance x Quality OEE = 0.87x 0.50x 0.98x100 = 74.79 % Example OEE Calculation 01 321 min
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. Example OEE Calculation 02 OEE = Availability x Performance x Quality OEE = 0.75x 0.89x 0.99 OEE = 67 % 480 min. - 120 min. 480 min. = .75 = 75%Operating Time Rate ( Availability ) = 19325 cans x 1/60 min. 360 min. = .894 = 89%Performance Rate = (19325 cans - 125 cans) 19325 cans = .993 = 99% Quality Product Rate =
  • 35.
  • 36.