 Earthquake history in Nepal
 About Gorkha earthquake
 Causes of earthquake
 Economic impact
 Impact on infrastructure
 Impact on natural resources
 Response during earthquake
 Reconstruction
 National role for disaster management
 Conclusion
2
Earthquake history in Nepal
 Nepal is the 11th most earthquake-prone country in the world.
 The first recorded earthquake in history of Nepal took place on June 7, 1255 AD.
 The magnitude of the earthquake is said to be around 7.7 in Richter scale.
 One third of the total population of Kathmandu were killed including Abahya
Malla.
 In 1408 A.D, 1681 A.D. and 1810 A.D. massive earthquake struck Nepal.
 In 1833 A. D. another earthquake devastated Kathmandu valley. Its magnitude
was reported to be of Mb=7.8. The event was located at 50 km North – North East
of Kathmandu.
 In 1934 A. D. 8 magnitude earthquake occurred in the territory of Nepal with
casualties of more than 16000 people.
 1988AD Udayapur Earthquake, 721 deaths, 6553 people injured, 64174 private
buildings, 468 public houses, 790 government buildings damaged, 1566 live
stocks, 22 districts of eastern Nepal affected.
3
4
Nepal earthquake 2015
 Date: 25 April 2015
 Origin time: 11:56:26 NST
 Magnitude: 7.8 Mw
 Hypocenter: 8.2 Km
 Epicenter: Barak village,
Gorkha District
 Nearly 9000 people died
 Nearabout 22000 injured
 The Earthquake triggered an avalanche on Mount Everest that killed 21 members.
another huge avalanche in the Langtang valley where 250 people missing.
 Property loss- approximately USD 8 million
 600,000 people internally displaced
5
Major Aftershock
 Date: 12 May 2015
 Origin time: 12:50 pm
 Magnitude: 7.3 Mw
 Hypocenter: 18.5 Km
 Epicenter: Border of Dolakha and Sindualchowk
 The earthquake occurred at the same fault as the larger magnitude.
 Next one is 6.3 Mw, Its epicenter in Ramechhap
 218 dead & 3,500+ injured
 Affected country : Nepal, India, Bangledesh, China
 Thirty-five districts in Nepal are reported to be affected by the earthquake, the
most affected 14 districts of which include Dhading, Gorkha, Rasuwa,
Sindhupalchowk, Kavre, Nuwakot, Dolakha, Kathmandu, Lalitpur, Bhaktapur, and
Ramechhap.
6
Causes of earthquake
 This earthquake occurred as the result of thrust faulting between the sub ducting
Indian Plate and the overriding Eurasian Plate to the north.
 At the location of this earthquake the Indian Plate is converging with Eurasia at a
rate of 45 mm/yr towards the north-northeast, driving the uplift of the Himalayas
and the Tibetan Plateau.
Fig: Convergent boundary
7
Economic impact
 Impact on GDP growth- The earthquake lowered GDP
growth by over 1.5 percentage points from an estimate of
4.6% in a no earthquake scenario in fiscal year 2015.
 Adverse effect on services sector wholesale and retail trade,
tourism(including air transport, and hotel and restaurant
businesses), and education sub-sectors were the most
affected.
 Impact on Per Capita Income, poverty-
 The income shock from the earthquake pushed an
additional 700,000-982,000 people below the poverty line.
 Multidimensional poverty due to affected water and
sanitation services, disruption of schools and health
services, damaged local infrastructure such as roads,
bridges, health posts, and schools for access to labor and
commodity markets, and for accumulation of human capital
(especially those of children)
8
Impact on infrastructure
 Government buildings : 4,231 including partially & fully damaged
 Private houses : 769,907 including partially & fully damaged
 1000 health facilities were destroyed
 7000 schools were destroyed
Source: Compiled by author based on Central Bureau of Statistics, 2015, Nepal
9
Impact on heritage sites
 Several temples on Kathmandu Durbar Square.
 Dharahara tower, built in 1832; the collapse of the latter structure killed at least
180 people
 Manakamana Temple in Gorkha.
 The northern side of Janaki Mandir in Janakpur was reported to have been
damaged.
 Several temples, including Kasthamandap, Panchtale temple, the top levels of the
nine-story Basantapur Durbar.
 Patan darbarsquare.
 Bhaktapur darbarsquare.
 Taleju Bhawani Temple partially collapsed.
10
11
Impact on natural resources
 Deforestation
 Water quality & quantity decrease
 Water sources drought
 Ozone layer depletion due to green house gases
 Reduce ground water
 Concentration of DO decreased in the areas affected by the Earthquake.
Canterbury Earthquake, New Zealand (Potter et.al.2015).
 Glacier lake outburst.
12
13
Other impacts
 Social impact
 Health and sanitation
 Mal nutrition
 Stunting
Factor for casualties and human loss
 In 2014, Chile was hit by 3 earthquakes of more than 8 magnitude but only 11
deaths, whereas in Nepal the magnitude was similar but so many fatalities and the
reason for this is:
 In 2014, Chile was hit by 3 earthquakes of more than 8 magnitude but only 11
deaths, whereas in Nepal the magnitude was similar but so many fatalities and the
reason for this is.
 Big and small aftershocks which continued for more than a month, 2nd earthquake
was because of the aftershock.
 Landslides and floods caused by earthquake, blocked the transportation to rural
