Date: 4/12/14
To : D.Roke
cc : A.Careford, B.Wigglesworth
From : M.Morgan
Re : Quality Report for November 2014
Current SC21 Quality Performance for the past twelvemonth = 99.465%. This is within the current Bronze rating.
Reference should be made to the document ‘Quality Report 2011 to present.xls accessed in "J:QUALITYMonthly
report databaseQuality Report 2011 to present.xlsm". This contains full data covering items mentioned in this report.
The management team are reminded of the need to review the data supplied and identify improvement plans for issues relating
to their own areas.
Performance Indicators
Month
Monitor KPI Batches Items
Customer Returns (RMAs) - 1 4
Supplier Returns (DMRs) - 4 101
Final inspection (rejects) <=1% 0 0
Minor issues* – Panels - 2 -
Minor issues* – Aircraft - 0 -
Minor Issues* –Austinlite - 0 -
Others
QIRS raised - 6 -
Audits/ issues - 0 -
RMA resolution time (days) <=30 days 0
Customer complaints - 1
Our SC21 quality performance >=98% 99.642% -
Our supplier SC21 performance - 99.7029%
INCOMING MATERIEL
Deliveries
Batches Rejected % Items Rejected %
101 4 3.9
3
33,966 86 0.25
Returns to Suppliers
Trends
2011 2012 2013 2014
Total DMRs 12 13 14 21
Per Month 1.0 1.2 1.2 2.04
The quantity of returns to supplier is low and our supplier quality is generally considered to be very good.
Approved Suppliers
The number of approved suppliers now stands at 112 and includes a number which are seldom used. The overall SC21 quality
performance of approved suppliers is 99.38% which is slightly better than last month and equates to an average bronze rating.
The SC21 rating for all suppliers is also 99.38% which also equates to a Bronze Rating
Of the 110 approved suppliers:
98 (87.5%) have gold rating.
4 (3.57%) have silver rating.
2(1.78%) has bronze rating.
8 (7.14%) have ratings below 95%.
Suppliers with SC21 Performance Below 95%.
1. Adapt (96.67)
2. Cellular Developments (59.18%)
3. Cambridge Circuits(92.15)
4. Marl International (89.18%)
5. Nemco Ltd (92.16%)
6. Lyncolec Precision In (73.68%)
7. Panel Graphics (92.86)
PROCESSING
Batches Inspected
Area Batches Rejected % Items Rejected %
Panels 26 0 0 124 0 0
Austinlite 1 0 0 10 0 0
Aircraft 17 0 0 698 0 0
Minor Issues Noted this Month (issues not at a sufficient level to warrant a QIR as per QA12).
Date Part Batch Area Problem Level Type
6/11/14 NP2337 F038866 INSP MARKS/SCRATCHES, APPROVED
BY D.ROKE
Moderate Panels
26/11/14 NP2379 F038990 INSP BACK SLIGHTLY LOOSE/TOO
MUCH LIGHT
LEAKING.REWORKED
Moderate Panel
Trends: All personnel aware of issues.
OUTGOING MATERIEL
Deliveries to Customers
Batches 55
Items 1128
Returns This Month
1 No returns.
Trends
2011 2012 2013 2014
Total RMAs 24 18 8 7
Per Month 2.0 1.5 0.75 0.5
Reasons for Returns
Turn Round and Liability
Comments. All RMA’s are currently within 30 days.
QUALITY INVESTIGATIONS
Audits
1. Corrective action audit 2.3.5 Tool Use, various list of tool held on system and on hard copies, also tool on rack not
shown on current list on system.
2. Minor corrective action from CAA (External audit) outstanding, to be completed by Feb 2015. We also must make
sure that the capability list is sent to the CAA every time we update it. Not once a year should we fail to do this we will
ge ta corrective action on the next audit.
3. No issue raised during the BSI audit.
