SlideShare a Scribd company logo
CORRIDOR
04
06
ELEC. RM.
GAMES RM.
07
SOUTH STAIR
08
CLOSET
UP
12
WC-F
0305
DATA CENTER
LOCKER RM.
+65mm
11
±0,00
01
LOBBY
+0,65
PT-5
COJHLC100
COJHLC300
COEL500UPH
AWRF254836
COEL500UPH
COJHLC100
COJHLC100
COJHLC100
COEL500UPHCOEL500UPH
MILLWORK TABLE
M I L L W O R K - S H EL V I N G
BOARD ROOM
PANTRY/LOUNGE
LOUNGE ROOM
MAIN FLOOR
CUSTOM-MADE TABLE78.490"
256.581"
123.529"
41.344"
80.237"
Desc.
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used without
the consent of RGO Office Products Partnership. Contact RGO Facilities
Department for information and application for consent.
This drawing is an electronic emulation of the original record drawing. Details
and dimensions are not guaranteed as accurate and complete and must be
certified on-site prior to design and construction work. This drawing is
designed for furniture installations only.
Desc.
FINAL APPROVAL:
PROPOSED FURNITURE LAYOUT
MYNTEX INC.
[Sold to, Address, Line #1]
05/17/16 Desc.
2 Date
3
Date
Date
Desc.
6
[Sold to, Address, City]
RGO OFFICE PRODUCTS
100, 229 - 33 ST. N.E.
MAIN FLOOR Desc.
[Sold to, Address, Line #2]
Date
Date
Date
Date
5
1
facilities Desc.4
CT
DATE (M/D/Y)
REVISIONS
No.
[Order entry, Dealer PO
PROJECT NUMBER:
DRAWN BY:
FILE NAME:
PROJECT:
DATE:
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
DESCRIPTION
+65mm
WC-F
12
UP
±0,00
01
LOBBY
BOARD ROOM
CUSTOM-MADE TABLE
41.344"
256.581"
6 Des.
Des.
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
[Sold to, Address, Line #2] 1
Des.4MYNTEX INC.
3
Des.
Date
2
[Sold to, Address, City]
MAIN (BOARD ROOM)
FINAL APPROVAL:
Date
Des.
RGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E.
Date
5 Date
[Sold to, Address, Line #1]
Date
Des.
05/17/16
facilities
design
Date
Date
[Order entry, Dealer
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
PROJECT:
CT
DRAWN BY:
PROJECT NUMBER:
REVISIONS
No.
DATE:
DATE (M/D/Y)
FILE NAME:
DESCRIPTION
+65mm
DATA CENTER
03
6
5
UP
±0,00
01
LOBBY
COJHLC100
COJHLC300
COJHLC100COJHLC100
COJHLC100
M I L L W O R K - S H EL V I N G
LOUNGE ROOM
[Sold to, Address, Line #1] 2 Date
Des.
facilities
design
Date
5
Date
FINAL APPROVAL:
Date
4
1
Date
MYNTEX INC.
Date[Sold to, Address, Line #2]
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
6
05/17/16
Des.
MAIN (LOUNGE ROOM)
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
Des.
Des.
Des.
3
[Order entry, Dealer
Des.
Date
RGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E. [Sold to, Address, City] DATE (M/D/Y)
PROJECT NUMBER:DATE:
PROJECT:
REVISIONSCT
No.DRAWN BY: DESCRIPTION
FILE NAME:
04
CORRIDOR
LOCKER RM.
11
+0,65
08
SOUTH STAIR
AWRF254836
COEL500UPHCOEL500UPH COEL500UPHCOEL500UPH
MILLWORK TABLE
PANTRY/LOUNGE
123.529"
78.490"
80.237"
5
Date
Des.
4
FINAL APPROVAL:
Date
[Sold to, Address, City]
Date
Des.
MYNTEX INC_MAY10-2016_For RENDER.cmdrw 3
facilities
design
[Sold to, Address, Line #2] 05/17/16
2
Des.
MAIN (PANTRY/LOUNGE)
RGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E.
Des.
[Sold to, Address, Line #1]
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
Des.
Date
6
1
Date
Des. Date
PANTRY/LOUNGE
[Order entry, Dealer
MYNTEX INC.
Date
FILE NAME:
DATE:
CT
No.
PROJECT NUMBER:
PROJECT:
DATE (M/D/Y)
REVISIONS
DRAWN BY: DESCRIPTION
NORTH STAIR
SOUTH STAIR
08
ESPRESSO BAR
16
600GAMES RM.
07
14
- ALIGN w/ SLAB EDGE IN BOTH DIRECTIONS