areas, people died and got disabled, without assistance and help.
 No prior notification.
 Low construction standards, most houses and buildings in rural areas not
seismically designed and constructed, people died and injured crushed in the
collapsed buildings and bridges.
14
15
Cont.….
 Less prepared government, crowed and unplanned buildings, unstable political
system, unevenly distributed geographical conditions, and weak surveillance
system.
16
Response during earthquake
 Local people are the first responder.
 Nepal Army, APF and Nepal police are mobilized for the rescue.
 Different country’s expert were involved for search and rescue. Japan, China, The
UK, India etc.
 Nepal and International Red Cross were actively involved for treatment of injured
people. Providing 1,500 volunteers and 300 staff.
Cont.….
 The British organization, Search and Rescue Assistance in Disasters (SARAID)
has sent a team of 14 experts with 1.5 tones of specialist equipment.
 Ham Radio used for communication.
 The British organization, Search and Rescue Assistance in Disasters (SARAID)
has sent a team of 14 experts with 1.5 tones of specialist equipment.
17
18
Long term response
 The Asian Development Bank (ADB) $3 million grant for immediate relief and $
200 million for the first phase of rehabilitation.
 Many countries donated aid. £73 million was donated by the UK (£23 million by
the government and £50 million by the public). In addition to this, the UK
provided 30 tones of humanitarian aid and eight tones of equipment.
19
Reconstruction
 The National Reconstruction Authority was then established again on 25
December 2015.
 Eight months after the devastating earthquake in Nepal.
 Objectives of the NRA are:
 To reconstruct, retrofit and restore partially- and completely-damaged residential,
community and government buildings and heritage sites, to make them disaster-
resistant using local technologies as needed.
 To reconstruct (restore) damaged cities and ancient villages to their original form.
 To build resilience among people and communities at risk in the earthquake
affected districts.
 To develop new opportunities by revitalizing the productive sector for economic
opportunities and livelihoods.
 To study and research the science of earthquakes, their impact including damages
and effects, and post-earthquake recovery, including reconstruction, resettlement,
rehabilitation and disaster risk reduction
 To resettle the affected communities by identifying appropriate sites.
20
Cont.…
 507623 private houses were constructed, 710268 houses are under construction.
21
Challenges for reconstruction
 Absence of local government at initial phase, weak governance.
 Weak infrastructures.
 Lack of preparedness.
 Knowledge gap and manpower shortage.
22
National role for disaster management
 Disaster Management in Nepal’s Constitution, 2015
 Enactment of Disaster Risk Reduction and Management Act, 2017
 Endorsement of Disaster Risk Reduction National Policy 2018 and Disaster
Risk Reduction National Strategic Action Plan (2018-2030)
 Local Government Operation (LGO) Act, 2017
 National Building Code (NBC)
 National Disaster Response Framework (NDRF)
23
Gaps in policy program and practice
 More emphasis has been given towards the disaster response and relief rather than
complete approaches including planning, preparedness and recovery.
 Lack of awareness on different hazards and its consequences.
 There is no focus on inclusive DRR.
 Lacks of capacities in mobilizing international humanitarian support at the real
time of emergencies.
24
Conclusion
 Based on the geological and seismic history, Nepal is always at the risk of
earthquake a
 landslides and flood are other natural disasters which frequently occur in Nepal
causing physical and mental effect
 The shallow and powerful earthquake with longer ground motions, continuous and
numerous aftershocks, geographical structure, weak surveillance system, no prior
notification, unstructured buildings, lack of preparedness, unorganized and
uncoordinated response system, unstable political system and poverty were the
direct and indirect factors causing those massive fatalities in Nepal.
 Well preparedness is most to cope with further disasters.
25
Recommendation
 Disaster risk reduction protocol needs to be implemented from urban to rural
areas.
 Building evacuation procedure, building inspection and tagging, and construction
with retrofitting (low-cost solutions) need to be implemented.
 Building codes specific to hospitals and health facilities need to be developed and
enforced.
 Enacting legislation for safety from hazards.
 Improving quality of education on disaster mitigation and preparedness.
 Stable political system
26
References
 https://en.wikipedia.org/wiki/April_2015_Nepal_earthquake
 Potter, et.al (2015). An overview of the impacts of the 2010-2011 Canterbury
earthquakes. International Journal of Disaster Risk Reduction, 14, 6-14.
 Sharma, K., KC, A. and Pokharel, B. (2017): Challenges for reconstruction after
Mw 7.8 Gorkha earthquake: a study on devastated area of Nepal, International
Journal of Disaster Risk Reduction (submitted).
27