4. Minor corrective action raised from the last BSI (June 2014) for suppliers not on the approved suppliers list. This has
been actioned and closed as per audit report.
Purchasing Approved suppliers
Still finding unapproved suppliers, we need to make sure all suppliers are approved (parts for production only) some of
the suppliers that have contacted are not replying to my emails, if this occurs again we will have to stop using them.
Some of the suppliers are historic and are only used now and again, but we still need to add these to the approved
suppliers list.
Comments
Bentham has been sent to the suppliers for repair, we should have answer by the end of the week. Also the spectraScan
has a fault, we have sent the unit for repair to Micron in Mill Hill, awaiting feedback from them.
Reason 2011 2012 2013 2014
Documentation 1 0 0 0
Finish 6 7 5 0
Lighting 0 1 0 0
Damage 1 0 0 1
Text 0 0 0 0
Dimensions 0 0 1 0
Functionality 4 6 2 3
Assembly 10 7 0 0
Delivery 0 0 0 0
Incorrect item 1 0 0 0
Faulty items 0 0 0 2
Other 2 0 0 1
SC21 – QUALITY PERFORMANCE
Overall Quality Performance for the Current Month – This Refers to all Despatches
Quality performance (% reject rate) =100 - (No of items rejected in the month x 100)
Total items despatched in the month
Items despatched this month : 1128
Total items rejected this month : 4
Quality performance (% acceptance rate) = 100% (SC21 gold rating for this month)
Overall Quality Performance for the Current Twelvemonth (SC21 Quality performance for all despatches)
The data represents actual accumulated twelvemonth data ending at the current month. It must be appreciated that the SC21
calculations use data for items returned in a particular month against items despatched. These do not necessarily refer to items
originating from the same batches and so maxima and minima are often greatly distorted, especially with customers who use
items on projects often months after receipt. Sadly the distortion can make suppliers performance appear to decline during
spells of low order throughput.
Quality performance (% reject rate) =100 - (No of items rejected in the twelvemonth x 100)
Total items despatched in the twelvemonth
Items despatched this twelvemonth :17926
Total items rejected this twelvemonth : 52
Quality performance (% acceptance rate) : 99.70 % (Silver)
Key Customer Quality Performance for the Last Twelvemonth.
Customer Trends % Rating
A D Aerospace Ltd Poor due to one return of 15 items in November 100.00 Unrated
Aerco Ltd Excellent 100 Gold
BAe Systems Ltd Excellent 100 Gold
Marshall Aerospace Excellent 100 Gold
MoD Excellent. 100 Gold
Oxley Developments Ltd Excellent 100 Gold
Racal Acoustics Ltd Excellent 100 Gold
Rockfords Ltd Slowly recovering 96.55 Unrated
Thales Avionics Ltd Excellent 100 Gold
Astute Excellent 100 Gold
Trends
The average for all key customers is 99.50% (Sliver Rating).
All customers based on monthly data.
Period 2011 2012 2013 2014
Quality Performance % - Mean 99.11309 99.64302 99.81523 99.416
Quality Performance % - Max 100.0000 100.0000 99.92381 100.00
Quality Performance % - Min 93.6260 97.24647 99.65508 95.38745
Suggested Actions
Data suggests that the overall quality performance for the company is very good and nearly all customers are receiving good
product.
Areas for Improvement Being Worked On
None
Safety
No new issues.
Written By
Mike Morgan
No new issues.
Written By
Mike Morgan