CARPET GRID STARTING POINT
VGC
UP
LANDING
15
UP
300
PT-5
VGC
BTC
28001U COMFLA3
1404M
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
1404M1404M
FPAEC2BIVI
1404M 1404M1404M
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
1404M
FPAEC2BIVI
FPAEC2BIVI
BTC
28001U
FPAEC2BIVI
1404M
TSAEGROM
MEETING RM - 20
FLEXIBLE WORK AREA
WRITABLEWALL
WORKING BAR - 23
COLAB AREA-22
WRITABLECLEARGLASS
FIREPLACE
LOUNGE ROOM - 16
WALL-MOUNTTV
WALL-MOUNTTV(DIRTWALL)
MEETING RM - 21
FILING / STOFILING / STO
40.000" 48.000"
49.642"
29.992"
74.239"
96"
29.992"
FINAL APPROVAL:
[Sold to, Address, Line #1]
Date
Date
Date
2
Desc.
Desc.
6
5
3
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used without
the consent of RGO Office Products Partnership. Contact RGO Facilities
Department for information and application for consent.
This drawing is an electronic emulation of the original record drawing. Details
and dimensions are not guaranteed as accurate and complete and must be
certified on-site prior to design and construction work. This drawing is
designed for furniture installations only.
Desc.
Date
4
Desc.
PROPOSED FURNITURE LAYOUT
Desc.
MYNTEX INC.
1
UPPER FLOOR
Desc.
Date
[Sold to, Address, City]
facilities
[Sold to, Address, Line #2]
Date
RGO OFFICE PRODUCTS
100, 229 - 33 ST. N.E.
05/17/16
Date
DRAWN BY: DESCRIPTION
FILE NAME:
PROJECT NUMBER:
DATE (M/D/Y)
REVISIONS
DATE:
CT
No.
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
[Order entry, Dealer PO
PROJECT:
NORTH STAI
SOUTH STAIR
08
ESPRESSO BAR
16
600
GAMES RM.
07
14
- ALIGN w/ SLAB EDGE IN BOTH DIRECTIO
CARPET GRID STARTIN
VGC
LANDING
15
300
VGC
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
1404M
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
1404M
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
TSAEGROM
MEETING RM - 20
FLEXIBLE WORK AREA
COLAB AREA-22
WALL-MOUNTTV(DIRTWALL)
FILING / STO FILING / STO
29.992"
49.642"
29.992"
74.239"
96" 48.000"40.000"
[Sold to, Address, City]
[Sold to, Address, Line #2]
3
Date
Desc.
FINAL APPROVAL:
1
6 GENERAL NOTES:
This drawing is the property of and may not be reproduced or used without
the consent of RGO Office Products Partnership. Contact RGO Facilities
Department for information and application for consent.
This drawing is an electronic emulation of the original record drawing. Details
and dimensions are not guaranteed as accurate and complete and must be
certified on-site prior to design and construction work. This drawing is
designed for furniture installations only.
Desc.
Date
Date
Desc.
MYNTEX INC.
Date[Sold to, Address, Line #1] 2
Date
Desc.
RGO OFFICE PRODUCTS
100, 229 - 33 ST. N.E.
PROPOSED FURNITURE LAYOUT 5
facilities
05/17/16
FLEXIBLE WORK AREA Desc.
4
Date
Desc.
Date
No.
FILE NAME:
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
CT
DATE (M/D/Y)DRAWN BY:
PROJECT NUMBER:
PROJECT:
REVISIONS
DESCRIPTION
DATE:
[Order entry, Dealer PO
SOUTH STAIR
08
ESPRESSO BAR
16
600
GAMES RM.
07
- ALIGN w/ SLAB EDGE IN B
CARPET
VGC
LANDING
15
300
VGC
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVIFPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
FPAEC2BIVI
TSAEGROM
MEETING RM - 20
FLEXIBLE WORK AREA
COLAB AREA-22
WALL-MOUNTTV(DIRTWALL)
FILING / STO FILING / STO
40.000"
49.642"
29.992"
74.239"
96"
48.000"
29.992"
Date
6
Date
Desc.
Date
Date