More Related Content

What's hot

Nepal Earthquake 2015
Nepal Earthquake 2015Nepal Earthquake 2015
Nepal Earthquake 2015
Anurag Dash
 
Bhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talparaBhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talpara
umang talpara
 
Malin Landslide : A Case study
Malin Landslide : A Case studyMalin Landslide : A Case study
Malin Landslide : A Case study
Pratik Khadatare
 
Earthquack in nepal
Earthquack in nepalEarthquack in nepal
Earthquack in nepal
SUPER ULTRON
 
Earthquake ppt
Earthquake pptEarthquake ppt
Earthquake ppt
Puneet Sidhu
 
Kerala Floods
Kerala FloodsKerala Floods
Kerala Floods
Rohan Sahu
 
Floods in India
Floods in IndiaFloods in India
Floods in India
Nitika Nikks
 
Study of natural disasters in india
Study of natural disasters in indiaStudy of natural disasters in india
Study of natural disasters in india
Anchit Garg
 
Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013
Beda Choudhury
 
landslide at malin village
landslide at malin villagelandslide at malin village
landslide at malin village
kailash patel
 
Cyclone Phailin in Odisha, 2013
Cyclone Phailin in Odisha, 2013Cyclone Phailin in Odisha, 2013
Cyclone Phailin in Odisha, 2013
Hrishikesh Satpute
 
Bhuj earthquake
Bhuj earthquakeBhuj earthquake
Bhuj earthquake
Gourav Surana
 
Disaster management in india
Disaster management in indiaDisaster management in india
Disaster management in india
Devyani Wanjari
 
Earthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,GujaratEarthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,Gujarat
Gaurang Kakadiya
 
LATUR-KILLARI EARTHQUAKE 1993 REPORT
LATUR-KILLARI EARTHQUAKE 1993 REPORTLATUR-KILLARI EARTHQUAKE 1993 REPORT
LATUR-KILLARI EARTHQUAKE 1993 REPORT
Amar Gohel
 
Disaster management
Disaster managementDisaster management
Disaster management
Neha Rampuria
 
natural disaster project by mirza ibrahim from greenwich academy
natural disaster project by mirza ibrahim from greenwich academynatural disaster project by mirza ibrahim from greenwich academy
natural disaster project by mirza ibrahim from greenwich academy
199917
 
Earthquake - Disaster Management
Earthquake - Disaster ManagementEarthquake - Disaster Management
Earthquake - Disaster Management
Bhavik A Shah
 
Jammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case studyJammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case study
Najibullah Ghaybi
 
Disaster management-ppt-INDIA
Disaster management-ppt-INDIADisaster management-ppt-INDIA
Disaster management-ppt-INDIA
Deepa George
 

What's hot (20)

Nepal Earthquake 2015
Nepal Earthquake 2015Nepal Earthquake 2015
Nepal Earthquake 2015
 
Bhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talparaBhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talpara
 
Malin Landslide : A Case study
Malin Landslide : A Case studyMalin Landslide : A Case study
Malin Landslide : A Case study
 
Earthquack in nepal
Earthquack in nepalEarthquack in nepal
Earthquack in nepal
 
Earthquake ppt
Earthquake pptEarthquake ppt
Earthquake ppt
 
Kerala Floods
Kerala FloodsKerala Floods
Kerala Floods
 
Floods in India
Floods in IndiaFloods in India
Floods in India
 
Study of natural disasters in india
Study of natural disasters in indiaStudy of natural disasters in india
Study of natural disasters in india
 
Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013
 
landslide at malin village
landslide at malin villagelandslide at malin village
landslide at malin village
 
Cyclone Phailin in Odisha, 2013
Cyclone Phailin in Odisha, 2013Cyclone Phailin in Odisha, 2013
Cyclone Phailin in Odisha, 2013
 
Bhuj earthquake
Bhuj earthquakeBhuj earthquake
Bhuj earthquake
 
Disaster management in india
Disaster management in indiaDisaster management in india
Disaster management in india
 
Earthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,GujaratEarthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,Gujarat
 
LATUR-KILLARI EARTHQUAKE 1993 REPORT
LATUR-KILLARI EARTHQUAKE 1993 REPORTLATUR-KILLARI EARTHQUAKE 1993 REPORT
LATUR-KILLARI EARTHQUAKE 1993 REPORT
 