More Related Content

What's hot

PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
GoLeanSixSigma.com
 
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
SlideTeam
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
Julian Kalac P.Eng
 
Ops Mgrs update - June 2016
Ops Mgrs update - June 2016Ops Mgrs update - June 2016
Ops Mgrs update - June 2016Andrew Porter
 
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
AkhilMurthy1
 
Enforcement from the Inside: Improving Quality of Business in Process Management
Enforcement from the Inside: Improving Quality of Business in Process ManagementEnforcement from the Inside: Improving Quality of Business in Process Management
Enforcement from the Inside: Improving Quality of Business in Process Management
Tobias Unger
 

What's hot (6)

PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
 
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Ops Mgrs update - June 2016
Ops Mgrs update - June 2016Ops Mgrs update - June 2016
Ops Mgrs update - June 2016
 
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...
 
Enforcement from the Inside: Improving Quality of Business in Process Management
Enforcement from the Inside: Improving Quality of Business in Process ManagementEnforcement from the Inside: Improving Quality of Business in Process Management
Enforcement from the Inside: Improving Quality of Business in Process Management
 

Viewers also liked

Gizi kerja ika meylan
Gizi kerja ika meylanGizi kerja ika meylan
Gizi kerja ika meylanriszha
 
Hipertensión arterial pulmonar
Hipertensión arterial pulmonarHipertensión arterial pulmonar
Hipertensión arterial pulmonar
Javier Domínguez
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)MICHAEL MORGAN
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15 MICHAEL MORGAN
 
iso presentation 2010 sept
iso presentation 2010 septiso presentation 2010 sept
iso presentation 2010 septMICHAEL MORGAN
 
Ronell strengths finder report
Ronell strengths finder reportRonell strengths finder report
Ronell strengths finder reportRonell Engelbrecht
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mmMICHAEL MORGAN
 
Inspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 docInspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 doc
MICHAEL MORGAN
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team
Sofie Hermansen
 
AAIT Triangle Infiller Presentation
AAIT Triangle Infiller PresentationAAIT Triangle Infiller Presentation
AAIT Triangle Infiller Presentation
Charlie Ezelle
 
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...MICHAEL MORGAN
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit
Sarah Moug
 
Cover Letter Edit
Cover Letter EditCover Letter Edit
Cover Letter Edit
Sarah Moug
 
Tutorial 2 - Skills Matrix
Tutorial 2 - Skills MatrixTutorial 2 - Skills Matrix
Tutorial 2 - Skills Matrix
Sarah Moug
 

Viewers also liked (15)

Gizi kerja ika meylan
Gizi kerja ika meylanGizi kerja ika meylan
Gizi kerja ika meylan
 
Hipertensión arterial pulmonar
Hipertensión arterial pulmonarHipertensión arterial pulmonar
Hipertensión arterial pulmonar
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
 
iso presentation 2010 sept
iso presentation 2010 septiso presentation 2010 sept
iso presentation 2010 sept
 
Ronell strengths finder report
Ronell strengths finder reportRonell strengths finder report
Ronell strengths finder report
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mm
 
Inspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 docInspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 doc
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team
 
AAIT Triangle Infiller Presentation
AAIT Triangle Infiller PresentationAAIT Triangle Infiller Presentation
AAIT Triangle Infiller Presentation
 
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
 
UP TO DATE CV
UP TO DATE CVUP TO DATE CV
UP TO DATE CV
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit
 
Cover Letter Edit
Cover Letter EditCover Letter Edit
Cover Letter Edit
 
Tutorial 2 - Skills Matrix
Tutorial 2 - Skills MatrixTutorial 2 - Skills Matrix
Tutorial 2 - Skills Matrix
 

Similar to November 2014 quality report

Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
sonutyagi20
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleDheerendra S Negi
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
Noble Institute of Quality Certification (NIQC)
 
Edison Site Visit Presentation
Edison Site Visit PresentationEdison Site Visit Presentation
Edison Site Visit PresentationBrian Keenan
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
bhanutomar
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
Tonatiuh Lozada Duarte
 
SCM review OCt-22 - final.pptx
SCM review OCt-22 - final.pptxSCM review OCt-22 - final.pptx
SCM review OCt-22 - final.pptx
SURESH SIVADASAN
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
HeartTouchingVideos1
 
Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...
InfoPerc/Te web
 
Eliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component ManufacturerEliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component Manufacturer
Anirban Mazumdar
 
Master review Dept performance.pptx
Master review Dept performance.pptxMaster review Dept performance.pptx
Master review Dept performance.pptx
RamkumarP32
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigmanatrajsenthil
 
Watkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_finalWatkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_finalOmnex Inc.
 
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docxEnforcement Penalty ProcessUniversity of HartfordApril 16,.docx
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
gidmanmary
 
Case steel works, inc. presentation (group 5)
Case   steel works, inc. presentation (group 5)Case   steel works, inc. presentation (group 5)
Case steel works, inc. presentation (group 5)
NIDA Business School
 

Similar to November 2014 quality report (20)

Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Edison Site Visit Presentation
Edison Site Visit PresentationEdison Site Visit Presentation
Edison Site Visit Presentation
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
 
Cluster+Bezel+091709+Final
Cluster+Bezel+091709+FinalCluster+Bezel+091709+Final
Cluster+Bezel+091709+Final
 
SCM review OCt-22 - final.pptx
SCM review OCt-22 - final.pptxSCM review OCt-22 - final.pptx
SCM review OCt-22 - final.pptx
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...
 
Eliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component ManufacturerEliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component Manufacturer
 
Master review Dept performance.pptx
Master review Dept performance.pptxMaster review Dept performance.pptx
Master review Dept performance.pptx
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigma
 
Ssoverview
SsoverviewSsoverview
Ssoverview
 
Watkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_finalWatkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_final
 
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docxEnforcement Penalty ProcessUniversity of HartfordApril 16,.docx
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
 
SMT Sales 2011
SMT Sales 2011SMT Sales 2011
SMT Sales 2011
 
SMT 2011
SMT 2011SMT 2011
SMT 2011
 
SMT 2011
SMT  2011SMT  2011
SMT 2011
 
Case steel works, inc. presentation (group 5)
Case   steel works, inc. presentation (group 5)Case   steel works, inc. presentation (group 5)
Case steel works, inc. presentation (group 5)
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

November 2014 quality report

  • 1. Paramount Panels (UK) Quality Report Date: 4/12/14 To : D.Roke cc : A.Careford, B.Wigglesworth From : M.Morgan Re : Quality Report for November 2014 Current SC21 Quality Performance for the past twelvemonth = 99.465%. This is within the current Bronze rating. Reference should be made to the document ‘Quality Report 2011 to present.xls accessed in "J:QUALITYMonthly report databaseQuality Report 2011 to present.xlsm". This contains full data covering items mentioned in this report. The management team are reminded of the need to review the data supplied and identify improvement plans for issues relating to their own areas. Performance Indicators Month Monitor KPI Batches Items Customer Returns (RMAs) - 1 4 Supplier Returns (DMRs) - 4 101 Final inspection (rejects) <=1% 0 0 Minor issues* – Panels - 2 - Minor issues* – Aircraft - 0 - Minor Issues* –Austinlite - 0 - Others QIRS raised - 6 - Audits/ issues - 0 - RMA resolution time (days) <=30 days 0 Customer complaints - 1 Our SC21 quality performance >=98% 99.642% - Our supplier SC21 performance - 99.7029%
  • 2. INCOMING MATERIEL Deliveries Batches Rejected % Items Rejected % 101 4 3.9 3 33,966 86 0.25 Returns to Suppliers Trends 2011 2012 2013 2014 Total DMRs 12 13 14 21 Per Month 1.0 1.2 1.2 2.04 The quantity of returns to supplier is low and our supplier quality is generally considered to be very good. Approved Suppliers The number of approved suppliers now stands at 112 and includes a number which are seldom used. The overall SC21 quality performance of approved suppliers is 99.38% which is slightly better than last month and equates to an average bronze rating. The SC21 rating for all suppliers is also 99.38% which also equates to a Bronze Rating Of the 110 approved suppliers: 98 (87.5%) have gold rating. 4 (3.57%) have silver rating. 2(1.78%) has bronze rating. 8 (7.14%) have ratings below 95%. Suppliers with SC21 Performance Below 95%. 1. Adapt (96.67) 2. Cellular Developments (59.18%) 3. Cambridge Circuits(92.15) 4. Marl International (89.18%) 5. Nemco Ltd (92.16%) 6. Lyncolec Precision In (73.68%) 7. Panel Graphics (92.86) PROCESSING Batches Inspected Area Batches Rejected % Items Rejected % Panels 26 0 0 124 0 0 Austinlite 1 0 0 10 0 0 Aircraft 17 0 0 698 0 0 Minor Issues Noted this Month (issues not at a sufficient level to warrant a QIR as per QA12). Date Part Batch Area Problem Level Type 6/11/14 NP2337 F038866 INSP MARKS/SCRATCHES, APPROVED BY D.ROKE Moderate Panels 26/11/14 NP2379 F038990 INSP BACK SLIGHTLY LOOSE/TOO MUCH LIGHT LEAKING.REWORKED Moderate Panel Trends: All personnel aware of issues.