4MYNTEX INC.
[Sold to, Address, Line #1]
Desc.
PROPOSED FURNITURE LAYOUT
facilities
05/17/16
FINAL APPROVAL:
Desc.
3
Desc.1
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used without
the consent of RGO Office Products Partnership. Contact RGO Facilities
Department for information and application for consent.
This drawing is an electronic emulation of the original record drawing. Details
and dimensions are not guaranteed as accurate and complete and must be
certified on-site prior to design and construction work. This drawing is
designed for furniture installations only.
2
Desc.
Date
5
Date
[Sold to, Address, Line #2]
Date
[Sold to, Address, City]
FLEXIBLE WORK AREA
RGO OFFICE PRODUCTS
100, 229 - 33 ST. N.E.
Desc.
DATE:
No.
CT
DATE (M/D/Y)
[Order entry, Dealer PO
PROJECT:
REVISIONS
DRAWN BY:
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
DESCRIPTION
PROJECT NUMBER:
FILE NAME:
600
300
COMFLA3
BTC
28001U
MEETING RM - 20
WALL-MOUNTTV(DIRTWALL)
WRITABLEWALL
WALL-MOUNTTV
49.642"
VGC
COMFLA3
BTC
28001U
WRITABLECLEARGLASS
WRITABLEWALL
MEETING RM - 21
WALL-MOUNTTV
74.239"
[Sold to, Address, Line #1]
Date
Date
[Order entry, Dealer
3 Des.
facilities
design
Date
[Sold to, Address, City]
4
MEETING RM - 20
2
Date
MEETING RM - 21
05/17/16[Sold to, Address, Line #2]
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
Des.
6
Des.
5
1
Des.
MYNTEX INC.
RGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E.
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
Date
Des.
Date
Date
Des.
UPPER (MEETING RM-21)
FINAL APPROVAL:
PROJECT:
PROJECT NUMBER:
DESCRIPTION
FILE NAME:
DATE (M/D/Y)DRAWN BY:
DATE:
No.
REVISIONSCT
SOUTH STAIR
08
600
UP
300
1404M 1404M1404M 1404M 1404M 1404M 1404M1404M
WORKING BAR - 23
WRITABLECLEARGLASS
COLAB AREA-22
48.000"40.000"
Date
MYNTEX INC.
Date
2
Date
WORKING BAR - 23
6
COLAB AREA - 22
[Sold to, Address, City]
Des.
UPPER (WORKING BAR & COLAB. AREA)
MYNTEX INC_MAY10-2016_For RENDER.cmdrw
Date
05/17/16
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
[Order entry, Dealer
4
[Sold to, Address, Line #1]
facilities
design
Des.RGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E.
3
Des.
5
Des.
Date
[Sold to, Address, Line #2] 1
Des.
Date
Des.
Date
FINAL APPROVAL: DATE (M/D/Y)DESCRIPTION
REVISIONS
FILE NAME:
CT
DRAWN BY:
PROJECT NUMBER:DATE:
No.
PROJECT:
NORTH STAIR
14
- ALIGN w/ SLAB EDGE IN BOTH DIRECTIONS
CARPET GRID STARTING POINT
UP
LANDING
15
FIREPLACE
LOUNGE ROOM - 16
UPPER (FLEXIBLE WORK AREA)
Date
4
3
Des.
Des.
Des. DateRGO OFFICE PRODUCTS
100, 229 - 33 STREET. N.E.
[Sold to, Address, Line #2]
facilities
design
[Sold to, Address, City]
[Sold to, Address, Line #1]
Date
Des. DateMYNTEX INC_MAY10-2016_For RENDER.cmdrw
Des.
GENERAL NOTES:
This drawing is the property of and may not be reproduced or used
without the consent of RGO Office Products Partnership. Contact
RGO Facilities Department for information and application for
consent.
This drawing is an electronic emulation of the original record
drawing. Details and dimensions are not guaranteed as accurate
and complete and must be certified on-site prior to design and
construction work. This drawing is designed for furniture
Date
2
Date
MYNTEX INC.
FINAL APPROVAL:
6
5
[Order entry, Dealer05/17/16 1
DateDes.
DRAWN BY: DESCRIPTION
CT REVISIONS
DATE (M/D/Y)No.
PROJECT:
FILE NAME:
DATE: PROJECT NUMBER:

More Related Content

What's hot

Demo for building design extension no.4
Demo for building design extension no.4Demo for building design extension no.4
Demo for building design extension no.4
Miguel Zamarripa
 
Demo for building design extension no.8
Demo for building design extension no.8Demo for building design extension no.8
Demo for building design extension no.8
Miguel Zamarripa
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORK
Noel Carroll
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des Drawings
AustinAyo
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6Officedesigncontinue
Christopher Baker
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
Christopher Bruner
 
Basement finish package
Basement finish packageBasement finish package
Basement finish package
Stan Perlinski
 
Demo for building design extension no.5
Demo for building design extension no.5Demo for building design extension no.5
Demo for building design extension no.5
Miguel Zamarripa
 
Eden Price List
Eden Price ListEden Price List
Eden Price List
Toni Enderli
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
Martin Pauly
 
Item # 8 934 Patterson The Argyle
Item # 8  934 Patterson The ArgyleItem # 8  934 Patterson The Argyle
Item # 8 934 Patterson The Argyle
ahcitycouncil
 
Construction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation SlidesConstruction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation Slides
SlideTeam
 
Park West Presentation Kit
Park West Presentation KitPark West Presentation Kit
Park West Presentation Kit
sevenseaspropertycorp
 
03 drawings stormwater drainage
03 drawings   stormwater drainage03 drawings   stormwater drainage
03 drawings stormwater drainage
SylvesterRakgate1
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
Richard Clark
 

What's hot (15)

Demo for building design extension no.4
Demo for building design extension no.4Demo for building design extension no.4
Demo for building design extension no.4
 
Demo for building design extension no.8
Demo for building design extension no.8Demo for building design extension no.8
Demo for building design extension no.8
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORK
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des Drawings
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6Officedesigncontinue
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
Basement finish package
Basement finish packageBasement finish package
Basement finish package
 
Demo for building design extension no.5
Demo for building design extension no.5Demo for building design extension no.5
Demo for building design extension no.5
 
Eden Price List
Eden Price ListEden Price List
Eden Price List
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
Item # 8 934 Patterson The Argyle
Item # 8  934 Patterson The ArgyleItem # 8  934 Patterson The Argyle
Item # 8 934 Patterson The Argyle
 
Construction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation SlidesConstruction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation Slides
 
Park West Presentation Kit
Park West Presentation KitPark West Presentation Kit
Park West Presentation Kit
 
03 drawings stormwater drainage
03 drawings   stormwater drainage03 drawings   stormwater drainage
03 drawings stormwater drainage
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
 

Viewers also liked

Visual Dictionary- Bark1
Visual Dictionary- Bark1Visual Dictionary- Bark1
Visual Dictionary- Bark1
bark1
 
General civil note 1
General civil note 1General civil note 1
General civil note 1
Shweyee Win
 
Focus four hazards_english
Focus four hazards_englishFocus four hazards_english
Focus four hazards_english
Shane Johns
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four Ppp
FFSafety
 
Fall protection checklist usace
Fall protection checklist usaceFall protection checklist usace
Fall protection checklist usace
Emmanuel Omeike (CSP,CMIOSH,CRSP)
 
Scaffold & fall arest checklist
Scaffold & fall arest checklistScaffold & fall arest checklist
Scaffold & fall arest checklist
Azmeel Contracting Company
 
Candy Construction Estimating and Valuations
Candy Construction Estimating and ValuationsCandy Construction Estimating and Valuations
Candy Construction Estimating and Valuations
Osama El-Shafiey
 
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
Specialty Technical Publishers
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry Construction
Scott Conwell, FAIA, FCSI
 
Form scaffold-inspection-report-tube-fitting-scaffolds
Form scaffold-inspection-report-tube-fitting-scaffoldsForm scaffold-inspection-report-tube-fitting-scaffolds
Form scaffold-inspection-report-tube-fitting-scaffolds
Celso Carvalho
 
Construction law basics 1103041
Construction law basics 1103041Construction law basics 1103041
Construction law basics 1103041
Dan Schleck
 
Top 16 Construction Hazards
Top 16 Construction HazardsTop 16 Construction Hazards
Top 16 Construction Hazards
Protection
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
Protection
 
Elements of a Safe Scaffold
Elements of a Safe ScaffoldElements of a Safe Scaffold
Elements of a Safe Scaffold
Protection
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
elliotfus
 
Masonry Detailing Series v.3.4
Masonry Detailing Series v.3.4Masonry Detailing Series v.3.4
Masonry Detailing Series v.3.4
Scott Conwell, FAIA, FCSI
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
kaolapenang
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation Safety
Protection
 
978 التصميمات التنفيذية
978 التصميمات التنفيذية978 التصميمات التنفيذية
978 التصميمات التنفيذية
Alaa Altaie
 
Unit 1 the role of housekeeping in hospitality operations
Unit 1   the role of housekeeping in hospitality operationsUnit 1   the role of housekeeping in hospitality operations
Unit 1 the role of housekeeping in hospitality operations
Nicole Hay-Walters
 

Viewers also liked (20)

