- The company's overall quality performance for the past twelve months was 99.465%, within the bronze rating.
- In November 2014, there was 1 customer return out of 1128 items shipped, maintaining a quality performance rate of 100%, or gold rating.
- Over the past twelve months, the average quality performance rate for all key customers was 99.50%, or silver rating, with no significant issues reported.
It was really excited to run my First Lean Six Sigma Black Belt Project in my factory . And during the project im really great full to my honorable management . Now im posting this project for the audience of this site .
Overview of Lean Manufacturing types of production , comparison between Batch vs Continuous Flow , how to convert batch to continuous flow and the savings
Data Driven Design for Manufacturability – From Validation to PPAP - OMTEC 2017April Bright
The use of data-driven design for manufacturability is a proven method to speed time to market using GD&T and data as a common language. By reducing the number of features called out as critical, inspection times are dramatically reduced and validation is simplified—not only during the development stage, but for the lifetime of the product. Mr. Jaeck demonstrates this process from the OEM and contract manufacturer perspectives.
It was really excited to run my First Lean Six Sigma Black Belt Project in my factory . And during the project im really great full to my honorable management . Now im posting this project for the audience of this site .
Overview of Lean Manufacturing types of production , comparison between Batch vs Continuous Flow , how to convert batch to continuous flow and the savings
Data Driven Design for Manufacturability – From Validation to PPAP - OMTEC 2017April Bright
The use of data-driven design for manufacturability is a proven method to speed time to market using GD&T and data as a common language. By reducing the number of features called out as critical, inspection times are dramatically reduced and validation is simplified—not only during the development stage, but for the lifetime of the product. Mr. Jaeck demonstrates this process from the OEM and contract manufacturer perspectives.
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...GoLeanSixSigma.com
Green Belt Project Storyboard: Herding Cats Using Lean Six Sigma: How to Plan for and Manage the Chaos of Parallel Processes
John Pettit's project is a great example of how effective Lean Six Sigma can be in helping all sizes and types of organizations. John volunteered his time and experience to help a local non-profit organization remove waste in their process thereby allowing them to increase the overall capacity of the services they provide which therefore yield additional revenues to help the people they serve. Congratulations to John in clearly demonstrating his knowledge of the Lean Six Sigma methodology and tools and using his expertise to help others.
https://goleansixsigma.com/herding-cats-using-lean-six-sigma-plan-manage-chaos-parallel-processes/
Change Control Process Identification Evaluation Engineering Fulfillment Requ...SlideTeam
This complete presentation has PPT slides on wide range of topics highlighting the core areas of your business needs. It has professionally designed templates with relevant visuals and subject driven content. This presentation deck has total of twelve slides. Get access to the customizable templates. Our designers have created editable templates for your convenience. You can edit the colour, text and font size as per your need. You can add or delete the content if required. You are just a click to away to have this ready-made presentation. Click the download button now. https://bit.ly/2QHxPtz
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...AkhilMurthy1
Emergency and standby power generation is a critical part of the UK’s energy production strategy and it has recently been in the media spotlight for a whole multitude of reasons. With the commitment and investment by the Government in renewable energy and the continuing changes to the energy mix actually produced due to tighter controls and legislation, flexible and reliable peak capacity has never played a more critical role in ensuring that the lights quite literally “do not go out”.
Enforcement from the Inside: Improving Quality of Business in Process ManagementTobias Unger
In this paper we introduce a new modeling tool for constraint handling in the area of workflow technology. The constraint handlers can be used to improve the quality of business processes but without changing already existing business logic. Todays workflow languages provide no possibility to model constraints and the actions in case the constraints get violated explicitly. Fault and event handling mechanisms to react to events not expected in normal executions are only provided by the BPEL language. Using BPEL as workflow language we integrate the constraint handling extension without changing any existing semantics in a smart way. In our approach we use this fault and event handling mechanisms to extend the BPEL language with a constraint handling mechanism. By integrating this constraint handling tool into the BPEL language we provide an approach for quality driven process modeling with the BPEL language.
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...GoLeanSixSigma.com
Green Belt Project Storyboard: Herding Cats Using Lean Six Sigma: How to Plan for and Manage the Chaos of Parallel Processes
John Pettit's project is a great example of how effective Lean Six Sigma can be in helping all sizes and types of organizations. John volunteered his time and experience to help a local non-profit organization remove waste in their process thereby allowing them to increase the overall capacity of the services they provide which therefore yield additional revenues to help the people they serve. Congratulations to John in clearly demonstrating his knowledge of the Lean Six Sigma methodology and tools and using his expertise to help others.
https://goleansixsigma.com/herding-cats-using-lean-six-sigma-plan-manage-chaos-parallel-processes/
Change Control Process Identification Evaluation Engineering Fulfillment Requ...SlideTeam
This complete presentation has PPT slides on wide range of topics highlighting the core areas of your business needs. It has professionally designed templates with relevant visuals and subject driven content. This presentation deck has total of twelve slides. Get access to the customizable templates. Our designers have created editable templates for your convenience. You can edit the colour, text and font size as per your need. You can add or delete the content if required. You are just a click to away to have this ready-made presentation. Click the download button now. https://bit.ly/2QHxPtz
Preventing Equipment Failures with Real Time Oil Condition Monitoring - Neptu...AkhilMurthy1
Emergency and standby power generation is a critical part of the UK’s energy production strategy and it has recently been in the media spotlight for a whole multitude of reasons. With the commitment and investment by the Government in renewable energy and the continuing changes to the energy mix actually produced due to tighter controls and legislation, flexible and reliable peak capacity has never played a more critical role in ensuring that the lights quite literally “do not go out”.
Enforcement from the Inside: Improving Quality of Business in Process ManagementTobias Unger
In this paper we introduce a new modeling tool for constraint handling in the area of workflow technology. The constraint handlers can be used to improve the quality of business processes but without changing already existing business logic. Todays workflow languages provide no possibility to model constraints and the actions in case the constraints get violated explicitly. Fault and event handling mechanisms to react to events not expected in normal executions are only provided by the BPEL language. Using BPEL as workflow language we integrate the constraint handling extension without changing any existing semantics in a smart way. In our approach we use this fault and event handling mechanisms to extend the BPEL language with a constraint handling mechanism. By integrating this constraint handling tool into the BPEL language we provide an approach for quality driven process modeling with the BPEL language.
This is Six Sigma Project sample for manufacturing company. This is helpful for green belt & black belt level projects. for more information, visit www.niqcgroup.com or www.niqcsixsigmatraining.com
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...Tonatiuh Lozada Duarte
Besides the traditional 8D's to solve problems this a great method to solve any problem, companies as Ford Motor Company requires this method to their suppliers to get quick and correct solutions, I hope this material can be helpful for you.
Eliminating Critical Quality Defects at a Component ManufacturerAnirban Mazumdar
An engagement where our team could help the client improve quality performance significantly within a short period. On some critical components, Zero Defect conditions were also achieved. Use of right tools, some creative techniques like Generation-Defect analysis and effective implementation of countermeasures was the key to success.
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docxgidmanmary
Enforcement
Penalty Process
University of Hartford
April 16, 2020
MaryAnn Haverstock
Penalty Components
Three main components
1. Economic Benefit
2. Basic Gravity Based
3. Continuing Gravity Based
+/- adjustments
You will be setting up your Penalty Assessment project in a spreadsheet format with individual sections that represent each of the three main components.
Then, you will have an additional spreadsheet that will make adjustments according to the Enforcement Response Policy and the Penalty Assessment Policy
Economic Benefit Component
Delayed economic benefit
OR
Avoided economic benefit
EPA has a BEN model that may help you to calculate your economic benefit.
More likely, you will be conducting your own research for penalty equivalent costs that have been delayed or avoided. Then, you are including that cost (economic benefit) in your penalty for that violation.
Basic Gravity Based Component
Extent of Deviation
Relates to the violation itself
Major – substantial noncompliance
Moderate – significant noncompliance
Minor – Minimal noncompliance
Potential for Harm
Harm to the Environment
Harm to the Regulatory Program
Population at risk
Environment at risk
Quantity of the discharge, emission, waste, material..
Nature of the physical, chemical, biological, other characteristics- including pollutant concentration, toxicity, fire or explosion hazard, corrosivity, hazard from direct contact..
Quality of natural resource
Continuing Gravity Based Penalty Component
Same breakout as the Gravity based component, except you will have a range for this penalty component.
Extent of Deviation (from legal requirements)
Relates to the violation itself
Major – substantial noncompliance
Moderate – significant noncompliance
Minor – Minimal noncompliance
Potential for harm
Harm to the Environment
Harm to the Regulatory Program
Population at risk
Environment at risk
Quantity of the discharge, emission, waste, material..
Nature of the physical, chemical, biological, other characteristics- including pollutant concentration, toxicity, fire or explosion hazard, corrosivity, hazard from direct contact..
Quality of natural resource
Adjustments portion of the penalty in the penalty component
Good faith efforts
Degree of willfulness/negligence
History of noncompliance
Ability to pay
Other unique factors (ex. Cost of litigation)
Final penalty summary page
Final report to include all subcategories of your penalty calculations and your final TOTAL penalty. Spreadsheet may be most helpful to you.
All format is up to your choices, But - you must be clear and concise.
An introduction to explain your assumptions as you move through the inspection report and make your decisions about extents and potentials and adjustments
This is an exercise. One goal for this project is the amount of critical thinking that must happen for you as you make your decisions – seeing the levels of choices and decisions
RCRA (HAZARDOUS WASTE) INSPECTION RE ...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Literature Review Basics and Understanding Reference Management.pptx
November 2014 quality report
1. Paramount Panels (UK)
Quality Report
Date: 4/12/14
To : D.Roke
cc : A.Careford, B.Wigglesworth
From : M.Morgan
Re : Quality Report for November 2014
Current SC21 Quality Performance for the past twelvemonth = 99.465%. This is within the current Bronze rating.
Reference should be made to the document ‘Quality Report 2011 to present.xls accessed in "J:QUALITYMonthly
report databaseQuality Report 2011 to present.xlsm". This contains full data covering items mentioned in this report.
The management team are reminded of the need to review the data supplied and identify improvement plans for issues relating
to their own areas.
Performance Indicators
Month
Monitor KPI Batches Items
Customer Returns (RMAs) - 1 4
Supplier Returns (DMRs) - 4 101
Final inspection (rejects) <=1% 0 0
Minor issues* – Panels - 2 -
Minor issues* – Aircraft - 0 -
Minor Issues* –Austinlite - 0 -
Others
QIRS raised - 6 -
Audits/ issues - 0 -
RMA resolution time (days) <=30 days 0
Customer complaints - 1
Our SC21 quality performance >=98% 99.642% -
Our supplier SC21 performance - 99.7029%
2. INCOMING MATERIEL
Deliveries
Batches Rejected % Items Rejected %
101 4 3.9
3
33,966 86 0.25
Returns to Suppliers
Trends
2011 2012 2013 2014
Total DMRs 12 13 14 21
Per Month 1.0 1.2 1.2 2.04
The quantity of returns to supplier is low and our supplier quality is generally considered to be very good.
Approved Suppliers
The number of approved suppliers now stands at 112 and includes a number which are seldom used. The overall SC21 quality
performance of approved suppliers is 99.38% which is slightly better than last month and equates to an average bronze rating.
The SC21 rating for all suppliers is also 99.38% which also equates to a Bronze Rating
Of the 110 approved suppliers:
98 (87.5%) have gold rating.
4 (3.57%) have silver rating.
2(1.78%) has bronze rating.
8 (7.14%) have ratings below 95%.
Suppliers with SC21 Performance Below 95%.
1. Adapt (96.67)
2. Cellular Developments (59.18%)
3. Cambridge Circuits(92.15)
4. Marl International (89.18%)
5. Nemco Ltd (92.16%)
6. Lyncolec Precision In (73.68%)
7. Panel Graphics (92.86)
PROCESSING
Batches Inspected
Area Batches Rejected % Items Rejected %
Panels 26 0 0 124 0 0
Austinlite 1 0 0 10 0 0
Aircraft 17 0 0 698 0 0
Minor Issues Noted this Month (issues not at a sufficient level to warrant a QIR as per QA12).
Date Part Batch Area Problem Level Type
6/11/14 NP2337 F038866 INSP MARKS/SCRATCHES, APPROVED
BY D.ROKE
Moderate Panels
26/11/14 NP2379 F038990 INSP BACK SLIGHTLY LOOSE/TOO
MUCH LIGHT
LEAKING.REWORKED
Moderate Panel
Trends: All personnel aware of issues.
3. OUTGOING MATERIEL
Deliveries to Customers
Batches 55
Items 1128
Returns This Month
1 No returns.
Trends
2011 2012 2013 2014
Total RMAs 24 18 8 7
Per Month 2.0 1.5 0.75 0.5
Reasons for Returns
Turn Round and Liability
Comments. All RMA’s are currently within 30 days.
QUALITY INVESTIGATIONS
Audits
1. Corrective action audit 2.3.5 Tool Use, various list of tool held on system and on hard copies, also tool on rack not
shown on current list on system.
2. Minor corrective action from CAA (External audit) outstanding, to be completed by Feb 2015. We also must make
sure that the capability list is sent to the CAA every time we update it. Not once a year should we fail to do this we will
ge ta corrective action on the next audit.
3. No issue raised during the BSI audit.
4. Minor corrective action raised from the last BSI (June 2014) for suppliers not on the approved suppliers list. This has
been actioned and closed as per audit report.
Purchasing Approved suppliers
Still finding unapproved suppliers, we need to make sure all suppliers are approved (parts for production only) some of
the suppliers that have contacted are not replying to my emails, if this occurs again we will have to stop using them.
Some of the suppliers are historic and are only used now and again, but we still need to add these to the approved
suppliers list.
Comments
Bentham has been sent to the suppliers for repair, we should have answer by the end of the week. Also the spectraScan
has a fault, we have sent the unit for repair to Micron in Mill Hill, awaiting feedback from them.
Reason 2011 2012 2013 2014
Documentation 1 0 0 0
Finish 6 7 5 0
Lighting 0 1 0 0
Damage 1 0 0 1
Text 0 0 0 0
Dimensions 0 0 1 0
Functionality 4 6 2 3
Assembly 10 7 0 0
Delivery 0 0 0 0
Incorrect item 1 0 0 0
Faulty items 0 0 0 2
Other 2 0 0 1
4. SC21 – QUALITY PERFORMANCE
Overall Quality Performance for the Current Month – This Refers to all Despatches
Quality performance (% reject rate) =100 - (No of items rejected in the month x 100)
Total items despatched in the month
Items despatched this month : 1128
Total items rejected this month : 4
Quality performance (% acceptance rate) = 100% (SC21 gold rating for this month)
Overall Quality Performance for the Current Twelvemonth (SC21 Quality performance for all despatches)
The data represents actual accumulated twelvemonth data ending at the current month. It must be appreciated that the SC21
calculations use data for items returned in a particular month against items despatched. These do not necessarily refer to items
originating from the same batches and so maxima and minima are often greatly distorted, especially with customers who use
items on projects often months after receipt. Sadly the distortion can make suppliers performance appear to decline during
spells of low order throughput.
Quality performance (% reject rate) =100 - (No of items rejected in the twelvemonth x 100)
Total items despatched in the twelvemonth
Items despatched this twelvemonth :17926
Total items rejected this twelvemonth : 52
Quality performance (% acceptance rate) : 99.70 % (Silver)
Key Customer Quality Performance for the Last Twelvemonth.
Customer Trends % Rating
A D Aerospace Ltd Poor due to one return of 15 items in November 100.00 Unrated
Aerco Ltd Excellent 100 Gold
BAe Systems Ltd Excellent 100 Gold
Marshall Aerospace Excellent 100 Gold
MoD Excellent. 100 Gold
Oxley Developments Ltd Excellent 100 Gold
Racal Acoustics Ltd Excellent 100 Gold
Rockfords Ltd Slowly recovering 96.55 Unrated
Thales Avionics Ltd Excellent 100 Gold
Astute Excellent 100 Gold
Trends
The average for all key customers is 99.50% (Sliver Rating).
All customers based on monthly data.
Period 2011 2012 2013 2014
Quality Performance % - Mean 99.11309 99.64302 99.81523 99.416
Quality Performance % - Max 100.0000 100.0000 99.92381 100.00
Quality Performance % - Min 93.6260 97.24647 99.65508 95.38745
Suggested Actions
Data suggests that the overall quality performance for the company is very good and nearly all customers are receiving good
product.
Areas for Improvement Being Worked On
None
Safety