  • 3. OUTGOING MATERIEL Deliveries to Customers Batches 55 Items 1128 Returns This Month 1 No returns. Trends 2011 2012 2013 2014 Total RMAs 24 18 8 7 Per Month 2.0 1.5 0.75 0.5 Reasons for Returns Turn Round and Liability Comments. All RMA’s are currently within 30 days. QUALITY INVESTIGATIONS Audits 1. Corrective action audit 2.3.5 Tool Use, various list of tool held on system and on hard copies, also tool on rack not shown on current list on system. 2. Minor corrective action from CAA (External audit) outstanding, to be completed by Feb 2015. We also must make sure that the capability list is sent to the CAA every time we update it. Not once a year should we fail to do this we will ge ta corrective action on the next audit. 3. No issue raised during the BSI audit. 4. Minor corrective action raised from the last BSI (June 2014) for suppliers not on the approved suppliers list. This has been actioned and closed as per audit report. Purchasing Approved suppliers Still finding unapproved suppliers, we need to make sure all suppliers are approved (parts for production only) some of the suppliers that have contacted are not replying to my emails, if this occurs again we will have to stop using them. Some of the suppliers are historic and are only used now and again, but we still need to add these to the approved suppliers list. Comments Bentham has been sent to the suppliers for repair, we should have answer by the end of the week. Also the spectraScan has a fault, we have sent the unit for repair to Micron in Mill Hill, awaiting feedback from them. Reason 2011 2012 2013 2014 Documentation 1 0 0 0 Finish 6 7 5 0 Lighting 0 1 0 0 Damage 1 0 0 1 Text 0 0 0 0 Dimensions 0 0 1 0 Functionality 4 6 2 3 Assembly 10 7 0 0 Delivery 0 0 0 0 Incorrect item 1 0 0 0 Faulty items 0 0 0 2 Other 2 0 0 1
  • 4. SC21 – QUALITY PERFORMANCE Overall Quality Performance for the Current Month – This Refers to all Despatches Quality performance (% reject rate) =100 - (No of items rejected in the month x 100) Total items despatched in the month Items despatched this month : 1128 Total items rejected this month : 4 Quality performance (% acceptance rate) = 100% (SC21 gold rating for this month) Overall Quality Performance for the Current Twelvemonth (SC21 Quality performance for all despatches) The data represents actual accumulated twelvemonth data ending at the current month. It must be appreciated that the SC21 calculations use data for items returned in a particular month against items despatched. These do not necessarily refer to items originating from the same batches and so maxima and minima are often greatly distorted, especially with customers who use items on projects often months after receipt. Sadly the distortion can make suppliers performance appear to decline during spells of low order throughput. Quality performance (% reject rate) =100 - (No of items rejected in the twelvemonth x 100) Total items despatched in the twelvemonth Items despatched this twelvemonth :17926 Total items rejected this twelvemonth : 52 Quality performance (% acceptance rate) : 99.70 % (Silver) Key Customer Quality Performance for the Last Twelvemonth. Customer Trends % Rating A D Aerospace Ltd Poor due to one return of 15 items in November 100.00 Unrated Aerco Ltd Excellent 100 Gold BAe Systems Ltd Excellent 100 Gold Marshall Aerospace Excellent 100 Gold MoD Excellent. 100 Gold Oxley Developments Ltd Excellent 100 Gold Racal Acoustics Ltd Excellent 100 Gold Rockfords Ltd Slowly recovering 96.55 Unrated Thales Avionics Ltd Excellent 100 Gold Astute Excellent 100 Gold Trends The average for all key customers is 99.50% (Sliver Rating). All customers based on monthly data. Period 2011 2012 2013 2014 Quality Performance % - Mean 99.11309 99.64302 99.81523 99.416 Quality Performance % - Max 100.0000 100.0000 99.92381 100.00 Quality Performance % - Min 93.6260 97.24647 99.65508 95.38745 Suggested Actions Data suggests that the overall quality performance for the company is very good and nearly all customers are receiving good product. Areas for Improvement Being Worked On None Safety
  • 5. No new issues. Written By Mike Morgan
  • 6. No new issues. Written By Mike Morgan