Visual Dictionary- Bark1
Visual Dictionary- Bark1Visual Dictionary- Bark1
Visual Dictionary- Bark1
 
General civil note 1
General civil note 1General civil note 1
General civil note 1
 
Focus four hazards_english
Focus four hazards_englishFocus four hazards_english
Focus four hazards_english
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four Ppp
 
Fall protection checklist usace
Fall protection checklist usaceFall protection checklist usace
Fall protection checklist usace
 
Scaffold & fall arest checklist
Scaffold & fall arest checklistScaffold & fall arest checklist
Scaffold & fall arest checklist
 
Candy Construction Estimating and Valuations
Candy Construction Estimating and ValuationsCandy Construction Estimating and Valuations
Candy Construction Estimating and Valuations
 
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
OSHA Auditing: Federal Compliance: Construction: The Complete Health and Safe...
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry Construction
 
Form scaffold-inspection-report-tube-fitting-scaffolds
Form scaffold-inspection-report-tube-fitting-scaffoldsForm scaffold-inspection-report-tube-fitting-scaffolds
Form scaffold-inspection-report-tube-fitting-scaffolds
 
Construction law basics 1103041
Construction law basics 1103041Construction law basics 1103041
Construction law basics 1103041
 
Top 16 Construction Hazards
Top 16 Construction HazardsTop 16 Construction Hazards
Top 16 Construction Hazards
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
 
Elements of a Safe Scaffold
Elements of a Safe ScaffoldElements of a Safe Scaffold
Elements of a Safe Scaffold
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Masonry Detailing Series v.3.4
Masonry Detailing Series v.3.4Masonry Detailing Series v.3.4
Masonry Detailing Series v.3.4
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation Safety
 
978 التصميمات التنفيذية
978 التصميمات التنفيذية978 التصميمات التنفيذية
978 التصميمات التنفيذية
 
Unit 1 the role of housekeeping in hospitality operations
Unit 1   the role of housekeeping in hospitality operationsUnit 1   the role of housekeeping in hospitality operations
Unit 1 the role of housekeeping in hospitality operations
 

Similar to MYNTEX INC_Furniture LAyout_MAY16-2016

Mahagun Mantra | Mahagun Mantra Greater Noida West
Mahagun Mantra | Mahagun Mantra Greater Noida West Mahagun Mantra | Mahagun Mantra Greater Noida West
Mahagun Mantra | Mahagun Mantra Greater Noida West
Rahul John
 
MICHELLE SCOTT DESIGN, LLC. – Corporate Identities
MICHELLE SCOTT DESIGN, LLC. – Corporate IdentitiesMICHELLE SCOTT DESIGN, LLC. – Corporate Identities
MICHELLE SCOTT DESIGN, LLC. – Corporate Identities
Michelle Scott
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
syedaliabl2023
 
Portfolio Final Edit.pdf
Portfolio Final Edit.pdfPortfolio Final Edit.pdf
Portfolio Final Edit.pdf
FinaDamastuti1
 
LINKS CAFE - Online publishing version
LINKS CAFE  -  Online publishing versionLINKS CAFE  -  Online publishing version
LINKS CAFE - Online publishing version
M. A. Architect
 
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
Ilia Mayer, P.Eng, PMP
 
RE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WMRE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WM
Petko Georgiev
 
2351 E 22ND ST (1)
2351 E 22ND ST (1)2351 E 22ND ST (1)
2351 E 22ND ST (1)
Richard Fisher
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
Jayson Ang
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
Dennis Ramm
 
Dick Smith
Dick SmithDick Smith
Dick Smith
Mike Darwich
 
Lisbon Renovation
Lisbon RenovationLisbon Renovation
Lisbon Renovation
Sergio Medina
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
NIZAM ISMAIL
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
amity university
 
A1.pdf
A1.pdfA1.pdf
Bim course in coimbatore, cadd centre coimbatore
Bim course in coimbatore, cadd centre coimbatoreBim course in coimbatore, cadd centre coimbatore
Bim course in coimbatore, cadd centre coimbatore
caddcbe1
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
Hai Nguyen
 
Bim course in coimbatore, bim training in coimbatore
Bim course in coimbatore, bim training in coimbatoreBim course in coimbatore, bim training in coimbatore
Bim course in coimbatore, bim training in coimbatore
caddcbe1
 
E1.pdf
E1.pdfE1.pdf
Beach house sheets
Beach house sheetsBeach house sheets
Beach house sheets
Miguel Zamarripa
 

