ISO 9001 : 2008
Management Review
September 2010
CUSTOMER COMPLAINTS
SEP 2005 - AUG 2010
0
5
10
15
20
25
30
35
40
Sep-05Dec-05M
ar-06Jun-06Sep-06Dec-06M
ar-07Jun-07Sep-07Dec-07M
ar-08Jun-08Sep-08Dec-08M
ar-09Jun-09Sep-09Dec-09M
ar-10Jun-10
No of Complaints
Moving Average over 12
Months
NON - CHARGEABLE REPAIR VISITS
2005 -2010
0
10
20
30
40
50
60
70
80
90
100
Aug-05
Oct-05
Dec-05
Feb-06
Apr-06
Jun-06
Aug-06
Oct-06
Dec-06
Feb-07
Apr-07
Jun-07
Aug-07
Oct-07
Dec-07
Feb-08
Apr-08
Jun-08
Aug-08
Oct-08
Dec-08
Feb-09
Apr-09
Jun-09
Aug-09
Oct-09
Dec-09
Feb-10
Apr-10
Jun-10
NOOFREQUESTS
All Customers
Moving Average Trend Over 12 Months
CUSTOMER COMPLAINTS SEP 2009 TO AUG 2010 (TOTAL134)
FUNCTION (47)
MISSING ITEMS
(40)
HANDLING (16)
LIGHTING (8)
DELIVERY (6)
APPEARANCE (6)
ELECTRICAL (4)
INSTALLERS (4)
NO COMPLAINT (2)
PACK (1)
SERVICE REQUESTS AUG 2009 TO JUL 2010 (TOTAL 226
VISITS)
MISSING/
INCORRECT ITEM
(42)
LIGHTING (35)
FUNCTION (32)
ELECTRICAL (17)
HANDLING
NO FAULT FOUND
POOR INSTALL
CLOCK
UNIT ALTERATION
SURVEY/ PHOTO
SHUTTER
BRANDING
BASE CABINET
SUPPLY PARTS
SLATWALL
APPEARANCE
Major Complaints & Site Visits 2009-2010
• Complaints
• Label M Glass Shelf Fit
• Barclays Displays Fragility
• Revlon Ferrari Israel - Gov
Electrics Assessment
• Coop Counters –
appearance and Installations
• Escada Appearance/ Image
• ITL Clocks
• Site Visits
• ITL Unit coming off wall
• 2 Spirits units collapsing
• Incorrect Coop unit installed
Scrap & Rework (Quality Related) 2005 -2010
0
1
2
3
4
5
6
7
8
9
10
Aug-05
Nov-05
Feb-06
May-06
Aug-06
Nov-06
Feb-07
May-07
Aug-07
Nov-07
Feb-08
May-08
Aug-08
Nov-08
Feb-09
May-09
Aug-09
Nov-09
Feb-10
May-10
Month
%Scrap&Rework
% Rejects (All Depts)
12 per. Mov. Avg. (% Rejects (All
Depts))
NO OF REJECT NOTES BY AREA
SEP 2009 TO AUG 2010
(606 RAISED)
SUPPLIER (162)
HANDLING (81)
TECHNICAL (76)
WOOD (69)
ASSEMBLY (53)
METAL (50)
MOULDING (26)
SCREEN (24)
PLASTIC LASER (24)
POWDERCOAT (18)
OTHERS (23)
QTY PARTS REJECTED
SEP 2009 TO AUG 2010 BY AREA
(TOTAL 88,535 PARTS)
SUPPLIER (45496)
TECHNICAL
(18808)
MOULDING (6400)
ASSEMBLY (3628)
WOOD (2814)
SCREEN (2519)
METAL (1924)
HANDLING (1694)
PLASTIC LASER
(1493)
OTHERS (3759)
SUPPLIER DEFECTS BY TYPE
SEP 2009 TO AUG 2010
(TOTAL 45496 ITEMS)
PRINTS (20476)
HARDWARE
(10001)
EXTRUSIONS
(4626)
PLASTIC SHEET
(2658)
GLASS (2108)