Disaster management
Disaster managementDisaster management
Disaster management
 
natural disaster project by mirza ibrahim from greenwich academy
natural disaster project by mirza ibrahim from greenwich academynatural disaster project by mirza ibrahim from greenwich academy
natural disaster project by mirza ibrahim from greenwich academy
 
Earthquake - Disaster Management
Earthquake - Disaster ManagementEarthquake - Disaster Management
Earthquake - Disaster Management
 
Jammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case studyJammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case study
 
Disaster management-ppt-INDIA
Disaster management-ppt-INDIADisaster management-ppt-INDIA
Disaster management-ppt-INDIA
 

Similar to Nepal earthquake 2015

AMCDRR 2016 Nepal Disaster Report
AMCDRR 2016 Nepal Disaster ReportAMCDRR 2016 Nepal Disaster Report
AMCDRR 2016 Nepal Disaster Report
DPNet
 
Earthquakes -its effects on environment
Earthquakes -its effects on environmentEarthquakes -its effects on environment
Earthquakes -its effects on environment
NARESH KUMAR
 
Gorkha Earthquake: Recovery Challenges in a Fluid Terrain
Gorkha Earthquake: Recovery Challenges in a Fluid TerrainGorkha Earthquake: Recovery Challenges in a Fluid Terrain
Gorkha Earthquake: Recovery Challenges in a Fluid Terrain
Kenneth MacClune
 
Nepal Earthquake disaster.pptx
Nepal Earthquake disaster.pptxNepal Earthquake disaster.pptx
Nepal Earthquake disaster.pptx
MayurdeepBora
 
Lessons from the nepal earthquake prepare and survive international viewpo...
Lessons from the nepal earthquake  prepare and survive   international viewpo...Lessons from the nepal earthquake  prepare and survive   international viewpo...
Lessons from the nepal earthquake prepare and survive international viewpo...
Kalpana Maharjan
 
Mapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
Mapping Recent Earthquake In Nepal and Its Geo-spatial ImpactsMapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
Mapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
Bijesh Mishra
 
Mapping Recent Earthquake in Nepal and Its Geospatial Impacts
Mapping Recent Earthquake in Nepal and Its Geospatial ImpactsMapping Recent Earthquake in Nepal and Its Geospatial Impacts
Mapping Recent Earthquake in Nepal and Its Geospatial Impacts
Bijesh Mishra
 
Sept. 2011 Earthquake in Sikkim .pptx
Sept. 2011 Earthquake in Sikkim .pptxSept. 2011 Earthquake in Sikkim .pptx
Sept. 2011 Earthquake in Sikkim .pptx
MingmaThendupSherpa
 
Disaster and Management
Disaster and ManagementDisaster and Management
Disaster and Management
Rohit yadav
 
Natural hazards and disaster management
Natural hazards and disaster managementNatural hazards and disaster management
Natural hazards and disaster management
Eternal University Baru Sahib, HP, India
 
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).pptDM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
SikanderZulkarnain1
 
Tsunami
TsunamiTsunami
Tsunami
Pramod Kumar
 
Disaster Management1
Disaster Management1Disaster Management1
Disaster Management1
Nijo Ninan
 
Shantanu project
Shantanu projectShantanu project
Shantanu project
Jayant Rana
 
PDNA - Post Disaster Need Assessment and role of multi-stakeholders
PDNA - Post Disaster Need Assessment and role of multi-stakeholders  PDNA - Post Disaster Need Assessment and role of multi-stakeholders
PDNA - Post Disaster Need Assessment and role of multi-stakeholders
Bibhuti Bhusan Gadanayak
 
A report on muzaffarabad earthquake oct
A report on muzaffarabad earthquake octA report on muzaffarabad earthquake oct
A report on muzaffarabad earthquake oct
Shawn Mad
 
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
Saritsa Foundation (Saritsa Charity Trust)
 
Disaster relief
Disaster reliefDisaster relief
Disaster relief
janiceaughey
 
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
RituSaha3
 
Vulnerability and Risk ppt 1.ppt
Vulnerability and Risk ppt 1.pptVulnerability and Risk ppt 1.ppt
Vulnerability and Risk ppt 1.ppt
Madhukar Sanap
 

Similar to Nepal earthquake 2015 (20)

AMCDRR 2016 Nepal Disaster Report
AMCDRR 2016 Nepal Disaster ReportAMCDRR 2016 Nepal Disaster Report
AMCDRR 2016 Nepal Disaster Report
 
Earthquakes -its effects on environment
Earthquakes -its effects on environmentEarthquakes -its effects on environment
Earthquakes -its effects on environment
 
Gorkha Earthquake: Recovery Challenges in a Fluid Terrain
Gorkha Earthquake: Recovery Challenges in a Fluid TerrainGorkha Earthquake: Recovery Challenges in a Fluid Terrain
Gorkha Earthquake: Recovery Challenges in a Fluid Terrain
 
Nepal Earthquake disaster.pptx
Nepal Earthquake disaster.pptxNepal Earthquake disaster.pptx
Nepal Earthquake disaster.pptx
 
Lessons from the nepal earthquake prepare and survive international viewpo...
Lessons from the nepal earthquake  prepare and survive   international viewpo...Lessons from the nepal earthquake  prepare and survive   international viewpo...
Lessons from the nepal earthquake prepare and survive international viewpo...
 
Mapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
Mapping Recent Earthquake In Nepal and Its Geo-spatial ImpactsMapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
Mapping Recent Earthquake In Nepal and Its Geo-spatial Impacts
 
Mapping Recent Earthquake in Nepal and Its Geospatial Impacts
Mapping Recent Earthquake in Nepal and Its Geospatial ImpactsMapping Recent Earthquake in Nepal and Its Geospatial Impacts
Mapping Recent Earthquake in Nepal and Its Geospatial Impacts
 
Sept. 2011 Earthquake in Sikkim .pptx
Sept. 2011 Earthquake in Sikkim .pptxSept. 2011 Earthquake in Sikkim .pptx
Sept. 2011 Earthquake in Sikkim .pptx
 
Disaster and Management
Disaster and ManagementDisaster and Management
Disaster and Management
 
Natural hazards and disaster management
Natural hazards and disaster managementNatural hazards and disaster management
Natural hazards and disaster management
 
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).pptDM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
 
Tsunami
TsunamiTsunami
Tsunami
 
Disaster Management1
Disaster Management1Disaster Management1
Disaster Management1
 
Shantanu project
Shantanu projectShantanu project
Shantanu project
 
PDNA - Post Disaster Need Assessment and role of multi-stakeholders
PDNA - Post Disaster Need Assessment and role of multi-stakeholders  PDNA - Post Disaster Need Assessment and role of multi-stakeholders
PDNA - Post Disaster Need Assessment and role of multi-stakeholders
 
A report on muzaffarabad earthquake oct
A report on muzaffarabad earthquake octA report on muzaffarabad earthquake oct
A report on muzaffarabad earthquake oct
 
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
Learning Lessons from Nepal Earthquake. Prepare & Protect Lives.
 
Disaster relief
Disaster reliefDisaster relief
Disaster relief
 
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
A Presentation On Cyclone Nargis in Myanmar, 2008 (Emergency responses)
 
Vulnerability and Risk ppt 1.ppt
Vulnerability and Risk ppt 1.pptVulnerability and Risk ppt 1.ppt
Vulnerability and Risk ppt 1.ppt
 

More from Mahendra Poudel

नागरिकता अनुसूची ८ सपथ
नागरिकता अनुसूची ८ सपथनागरिकता अनुसूची ८ सपथ
नागरिकता अनुसूची ८ सपथ
Mahendra Poudel
 
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्रनागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
Mahendra Poudel
 
नागरिकता अनुसुची_८ग फारम
नागरिकता अनुसुची_८ग फारमनागरिकता अनुसुची_८ग फारम
नागरिकता अनुसुची_८ग फारम
Mahendra Poudel
 
पोखरा कास्की 2080_81.pdf
पोखरा कास्की 2080_81.pdfपोखरा कास्की 2080_81.pdf
पोखरा कास्की 2080_81.pdf
Mahendra Poudel
 
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdfलेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
Mahendra Poudel
 
District_rate_kaski_080_81.pdf
District_rate_kaski_080_81.pdfDistrict_rate_kaski_080_81.pdf
District_rate_kaski_080_81.pdf
Mahendra Poudel
 
Internal examination 3rd semester disaster
Internal examination 3rd semester disasterInternal examination 3rd semester disaster
Internal examination 3rd semester disaster
Mahendra Poudel
 
Automated system design for emergencies
Automated system design for emergenciesAutomated system design for emergencies
Automated system design for emergencies
Mahendra Poudel
 
Himalayan tsunami
Himalayan tsunamiHimalayan tsunami
Himalayan tsunami
Mahendra Poudel
 
Hurricane Katrina 2005
Hurricane Katrina 2005Hurricane Katrina 2005
Hurricane Katrina 2005
Mahendra Poudel
 
Haiti disaster
Haiti disasterHaiti disaster
Haiti disaster
Mahendra Poudel
 
Fukushima nuclear disaster in japan
Fukushima nuclear disaster in japan Fukushima nuclear disaster in japan
Fukushima nuclear disaster in japan
Mahendra Poudel
 
Bhopal disaster (ucil)
Bhopal disaster (ucil)Bhopal disaster (ucil)
Bhopal disaster (ucil)
Mahendra Poudel
 