Similar to MYNTEX INC_Furniture LAyout_MAY16-2016 (20)

Mahagun Mantra | Mahagun Mantra Greater Noida West
Mahagun Mantra | Mahagun Mantra Greater Noida West Mahagun Mantra | Mahagun Mantra Greater Noida West
Mahagun Mantra | Mahagun Mantra Greater Noida West
 
MICHELLE SCOTT DESIGN, LLC. – Corporate Identities
MICHELLE SCOTT DESIGN, LLC. – Corporate IdentitiesMICHELLE SCOTT DESIGN, LLC. – Corporate Identities
MICHELLE SCOTT DESIGN, LLC. – Corporate Identities
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
Portfolio Final Edit.pdf
Portfolio Final Edit.pdfPortfolio Final Edit.pdf
Portfolio Final Edit.pdf
 
LINKS CAFE - Online publishing version
LINKS CAFE  -  Online publishing versionLINKS CAFE  -  Online publishing version
LINKS CAFE - Online publishing version
 
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
 
RE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WMRE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WM
 
2351 E 22ND ST (1)
2351 E 22ND ST (1)2351 E 22ND ST (1)
2351 E 22ND ST (1)
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Lisbon Renovation
Lisbon RenovationLisbon Renovation
Lisbon Renovation
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
A1.pdf
A1.pdfA1.pdf
A1.pdf
 
Bim course in coimbatore, cadd centre coimbatore
Bim course in coimbatore, cadd centre coimbatoreBim course in coimbatore, cadd centre coimbatore
Bim course in coimbatore, cadd centre coimbatore
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Bim course in coimbatore, bim training in coimbatore
Bim course in coimbatore, bim training in coimbatoreBim course in coimbatore, bim training in coimbatore
Bim course in coimbatore, bim training in coimbatore
 