METAL (1841)
SUBCON
ELECTRICALS
TIMBER
PAINT
MISC
PACK
SUPPLIER DEFECTS SEP 2009 TO AUG 2010
(TOTAL 45496 PARTS)
SHOWCARD (7691
PRINTS)
ANIXTER (7000 H/WARE)
SERVICE GRAPHICS
(4800 PRINTS)
JAMES TOWNSEND
(4390 PRINTS)
CONDALE
(EXTRUSIONS)
WYNDHAM (GLASS)
PERSPEX DISTRIB
(PLASTICS)
VGL (PRINTS)
ALEXANDER (H/WARE)
QEF (H/WARE)
OTHERS
Corrective and Preventive Actions
• Mike Morgan Monthly Corrective Action Meetings
• Specific Corrective Actions (eg Revlon Israel Spec)
• No process capability studies being undertaken
• The nature of the operation limits a “zero defects” approach
• Limited individual knowledge (eg electrics, fire resistance)
• Expertise in “solving” problems, perhaps not so strong on
“avoiding” problems.
• How to progress (eg reducing print losses, or missing/
incorrect parts, marginal fits).
External and Internal Audits
• 8. General Observations and Opportunities for
Improvement (External Assessor)
• 1. Clarify the method of monitoring customer satisfaction and
amend the procedure as appropriate. Failure to address this
issue may result in a nonconformity at the next visit.
• 2. Update the list of approved suppliers in the designated time
frame. Also the company may benefit from including the
suppliers of tooling in the list of the approved suppliers.
• The company has implemented various improvement plans.
Well done to the team.
ISO 9001 : 2008 (Exact Wording)
8.2.1 Customer Satisfaction
• As one of the measurements of the performance of the quality
management system, the organization shall monitor
information relating to customer perception as to whether the
organization has met customer requirements. The methods for
obtaining and using this information shall be determined.
• NOTE Monitoring customer perception can include obtaining
input from sources such as customer satisfaction surveys,
customer data on delivered product quality, user opinion
surveys, lost business analysis, compliments, warranty claims
and dealer reports.
Previous Management Review Actions
• Customer Feedback process
• Electrical Training
• Management Review Meetings Frequency
• ISO 14001 Environmental Standard
• Approved Suppliers List
• Revlon Ferrari
• Update Company Structure
Continuing Accreditation – is the
ISO relevant to the Business/
Customer Needs?
Changes and Recommendations
Any Other Business

More Related Content

What's hot

vijay_Resume
vijay_Resumevijay_Resume
vijay_ResumeVzu viji
 
Miguel Torres Resume; 03-17-2016
Miguel Torres Resume; 03-17-2016Miguel Torres Resume; 03-17-2016
Miguel Torres Resume; 03-17-2016Miguel Torres
 
home depot Paul Raines Presentation
home depot Paul Raines Presentation home depot Paul Raines Presentation
home depot Paul Raines Presentation finance2
 
Rob Gibb - updated CV
Rob Gibb - updated CVRob Gibb - updated CV
Rob Gibb - updated CVRobert Gibb
 
Sop On Complaint Handling
Sop On Complaint HandlingSop On Complaint Handling
Sop On Complaint Handlingbroim
 
Ahmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed Fawzy
 

What's hot (8)

vijay_Resume
vijay_Resumevijay_Resume
vijay_Resume
 
Miguel Torres Resume; 03-17-2016
Miguel Torres Resume; 03-17-2016Miguel Torres Resume; 03-17-2016
Miguel Torres Resume; 03-17-2016
 
home depot Paul Raines Presentation
home depot Paul Raines Presentation home depot Paul Raines Presentation
home depot Paul Raines Presentation
 
Thermal Road Repair
Thermal Road RepairThermal Road Repair
Thermal Road Repair
 
Rob Gibb - updated CV
Rob Gibb - updated CVRob Gibb - updated CV
Rob Gibb - updated CV
 
Sop On Complaint Handling
Sop On Complaint HandlingSop On Complaint Handling
Sop On Complaint Handling
 
lean manufacturing
lean manufacturinglean manufacturing
lean manufacturing
 
Ahmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineer
 

Viewers also liked

2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)MICHAEL MORGAN
 
November 2014 quality report
November  2014 quality reportNovember  2014 quality report
November 2014 quality reportMICHAEL MORGAN
 
Hipertensión arterial pulmonar
Hipertensión arterial pulmonarHipertensión arterial pulmonar
Hipertensión arterial pulmonarJavier Domínguez
 
Gizi kerja ika meylan
Gizi kerja ika meylanGizi kerja ika meylan
Gizi kerja ika meylanriszha
 
AAIT Triangle Infiller Presentation
AAIT Triangle Infiller PresentationAAIT Triangle Infiller Presentation
AAIT Triangle Infiller PresentationCharlie Ezelle
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15 MICHAEL MORGAN
 
Ronell strengths finder report
Ronell strengths finder reportRonell strengths finder report
Ronell strengths finder reportRonell Engelbrecht
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mmMICHAEL MORGAN
 
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...MICHAEL MORGAN
 
Inspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 docInspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 docMICHAEL MORGAN
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team Sofie Hermansen
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit Sarah Moug
 
Cover Letter Edit
Cover Letter EditCover Letter Edit
Cover Letter EditSarah Moug
 
Tutorial 2 - Skills Matrix
Tutorial 2 - Skills MatrixTutorial 2 - Skills Matrix
Tutorial 2 - Skills MatrixSarah Moug
 

Viewers also liked (15)

2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
 
November 2014 quality report
November  2014 quality reportNovember  2014 quality report
November 2014 quality report
 
Hipertensión arterial pulmonar
Hipertensión arterial pulmonarHipertensión arterial pulmonar
Hipertensión arterial pulmonar
 
Gizi kerja ika meylan
Gizi kerja ika meylanGizi kerja ika meylan
Gizi kerja ika meylan
 
AAIT Triangle Infiller Presentation
AAIT Triangle Infiller PresentationAAIT Triangle Infiller Presentation
AAIT Triangle Infiller Presentation
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
 
Ronell strengths finder report
Ronell strengths finder reportRonell strengths finder report
Ronell strengths finder report
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mm
 
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
 
Inspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 docInspection report akz colour card holder 15 11-12 doc
Inspection report akz colour card holder 15 11-12 doc
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team
 
UP TO DATE CV
UP TO DATE CVUP TO DATE CV
UP TO DATE CV
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit
 
Cover Letter Edit
Cover Letter EditCover Letter Edit
Cover Letter Edit
 
Tutorial 2 - Skills Matrix
Tutorial 2 - Skills MatrixTutorial 2 - Skills Matrix
Tutorial 2 - Skills Matrix
 

Similar to iso presentation 2010 sept

Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02darkanimie
 
Certification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQACertification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQANQA
 
Bussines Strategy
Bussines StrategyBussines Strategy
Bussines StrategyLuis Palomo
 
ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process Abdul Rahman
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingTony Lopez
 
Construction & supervision skills.pptx
Construction & supervision skills.pptxConstruction & supervision skills.pptx
Construction & supervision skills.pptxssuser8cff9d
 
Iso 9001.2015 full module
Iso 9001.2015 full moduleIso 9001.2015 full module
Iso 9001.2015 full moduleMd.Mahedi Hasan
 
ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationSpecialty Technical Publishers
 
ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15Colin Gray
 
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...TEST Huddle
 
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageIms iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageAbid Iqbal
 
Supplier collaboration in quality improvement programs
Supplier collaboration in quality improvement programsSupplier collaboration in quality improvement programs
Supplier collaboration in quality improvement programsConnie Dello Buono
 

Similar to iso presentation 2010 sept (20)

CV_Rahul_Nishant
CV_Rahul_NishantCV_Rahul_Nishant
CV_Rahul_Nishant
 
Resume .Thangam
Resume .ThangamResume .Thangam
Resume .Thangam
 
Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02
 
Introduction to iso 9001
Introduction to iso 9001 Introduction to iso 9001
Introduction to iso 9001
 
What is ISO?
What is ISO?What is ISO?
What is ISO?
 
Maheswaran Resume
Maheswaran ResumeMaheswaran Resume
Maheswaran Resume
 
Certification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQACertification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQA
 
Bussines Strategy
Bussines StrategyBussines Strategy
Bussines Strategy
 
ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
 
Construction & supervision skills.pptx
Construction & supervision skills.pptxConstruction & supervision skills.pptx
Construction & supervision skills.pptx
 
Iso 9001.2015 full module
Iso 9001.2015 full moduleIso 9001.2015 full module
Iso 9001.2015 full module
 
Iso 9001
Iso 9001Iso 9001
Iso 9001
 
ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and Integration
 
Piyalux_Wiwatsripaiboon Resume New
Piyalux_Wiwatsripaiboon Resume NewPiyalux_Wiwatsripaiboon Resume New
Piyalux_Wiwatsripaiboon Resume New
 
ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15
 
ISO 9001 overview
ISO 9001 overviewISO 9001 overview
ISO 9001 overview
 
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
 
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageIms iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
 
Supplier collaboration in quality improvement programs
Supplier collaboration in quality improvement programsSupplier collaboration in quality improvement programs
Supplier collaboration in quality improvement programs
 

iso presentation 2010 sept

  • 1.
  • 2. ISO 9001 : 2008 Management Review September 2010
  • 3. CUSTOMER COMPLAINTS SEP 2005 - AUG 2010 0 5 10 15 20 25 30 35 40 Sep-05Dec-05M ar-06Jun-06Sep-06Dec-06M ar-07Jun-07Sep-07Dec-07M ar-08Jun-08Sep-08Dec-08M ar-09Jun-09Sep-09Dec-09M ar-10Jun-10 No of Complaints Moving Average over 12 Months
  • 4. NON - CHARGEABLE REPAIR VISITS 2005 -2010 0 10 20 30 40 50 60 70 80 90 100 Aug-05 Oct-05 Dec-05 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-07 Apr-07 Jun-07 Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 Jun-08 Aug-08 Oct-08 Dec-08 Feb-09 Apr-09 Jun-09 Aug-09 Oct-09 Dec-09 Feb-10 Apr-10 Jun-10 NOOFREQUESTS All Customers Moving Average Trend Over 12 Months
  • 5. CUSTOMER COMPLAINTS SEP 2009 TO AUG 2010 (TOTAL134) FUNCTION (47) MISSING ITEMS (40) HANDLING (16) LIGHTING (8) DELIVERY (6) APPEARANCE (6) ELECTRICAL (4) INSTALLERS (4) NO COMPLAINT (2) PACK (1)
  • 6. SERVICE REQUESTS AUG 2009 TO JUL 2010 (TOTAL 226 VISITS) MISSING/ INCORRECT ITEM (42) LIGHTING (35) FUNCTION (32) ELECTRICAL (17) HANDLING NO FAULT FOUND POOR INSTALL CLOCK UNIT ALTERATION SURVEY/ PHOTO SHUTTER BRANDING BASE CABINET SUPPLY PARTS SLATWALL APPEARANCE
  • 7. Major Complaints & Site Visits 2009-2010 • Complaints • Label M Glass Shelf Fit • Barclays Displays Fragility • Revlon Ferrari Israel - Gov Electrics Assessment • Coop Counters – appearance and Installations • Escada Appearance/ Image • ITL Clocks • Site Visits • ITL Unit coming off wall • 2 Spirits units collapsing • Incorrect Coop unit installed
  • 8. Scrap & Rework (Quality Related) 2005 -2010 0 1 2 3 4 5 6 7 8 9 10 Aug-05 Nov-05 Feb-06 May-06 Aug-06 Nov-06 Feb-07 May-07 Aug-07 Nov-07 Feb-08 May-08 Aug-08 Nov-08 Feb-09 May-09 Aug-09 Nov-09 Feb-10 May-10 Month %Scrap&Rework % Rejects (All Depts) 12 per. Mov. Avg. (% Rejects (All Depts))
  • 9. NO OF REJECT NOTES BY AREA SEP 2009 TO AUG 2010 (606 RAISED) SUPPLIER (162) HANDLING (81) TECHNICAL (76) WOOD (69) ASSEMBLY (53) METAL (50) MOULDING (26) SCREEN (24) PLASTIC LASER (24) POWDERCOAT (18) OTHERS (23)
  • 10. QTY PARTS REJECTED SEP 2009 TO AUG 2010 BY AREA (TOTAL 88,535 PARTS) SUPPLIER (45496) TECHNICAL (18808) MOULDING (6400) ASSEMBLY (3628) WOOD (2814) SCREEN (2519) METAL (1924) HANDLING (1694) PLASTIC LASER (1493) OTHERS (3759)
  • 11. SUPPLIER DEFECTS BY TYPE SEP 2009 TO AUG 2010 (TOTAL 45496 ITEMS) PRINTS (20476) HARDWARE (10001) EXTRUSIONS (4626) PLASTIC SHEET (2658) GLASS (2108) METAL (1841) SUBCON ELECTRICALS TIMBER PAINT MISC PACK
  • 12. SUPPLIER DEFECTS SEP 2009 TO AUG 2010 (TOTAL 45496 PARTS) SHOWCARD (7691 PRINTS) ANIXTER (7000 H/WARE) SERVICE GRAPHICS (4800 PRINTS) JAMES TOWNSEND (4390 PRINTS) CONDALE (EXTRUSIONS) WYNDHAM (GLASS) PERSPEX DISTRIB (PLASTICS) VGL (PRINTS) ALEXANDER (H/WARE) QEF (H/WARE) OTHERS
  • 13. Corrective and Preventive Actions • Mike Morgan Monthly Corrective Action Meetings • Specific Corrective Actions (eg Revlon Israel Spec) • No process capability studies being undertaken • The nature of the operation limits a “zero defects” approach • Limited individual knowledge (eg electrics, fire resistance) • Expertise in “solving” problems, perhaps not so strong on “avoiding” problems. • How to progress (eg reducing print losses, or missing/ incorrect parts, marginal fits).
  • 14. External and Internal Audits • 8. General Observations and Opportunities for Improvement (External Assessor) • 1. Clarify the method of monitoring customer satisfaction and amend the procedure as appropriate. Failure to address this issue may result in a nonconformity at the next visit. • 2. Update the list of approved suppliers in the designated time frame. Also the company may benefit from including the suppliers of tooling in the list of the approved suppliers. • The company has implemented various improvement plans. Well done to the team.
  • 15. ISO 9001 : 2008 (Exact Wording) 8.2.1 Customer Satisfaction • As one of the measurements of the performance of the quality management system, the organization shall monitor information relating to customer perception as to whether the organization has met customer requirements. The methods for obtaining and using this information shall be determined. • NOTE Monitoring customer perception can include obtaining input from sources such as customer satisfaction surveys, customer data on delivered product quality, user opinion surveys, lost business analysis, compliments, warranty claims and dealer reports.
  • 16. Previous Management Review Actions • Customer Feedback process • Electrical Training • Management Review Meetings Frequency • ISO 14001 Environmental Standard • Approved Suppliers List • Revlon Ferrari • Update Company Structure
  • 17. Continuing Accreditation – is the ISO relevant to the Business/ Customer Needs? Changes and Recommendations Any Other Business