Ussr cernobly disaster
Ussr cernobly disasterUssr cernobly disaster
Ussr cernobly disaster
Mahendra Poudel
 
Spss intro for engineering
Spss intro for engineeringSpss intro for engineering
Spss intro for engineering
Mahendra Poudel
 
Introduction to the economics of disasters
Introduction to the economics of disastersIntroduction to the economics of disasters
Introduction to the economics of disasters
Mahendra Poudel
 
Impacts of natural disaster globally public health
Impacts of natural disaster globally public healthImpacts of natural disaster globally public health
Impacts of natural disaster globally public health
Mahendra Poudel
 
14 mental health promotion for elderly
14 mental health promotion for elderly14 mental health promotion for elderly
14 mental health promotion for elderly
Mahendra Poudel
 
13 Mental Health Problem for elderly
13 Mental Health Problem for elderly13 Mental Health Problem for elderly
13 Mental Health Problem for elderly
Mahendra Poudel
 
Impacts of natural disaster globally economics and development
Impacts of natural disaster globally economics and developmentImpacts of natural disaster globally economics and development
Impacts of natural disaster globally economics and development
Mahendra Poudel
 

More from Mahendra Poudel (20)

नागरिकता अनुसूची ८ सपथ
नागरिकता अनुसूची ८ सपथनागरिकता अनुसूची ८ सपथ
नागरिकता अनुसूची ८ सपथ
 
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्रनागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
नागरिकता अनुसूची ८ प्रतिबद्धता_पत्र
 
नागरिकता अनुसुची_८ग फारम
नागरिकता अनुसुची_८ग फारमनागरिकता अनुसुची_८ग फारम
नागरिकता अनुसुची_८ग फारम
 
पोखरा कास्की 2080_81.pdf
पोखरा कास्की 2080_81.pdfपोखरा कास्की 2080_81.pdf
पोखरा कास्की 2080_81.pdf
 
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdfलेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
लेखनाथ कास्की Jaga Mulyakan file 2080।81.pdf
 
District_rate_kaski_080_81.pdf
District_rate_kaski_080_81.pdfDistrict_rate_kaski_080_81.pdf
District_rate_kaski_080_81.pdf
 
Internal examination 3rd semester disaster
Internal examination 3rd semester disasterInternal examination 3rd semester disaster
Internal examination 3rd semester disaster
 
Automated system design for emergencies
Automated system design for emergenciesAutomated system design for emergencies
Automated system design for emergencies
 
Himalayan tsunami
Himalayan tsunamiHimalayan tsunami
Himalayan tsunami
 
Hurricane Katrina 2005
Hurricane Katrina 2005Hurricane Katrina 2005
Hurricane Katrina 2005
 
Haiti disaster
Haiti disasterHaiti disaster
Haiti disaster
 
Fukushima nuclear disaster in japan
Fukushima nuclear disaster in japan Fukushima nuclear disaster in japan
Fukushima nuclear disaster in japan
 
Bhopal disaster (ucil)
Bhopal disaster (ucil)Bhopal disaster (ucil)
Bhopal disaster (ucil)
 
Ussr cernobly disaster
Ussr cernobly disasterUssr cernobly disaster
Ussr cernobly disaster
 
Spss intro for engineering
Spss intro for engineeringSpss intro for engineering
Spss intro for engineering
 
Introduction to the economics of disasters
Introduction to the economics of disastersIntroduction to the economics of disasters
Introduction to the economics of disasters
 
Impacts of natural disaster globally public health
Impacts of natural disaster globally public healthImpacts of natural disaster globally public health
Impacts of natural disaster globally public health
 
14 mental health promotion for elderly
14 mental health promotion for elderly14 mental health promotion for elderly
14 mental health promotion for elderly
 
13 Mental Health Problem for elderly
13 Mental Health Problem for elderly13 Mental Health Problem for elderly
13 Mental Health Problem for elderly
 
Impacts of natural disaster globally economics and development
Impacts of natural disaster globally economics and developmentImpacts of natural disaster globally economics and development
Impacts of natural disaster globally economics and development
 

Recently uploaded

IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 

Recently uploaded (20)

IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 

Nepal earthquake 2015

  • 1. NEPAL EARTHQUAKE 2015 Prepared By: Sudip Pandey & Usha Kiran Rokaya M.Sc. In Public Health and Disaster Engineering School of Engineering Pokhara University
  • 2. Outline of presentation  Earthquake history in Nepal  About Gorkha earthquake  Causes of earthquake  Economic impact  Impact on infrastructure  Impact on natural resources  Response during earthquake  Reconstruction  National role for disaster management  Conclusion 2
  • 3. Earthquake history in Nepal  Nepal is the 11th most earthquake-prone country in the world.  The first recorded earthquake in history of Nepal took place on June 7, 1255 AD.  The magnitude of the earthquake is said to be around 7.7 in Richter scale.  One third of the total population of Kathmandu were killed including Abahya Malla.  In 1408 A.D, 1681 A.D. and 1810 A.D. massive earthquake struck Nepal.  In 1833 A. D. another earthquake devastated Kathmandu valley. Its magnitude was reported to be of Mb=7.8. The event was located at 50 km North – North East of Kathmandu.  In 1934 A. D. 8 magnitude earthquake occurred in the territory of Nepal with casualties of more than 16000 people.  1988AD Udayapur Earthquake, 721 deaths, 6553 people injured, 64174 private buildings, 468 public houses, 790 government buildings damaged, 1566 live stocks, 22 districts of eastern Nepal affected. 3
  • 4. 4 Nepal earthquake 2015  Date: 25 April 2015  Origin time: 11:56:26 NST  Magnitude: 7.8 Mw  Hypocenter: 8.2 Km  Epicenter: Barak village, Gorkha District  Nearly 9000 people died  Nearabout 22000 injured  The Earthquake triggered an avalanche on Mount Everest that killed 21 members. another huge avalanche in the Langtang valley where 250 people missing.  Property loss- approximately USD 8 million  600,000 people internally displaced
  • 5. 5 Major Aftershock  Date: 12 May 2015  Origin time: 12:50 pm  Magnitude: 7.3 Mw  Hypocenter: 18.5 Km  Epicenter: Border of Dolakha and Sindualchowk  The earthquake occurred at the same fault as the larger magnitude.  Next one is 6.3 Mw, Its epicenter in Ramechhap  218 dead & 3,500+ injured  Affected country : Nepal, India, Bangledesh, China  Thirty-five districts in Nepal are reported to be affected by the earthquake, the most affected 14 districts of which include Dhading, Gorkha, Rasuwa, Sindhupalchowk, Kavre, Nuwakot, Dolakha, Kathmandu, Lalitpur, Bhaktapur, and Ramechhap.
  • 6. 6 Causes of earthquake  This earthquake occurred as the result of thrust faulting between the sub ducting Indian Plate and the overriding Eurasian Plate to the north.  At the location of this earthquake the Indian Plate is converging with Eurasia at a rate of 45 mm/yr towards the north-northeast, driving the uplift of the Himalayas and the Tibetan Plateau. Fig: Convergent boundary
  • 7. 7 Economic impact  Impact on GDP growth- The earthquake lowered GDP growth by over 1.5 percentage points from an estimate of 4.6% in a no earthquake scenario in fiscal year 2015.  Adverse effect on services sector wholesale and retail trade, tourism(including air transport, and hotel and restaurant businesses), and education sub-sectors were the most affected.  Impact on Per Capita Income, poverty-  The income shock from the earthquake pushed an additional 700,000-982,000 people below the poverty line.  Multidimensional poverty due to affected water and sanitation services, disruption of schools and health services, damaged local infrastructure such as roads, bridges, health posts, and schools for access to labor and commodity markets, and for accumulation of human capital (especially those of children)
  • 8. 8 Impact on infrastructure  Government buildings : 4,231 including partially & fully damaged  Private houses : 769,907 including partially & fully damaged  1000 health facilities were destroyed  7000 schools were destroyed Source: Compiled by author based on Central Bureau of Statistics, 2015, Nepal
  • 9. 9 Impact on heritage sites  Several temples on Kathmandu Durbar Square.  Dharahara tower, built in 1832; the collapse of the latter structure killed at least 180 people  Manakamana Temple in Gorkha.  The northern side of Janaki Mandir in Janakpur was reported to have been damaged.  Several temples, including Kasthamandap, Panchtale temple, the top levels of the nine-story Basantapur Durbar.  Patan darbarsquare.  Bhaktapur darbarsquare.  Taleju Bhawani Temple partially collapsed.
  • 10. 10
  • 11. 11
  • 12. Impact on natural resources  Deforestation  Water quality & quantity decrease  Water sources drought  Ozone layer depletion due to green house gases  Reduce ground water  Concentration of DO decreased in the areas affected by the Earthquake. Canterbury Earthquake, New Zealand (Potter et.al.2015).  Glacier lake outburst. 12
  • 13. 13 Other impacts  Social impact  Health and sanitation  Mal nutrition  Stunting
  • 14. Factor for casualties and human loss  In 2014, Chile was hit by 3 earthquakes of more than 8 magnitude but only 11 deaths, whereas in Nepal the magnitude was similar but so many fatalities and the reason for this is:  In 2014, Chile was hit by 3 earthquakes of more than 8 magnitude but only 11 deaths, whereas in Nepal the magnitude was similar but so many fatalities and the reason for this is.  Big and small aftershocks which continued for more than a month, 2nd earthquake was because of the aftershock.  Landslides and floods caused by earthquake, blocked the transportation to rural areas, people died and got disabled, without assistance and help.  No prior notification.  Low construction standards, most houses and buildings in rural areas not seismically designed and constructed, people died and injured crushed in the collapsed buildings and bridges. 14
  • 15. 15 Cont.….  Less prepared government, crowed and unplanned buildings, unstable political system, unevenly distributed geographical conditions, and weak surveillance system.
  • 16. 16 Response during earthquake  Local people are the first responder.  Nepal Army, APF and Nepal police are mobilized for the rescue.  Different country’s expert were involved for search and rescue. Japan, China, The UK, India etc.  Nepal and International Red Cross were actively involved for treatment of injured people. Providing 1,500 volunteers and 300 staff.
  • 17. Cont.….  The British organization, Search and Rescue Assistance in Disasters (SARAID) has sent a team of 14 experts with 1.5 tones of specialist equipment.  Ham Radio used for communication.  The British organization, Search and Rescue Assistance in Disasters (SARAID) has sent a team of 14 experts with 1.5 tones of specialist equipment. 17
  • 18. 18 Long term response  The Asian Development Bank (ADB) $3 million grant for immediate relief and $ 200 million for the first phase of rehabilitation.  Many countries donated aid. £73 million was donated by the UK (£23 million by the government and £50 million by the public). In addition to this, the UK provided 30 tones of humanitarian aid and eight tones of equipment.
  • 19. 19 Reconstruction  The National Reconstruction Authority was then established again on 25 December 2015.  Eight months after the devastating earthquake in Nepal.  Objectives of the NRA are:  To reconstruct, retrofit and restore partially- and completely-damaged residential, community and government buildings and heritage sites, to make them disaster- resistant using local technologies as needed.  To reconstruct (restore) damaged cities and ancient villages to their original form.  To build resilience among people and communities at risk in the earthquake affected districts.  To develop new opportunities by revitalizing the productive sector for economic opportunities and livelihoods.  To study and research the science of earthquakes, their impact including damages and effects, and post-earthquake recovery, including reconstruction, resettlement, rehabilitation and disaster risk reduction  To resettle the affected communities by identifying appropriate sites.
  • 20. 20 Cont.…  507623 private houses were constructed, 710268 houses are under construction.
  • 21. 21 Challenges for reconstruction  Absence of local government at initial phase, weak governance.  Weak infrastructures.  Lack of preparedness.  Knowledge gap and manpower shortage.
  • 22. 22 National role for disaster management  Disaster Management in Nepal’s Constitution, 2015  Enactment of Disaster Risk Reduction and Management Act, 2017  Endorsement of Disaster Risk Reduction National Policy 2018 and Disaster Risk Reduction National Strategic Action Plan (2018-2030)  Local Government Operation (LGO) Act, 2017  National Building Code (NBC)  National Disaster Response Framework (NDRF)
  • 23. 23 Gaps in policy program and practice  More emphasis has been given towards the disaster response and relief rather than complete approaches including planning, preparedness and recovery.  Lack of awareness on different hazards and its consequences.  There is no focus on inclusive DRR.  Lacks of capacities in mobilizing international humanitarian support at the real time of emergencies.
  • 24. 24 Conclusion  Based on the geological and seismic history, Nepal is always at the risk of earthquake a  landslides and flood are other natural disasters which frequently occur in Nepal causing physical and mental effect  The shallow and powerful earthquake with longer ground motions, continuous and numerous aftershocks, geographical structure, weak surveillance system, no prior notification, unstructured buildings, lack of preparedness, unorganized and uncoordinated response system, unstable political system and poverty were the direct and indirect factors causing those massive fatalities in Nepal.  Well preparedness is most to cope with further disasters.
  • 25. 25 Recommendation  Disaster risk reduction protocol needs to be implemented from urban to rural areas.  Building evacuation procedure, building inspection and tagging, and construction with retrofitting (low-cost solutions) need to be implemented.  Building codes specific to hospitals and health facilities need to be developed and enforced.  Enacting legislation for safety from hazards.  Improving quality of education on disaster mitigation and preparedness.  Stable political system
  • 26. 26 References  https://en.wikipedia.org/wiki/April_2015_Nepal_earthquake  Potter, et.al (2015). An overview of the impacts of the 2010-2011 Canterbury earthquakes. International Journal of Disaster Risk Reduction, 14, 6-14.  Sharma, K., KC, A. and Pokharel, B. (2017): Challenges for reconstruction after Mw 7.8 Gorkha earthquake: a study on devastated area of Nepal, International Journal of Disaster Risk Reduction (submitted).