E1.pdf
E1.pdfE1.pdf
E1.pdf
 
Beach house sheets
Beach house sheetsBeach house sheets
Beach house sheets
 

MYNTEX INC_Furniture LAyout_MAY16-2016

  • 1. CORRIDOR 04 06 ELEC. RM. GAMES RM. 07 SOUTH STAIR 08 CLOSET UP 12 WC-F 0305 DATA CENTER LOCKER RM. +65mm 11 ±0,00 01 LOBBY +0,65 PT-5 COJHLC100 COJHLC300 COEL500UPH AWRF254836 COEL500UPH COJHLC100 COJHLC100 COJHLC100 COEL500UPHCOEL500UPH MILLWORK TABLE M I L L W O R K - S H EL V I N G BOARD ROOM PANTRY/LOUNGE LOUNGE ROOM MAIN FLOOR CUSTOM-MADE TABLE78.490" 256.581" 123.529" 41.344" 80.237" Desc. GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture installations only. Desc. FINAL APPROVAL: PROPOSED FURNITURE LAYOUT MYNTEX INC. [Sold to, Address, Line #1] 05/17/16 Desc. 2 Date 3 Date Date Desc. 6 [Sold to, Address, City] RGO OFFICE PRODUCTS 100, 229 - 33 ST. N.E. MAIN FLOOR Desc. [Sold to, Address, Line #2] Date Date Date Date 5 1 facilities Desc.4 CT DATE (M/D/Y) REVISIONS No. [Order entry, Dealer PO PROJECT NUMBER: DRAWN BY: FILE NAME: PROJECT: DATE: MYNTEX INC_MAY10-2016_For RENDER.cmdrw DESCRIPTION
  • 2. +65mm WC-F 12 UP ±0,00 01 LOBBY BOARD ROOM CUSTOM-MADE TABLE 41.344" 256.581" 6 Des. Des. GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture [Sold to, Address, Line #2] 1 Des.4MYNTEX INC. 3 Des. Date 2 [Sold to, Address, City] MAIN (BOARD ROOM) FINAL APPROVAL: Date Des. RGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. Date 5 Date [Sold to, Address, Line #1] Date Des. 05/17/16 facilities design Date Date [Order entry, Dealer MYNTEX INC_MAY10-2016_For RENDER.cmdrw PROJECT: CT DRAWN BY: PROJECT NUMBER: REVISIONS No. DATE: DATE (M/D/Y) FILE NAME: DESCRIPTION
  • 3. +65mm DATA CENTER 03 6 5 UP ±0,00 01 LOBBY COJHLC100 COJHLC300 COJHLC100COJHLC100 COJHLC100 M I L L W O R K - S H EL V I N G LOUNGE ROOM [Sold to, Address, Line #1] 2 Date Des. facilities design Date 5 Date FINAL APPROVAL: Date 4 1 Date MYNTEX INC. Date[Sold to, Address, Line #2] GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture 6 05/17/16 Des. MAIN (LOUNGE ROOM) MYNTEX INC_MAY10-2016_For RENDER.cmdrw Des. Des. Des. 3 [Order entry, Dealer Des. Date RGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. [Sold to, Address, City] DATE (M/D/Y) PROJECT NUMBER:DATE: PROJECT: REVISIONSCT No.DRAWN BY: DESCRIPTION FILE NAME:
  • 4. 04 CORRIDOR LOCKER RM. 11 +0,65 08 SOUTH STAIR AWRF254836 COEL500UPHCOEL500UPH COEL500UPHCOEL500UPH MILLWORK TABLE PANTRY/LOUNGE 123.529" 78.490" 80.237" 5 Date Des. 4 FINAL APPROVAL: Date [Sold to, Address, City] Date Des. MYNTEX INC_MAY10-2016_For RENDER.cmdrw 3 facilities design [Sold to, Address, Line #2] 05/17/16 2 Des. MAIN (PANTRY/LOUNGE) RGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. Des. [Sold to, Address, Line #1] GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture Des. Date 6 1 Date Des. Date PANTRY/LOUNGE [Order entry, Dealer MYNTEX INC. Date FILE NAME: DATE: CT No. PROJECT NUMBER: PROJECT: DATE (M/D/Y) REVISIONS DRAWN BY: DESCRIPTION
  • 5. NORTH STAIR SOUTH STAIR 08 ESPRESSO BAR 16 600GAMES RM. 07 14 - ALIGN w/ SLAB EDGE IN BOTH DIRECTIONS CARPET GRID STARTING POINT VGC UP LANDING 15 UP 300 PT-5 VGC BTC 28001U COMFLA3 1404M FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI 1404M1404M FPAEC2BIVI 1404M 1404M1404M FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI 1404M FPAEC2BIVI FPAEC2BIVI BTC 28001U FPAEC2BIVI 1404M TSAEGROM MEETING RM - 20 FLEXIBLE WORK AREA WRITABLEWALL WORKING BAR - 23 COLAB AREA-22 WRITABLECLEARGLASS FIREPLACE LOUNGE ROOM - 16 WALL-MOUNTTV WALL-MOUNTTV(DIRTWALL) MEETING RM - 21 FILING / STOFILING / STO 40.000" 48.000" 49.642" 29.992" 74.239" 96" 29.992" FINAL APPROVAL: [Sold to, Address, Line #1] Date Date Date 2 Desc. Desc. 6 5 3 GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture installations only. Desc. Date 4 Desc. PROPOSED FURNITURE LAYOUT Desc. MYNTEX INC. 1 UPPER FLOOR Desc. Date [Sold to, Address, City] facilities [Sold to, Address, Line #2] Date RGO OFFICE PRODUCTS 100, 229 - 33 ST. N.E. 05/17/16 Date DRAWN BY: DESCRIPTION FILE NAME: PROJECT NUMBER: DATE (M/D/Y) REVISIONS DATE: CT No. MYNTEX INC_MAY10-2016_For RENDER.cmdrw [Order entry, Dealer PO PROJECT:
  • 6. NORTH STAI SOUTH STAIR 08 ESPRESSO BAR 16 600 GAMES RM. 07 14 - ALIGN w/ SLAB EDGE IN BOTH DIRECTIO CARPET GRID STARTIN VGC LANDING 15 300 VGC FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI 1404M FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI 1404M FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI TSAEGROM MEETING RM - 20 FLEXIBLE WORK AREA COLAB AREA-22 WALL-MOUNTTV(DIRTWALL) FILING / STO FILING / STO 29.992" 49.642" 29.992" 74.239" 96" 48.000"40.000" [Sold to, Address, City] [Sold to, Address, Line #2] 3 Date Desc. FINAL APPROVAL: 1 6 GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture installations only. Desc. Date Date Desc. MYNTEX INC. Date[Sold to, Address, Line #1] 2 Date Desc. RGO OFFICE PRODUCTS 100, 229 - 33 ST. N.E. PROPOSED FURNITURE LAYOUT 5 facilities 05/17/16 FLEXIBLE WORK AREA Desc. 4 Date Desc. Date No. FILE NAME: MYNTEX INC_MAY10-2016_For RENDER.cmdrw CT DATE (M/D/Y)DRAWN BY: PROJECT NUMBER: PROJECT: REVISIONS DESCRIPTION DATE: [Order entry, Dealer PO
  • 7. SOUTH STAIR 08 ESPRESSO BAR 16 600 GAMES RM. 07 - ALIGN w/ SLAB EDGE IN B CARPET VGC LANDING 15 300 VGC FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVIFPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI FPAEC2BIVI TSAEGROM MEETING RM - 20 FLEXIBLE WORK AREA COLAB AREA-22 WALL-MOUNTTV(DIRTWALL) FILING / STO FILING / STO 40.000" 49.642" 29.992" 74.239" 96" 48.000" 29.992" Date 6 Date Desc. Date Date 4MYNTEX INC. [Sold to, Address, Line #1] Desc. PROPOSED FURNITURE LAYOUT facilities 05/17/16 FINAL APPROVAL: Desc. 3 Desc.1 GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture installations only. 2 Desc. Date 5 Date [Sold to, Address, Line #2] Date [Sold to, Address, City] FLEXIBLE WORK AREA RGO OFFICE PRODUCTS 100, 229 - 33 ST. N.E. Desc. DATE: No. CT DATE (M/D/Y) [Order entry, Dealer PO PROJECT: REVISIONS DRAWN BY: MYNTEX INC_MAY10-2016_For RENDER.cmdrw DESCRIPTION PROJECT NUMBER: FILE NAME:
  • 8. 600 300 COMFLA3 BTC 28001U MEETING RM - 20 WALL-MOUNTTV(DIRTWALL) WRITABLEWALL WALL-MOUNTTV 49.642" VGC COMFLA3 BTC 28001U WRITABLECLEARGLASS WRITABLEWALL MEETING RM - 21 WALL-MOUNTTV 74.239" [Sold to, Address, Line #1] Date Date [Order entry, Dealer 3 Des. facilities design Date [Sold to, Address, City] 4 MEETING RM - 20 2 Date MEETING RM - 21 05/17/16[Sold to, Address, Line #2] GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture Des. 6 Des. 5 1 Des. MYNTEX INC. RGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. MYNTEX INC_MAY10-2016_For RENDER.cmdrw Date Des. Date Date Des. UPPER (MEETING RM-21) FINAL APPROVAL: PROJECT: PROJECT NUMBER: DESCRIPTION FILE NAME: DATE (M/D/Y)DRAWN BY: DATE: No. REVISIONSCT
  • 9. SOUTH STAIR 08 600 UP 300 1404M 1404M1404M 1404M 1404M 1404M 1404M1404M WORKING BAR - 23 WRITABLECLEARGLASS COLAB AREA-22 48.000"40.000" Date MYNTEX INC. Date 2 Date WORKING BAR - 23 6 COLAB AREA - 22 [Sold to, Address, City] Des. UPPER (WORKING BAR & COLAB. AREA) MYNTEX INC_MAY10-2016_For RENDER.cmdrw Date 05/17/16 GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture [Order entry, Dealer 4 [Sold to, Address, Line #1] facilities design Des.RGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. 3 Des. 5 Des. Date [Sold to, Address, Line #2] 1 Des. Date Des. Date FINAL APPROVAL: DATE (M/D/Y)DESCRIPTION REVISIONS FILE NAME: CT DRAWN BY: PROJECT NUMBER:DATE: No. PROJECT:
  • 10. NORTH STAIR 14 - ALIGN w/ SLAB EDGE IN BOTH DIRECTIONS CARPET GRID STARTING POINT UP LANDING 15 FIREPLACE LOUNGE ROOM - 16 UPPER (FLEXIBLE WORK AREA) Date 4 3 Des. Des. Des. DateRGO OFFICE PRODUCTS 100, 229 - 33 STREET. N.E. [Sold to, Address, Line #2] facilities design [Sold to, Address, City] [Sold to, Address, Line #1] Date Des. DateMYNTEX INC_MAY10-2016_For RENDER.cmdrw Des. GENERAL NOTES: This drawing is the property of and may not be reproduced or used without the consent of RGO Office Products Partnership. Contact RGO Facilities Department for information and application for consent. This drawing is an electronic emulation of the original record drawing. Details and dimensions are not guaranteed as accurate and complete and must be certified on-site prior to design and construction work. This drawing is designed for furniture Date 2 Date MYNTEX INC. FINAL APPROVAL: 6 5 [Order entry, Dealer05/17/16 1 DateDes. DRAWN BY: DESCRIPTION CT REVISIONS DATE (M/D/Y)No. PROJECT: FILE NAME: DATE: PROJECT NUMBER: