SlideShare a Scribd company logo
Project :
Project Number :
Project Issue Date :
Drawings Statues :
documents type includes :
Project Owner :
Location :
documents Approvals
Project Engineer Date
Deputy Director Date
Director Date
Project Manager Date
Project use :
Links Cafe
S-03
30-Apr-2024
to be confirmed
-Interior Design
-Working Drawings
C.L.C.
Damietta Gov.- New
Damietta-District
5-Avenue 29-Nagar
St.-29/39
Designed
By
:
Mohannad
Rabea
A.Ullah
Drawn
By
:
Mohannad
Rabea
A.Ullah
Entertainment
Cafe Lab Collaboration
Notes
Date : 02/06/24
Designed By :
Designer
Project : Links Cafe
Project Number : S-03
Sheet No :
A-01.1
Owner : C.L.C.
Drawn By :
Mohannad Rabea
A.Ullah
A. Cover & Info.
01. Info. 2
B. Design Package
00. Cover 1
01. 3D 4
02. Plan 1
03. 3D details 5
C. Technical Package
00. Cover 1
01. Plans 8
02. Elevations 5
03. Sections 5
04. Doors & Windows 2
05.Detail 5
06 .Ceiling Details 6
07. Furniture details 17
Sheets numbering system
General sheets
P-03.1
Package Code Sheet. NO
Sheet. Series
Notes
Date : 02/06/24
Designed By :
Mohannad Rabea
A.Ullah
Project : Links Cafe
Project Number : S-03
Sheet No :
A-01.2
Owner : C.L.C.
Drawn By :
Mohannad Rabea
A.Ullah
City : New Damietta
Address: District 5-Avenue 29-Nagar St.-29/39
Mohannad Rabea A.Ullah
Designed & Drawn By :
Year : Building No :
2024
Project Type :
Project status : Project Area :
260m2
to be confirmed
cafe
29/39
Revit 2024
Software used :
Project target :
Interior Design
Notes
Date : 02/06/24
Designed By :
Mohannad Rabea
A.Ullah
Project : Links Cafe
Project Number : S-03
Sheet No :
B-00
Owner : C.L.C.
Drawn By :
Mohannad Rabea
A.Ullah
00. Cover
B-00 Design Package Cover
01. 3D
B-01.1 3D plan
B-01.2 3D plan
B-01.3 3D plan
B-01.4 Perspective View
02. Plan
B-02.1 plan
03. 3D details
B-03.1 3D s zone
B-03.2 3D back Sofa zone
B-03.3 bar zone
B-03.4 3D restrooms
B-03.5 3D Ceiling
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-01.1
Sheet : 3D
plan
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-01.2
Sheet : 3D
plan
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-01.3
Sheet : 3D
plan
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-01.4
Sheet :
Perspective
View
Social Zone
Catering
Restroom
Store room
kitchen
Soft Seats Soft Seats
pastry & bakery
Entrance zone
Dinning Area
Catering Service
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : B-02.1
Sheet : plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-03.1
Sheet : 3D s
zone
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-03.2
Sheet : 3D
back Sofa
zone
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-03.3
Sheet : bar
zone
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-03.4
Sheet : 3D
restrooms
Date
:
01/02/24
Designed
By
:
Mohannad
Rabea
A.Ullah
Project
:
Links
Cafe
Owner
:
C.L.C.
Project
Number
:
S-03
No : B-03.5
Sheet : 3D
Ceiling
1
View Name
Sheet Number
1t
1i
1
A101
Section Name
1t
TD1
1i
1t
1t
1t
M1M
Elevation
Section
Door Tag
Spot Level
Lighting Tag
Curtain wall Tag
Hidden Lighting Tag
Furniture Tag
Window Tag
Air Terminal Tag
Type mark
supply
direction
return
direction
Both
direction
Type mark
Type mark
Lighting mark
Lighting mark
Lighting mark
Level Elevation
Lighting mark
Detail No
on Sheet
Sheet No
Detail No
on Sheet
Sheet No
Notes
Date : 02/06/24
Designed By :
Mohannad Rabea
A.Ullah
Project : Links Cafe
Project Number : S-03
Sheet No :
C-00
Owner : C.L.C.
Drawn By :
Mohannad Rabea
A.Ullah
Technical Package Index
Sheet
Number Sheet Name Scale
00. Cover
C-00 Technical Package Cover
01. Plans
C-01.1 As built 1 :50
C-01.2 Demolition 1 :50
C-01.3 Plan 1 :50
C-01.4 Plan - Service zone 1 :25
C-01.6 Reflected Ceiling Plan 1 :50
C-01.7 Flooring Plan 1 :50
C-01.D1 Materials & Keys for Flooring -
C-01.D2 Materials & Keys for Reflected
Ceiling Plan
-
02. Elevations
C-02.01 Elevations 1-A & 1-C 1 :35
C-02.02 Elevations 1-B & 1-D 1 :35
C-02.03 Elevations 2-A & 2-C 1 :35
C-02.04 Elevations 2-B & 2-D 1 :35
C-02.D1 Materials & Keys for Elevations -
03. Sections
C-03.1 Section A-A & Section B-B 1 :30
C-03.2 Section C-C 7 & Section D-D 1 :30
C-03.3 Section E-E 7 & Section F-F 1 :30
C-03.4 Section G-G 7 & Section H-H 1 :20
C-03.D1 Materials & Keys for Sections -
04. Doors & Windows
C-04.1 Curtain wall windows 1 :20
C-04.2 Doors and windows 1 :20
05.Detail
C-05.1 Stickers 1 :10
C-05.2 Stickers 1 :15
C-05.3 Recessed part 1 :10
C-05.4 Skeleton for Deconstructivism wall
detail
1 :15
C-05.5 WC Details 1 :10, 1 :5
06 .Ceiling Details
C-06.1 Rigging points 1 :50
C-06.2 Wall support height 1 :50
C-06.3 upper bar ceiling - Main points
support
1 :50
C-06.4 upper ceiling bar - inner sector 1 :15
C-06.5 Ceiling Details 1 :5
C-06.6 Linear Lighting Integration Ceiling
Plan
1 :50
07. Furniture details
C-07.1 Furniture Marking plan 1 :50
C-07.2 bar 1 :20
C-07.2-1 Bar - B1 -1 1 :20
Technical Package Index
Sheet
Number Sheet Name Scale
C-07.2-2 Bar - B1 -2 1 :10, 1 :5
C-07.2-3 Bar - B2 1 :20
C-07.3 The Wing Armchair 1 :5
C-07.4 flower pots wall 1 :20
C-07.5 Sink Mirror 1 :10, 1 :5
C-07.6 Wall Mirror 1 :10
C-07.7 Fixed Flower box 1 :25
C-07.8 Deconstructivism Sofa 1 :10
C-07.9 Deconstructivism Sofa Left corner 1 :20
C-07.10 Deconstructivism Sofa Right
corner
1 :20
C-07.11 Social zone seats 1 :15
C-07.12 Main Table 1 :5
C-07.13 Low Table 1 :10
C-07.D1 Furniture Materials -
SYMBOLS LEGEND
General notes
Abbreviation index
1. These drawings are revit files. Should not be altered by any
softwares without prior notice
2. All levels are in meters
3. All dimensions used to be verified on site. Any discrepancies should
be notified
4. All work is to be completed in strict accordance with all applicable
codes, ordinances and Regulations.
5. Prior to beginning work in any area, all existing conditions and
dimensions are to be verifiedi n field. Any discrepancies between the
architectural drawings and specifications and Existing conditions are
to be reported to the architect prior to proceeding with the work.
6. All existing elements are to be protected from damage during
construction. Any damage is To be repaired or replaced by the
responsible trade at their own expense.
7. Contractor to indentify all utility locations prior to beginning work.
8. Contractor shall seal all penetrations in exterior wall and roof
assemblies with appropriate joint sealant(s) and flashing(s) to
maintain a weathertight and airtight Building envelope. All joints and
penetrations shall be sealed, gasketed, or weather-stripped to
minimize air leakage, including the following:
A. Joints around fenestration and door frames.
B. Junctions between walls and foundations, between walls at
building corners, between walls and floors or roofs, and
between walls and roof or wall panels.
C. Openings at penetrations of utility services through roofs,
walls, and floors.
D. Joints, seams, and penetrations of vapor retarders.
E. All other openings in the building envelope
9. The letters I, o, and q are not used to indicate sections or Elevations.
10.
11. All sleeves, openings, etc. For conduit, pipes, ducts, etc. (outside of
rated chases) through floor slabs, smoke Partitions and rated
partitions are to be fire sealed in Accordance with fire rated
assembly designs, applicable Codes and fire marshall’s
requirements.
12. Refer to drawings of each trade or discipline for additional general
notes and information, including civil/site development, architectural,
structural, mechanical, Plumbing, fire protection and electrical.
13. These drawings shall not be scaled to obtain dimensions. If the
dimensions cannot be determined by the information given, the
contractor shall request clarification from The architect.
14. The list of abbreviations is shown as a guide only and does not
necessarily include all abbreviations used. Other abbreviations may
be found among the drawings.
15. Refer to this sheet for architectural abbreviations.
• ACT
• CFP
• CTB
• CT
• CONC
• EP
• EXP
• GL
• GR
• LVT
• MTL
• PEMB
• PNT
• RB
• SHT
• SS
• SSTL
ACOUSTIC CEILING PANEL
COLOR FLUORO-POLYMER
CERAMIC TILE BASE
CERAMIC TILE
CONCRETE
EPOXY
EXPOSED
GLASS
GROUT
LUXURY VINYL TILE
METAL
PRE-ENGINEERED MTL BLDG
PAINT
RUBBER BASE
INTERIOR SHEATHING
SOLID SURFACE STAINLESS
STEEL
7
6
5
4
3
2
1
14.611
0.850 2.000
0.590
0.200 15.960
10.800
3.810
14.900 4.700
3.611
0.510
0.800
2.300
1.650
27
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-01.1
Sheet : As built
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
As built
2 Demolish
1 remove
3 remove
0.675
0.595
2.210
0.595
0.170
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-01.2
Sheet : Demolition
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Demolition
D no. note
1 Remove the door for reuse
later
2 demolish a wall
3 remove parts of the wall to
add some fixture
1 : 50
Demolition Plan
1
20.000
15.010
15.960
2.728 0.475 5.973 0.475 6.033 0.275
7.170
3.640
0.410 2.880 0.350
0.416
6.605
0.395
0.290 6.018 0.475 4.651
11.434
2.668 0.468 4.658 8.166
1.374
1.674
1
.
3
0
6
0
.
6
3
8
0.395
6.600
7.615
1.374
3.221
2.863
2.588 0.275
10.980
0.410
1.440 1.575 1.235
2.400
2.000
0.126
0.810
1.464
2.356
1.591
2.051
1.043
1
.
2
2
7
0
.
4
5
6
2.400
2.500
1.160
4.250
4.816
1.868 1.983
1.040 0.828
1.680
1.340
3.020
0.958 1.035
3.020
0.420
1.260
1.340
0.379
0.810
0.152
0.379
0.810
0.152
14.610
1
Elevation 1 - A
C-02.01
2
Elevation
1
-
D
C-02.02
2
Elevation 1 - C
C-02.01
1
Elevation 2 - a
C-02.03
2 Elevation
2
-
D
C-02.04
1
Elevation
2
-
B
C-02.04
2
Elevation 2 - c
C-02.03
1
C-03.1
A
2
C-03.1
B
1
C-03.2
C
2
C-03.2
D
1
C-03.3
E
1
C-01.4
1.200
D3
D4 D4
D1
19
W1 W2 W3
1
Elevation
1
-
B
C-02.02
0.160 2.400 0.176 0.140 5.700 0.141 0.126 5.800 0.130
1
C-03.4
G
2
C-03.3
F
2
C-03.4
H
1
C-07.4
P
D2
1
C-05.4
Section 1
2
C-05.4
Section 2
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-01.3
Sheet : Plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Door Schedule
Type
Mark
Dimensions
Comments
Width Height
D1 1.950 2.125
D2 0.900 2.200
D3 0.810 2.080 Existing door
D4 0.810 2.080
all walls finsh in elevations
sheets
1
C-03.1
A
2
C-03.1
B
1
C-03.2
C
2
C-03.2
D
1
C-03.3
E
1.470
4.567
1.579
1.274
3.221
2.863
2.588 0.475
1.440 1.575 1.235
2.500
2.000
0.126
0.810
1.464
2.356
1.579
2.051
1.218
2.400
2.500
1.160
4.250
4.816
1.868
1.983
1.040 0.828
1.680
1.340
3.020
0.958 1.035
3.020
0.420
1.260
1.340
0.379
0.810
0.152
0.379
0.810
0.152
1
C-03.4
G
2
C-03.3
F
2
C-03.4
H
0.400 1.791 0.400
1
C-07.4
P
D4 D4
D3
D2
Notes :-
Scale : 1 : 25
Date : 01/02/24
No : C-01.4
Sheet : Plan - Service zone
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 25
Plan - Service zone
H1
H1
H1 H1
H1
LW1
LW1
LW1
LW1
LW1
LW1
LW1
LW1
LW1
LW1 LW1
LW1
LW1
LW1
LW1
LW1
LW1
LW1
LW1
LC2
LC2
LC2
LB1
LB1
LB1
LB1
LB1 LB1
LC3 LC3 LC3 LC3
LB3
LB3
LB3 LB3
CW3
MM1
CSB
GB2
CW3
CW4
GB1
GB1
GB1
GB1
GB2
HL2
HL2 HL2
R1 R1 R1
R1
R1
R1
R1
R1
R1
R1
R1
R1
R1
R1 R1 R1
R1
R1
R1
R1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S2 S2
S2 S2
RS
RS
RS
RS
S2 RS
RS
RS
RS
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-01.6
Sheet : Reflected Ceiling Plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
Reflected Ceiling Plan
Lighting Fixture Schedule
Mark Type
H1 Deconstructivism Lamp Box
LB1 slant lighting
LB3 TASK S rectangle
LC2 4 cups light
LC3 Liner wood - concrete
LW1 Wood Lamp
SL1 Light bar
All data used acorrding to mep engnineer
Air Terminal Schedule
Type
Mark Count Description
R1 20 A linear diffuser module of
dimensions A(1M) x 2 Slots , with
180° pattern controller adjustment.
Both the direction and volume of
Return air can be adjusted by
manual or digital controllers.
RS 8 Concealed Mounting A square
diffuser module of dimensions
A(.3M) with 180° pattern controller
adjustment. Combination Supply
-Return Directional Diffuser.
S1 16 A linear diffuser module of
dimensions A(1.8M) x 8 Slots , with
180° pattern controller adjustment.
Both the direction and volume of
Supply air can be adjusted by
manually or digital controllers.
S2 5 Concealed Mounting A linear diffuser
module of dimensions A(1M) x 2
Slots , with 180° pattern controller
adjustment. Both the direction and
volume of Supply air can be adjusted
by manual or digital controllers.
Ceiling Materials
Mark Name
CSB concrete slab finish
CW3 Wooden ceiling Ribs
CW4 Plain Slice Walnut
GB1 Ceiling Tiles moisture resistant
GB2 Ceiling Tiles Fire & moisture resistant
MM1 metal mesh
HL2 : hidden light for ceiling as selected samples
WH5 WH2
WH4
WH1
WH2
0.561 0.975 0.501 2.199 2.080
1.263
1.801
0.412
1.376
0.615
0.451
0.966
1.399
1.648
3.528
0.309
3.009
4.210
1.450
3.050
2.149
2.427
2.749
3.200
3.207
1.470
3.134
5.367
3.584
CW2
WH3
WH3
WH2
WH4 WH3
WH1
WH2
WH5
WH2
WH3
WH5
CC2 WC2
WC1
CG1 CG1
WC1
WC2
CC2
GC2
GC2
1.505
0.411
0.200
2.947
0.350
initial points for hexagon tiles
0.520
0.600
hexagon tiles
TC1
2.315
3.715
CC1
CC1
TC1
WH1
WH3
WH5
WH5
WH3
WH1
WH2
WH5
WH2
WH1
WH3
WH3
WH3
WH3
WH1
WH2
WH3
WH5
WH1
WH5
WH2
WH1
WH3
WH2
WH5
WH5
WH4
WH5
WH1
WH5
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-01.7
Sheet : Flooring Plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
Flooring plan
Flooring Materials
Mark Name
CC1 Aurora Ivory Porcelain
CC2 Romance White
CG1 Veranda White Gravel
CP1 painting textured concrete
CSB concrete slab finish
CW2 WPC Wood(1)
GC2 Rust Green Geometric Luster Porcelain
ST1 black sticker
TC1 Threshold Salerno Anthracite Geometric
WC1 WPC Wood
WC2 Marbella Ivory
WH1 Toscana Geometric
WH2 Toscana Dark Blue
WH3 Toscana Dark Beige
WH4 Runway Dark Blue Stripe
WH5 Amelia Geometric
Notes :-
Scale :
Date : 01/02/24
No : C-01.D1
Sheet : Materials & Keys for Flooring
Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Prep. by :Mohannad Rabea A.Ullah
Flooring Materials Full Data
Mark Name Area Material Description Material Image
CC1 Aurora Ivory
Porcelain
327 m² GEMMA Aurora Floor
Glazed Porcelain
MATT tiles Ivory 120x60
cm.
CC2 Romance White 56 m² GEMMA Romance Floor
tiles White 60x60 cm.
CG1 Veranda White
Gravel
0 m² GEMMA Veranda Floor
tiles White 42x42 cm.
CW2 WPC Wood(1) 27 m² WPC on grid for water
drain
GC2 Rust Green
Geometric
Luster Porcelain
17 m² GEMMA Rust Floor
Glazed Porcelain
MATT tiles Green
Geometric Luster 120x60
cm.
Flooring Materials Full Data
Mark Name Area Material Description Material Image
ST1 black sticker 2 m² self adhesive stickers for
walls strrips 5cm as
selected sample.
TC1 Threshold
Salerno
Anthracite
Geometric
1 m² GEMMA Salerno Floor
Glazed Porcelain
MATT tiles Anthracite
Geometric 80x80 cm.
WC1 WPC Wood 8 m² WPC on grid for water
drain
WC2 Marbella Ivory 12 m² GEMMA Marbella Floor
tiles Ivory 60x60 cm.
WH1 Toscana
Geometric
16 m² GEMMA Toscana Floor
Glazed Porcelain
MATT tiles Geometric
60x120 cm.
Flooring Materials Full Data
Mark Name Area Material Description Material Image
WH2 Toscana Dark
Blue
13 m² GEMMA Toscana Floor
Glazed Porcelain
MATT tiles Dark Blue
60x120 cm.
WH3 Toscana Dark
Beige
21 m² GEMMA Toscana Floor
Glazed Porcelain
MATT tiles Dark Beige
60x120 cm.
WH4 Runway Dark
Blue Stripe
9 m² GEMMA Runway Floor
Glazed Porcelain
MATT tiles Dark Blue
Stripe 60x120 cm.
WH5 Amelia
Geometric
19 m² GEMMA Amelia Floor
Glazed Porcelain
MATT tiles Geometric
60x120 cm.
Notes :-
Scale :
Date : 01/02/24
No : C-01.D2
Sheet : Materials & Keys for Reflected
Ceiling Plan
Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Prep. by :Mohannad Rabea A.Ullah
Lighting Fixture Schedule full data
Mark Type Description Count Type Image
H1 Deconstruct
ivism Lamp
Box
Deconstructivism
pendant Lamp
chamfered Box
with a brass finish
as a selected
sample.
5
LB1 slant
lighting
Linear with
variable length &
depth for each
one as a selected
sample
6
LB3 TASK S
rectangle
Task s rectangle
1.2 x .2
suspended direct
soft, black, 4000 k
as a selected
sample.
4
LC2 4 cups light Linear with 4 cups
suspended on
wooden plate
3
LC3 Liner wood -
concrete
A Linear
lamp1.2m with a
wooden &
concrete textured
finish as a
selected sample.
4
Ceiling Materials Takeoff
Mark Name Description Image
CSB concrete slab finish let the concrete slab as
it is and add the effect
of the wood board if it
doesn't already exist
CW3 Wooden ceiling Ribs 2-1/4" * 1" Salts are
variable length and
assembled on a
Notched Backers
customized shape ,
Golden Maple finish as
selected sample
CW4 Plain Slice Walnut wooden panels mdf
18mm with Plain Slice
Walnut finish as
selected sample
GB1 Ceiling Tiles moisture
resistant
12.5mm moisture
resistant gypsum
board with Ventilation
Protection ceiling with
white matt emulsion
paint finish
GB2 Ceiling Tiles Fire &
moisture resistant
12.5mm Fire &
moisture resistant
gypsum board ceiling
with Gray gloss
emulsion paint finish.
MM1 metal mesh black metal mesh
panel on 5*5cm box
electrostatic paint as
selected sample
Lighting Fixture Schedule full data
Mark Type Description Count Type Image
LW1 Wood Lamp A chamfered
pyramid of
deconstruction
pendant lamp with
a wooden finish as
a selected
sample.
19
SL1 Light bar LED bar Direct
Light with Variable
Length between
wooden slots
Width 5 cm
-quantity and
length on
schedule
150
HL2 : hidden light for ceiling as selected
samples
G
1.200
1
5.200
ST1
CP1
ST2
3.744
2.950
0.794
1.491
0.990
0.315 4.047 0.289
1
C-05.2
PST1
1
C-05.4
Section 1
G
1.200
1
5.200
P1
WP1
2.950
0.794
3.744
0.961
0.698
3.744
CP1 CP1
2.950
0.999
P2
1
C-05.4
Section 1
Notes :-
Scale : 1 : 35
Date : 01/02/24
No : C-02.01
Sheet : Elevations 1-A & 1-C
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 35
Elevation 1 - A
1
1 : 35
Elevation 1 - C
2
Walls Material
Mark Name
CP1 painting textured concrete
CW3 Wooden ceiling Ribs
P1 Beige Paint
P2 Yellow Paint
PVC1 Orange matt Cladding
ST1 black sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
G
1.200
1
5.200
1.126 2.709 3.360
1.470
0.820
0.845
1.437
3.744
0.599
2.245
0.900
3.744
1.402
2.342
0.108 3.257
2.950
2.950
ST1 P1
P2 CP1 P2 Recessed -4CM
G
1.200
1
5.200
0.599
2.245
0.900
3.744
0.794
2.950
1.329
0.663
0.852
2.950
0.999
P1
0.698
1.308
P2
WP1
PVC1 PVC1
CP1
?
P2
1.505
1.674
CW3
0.100
0
.1
0
0
Notes :-
Scale : 1 : 35
Date : 01/02/24
No : C-02.02
Sheet : Elevations 1-B & 1-D
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 35
Elevation 1 - D
2
1 : 35
Elevation 1 - B
1
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
P2 Yellow Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
G
1.200
1
5.200
3.744
2.950
0.900
2.245
0.599
0.923
0.900
2.245
0.599
P2 P1
W2
W3 W1
-
---
G
1.200
1
5.200
1
C-03.2
C
2
C-03.2
D
0.582
3.744
1.491
0.990
0.315 4.047 0.289
0.999
3.744
2.950
3.151
0.560
2.440
1.326
0.767
2.829
0.148
CP1 ST2
ST2
ST1
ST2
1.329
0.680
1.329
2.282
ST1
P2
PST1
1
C-05.3
2
C-05.3
Notes :-
Scale : 1 : 35
Date : 01/02/24
No : C-02.03
Sheet : Elevations 2-A & 2-C
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 35
Elevation 2 - a
1
1 : 35
Elevation 2 - c
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
P2 Yellow Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
G
1.200
1
5.200
3.745
0.599
2.245
0.900
3.744
1.402
2.342
0.108 3.257
2.950
0.794
2.950
0.582
0.961
P2 P1 CP1
P2
ST1 P2
2
C-05.4
Section 2
G
1.200
1
5.200
1
C-03.1
A
2
C-03.1
B
1
C-03.3
E
3.744
0.895
2.245
0.599
3.744
3.200
0.749
1.329
0.953
1.329
1.011
0.716
1.700
0.635
2.403 3.090 1.498
? P1 P2
PVC1
1.329
0.680
0.169 1.505
2
C-03.3
F
2
C-03.4
H
PVC1
CP1
Notes :-
Scale : 1 : 35
Date : 01/02/24
No : C-02.04
Sheet : Elevations 2-B & 2-D
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 35
Elevation 2 - B
1
1 : 35
Elevation 2 - D
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
P2 Yellow Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
Notes :-
Scale :
Date : 01/02/24
No : C-02.D1
Sheet : Materials & Keys for Elevations
Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Prep. by :Mohannad Rabea A.Ullah
Wall Material Takeoff
Mark Name Description Image
CP1 painting
textured
concrete
Jazeera paints concrete effect primer as selected sample.
CT1 Tribe white GEMMA Tribe Wall tiles White 25x75 cm
CT2 Salmon
Pastel
GEMMA Pastel Wall tiles Salmon 25x75 cm
CT3 Etna Grey
Geometric
GEMMA Etna Wall tiles Grey Geometric 50x150 cm
CW3 Wooden
ceiling Ribs
2-1/4" * 1" Salts are variable length and assembled on a
Notched Backers customized shape , Golden Maple finish as
selected sample
G1 blurred
glass
Yellow blurred glass thickness 1cm as selected sample.
P1 Beige Paint Jazeera Paint Beige Sky Light OW-4802
Wall Material Takeoff
Mark Name Description Image
P2 Yellow
Paint
Jazeera Paint yellow Summer Sun YL-0058
PVC1 Orange
matt
Cladding
Orange matt PVC Wall Cladding Sheet chemical resistance
Fire rated to self extinguishing Sheet Thickness 2.5mm as
selected sample.
SS1 black steel
square
tube
black steel 1.5x1.5cm square tube electrostatic painting as
selected sample.costmuzed shape a black steel 1.5x 1.5 cm
rectangular tube electrostatic painting custom shape &
Welded as drawings
ST1 black
sticker
self adhesive stickers for walls strrips 5cm as selected
sample.
ST2 orange
sticker
orange self adhesive stickers for walls as selected sample.
WP1 Wooden
sheild paint
Block Board Wooden sheild paint as selected sample.
WS1 Wooden
skirting
Wooden skirting boards 100mm white vintage oak with
dimensions of 2400 x 14 x 100 mm. With A gap for led
profile.- as selected sample.
G
1.200
1
5.200
CT2
P1 CP1
3.745
CT3 CT1
3.745
0.544
3.200
1.944
1.710
0.090
1.135
1.909
0.700
1.135
1.369
0.200
1.040
1.070 0.800
CT1
0.805 0.905
0.253
0.595
0.223 0.153
0.050
0.677
0.070 0.070
0.677
0.050
HL1 HL1
1
C-07.4
P
CT3
CT3
G
1.200
1
5.200
CT1 CT2 P1
1.690
0.599
1.455
3.745
0.948
1.035 1.040
0.828
WS1 CP1
3.200
0.544
1.800
1.944
0.090
1.710
0.179 2.299 0.078
1
C-07.4
P
PST2
2
C-05.1
Notes :-
Scale : 1 : 30
Date : 01/02/24
No : C-03.1
Sheet : Section A-A & Section B-B
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 30
Section A-A
1
1 : 30
Section B-B
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
WS1 Wooden skirting
G
1.200
1
5.200
3.744
1.135
2.609
3.745
3.744
3.151
0.593
1.534
2.210
2.400
0.000
1.344
2.400
1.944
1.710
0.090
P1
CP1 WS1
CT1
CT2 G1
2.300
2.100
0.100
G
1.200
1
5.200
1.392
0.679
1.673
0.544
3.200
CP1 WS1
3.745
0.544
3.200
3.151
0.593
3.745
0.230 2.280 0.090 0.119 2.181 0.200
P1
3
C-05.1
4
C-05.1
PST3 PST4
Notes :-
Scale : 1 : 30
Date : 01/02/24
No : C-03.2
Sheet : Section C-C 7 & Section D-D
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 30
Section C-C
1
1 : 30
Section D-D
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WS1 Wooden skirting
G
1.200
1
5.200
1.687
0.630
1.427
0.235 2.200 0.109
CP1 WS1
3.145
0.599
3.745
0.090
1.710
1.944
1
C-05.1
PST5
P1
G
1.200
1
5.200
MG1 CP1
WS1
2.400
0.400
1.575
0.445
2.100
3.745
1
C-07.4
P
P1
PST6
PST7
2
C-05.2
3
C-05.2
Notes :-
Scale : 1 : 30
Date : 01/02/24
No : C-03.3
Sheet : Section E-E 7 & Section F-F
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 30
Section E-E
1
1 : 30
Section F-F
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
P2 Yellow Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
G
1.200
1
5.200
1.329
PVC1
CP1
2.181
1.929
0.619
0.475
PVC1
G
1.200
1
5.200
MG1 HL1
1.664
2.080
3.745
2.110
0.100
1.344
2.400
0.445
0.848
0.915
0.665
0.847
0.513
1.313
1.738
0.881
1.502
HL1
Notes :-
Scale : 1 : 20
Date : 01/02/24
No : C-03.4
Sheet : Section G-G 7 & Section H-H
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 20
Section G-G
1 1 : 20
Section H-H
2
Walls Material
Mark Name
CP1 painting textured concrete
CT1 Tribe white
CT2 Salmon Pastel
CT3 Etna Grey Geometric
CW3 Wooden ceiling Ribs
G1 blurred glass
P1 Beige Paint
PVC1 Orange matt Cladding
SS1 black steel square tube
ST1 black sticker
ST2 orange sticker
WP1 Wooden sheild paint
WS1 Wooden skirting
Notes :-
Scale :
Date : 01/02/24
No : C-03.D1
Sheet : Materials & Keys for Sections
Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Prep. by :Mohannad Rabea A.Ullah
Wall Material Takeoff
Mark Name Description Image
CP1 painting
textured
concrete
Jazeera paints concrete effect primer as selected sample.
CT1 Tribe white GEMMA Tribe Wall tiles White 25x75 cm
CT2 Salmon
Pastel
GEMMA Pastel Wall tiles Salmon 25x75 cm
CT3 Etna Grey
Geometric
GEMMA Etna Wall tiles Grey Geometric 50x150 cm
CW3 Wooden
ceiling Ribs
2-1/4" * 1" Salts are variable length and assembled on a
Notched Backers customized shape , Golden Maple finish as
selected sample
G1 blurred
glass
Yellow blurred glass thickness 1cm as selected sample.
P1 Beige Paint Jazeera Paint Beige Sky Light OW-4802
Wall Material Takeoff
Mark Name Description Image
P2 Yellow
Paint
Jazeera Paint yellow Summer Sun YL-0058
PVC1 Orange
matt
Cladding
Orange matt PVC Wall Cladding Sheet chemical resistance
Fire rated to self extinguishing Sheet Thickness 2.5mm as
selected sample.
SS1 black steel
square
tube
black steel 1.5x1.5cm square tube electrostatic painting as
selected sample.costmuzed shape a black steel 1.5x 1.5 cm
rectangular tube electrostatic painting custom shape &
Welded as drawings
ST1 black
sticker
self adhesive stickers for walls strrips 5cm as selected
sample.
ST2 orange
sticker
orange self adhesive stickers for walls as selected sample.
WP1 Wooden
sheild paint
Block Board Wooden sheild paint as selected sample.
WS1 Wooden
skirting
Wooden skirting boards 100mm white vintage oak with
dimensions of 2400 x 14 x 100 mm. With A gap for led
profile.- as selected sample.
2.245
2.400
0.050
0.445
0.050
1.155
0.050
0.445
0.050
0.050
1.125
0.050
1.125
0.050
0.665 0.050 0.870 0.050 0.665
2.245
5.700
0.050
0.445
0.050
1.155
0.050
0.445
0.050
0.050 0.625 0.050 2.100 0.050 2.100 0.050 0.625 0.050
0.175
0.050
0.860
0.050
1.180
0.050
0.870
0.050
1.200
0.050
0.840
0.050
0.175
2.245
5.817
0.050
0.445
0.050
1.155
0.050
0.445
0.050
0.050 0.630 0.050 2.148 0.050 2.140 0.050 0.650 0.050
0.189
0.050
0.850
0.050
1.250
0.050
0.850
0.050
1.250
0.050
0.851
0.050
0.178
Notes :-
Scale : 1 : 30
Date : 01/02/24
No : C-04.1
Sheet : Curtain wall windows
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
3D Ortho
3D Ortho
1 : 30
Elevation Front
1 : 30
Elevation Front
1 : 30
Elevation Front
Glass panel
Aluminum
stain steel handle
2.105
1.950
0.960
0.005
0.985
2.125
1.950
painted as selected sample.
2.080
2.065
0.035
2.030
0.810
painted as selected sample.
2.065
0.810
0.060
2.065
2.125
1.045
1.000
0.131
1.978
0.091
2.200
0.900
0.625 0.100 0.175
0.373
1.455
0.373
2.200
Orange Glass as selected sample.
concrete texture as selected sample.
0.900
Notes :-
Scale : 1 : 20
Date : 01/02/24
No : C-04.2
Sheet : Doors and windows
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Type
Mark Usage Description
Dimensions
Count Comments
Width Height
D1 Entrance Curtain door - 2 leaf with double tempered glass 6
mm with aluminum frame
1.950 2.125 1
Type
Mark Usage Description
Dimensions
Count Comments
Width Height
D3 storage Wood oak cm 8 - wood oak door hinged casing
and architrave - renewed door
0.810 2.080 1 Existing door
Type
Mark Usage Description
Dimensions
Count Comments
Width Height
D2 kitchen Hinged Door frameless Flush with wall with
concrete texture & orange Glass panel
0.900 2.200 1
Type
Mark Usage Description
Dimensions
Count Comments
Width Height
D4 WC MDF wooden door with oak veneer treated for
water resistance
0.810 2.080 2
0.600
2.300
2.280
0.680
0.680
2.180
2.200
0.630
Notes :-
Scale : 1 : 10
Date : 01/02/24
No : C-05.1
Sheet : Stickers
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 10
PST2
2
1 : 10
PST3
3 1 : 10
PST4
4
1 : 10
ST5
1
4.045
1.490
G
1.200
0.400
2.400
G
1.200
2.100
0.450
Notes :-
Scale : 1 : 15
Date : 01/02/24
No : C-05.2
Sheet : Stickers
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 15
PST1
1 1 : 15
PST6
2
1 : 15
PST7
3
±0
±0
-3cm
-3cm
-3cm
-1.5cm
-1.5cm
-3cm
-4cm
G
1.200
1.360
0.235
0.235
0.175
0.160
0.160
0.600
0.935
0.940
0.955
2.410
2.410
1.855
2.160
2.170
2.300
2.950
1.685
0.755
1.995
0.450
2.400 0.040
1.560
0.880
1.550
0.890
0.545
1.895
2.425
0.015
0.770
0.145
1.375
1.350
1.090
1.355
1.085
1.350
1.090
1.990
0.450
1.980
0.460
1.665
0.775
1.655
0.785
1.230
1.210
1.220
1.220
1.230
1.210
Notes :-
Scale : 1 : 10
Date : 01/02/24
No : C-05.3
Sheet : Recessed part
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 10
Recessed parts
1 : 10
parts points
G
1.200
0.000
0.000
0.140
0.000
0.100
0.000
0.000 0.030
0.000
0.050
0.065
0.000
0.085
0.000
0.045
0.803 0.511 0.392 0.635 0.395 0.629
1.314 1.517 0.537
0.311 0.417 0.134 0.748 0.346 0.298 0.408 0.562
0.152
0.271
0.374
0.500
0.900
1.683
1.191
1.161
1.263
1:0.025
G
1.200
0.060
0.000
0.000
0.074 0.000
0.000
0.000
0.000
0.000
0.211
0.000
0.000
0.118
0.900
1.130
1.956
1.487
0.550
0.136
1.332 3.436 0.844 0.406
0.719
0.344
0.771
0.406
2.768
1.011
framing system
Faces
Framing System
1.5cm Aluminum tube
Aluminum wires for flexibility
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-05.4
Sheet : Skeleton for Deconstructivism wall
detail
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 25
Section S1
1 : 25
Section S2
Metal skeleton frame
WPC for water drain
water drain fixture
slope
wooden support
0.875
0.100
2.100
0.100
2.300
Fixing bar
support bar
glass sheet
G1
SS1
Notes :-
Scale : 1 : 5
Date : 01/02/24
No : C-05.5
Sheet : WC Details
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Section WC
1 : 5
Wall Hung Toilet detail
1 : 5
flooring drain system glazed partitions detail
depth
=0.510
depth
=0.560
depth
=0.710
depth
=0.710
depth
=0.610
depth
=0.460
depth
=0.450
depth
=0.510
depth
=0.710
depth
=0.560
depth
=0.660
depth
=0.610
depth
=0.610
depth
=0.620
depth
=0.710
depth
=0.610
1.555
1.329
2.063
6.052
4.155
3.945
1.637
2.478
5.225
3.508
3.277
2.229
5.787
1.538
1.101
6.529
2.534
3.675
3.409
4.427
2.123
4.657
5.146
depth
=0.660
depth
=0.510
6.947
1.666
1.902
5.582
6.023
5.584
6.541
3.535
3.998
5.584
5.934
5.792
5.939
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-06.1
Sheet : Rigging points
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
Rigging points
height = 3.080
height = 3.180
height = 3.130
height = 3.330
height = 3.330
height = 3.270
height = 3.130
height = 3.260
height = 3.250
height = 3.200
height = 3.080
height = 3.080
height = 3.080
height = 3.190
height = 3.280
height = 3.130
height = 3.180
height = 3.180
height = 3.230
height = 3.320
height = 3.330
height = 3.270
height = 3.280
height = 3.270
height = 3.240
height = 3.200
height = 3.230
height = 3.288
height = 3.216
height = 3.276 height = 3.222
height = 3.204
height = 3.242
height = 3.234
height = 3.200
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-06.2
Sheet : Wall support height
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
height Wall
0.463
0.163
Ceiling
Support
1.000
0.300
0.700
5.604
6.757 3.200 6.002
5.687
6.638
1.101
1.378
5.832
5.946
5.631
6.007
1.725
2.652
1.644
5.660
1.973
6.113
0.488
0.366
1.051
0.717
0.606
5.927
*wire depth in attached section D (2)
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-06.3
Sheet : upper bar ceiling - Main points
support
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 15
Detail Section A
1 : 50
upper bar ceiling - Main points support
panels 8mm
Aluminum Frame
0.130 1.325 0.805 1.210
Start point
0.315
0.155
0.620
0.385
1.190
1.390
2.965
2.620
0.615
2.635
3.400
0.930
0.915
1.510
3.035
3.485
3.710
4.020
4.520
5.090
D=11.5CM D=14CM D=14.5CM D=13.5CM
Notes :-
Scale : 1 : 15
Date : 01/02/24
No : C-06.4
Sheet : upper ceiling bar - inner sector
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 15
Aluminum Frame Coordinate Plan
wall
2-1/4" * 1" Salts
Wooden Backers
Suspension System
Beam End
Retaining Clip
Adjustable Trim Clip
Fixture
Suspension System
2-1/4" * 1" Salts
Wooden Backers
Sliding Integration Bracket
Integrated Light Connection Clip
Cut Backer Support Clip
Linear Integrated Lighting Fixture
Notes :-
Scale : 1 : 5
Date : 01/02/24
No : C-06.5
Sheet : Ceiling Details
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 5
ceiling wall connection detail
1 : 5
ceiling Suspension System 3D detail
1 : 5
Linear Integrated Lighting 3D Detail
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-06.6
Sheet : Linear Lighting Integration Ceiling
Plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
Linear Lighting Integration Ceiling Plan
Light Bar Lengths
Length Count
0.600 90
1.200 60
T1
C1
C1
T1
C1
C1
T1
C1
C1
T1
C1
C1
T1
C1
C1
T1
C1
C1
T1
C1
C1
B1
SZ
C1
S1
T1
T1
C1
C1
C1 C1
S1
C1
C1
S1
C1 C1
S1
C1
S2 S3
T1
B2
P1
MR1
MR1
MR2
MR2
T2 T2 T2 T2
Notes :-
Scale : 1 : 50
Date : 01/02/24
No : C-07.1
Sheet : Furniture Marking plan
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 50
Furniture detail plan
Furniture Schedule
Type
Mark Count Sheet No.
B1 1 C-07.2-1 ,
C-07.2-2
B2 1 C-07.2-3
C1 24 C-07.3
FP1 11 C-07.4
FP2 58 C-07.4
FP3 26 C-07.4
MR1 2 C-07.5
MR2 2 C-07.6
P1 1 C-07.7
S1 4 C-07.8
S2 1 C-07.9
S3 1 C-07.10
SZ 2 C-07.11
T1 10 C-07.12
T2 4 C-07.13
B1
B2
Notes :-
Scale :
Date : 01/02/24
No : C-07.2
Sheet : bar
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
*
Furniture Schedule Type Mark :B1 -
B2
MC1
MO1
WL1
3
C-07.2-2
Elevation Front
1
C-07.2-2
Detail Section
A1
2
C-07.2-2
Detail Section
A3
3
.
3
9
7
3.341
3.089
2
.
6
7
6
1.168
0
.
3
6
3
8
3
.
5
2
°
89.69°
237.00°
118.55°
112.53°
7
8
.
7
2
°
4
C-07.2-2
Detail 4
3
C-07.2-2
Elevation Front
1
C-07.2-2
Detail Section
A1
2
C-07.2-2
Detail Section
A3
4
C-07.2-2
Detail 4
1
.
7
4
0
0
.
0
5
0
1
.
1
1
4
0
.
1
4
9
0.136 0.051 1.608 0.051 1.062 0.150
0.056
0.888
2
.
4
5
5
WL2
WL1
MC1
MG1 WL2
B1
Notes :-
Scale : 1 : 20
Date : 01/02/24
No : C-07.2-1
Sheet : Bar - B1 -1
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
1 : 20
Top Plan Detail
1 1 : 20
Section Plan Detail
2
3D Ortho
* Furniture Schedule Type Mark :B1
0.171
0.470
0.194
Drawer
0.155
0.150
0.150
0.349
cabinet
Shelf
handle handle
ribs 18mm
laminated
0.935
0.100
0.835
0.030
0.804
1.204
0.050
1.122
0.174
0.470
0.191
1
C-07.2-1
Plan Detail
2
C-07.2-1
Plan Detail1
0.100
0.835
0.935
0.027
0.739
0.069
0.057
0.056
0.057
0.057
0.027
0.187
0.377
0.193
0.051
0.020
0.020
0.020
0.020
0.020
0.020
0.020
0.060
0.100
Variable as top plan
6
0
.
9
0
°
60.90°
0.050
0.735
0.050
0.045
0.012
0.470
0.010
5
8
.
1
9
°
0.359
0.018
0.359
0.173
0.192
0.470
marble 3 cm
marble 5 cm
ribs 18mm
laminated
onyx marble
1cm
LED Profile
2cm
Laminted shelf
18 mm
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-07.2-2
Sheet : Bar - B1 -2
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 10
Detail Section A1
1
1 : 10
Detail Section A3
2
1 : 10
Elevation Front
3
1 : 5
Detail 4
4
* Furniture Schedule Type Mark :B1
PC1
WPC1
MC1
MG1
MG1
MC1
WPC1
WL2
5
C-07.2-3
Detail 1
4
C-07.2-3
Detail 2
3
C-07.2-3
Detail 3
0.216
0.148
3.209
0.857
3.573
1.082
0.644
1.150
1.415
0.100 0.875 0.107
2.817
0.216
0.057
2.544
0.297
1.150
1.098
0.832
0.245
0.582
67.93°
marble 3 cm
marble 3 cm
5
C-07.2-3
Detail 1
4
C-07.2-3
Detail 2
3
C-07.2-3
Detail 3
1.162
1.146
0.354
0.216
3.501
1.082
0.300 0.782
0.216
2.662
1.168
1.154 1
C-07.2-3
Plan Detail
2
C-07.2-3
Plan Detail1
0.900
1.047
0.800
0.100
0.050
0.700
0.050
drawer
cabinet
handle
1
C-07.2-3
Plan Detail
0.100
0.770
0.030
Laminted wood 18mm
Marble 3cm
Marble 2cm
Laminted wood 18mm
1
C-07.2-3
Plan Detail
2
C-07.2-3
Plan Detail1
0.404
0.584
0.059
sticker
0.900
0.147
Notes :-
Scale : 1 : 20
Date : 01/02/24
No : C-07.2-3
Sheet : Bar - B2
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
3D Ortho
1 : 20
Plan Detail
1 1 : 20
Plan Detail1
2
1 : 20
Detail 3
3
1 : 20
Detail 1
5
1 : 20
Detail 2
4
* Furniture Schedule Type Mark :B2
SB1
FO1
FO1
RF1
C1
SS1
0.723
0.010
0.627
0.053
0.033
0.377
0.040
0.014
0.323
0.630
0.015
0.600
0.015
0.618
0.013
0.156
0.015
0.409
0.015
0.812
0.055
0.045 0.581 0.0450.086
0.017
0.314
0.015
0.351
0.015
0.010
0.713
0.586 0.226
0.540
0.187
0.215
0.193
0.180
0
.
0
0
6
sponge customize
0.132
0.
33
6
metal grid
0.630
0.812
0.190
0.212
0.410
0.209
0.177
0.426
0.030 0.030
0.690
Notes :-
Scale : 1 : 5
Date : 01/02/24
No : C-07.3
Sheet : The Wing Armchair
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
1 : 5
Elevation Back
3
1 : 5
Elevation Right
2
1 : 5
Elevation Front
4
1 : 5
Plan Detail
1
* Furniture Schedule Type Mark :C1
**all copyrights reserved to Dmitry Kozachyshyn
3.785
1.125
1.790
3.175
1.000
1.725
2.450
2.630
1.900
0.365 0.920 1.505 0.995
0.665 2.120 0.995
0.365 3.420
0.365
0.365
0.670 0
.
6
0
6
0.350
0.700
0.117
0
.
3
0
3
0.350
0.142
0.350
0
.
3
0
3
0.142
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-07.4
Sheet : flower pots wall
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 20
Section P-P
*
Furniture Schedule Type Mark :FP1 ,
FP2, FP3
flower pots Schedule
Type Mark Count
FP1 11
FP2 58
FP3 26
FP1
FP2 FP3
MR1
MRR
WF1
0.515
0.025
0.420
0.025
0.385
0.470
1.375
1:0.03
1:0.026
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-07.5
Sheet : Sink Mirror
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
1 : 5
Elevation Back
1 : 5
Elevation Front
1 : 10
Mirror Parts _ Laser cut
* Furniture Schedule Type Mark :MR1
MR2
MRR
WF1
2.220
0.965
Notes :-
Scale : 1 : 10
Date : 01/02/24
No : C-07.6
Sheet : Wall Mirror
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 10
Elevation Front
1 : 10
Elevation Back
1 : 10
Mirror Parts _ Laser cut
* Furniture Schedule Type Mark :MR2
P1
WL3
0.900
9.557
9.557
0.459
5.973 0.475 3.108
0.410
0.049
5.617
0.259
0.100
0.100
0.256
0.100 2.808
0.100 0.201
0.259
5.973 0.475 3.108
0.900
0.900
0.100
0.800
Notes :-
Scale : 1 : 25
Date : 01/02/24
No : C-07.7
Sheet : Fixed Flower box
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Flower box
1 : 25
Elevation Front
1 : 25
Plan Detail
1 : 25
Elevation Back 1 : 25
Elevation Right
* Furniture Schedule Type Mark :P1
S1
LG1
FG1
0.954
0.993
0.560
0.280
0.065
0.609
0.346 0.302 0.346
0.280
0.065
0.200
0.954
2.200
0.609
0.345
0.400 1.400 0.400
0.345
Sponge
Height
0.215
0.394
2.200
0.954
0.400 1.540 0.0400.220
Notes :-
Scale : 1 : 10
Date : 01/02/24
No : C-07.8
Sheet : Deconstructivism Sofa
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
1 : 10
Plan Detail
1
1 : 10
Detail 2
2
1 : 10
Elevation Front
3 1 : 10
Elevation Back
4
sponge detail
* Furniture Schedule Type Mark :S1
LG1
LG1
FG1
3.960
2.894
0.500
0.100
0.600
S2
GW1
1.800
1.966
1.891
2.177
1.889
1.880
2.166
1.920
2.077
2.060
1.965
LG1
WL3
FG1
Laminated part back base cushion outlins
main base
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-07.9
Sheet : Deconstructivism Sofa Left corner
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
* Furniture Schedule Type Mark :S2
3D Ortho
1 : 20
Plan Detail
1
1 : 20
Elevation Back
2
1 : 20
Elevation Front
3
1 : 20
Elevation Left
4
1 : 20
Elevation Right
5
3D Ortho
1 : 50
Sofa outlines
S3
2.090
2.084
1.882
1.884
2.104
2.088
2.191
2.179
1.937
1.920
LG1
FG1
GW1
LG1
FG1
WL3
LG1
LG1
4.172
3.077
0.434 2.368 0.275
0.411
3.214
0.547
0.600
0.500
0.100
Laminated part
back base
cushion outlines
main base
4.172
3.077
Notes :-
Scale : As indicated
Date : 01/02/24
No : C-07.10
Sheet : Deconstructivism Sofa Right corner
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
* Furniture Schedule Type Mark :S2
3D Ortho 3D Ortho
1 : 20
Plan Detail
1
1 : 20
Elevation Back
4
1 : 20
Elevation Front
2
1 : 20
Elevation Left
3
1 : 20
Elevation Right
5
1 : 50
Sofa outlines
SZ
WP1
WP1
Soft close
0.410
3.220
3.630 0.275 4.200
4.475
0.560
3.069
0.644 3.831
2.100
2
C-07.11
Detail 0
1.159
0.960
0.591
0.573
2.702
2.931
2.285
0.900
0.058
0.750
0.092
0.915
0.850 0.063
0.425 0.426
0.900
0.500
0.400
Notes :-
Scale : 1 : 15
Date : 01/02/24
No : C-07.11
Sheet : Social zone seats
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D View
1 : 15
Plan Detail
1
1 : 15
Detail Section
2
Furniture marking
* Furniture Schedule Type Mark :SZ
T1
SB2
CW1
MG2
0.356 0.356
0.356
0.356
ø
0
.
1
0
0
RF1
0.050
0.650
ø 1.000
Notes :-
Scale : 1 : 5
Date : 01/02/24
No : C-07.12
Sheet : Main Table
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
3D Ortho
* Furniture Schedule Type Mark :T1
1 : 5
Base paln
1 : 5
Elevation Front
1 : 5
Plan Detail Copy 1
T2
WL2
SS1
0.415
1.760
0.210 1.300 0.250
14
.9
9°
4
3
.
9
5
°
121.07°
6
3
.
4
3
°
101.58°
14
.9
9°
0.415
0.415
0.900
1.760
0.055 1.245 0.240
0.015
0.400
0.445
0.445
0.445
Notes :-
Scale : 1 : 10
Date : 01/02/24
No : C-07.13
Sheet : Low Table
Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
* Furniture Schedule Type Mark :T2
3D Ortho
1 : 10
Elevation Front
2
1 : 10
Elevation Right
3
1 : 10
Plan Detail
1 1 : 10
Elevation Left
4
1 : 10
Wireframe View
5
Notes :-
Date : 01/02/24
No : C-07.D1
Sheet : Furniture Materials
Scale : -
Project : Links Cafe
Owner : C.L.C.
Project Number : S-03
Prep. by :Mohannad Rabea A.Ullah
Furniture Materials Schedule
Name Mark Description Image
wooden
cilynder
CW1 wooden cilynder finish Wooden sheild paint
as selected sample.
Fabric grey FG1 Fabric grey matt Finish as selected sample.
off-white fabric FO1 off-white fabric fabric with a matt texture as
selected sample.
light grey
leather
LG1 light grey leather matt finish as selected
sample.
Calacatta White
Marble
MC1 Calacatta White Marble Variable thickness
Polished finish as selected sample.
Piazza Grigio
Marble
MG1 Piazza Grigio Matt Marble Variable
thickness as selected sample.
white gold gray
marble
MG2 Natural white gold gray marble texture as
selected sample.
Furniture Materials Schedule
Name Mark Description Image
Orange Onyx
Marble
MO1 Orange Onyx Marble light through thick
1cm as selected sample.
MIROR MRR Mirror Tempered glass with high reflection
as selected sample.
paint or sticker PC1 Void area with paint or sticker orange as
selected sample.
Rubber Feet RF1 Rubber Polyamide Feet rectangle as
selected sample.
black steel
rectangular
tube
SB1 black steel 1.5x30cm rectangular tube
electrostatic painting costmuzed shape
ablack steel 1.5x 30 cm rectangular tube
electrostatic painting as selected sample.
custom shape & Welded as drawings.
black steel
polish tube
SB2 black steel 1.5x30cm rectangular tube
electrostatic painting costmuzed shape
ablack steel 1.5x 30 cm rectangular tube
electrostatic painting as selected sample.
custom shape & Welded as drawings
black steel
square tube
SS1 black steel 1.5x1.5cm square tube
electrostatic painting as selected
sample.costmuzed shape a black steel 1.5x
1.5 cm rectangular tube electrostatic
painting custom shape & Welded as
drawings
ADDITNAL ACSESORIS
Furniture Materials Schedule
Name Mark Description Image
wooden frame WF1 painted wooden frame
Wooden
Texture Ribs
WL1 wooden texture ribs 1.8 x 1.8 cm Polished
finish as selected sample.
Wooden
Texture 2
WL2 wooden texture panels Matt finish as
selected sample.
Wooden
Texture 3
WL3 cladding wooden texture panels Matt finish
as selected sample.
Wooden sheild
paint
WP1 Block Board Wooden sheild paint as
selected sample.
Wood painting
textured
concrete
WPC1 Block Board painting textured concrete 1.8
cm as selected sample.
handle
Mohannad Rabea Abdullah
www.linkedin.com/in/p-mohannad
m.abdullah.architect@gmail.com
+20155 865 7734
For contact
THANK
YOU

More Related Content

Similar to LINKS CAFE - Online publishing version

Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
jenkinswilliamc
 
2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx
ssuser98d50d
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
ecep nurali
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
Jayson Ang
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
Hafiz Waheed
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
Hafiz Waheed
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
cyberyogi07
 
Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper
Vamsi Putta
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Shze Hwa Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Kailyn Lee
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadBarun Chatterjee
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
TalebAlfihan
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
MODI20077
 
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...Ar.Harry Sachdeva
 
Field residences Contact Me
Field residences Contact MeField residences Contact Me
Field residences Contact Me
tester tester
 
76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractorsKrishna Patel
 

Similar to LINKS CAFE - Online publishing version (20)

Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
 
SECTIONAL DIAGRAM
SECTIONAL DIAGRAMSECTIONAL DIAGRAM
SECTIONAL DIAGRAM
 
2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
JAGANNATH PATIL RESUME
JAGANNATH PATIL RESUMEJAGANNATH PATIL RESUME
JAGANNATH PATIL RESUME
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...
Harry Sachdeva Port folio _Documentation_Design_Photoshop_ArchiCAD_Freelancin...
 
Field residences Contact Me
Field residences Contact MeField residences Contact Me
Field residences Contact Me
 
76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
 

Recently uploaded

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 

Recently uploaded (20)

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

LINKS CAFE - Online publishing version

  • 1. Project : Project Number : Project Issue Date : Drawings Statues : documents type includes : Project Owner : Location : documents Approvals Project Engineer Date Deputy Director Date Director Date Project Manager Date Project use : Links Cafe S-03 30-Apr-2024 to be confirmed -Interior Design -Working Drawings C.L.C. Damietta Gov.- New Damietta-District 5-Avenue 29-Nagar St.-29/39 Designed By : Mohannad Rabea A.Ullah Drawn By : Mohannad Rabea A.Ullah Entertainment Cafe Lab Collaboration
  • 2. Notes Date : 02/06/24 Designed By : Designer Project : Links Cafe Project Number : S-03 Sheet No : A-01.1 Owner : C.L.C. Drawn By : Mohannad Rabea A.Ullah A. Cover & Info. 01. Info. 2 B. Design Package 00. Cover 1 01. 3D 4 02. Plan 1 03. 3D details 5 C. Technical Package 00. Cover 1 01. Plans 8 02. Elevations 5 03. Sections 5 04. Doors & Windows 2 05.Detail 5 06 .Ceiling Details 6 07. Furniture details 17
  • 3. Sheets numbering system General sheets P-03.1 Package Code Sheet. NO Sheet. Series Notes Date : 02/06/24 Designed By : Mohannad Rabea A.Ullah Project : Links Cafe Project Number : S-03 Sheet No : A-01.2 Owner : C.L.C. Drawn By : Mohannad Rabea A.Ullah City : New Damietta Address: District 5-Avenue 29-Nagar St.-29/39 Mohannad Rabea A.Ullah Designed & Drawn By : Year : Building No : 2024 Project Type : Project status : Project Area : 260m2 to be confirmed cafe 29/39 Revit 2024 Software used : Project target : Interior Design
  • 4. Notes Date : 02/06/24 Designed By : Mohannad Rabea A.Ullah Project : Links Cafe Project Number : S-03 Sheet No : B-00 Owner : C.L.C. Drawn By : Mohannad Rabea A.Ullah 00. Cover B-00 Design Package Cover 01. 3D B-01.1 3D plan B-01.2 3D plan B-01.3 3D plan B-01.4 Perspective View 02. Plan B-02.1 plan 03. 3D details B-03.1 3D s zone B-03.2 3D back Sofa zone B-03.3 bar zone B-03.4 3D restrooms B-03.5 3D Ceiling
  • 9. Social Zone Catering Restroom Store room kitchen Soft Seats Soft Seats pastry & bakery Entrance zone Dinning Area Catering Service Notes :- Scale : 1 : 50 Date : 01/02/24 No : B-02.1 Sheet : plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03
  • 15. 1 View Name Sheet Number 1t 1i 1 A101 Section Name 1t TD1 1i 1t 1t 1t M1M Elevation Section Door Tag Spot Level Lighting Tag Curtain wall Tag Hidden Lighting Tag Furniture Tag Window Tag Air Terminal Tag Type mark supply direction return direction Both direction Type mark Type mark Lighting mark Lighting mark Lighting mark Level Elevation Lighting mark Detail No on Sheet Sheet No Detail No on Sheet Sheet No Notes Date : 02/06/24 Designed By : Mohannad Rabea A.Ullah Project : Links Cafe Project Number : S-03 Sheet No : C-00 Owner : C.L.C. Drawn By : Mohannad Rabea A.Ullah Technical Package Index Sheet Number Sheet Name Scale 00. Cover C-00 Technical Package Cover 01. Plans C-01.1 As built 1 :50 C-01.2 Demolition 1 :50 C-01.3 Plan 1 :50 C-01.4 Plan - Service zone 1 :25 C-01.6 Reflected Ceiling Plan 1 :50 C-01.7 Flooring Plan 1 :50 C-01.D1 Materials & Keys for Flooring - C-01.D2 Materials & Keys for Reflected Ceiling Plan - 02. Elevations C-02.01 Elevations 1-A & 1-C 1 :35 C-02.02 Elevations 1-B & 1-D 1 :35 C-02.03 Elevations 2-A & 2-C 1 :35 C-02.04 Elevations 2-B & 2-D 1 :35 C-02.D1 Materials & Keys for Elevations - 03. Sections C-03.1 Section A-A & Section B-B 1 :30 C-03.2 Section C-C 7 & Section D-D 1 :30 C-03.3 Section E-E 7 & Section F-F 1 :30 C-03.4 Section G-G 7 & Section H-H 1 :20 C-03.D1 Materials & Keys for Sections - 04. Doors & Windows C-04.1 Curtain wall windows 1 :20 C-04.2 Doors and windows 1 :20 05.Detail C-05.1 Stickers 1 :10 C-05.2 Stickers 1 :15 C-05.3 Recessed part 1 :10 C-05.4 Skeleton for Deconstructivism wall detail 1 :15 C-05.5 WC Details 1 :10, 1 :5 06 .Ceiling Details C-06.1 Rigging points 1 :50 C-06.2 Wall support height 1 :50 C-06.3 upper bar ceiling - Main points support 1 :50 C-06.4 upper ceiling bar - inner sector 1 :15 C-06.5 Ceiling Details 1 :5 C-06.6 Linear Lighting Integration Ceiling Plan 1 :50 07. Furniture details C-07.1 Furniture Marking plan 1 :50 C-07.2 bar 1 :20 C-07.2-1 Bar - B1 -1 1 :20 Technical Package Index Sheet Number Sheet Name Scale C-07.2-2 Bar - B1 -2 1 :10, 1 :5 C-07.2-3 Bar - B2 1 :20 C-07.3 The Wing Armchair 1 :5 C-07.4 flower pots wall 1 :20 C-07.5 Sink Mirror 1 :10, 1 :5 C-07.6 Wall Mirror 1 :10 C-07.7 Fixed Flower box 1 :25 C-07.8 Deconstructivism Sofa 1 :10 C-07.9 Deconstructivism Sofa Left corner 1 :20 C-07.10 Deconstructivism Sofa Right corner 1 :20 C-07.11 Social zone seats 1 :15 C-07.12 Main Table 1 :5 C-07.13 Low Table 1 :10 C-07.D1 Furniture Materials - SYMBOLS LEGEND General notes Abbreviation index 1. These drawings are revit files. Should not be altered by any softwares without prior notice 2. All levels are in meters 3. All dimensions used to be verified on site. Any discrepancies should be notified 4. All work is to be completed in strict accordance with all applicable codes, ordinances and Regulations. 5. Prior to beginning work in any area, all existing conditions and dimensions are to be verifiedi n field. Any discrepancies between the architectural drawings and specifications and Existing conditions are to be reported to the architect prior to proceeding with the work. 6. All existing elements are to be protected from damage during construction. Any damage is To be repaired or replaced by the responsible trade at their own expense. 7. Contractor to indentify all utility locations prior to beginning work. 8. Contractor shall seal all penetrations in exterior wall and roof assemblies with appropriate joint sealant(s) and flashing(s) to maintain a weathertight and airtight Building envelope. All joints and penetrations shall be sealed, gasketed, or weather-stripped to minimize air leakage, including the following: A. Joints around fenestration and door frames. B. Junctions between walls and foundations, between walls at building corners, between walls and floors or roofs, and between walls and roof or wall panels. C. Openings at penetrations of utility services through roofs, walls, and floors. D. Joints, seams, and penetrations of vapor retarders. E. All other openings in the building envelope 9. The letters I, o, and q are not used to indicate sections or Elevations. 10. 11. All sleeves, openings, etc. For conduit, pipes, ducts, etc. (outside of rated chases) through floor slabs, smoke Partitions and rated partitions are to be fire sealed in Accordance with fire rated assembly designs, applicable Codes and fire marshall’s requirements. 12. Refer to drawings of each trade or discipline for additional general notes and information, including civil/site development, architectural, structural, mechanical, Plumbing, fire protection and electrical. 13. These drawings shall not be scaled to obtain dimensions. If the dimensions cannot be determined by the information given, the contractor shall request clarification from The architect. 14. The list of abbreviations is shown as a guide only and does not necessarily include all abbreviations used. Other abbreviations may be found among the drawings. 15. Refer to this sheet for architectural abbreviations. • ACT • CFP • CTB • CT • CONC • EP • EXP • GL • GR • LVT • MTL • PEMB • PNT • RB • SHT • SS • SSTL ACOUSTIC CEILING PANEL COLOR FLUORO-POLYMER CERAMIC TILE BASE CERAMIC TILE CONCRETE EPOXY EXPOSED GLASS GROUT LUXURY VINYL TILE METAL PRE-ENGINEERED MTL BLDG PAINT RUBBER BASE INTERIOR SHEATHING SOLID SURFACE STAINLESS STEEL
  • 16. 7 6 5 4 3 2 1 14.611 0.850 2.000 0.590 0.200 15.960 10.800 3.810 14.900 4.700 3.611 0.510 0.800 2.300 1.650 27 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-01.1 Sheet : As built Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 As built
  • 17. 2 Demolish 1 remove 3 remove 0.675 0.595 2.210 0.595 0.170 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-01.2 Sheet : Demolition Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 Demolition D no. note 1 Remove the door for reuse later 2 demolish a wall 3 remove parts of the wall to add some fixture 1 : 50 Demolition Plan 1
  • 18. 20.000 15.010 15.960 2.728 0.475 5.973 0.475 6.033 0.275 7.170 3.640 0.410 2.880 0.350 0.416 6.605 0.395 0.290 6.018 0.475 4.651 11.434 2.668 0.468 4.658 8.166 1.374 1.674 1 . 3 0 6 0 . 6 3 8 0.395 6.600 7.615 1.374 3.221 2.863 2.588 0.275 10.980 0.410 1.440 1.575 1.235 2.400 2.000 0.126 0.810 1.464 2.356 1.591 2.051 1.043 1 . 2 2 7 0 . 4 5 6 2.400 2.500 1.160 4.250 4.816 1.868 1.983 1.040 0.828 1.680 1.340 3.020 0.958 1.035 3.020 0.420 1.260 1.340 0.379 0.810 0.152 0.379 0.810 0.152 14.610 1 Elevation 1 - A C-02.01 2 Elevation 1 - D C-02.02 2 Elevation 1 - C C-02.01 1 Elevation 2 - a C-02.03 2 Elevation 2 - D C-02.04 1 Elevation 2 - B C-02.04 2 Elevation 2 - c C-02.03 1 C-03.1 A 2 C-03.1 B 1 C-03.2 C 2 C-03.2 D 1 C-03.3 E 1 C-01.4 1.200 D3 D4 D4 D1 19 W1 W2 W3 1 Elevation 1 - B C-02.02 0.160 2.400 0.176 0.140 5.700 0.141 0.126 5.800 0.130 1 C-03.4 G 2 C-03.3 F 2 C-03.4 H 1 C-07.4 P D2 1 C-05.4 Section 1 2 C-05.4 Section 2 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-01.3 Sheet : Plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 Door Schedule Type Mark Dimensions Comments Width Height D1 1.950 2.125 D2 0.900 2.200 D3 0.810 2.080 Existing door D4 0.810 2.080 all walls finsh in elevations sheets
  • 19. 1 C-03.1 A 2 C-03.1 B 1 C-03.2 C 2 C-03.2 D 1 C-03.3 E 1.470 4.567 1.579 1.274 3.221 2.863 2.588 0.475 1.440 1.575 1.235 2.500 2.000 0.126 0.810 1.464 2.356 1.579 2.051 1.218 2.400 2.500 1.160 4.250 4.816 1.868 1.983 1.040 0.828 1.680 1.340 3.020 0.958 1.035 3.020 0.420 1.260 1.340 0.379 0.810 0.152 0.379 0.810 0.152 1 C-03.4 G 2 C-03.3 F 2 C-03.4 H 0.400 1.791 0.400 1 C-07.4 P D4 D4 D3 D2 Notes :- Scale : 1 : 25 Date : 01/02/24 No : C-01.4 Sheet : Plan - Service zone Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 25 Plan - Service zone
  • 20. H1 H1 H1 H1 H1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LW1 LC2 LC2 LC2 LB1 LB1 LB1 LB1 LB1 LB1 LC3 LC3 LC3 LC3 LB3 LB3 LB3 LB3 CW3 MM1 CSB GB2 CW3 CW4 GB1 GB1 GB1 GB1 GB2 HL2 HL2 HL2 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S2 S2 S2 S2 RS RS RS RS S2 RS RS RS RS Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-01.6 Sheet : Reflected Ceiling Plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 Reflected Ceiling Plan Lighting Fixture Schedule Mark Type H1 Deconstructivism Lamp Box LB1 slant lighting LB3 TASK S rectangle LC2 4 cups light LC3 Liner wood - concrete LW1 Wood Lamp SL1 Light bar All data used acorrding to mep engnineer Air Terminal Schedule Type Mark Count Description R1 20 A linear diffuser module of dimensions A(1M) x 2 Slots , with 180° pattern controller adjustment. Both the direction and volume of Return air can be adjusted by manual or digital controllers. RS 8 Concealed Mounting A square diffuser module of dimensions A(.3M) with 180° pattern controller adjustment. Combination Supply -Return Directional Diffuser. S1 16 A linear diffuser module of dimensions A(1.8M) x 8 Slots , with 180° pattern controller adjustment. Both the direction and volume of Supply air can be adjusted by manually or digital controllers. S2 5 Concealed Mounting A linear diffuser module of dimensions A(1M) x 2 Slots , with 180° pattern controller adjustment. Both the direction and volume of Supply air can be adjusted by manual or digital controllers. Ceiling Materials Mark Name CSB concrete slab finish CW3 Wooden ceiling Ribs CW4 Plain Slice Walnut GB1 Ceiling Tiles moisture resistant GB2 Ceiling Tiles Fire & moisture resistant MM1 metal mesh HL2 : hidden light for ceiling as selected samples
  • 21. WH5 WH2 WH4 WH1 WH2 0.561 0.975 0.501 2.199 2.080 1.263 1.801 0.412 1.376 0.615 0.451 0.966 1.399 1.648 3.528 0.309 3.009 4.210 1.450 3.050 2.149 2.427 2.749 3.200 3.207 1.470 3.134 5.367 3.584 CW2 WH3 WH3 WH2 WH4 WH3 WH1 WH2 WH5 WH2 WH3 WH5 CC2 WC2 WC1 CG1 CG1 WC1 WC2 CC2 GC2 GC2 1.505 0.411 0.200 2.947 0.350 initial points for hexagon tiles 0.520 0.600 hexagon tiles TC1 2.315 3.715 CC1 CC1 TC1 WH1 WH3 WH5 WH5 WH3 WH1 WH2 WH5 WH2 WH1 WH3 WH3 WH3 WH3 WH1 WH2 WH3 WH5 WH1 WH5 WH2 WH1 WH3 WH2 WH5 WH5 WH4 WH5 WH1 WH5 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-01.7 Sheet : Flooring Plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 Flooring plan Flooring Materials Mark Name CC1 Aurora Ivory Porcelain CC2 Romance White CG1 Veranda White Gravel CP1 painting textured concrete CSB concrete slab finish CW2 WPC Wood(1) GC2 Rust Green Geometric Luster Porcelain ST1 black sticker TC1 Threshold Salerno Anthracite Geometric WC1 WPC Wood WC2 Marbella Ivory WH1 Toscana Geometric WH2 Toscana Dark Blue WH3 Toscana Dark Beige WH4 Runway Dark Blue Stripe WH5 Amelia Geometric
  • 22. Notes :- Scale : Date : 01/02/24 No : C-01.D1 Sheet : Materials & Keys for Flooring Project : Links Cafe Owner : C.L.C. Project Number : S-03 Prep. by :Mohannad Rabea A.Ullah Flooring Materials Full Data Mark Name Area Material Description Material Image CC1 Aurora Ivory Porcelain 327 m² GEMMA Aurora Floor Glazed Porcelain MATT tiles Ivory 120x60 cm. CC2 Romance White 56 m² GEMMA Romance Floor tiles White 60x60 cm. CG1 Veranda White Gravel 0 m² GEMMA Veranda Floor tiles White 42x42 cm. CW2 WPC Wood(1) 27 m² WPC on grid for water drain GC2 Rust Green Geometric Luster Porcelain 17 m² GEMMA Rust Floor Glazed Porcelain MATT tiles Green Geometric Luster 120x60 cm. Flooring Materials Full Data Mark Name Area Material Description Material Image ST1 black sticker 2 m² self adhesive stickers for walls strrips 5cm as selected sample. TC1 Threshold Salerno Anthracite Geometric 1 m² GEMMA Salerno Floor Glazed Porcelain MATT tiles Anthracite Geometric 80x80 cm. WC1 WPC Wood 8 m² WPC on grid for water drain WC2 Marbella Ivory 12 m² GEMMA Marbella Floor tiles Ivory 60x60 cm. WH1 Toscana Geometric 16 m² GEMMA Toscana Floor Glazed Porcelain MATT tiles Geometric 60x120 cm. Flooring Materials Full Data Mark Name Area Material Description Material Image WH2 Toscana Dark Blue 13 m² GEMMA Toscana Floor Glazed Porcelain MATT tiles Dark Blue 60x120 cm. WH3 Toscana Dark Beige 21 m² GEMMA Toscana Floor Glazed Porcelain MATT tiles Dark Beige 60x120 cm. WH4 Runway Dark Blue Stripe 9 m² GEMMA Runway Floor Glazed Porcelain MATT tiles Dark Blue Stripe 60x120 cm. WH5 Amelia Geometric 19 m² GEMMA Amelia Floor Glazed Porcelain MATT tiles Geometric 60x120 cm.
  • 23. Notes :- Scale : Date : 01/02/24 No : C-01.D2 Sheet : Materials & Keys for Reflected Ceiling Plan Project : Links Cafe Owner : C.L.C. Project Number : S-03 Prep. by :Mohannad Rabea A.Ullah Lighting Fixture Schedule full data Mark Type Description Count Type Image H1 Deconstruct ivism Lamp Box Deconstructivism pendant Lamp chamfered Box with a brass finish as a selected sample. 5 LB1 slant lighting Linear with variable length & depth for each one as a selected sample 6 LB3 TASK S rectangle Task s rectangle 1.2 x .2 suspended direct soft, black, 4000 k as a selected sample. 4 LC2 4 cups light Linear with 4 cups suspended on wooden plate 3 LC3 Liner wood - concrete A Linear lamp1.2m with a wooden & concrete textured finish as a selected sample. 4 Ceiling Materials Takeoff Mark Name Description Image CSB concrete slab finish let the concrete slab as it is and add the effect of the wood board if it doesn't already exist CW3 Wooden ceiling Ribs 2-1/4" * 1" Salts are variable length and assembled on a Notched Backers customized shape , Golden Maple finish as selected sample CW4 Plain Slice Walnut wooden panels mdf 18mm with Plain Slice Walnut finish as selected sample GB1 Ceiling Tiles moisture resistant 12.5mm moisture resistant gypsum board with Ventilation Protection ceiling with white matt emulsion paint finish GB2 Ceiling Tiles Fire & moisture resistant 12.5mm Fire & moisture resistant gypsum board ceiling with Gray gloss emulsion paint finish. MM1 metal mesh black metal mesh panel on 5*5cm box electrostatic paint as selected sample Lighting Fixture Schedule full data Mark Type Description Count Type Image LW1 Wood Lamp A chamfered pyramid of deconstruction pendant lamp with a wooden finish as a selected sample. 19 SL1 Light bar LED bar Direct Light with Variable Length between wooden slots Width 5 cm -quantity and length on schedule 150 HL2 : hidden light for ceiling as selected samples
  • 24. G 1.200 1 5.200 ST1 CP1 ST2 3.744 2.950 0.794 1.491 0.990 0.315 4.047 0.289 1 C-05.2 PST1 1 C-05.4 Section 1 G 1.200 1 5.200 P1 WP1 2.950 0.794 3.744 0.961 0.698 3.744 CP1 CP1 2.950 0.999 P2 1 C-05.4 Section 1 Notes :- Scale : 1 : 35 Date : 01/02/24 No : C-02.01 Sheet : Elevations 1-A & 1-C Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 35 Elevation 1 - A 1 1 : 35 Elevation 1 - C 2 Walls Material Mark Name CP1 painting textured concrete CW3 Wooden ceiling Ribs P1 Beige Paint P2 Yellow Paint PVC1 Orange matt Cladding ST1 black sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 25. G 1.200 1 5.200 1.126 2.709 3.360 1.470 0.820 0.845 1.437 3.744 0.599 2.245 0.900 3.744 1.402 2.342 0.108 3.257 2.950 2.950 ST1 P1 P2 CP1 P2 Recessed -4CM G 1.200 1 5.200 0.599 2.245 0.900 3.744 0.794 2.950 1.329 0.663 0.852 2.950 0.999 P1 0.698 1.308 P2 WP1 PVC1 PVC1 CP1 ? P2 1.505 1.674 CW3 0.100 0 .1 0 0 Notes :- Scale : 1 : 35 Date : 01/02/24 No : C-02.02 Sheet : Elevations 1-B & 1-D Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 35 Elevation 1 - D 2 1 : 35 Elevation 1 - B 1 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint P2 Yellow Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 26. G 1.200 1 5.200 3.744 2.950 0.900 2.245 0.599 0.923 0.900 2.245 0.599 P2 P1 W2 W3 W1 - --- G 1.200 1 5.200 1 C-03.2 C 2 C-03.2 D 0.582 3.744 1.491 0.990 0.315 4.047 0.289 0.999 3.744 2.950 3.151 0.560 2.440 1.326 0.767 2.829 0.148 CP1 ST2 ST2 ST1 ST2 1.329 0.680 1.329 2.282 ST1 P2 PST1 1 C-05.3 2 C-05.3 Notes :- Scale : 1 : 35 Date : 01/02/24 No : C-02.03 Sheet : Elevations 2-A & 2-C Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 35 Elevation 2 - a 1 1 : 35 Elevation 2 - c 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint P2 Yellow Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 27. G 1.200 1 5.200 3.745 0.599 2.245 0.900 3.744 1.402 2.342 0.108 3.257 2.950 0.794 2.950 0.582 0.961 P2 P1 CP1 P2 ST1 P2 2 C-05.4 Section 2 G 1.200 1 5.200 1 C-03.1 A 2 C-03.1 B 1 C-03.3 E 3.744 0.895 2.245 0.599 3.744 3.200 0.749 1.329 0.953 1.329 1.011 0.716 1.700 0.635 2.403 3.090 1.498 ? P1 P2 PVC1 1.329 0.680 0.169 1.505 2 C-03.3 F 2 C-03.4 H PVC1 CP1 Notes :- Scale : 1 : 35 Date : 01/02/24 No : C-02.04 Sheet : Elevations 2-B & 2-D Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 35 Elevation 2 - B 1 1 : 35 Elevation 2 - D 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint P2 Yellow Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 28. Notes :- Scale : Date : 01/02/24 No : C-02.D1 Sheet : Materials & Keys for Elevations Project : Links Cafe Owner : C.L.C. Project Number : S-03 Prep. by :Mohannad Rabea A.Ullah Wall Material Takeoff Mark Name Description Image CP1 painting textured concrete Jazeera paints concrete effect primer as selected sample. CT1 Tribe white GEMMA Tribe Wall tiles White 25x75 cm CT2 Salmon Pastel GEMMA Pastel Wall tiles Salmon 25x75 cm CT3 Etna Grey Geometric GEMMA Etna Wall tiles Grey Geometric 50x150 cm CW3 Wooden ceiling Ribs 2-1/4" * 1" Salts are variable length and assembled on a Notched Backers customized shape , Golden Maple finish as selected sample G1 blurred glass Yellow blurred glass thickness 1cm as selected sample. P1 Beige Paint Jazeera Paint Beige Sky Light OW-4802 Wall Material Takeoff Mark Name Description Image P2 Yellow Paint Jazeera Paint yellow Summer Sun YL-0058 PVC1 Orange matt Cladding Orange matt PVC Wall Cladding Sheet chemical resistance Fire rated to self extinguishing Sheet Thickness 2.5mm as selected sample. SS1 black steel square tube black steel 1.5x1.5cm square tube electrostatic painting as selected sample.costmuzed shape a black steel 1.5x 1.5 cm rectangular tube electrostatic painting custom shape & Welded as drawings ST1 black sticker self adhesive stickers for walls strrips 5cm as selected sample. ST2 orange sticker orange self adhesive stickers for walls as selected sample. WP1 Wooden sheild paint Block Board Wooden sheild paint as selected sample. WS1 Wooden skirting Wooden skirting boards 100mm white vintage oak with dimensions of 2400 x 14 x 100 mm. With A gap for led profile.- as selected sample.
  • 29. G 1.200 1 5.200 CT2 P1 CP1 3.745 CT3 CT1 3.745 0.544 3.200 1.944 1.710 0.090 1.135 1.909 0.700 1.135 1.369 0.200 1.040 1.070 0.800 CT1 0.805 0.905 0.253 0.595 0.223 0.153 0.050 0.677 0.070 0.070 0.677 0.050 HL1 HL1 1 C-07.4 P CT3 CT3 G 1.200 1 5.200 CT1 CT2 P1 1.690 0.599 1.455 3.745 0.948 1.035 1.040 0.828 WS1 CP1 3.200 0.544 1.800 1.944 0.090 1.710 0.179 2.299 0.078 1 C-07.4 P PST2 2 C-05.1 Notes :- Scale : 1 : 30 Date : 01/02/24 No : C-03.1 Sheet : Section A-A & Section B-B Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 30 Section A-A 1 1 : 30 Section B-B 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker WS1 Wooden skirting
  • 30. G 1.200 1 5.200 3.744 1.135 2.609 3.745 3.744 3.151 0.593 1.534 2.210 2.400 0.000 1.344 2.400 1.944 1.710 0.090 P1 CP1 WS1 CT1 CT2 G1 2.300 2.100 0.100 G 1.200 1 5.200 1.392 0.679 1.673 0.544 3.200 CP1 WS1 3.745 0.544 3.200 3.151 0.593 3.745 0.230 2.280 0.090 0.119 2.181 0.200 P1 3 C-05.1 4 C-05.1 PST3 PST4 Notes :- Scale : 1 : 30 Date : 01/02/24 No : C-03.2 Sheet : Section C-C 7 & Section D-D Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 30 Section C-C 1 1 : 30 Section D-D 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WS1 Wooden skirting
  • 31. G 1.200 1 5.200 1.687 0.630 1.427 0.235 2.200 0.109 CP1 WS1 3.145 0.599 3.745 0.090 1.710 1.944 1 C-05.1 PST5 P1 G 1.200 1 5.200 MG1 CP1 WS1 2.400 0.400 1.575 0.445 2.100 3.745 1 C-07.4 P P1 PST6 PST7 2 C-05.2 3 C-05.2 Notes :- Scale : 1 : 30 Date : 01/02/24 No : C-03.3 Sheet : Section E-E 7 & Section F-F Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 30 Section E-E 1 1 : 30 Section F-F 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint P2 Yellow Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 32. G 1.200 1 5.200 1.329 PVC1 CP1 2.181 1.929 0.619 0.475 PVC1 G 1.200 1 5.200 MG1 HL1 1.664 2.080 3.745 2.110 0.100 1.344 2.400 0.445 0.848 0.915 0.665 0.847 0.513 1.313 1.738 0.881 1.502 HL1 Notes :- Scale : 1 : 20 Date : 01/02/24 No : C-03.4 Sheet : Section G-G 7 & Section H-H Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 20 Section G-G 1 1 : 20 Section H-H 2 Walls Material Mark Name CP1 painting textured concrete CT1 Tribe white CT2 Salmon Pastel CT3 Etna Grey Geometric CW3 Wooden ceiling Ribs G1 blurred glass P1 Beige Paint PVC1 Orange matt Cladding SS1 black steel square tube ST1 black sticker ST2 orange sticker WP1 Wooden sheild paint WS1 Wooden skirting
  • 33. Notes :- Scale : Date : 01/02/24 No : C-03.D1 Sheet : Materials & Keys for Sections Project : Links Cafe Owner : C.L.C. Project Number : S-03 Prep. by :Mohannad Rabea A.Ullah Wall Material Takeoff Mark Name Description Image CP1 painting textured concrete Jazeera paints concrete effect primer as selected sample. CT1 Tribe white GEMMA Tribe Wall tiles White 25x75 cm CT2 Salmon Pastel GEMMA Pastel Wall tiles Salmon 25x75 cm CT3 Etna Grey Geometric GEMMA Etna Wall tiles Grey Geometric 50x150 cm CW3 Wooden ceiling Ribs 2-1/4" * 1" Salts are variable length and assembled on a Notched Backers customized shape , Golden Maple finish as selected sample G1 blurred glass Yellow blurred glass thickness 1cm as selected sample. P1 Beige Paint Jazeera Paint Beige Sky Light OW-4802 Wall Material Takeoff Mark Name Description Image P2 Yellow Paint Jazeera Paint yellow Summer Sun YL-0058 PVC1 Orange matt Cladding Orange matt PVC Wall Cladding Sheet chemical resistance Fire rated to self extinguishing Sheet Thickness 2.5mm as selected sample. SS1 black steel square tube black steel 1.5x1.5cm square tube electrostatic painting as selected sample.costmuzed shape a black steel 1.5x 1.5 cm rectangular tube electrostatic painting custom shape & Welded as drawings ST1 black sticker self adhesive stickers for walls strrips 5cm as selected sample. ST2 orange sticker orange self adhesive stickers for walls as selected sample. WP1 Wooden sheild paint Block Board Wooden sheild paint as selected sample. WS1 Wooden skirting Wooden skirting boards 100mm white vintage oak with dimensions of 2400 x 14 x 100 mm. With A gap for led profile.- as selected sample.
  • 34. 2.245 2.400 0.050 0.445 0.050 1.155 0.050 0.445 0.050 0.050 1.125 0.050 1.125 0.050 0.665 0.050 0.870 0.050 0.665 2.245 5.700 0.050 0.445 0.050 1.155 0.050 0.445 0.050 0.050 0.625 0.050 2.100 0.050 2.100 0.050 0.625 0.050 0.175 0.050 0.860 0.050 1.180 0.050 0.870 0.050 1.200 0.050 0.840 0.050 0.175 2.245 5.817 0.050 0.445 0.050 1.155 0.050 0.445 0.050 0.050 0.630 0.050 2.148 0.050 2.140 0.050 0.650 0.050 0.189 0.050 0.850 0.050 1.250 0.050 0.850 0.050 1.250 0.050 0.851 0.050 0.178 Notes :- Scale : 1 : 30 Date : 01/02/24 No : C-04.1 Sheet : Curtain wall windows Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho 3D Ortho 3D Ortho 1 : 30 Elevation Front 1 : 30 Elevation Front 1 : 30 Elevation Front
  • 35. Glass panel Aluminum stain steel handle 2.105 1.950 0.960 0.005 0.985 2.125 1.950 painted as selected sample. 2.080 2.065 0.035 2.030 0.810 painted as selected sample. 2.065 0.810 0.060 2.065 2.125 1.045 1.000 0.131 1.978 0.091 2.200 0.900 0.625 0.100 0.175 0.373 1.455 0.373 2.200 Orange Glass as selected sample. concrete texture as selected sample. 0.900 Notes :- Scale : 1 : 20 Date : 01/02/24 No : C-04.2 Sheet : Doors and windows Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 Type Mark Usage Description Dimensions Count Comments Width Height D1 Entrance Curtain door - 2 leaf with double tempered glass 6 mm with aluminum frame 1.950 2.125 1 Type Mark Usage Description Dimensions Count Comments Width Height D3 storage Wood oak cm 8 - wood oak door hinged casing and architrave - renewed door 0.810 2.080 1 Existing door Type Mark Usage Description Dimensions Count Comments Width Height D2 kitchen Hinged Door frameless Flush with wall with concrete texture & orange Glass panel 0.900 2.200 1 Type Mark Usage Description Dimensions Count Comments Width Height D4 WC MDF wooden door with oak veneer treated for water resistance 0.810 2.080 2
  • 36. 0.600 2.300 2.280 0.680 0.680 2.180 2.200 0.630 Notes :- Scale : 1 : 10 Date : 01/02/24 No : C-05.1 Sheet : Stickers Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 10 PST2 2 1 : 10 PST3 3 1 : 10 PST4 4 1 : 10 ST5 1
  • 37. 4.045 1.490 G 1.200 0.400 2.400 G 1.200 2.100 0.450 Notes :- Scale : 1 : 15 Date : 01/02/24 No : C-05.2 Sheet : Stickers Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 15 PST1 1 1 : 15 PST6 2 1 : 15 PST7 3
  • 39. G 1.200 0.000 0.000 0.140 0.000 0.100 0.000 0.000 0.030 0.000 0.050 0.065 0.000 0.085 0.000 0.045 0.803 0.511 0.392 0.635 0.395 0.629 1.314 1.517 0.537 0.311 0.417 0.134 0.748 0.346 0.298 0.408 0.562 0.152 0.271 0.374 0.500 0.900 1.683 1.191 1.161 1.263 1:0.025 G 1.200 0.060 0.000 0.000 0.074 0.000 0.000 0.000 0.000 0.000 0.211 0.000 0.000 0.118 0.900 1.130 1.956 1.487 0.550 0.136 1.332 3.436 0.844 0.406 0.719 0.344 0.771 0.406 2.768 1.011 framing system Faces Framing System 1.5cm Aluminum tube Aluminum wires for flexibility Notes :- Scale : As indicated Date : 01/02/24 No : C-05.4 Sheet : Skeleton for Deconstructivism wall detail Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 25 Section S1 1 : 25 Section S2 Metal skeleton frame
  • 40. WPC for water drain water drain fixture slope wooden support 0.875 0.100 2.100 0.100 2.300 Fixing bar support bar glass sheet G1 SS1 Notes :- Scale : 1 : 5 Date : 01/02/24 No : C-05.5 Sheet : WC Details Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Section WC 1 : 5 Wall Hung Toilet detail 1 : 5 flooring drain system glazed partitions detail
  • 42. height = 3.080 height = 3.180 height = 3.130 height = 3.330 height = 3.330 height = 3.270 height = 3.130 height = 3.260 height = 3.250 height = 3.200 height = 3.080 height = 3.080 height = 3.080 height = 3.190 height = 3.280 height = 3.130 height = 3.180 height = 3.180 height = 3.230 height = 3.320 height = 3.330 height = 3.270 height = 3.280 height = 3.270 height = 3.240 height = 3.200 height = 3.230 height = 3.288 height = 3.216 height = 3.276 height = 3.222 height = 3.204 height = 3.242 height = 3.234 height = 3.200 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-06.2 Sheet : Wall support height Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 height Wall
  • 43. 0.463 0.163 Ceiling Support 1.000 0.300 0.700 5.604 6.757 3.200 6.002 5.687 6.638 1.101 1.378 5.832 5.946 5.631 6.007 1.725 2.652 1.644 5.660 1.973 6.113 0.488 0.366 1.051 0.717 0.606 5.927 *wire depth in attached section D (2) Notes :- Scale : As indicated Date : 01/02/24 No : C-06.3 Sheet : upper bar ceiling - Main points support Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 15 Detail Section A 1 : 50 upper bar ceiling - Main points support
  • 44. panels 8mm Aluminum Frame 0.130 1.325 0.805 1.210 Start point 0.315 0.155 0.620 0.385 1.190 1.390 2.965 2.620 0.615 2.635 3.400 0.930 0.915 1.510 3.035 3.485 3.710 4.020 4.520 5.090 D=11.5CM D=14CM D=14.5CM D=13.5CM Notes :- Scale : 1 : 15 Date : 01/02/24 No : C-06.4 Sheet : upper ceiling bar - inner sector Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 15 Aluminum Frame Coordinate Plan
  • 45. wall 2-1/4" * 1" Salts Wooden Backers Suspension System Beam End Retaining Clip Adjustable Trim Clip Fixture Suspension System 2-1/4" * 1" Salts Wooden Backers Sliding Integration Bracket Integrated Light Connection Clip Cut Backer Support Clip Linear Integrated Lighting Fixture Notes :- Scale : 1 : 5 Date : 01/02/24 No : C-06.5 Sheet : Ceiling Details Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 5 ceiling wall connection detail 1 : 5 ceiling Suspension System 3D detail 1 : 5 Linear Integrated Lighting 3D Detail
  • 46. Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-06.6 Sheet : Linear Lighting Integration Ceiling Plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 Linear Lighting Integration Ceiling Plan Light Bar Lengths Length Count 0.600 90 1.200 60
  • 47. T1 C1 C1 T1 C1 C1 T1 C1 C1 T1 C1 C1 T1 C1 C1 T1 C1 C1 T1 C1 C1 B1 SZ C1 S1 T1 T1 C1 C1 C1 C1 S1 C1 C1 S1 C1 C1 S1 C1 S2 S3 T1 B2 P1 MR1 MR1 MR2 MR2 T2 T2 T2 T2 Notes :- Scale : 1 : 50 Date : 01/02/24 No : C-07.1 Sheet : Furniture Marking plan Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 50 Furniture detail plan Furniture Schedule Type Mark Count Sheet No. B1 1 C-07.2-1 , C-07.2-2 B2 1 C-07.2-3 C1 24 C-07.3 FP1 11 C-07.4 FP2 58 C-07.4 FP3 26 C-07.4 MR1 2 C-07.5 MR2 2 C-07.6 P1 1 C-07.7 S1 4 C-07.8 S2 1 C-07.9 S3 1 C-07.10 SZ 2 C-07.11 T1 10 C-07.12 T2 4 C-07.13
  • 48. B1 B2 Notes :- Scale : Date : 01/02/24 No : C-07.2 Sheet : bar Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 * Furniture Schedule Type Mark :B1 - B2
  • 49. MC1 MO1 WL1 3 C-07.2-2 Elevation Front 1 C-07.2-2 Detail Section A1 2 C-07.2-2 Detail Section A3 3 . 3 9 7 3.341 3.089 2 . 6 7 6 1.168 0 . 3 6 3 8 3 . 5 2 ° 89.69° 237.00° 118.55° 112.53° 7 8 . 7 2 ° 4 C-07.2-2 Detail 4 3 C-07.2-2 Elevation Front 1 C-07.2-2 Detail Section A1 2 C-07.2-2 Detail Section A3 4 C-07.2-2 Detail 4 1 . 7 4 0 0 . 0 5 0 1 . 1 1 4 0 . 1 4 9 0.136 0.051 1.608 0.051 1.062 0.150 0.056 0.888 2 . 4 5 5 WL2 WL1 MC1 MG1 WL2 B1 Notes :- Scale : 1 : 20 Date : 01/02/24 No : C-07.2-1 Sheet : Bar - B1 -1 Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho 1 : 20 Top Plan Detail 1 1 : 20 Section Plan Detail 2 3D Ortho * Furniture Schedule Type Mark :B1
  • 50. 0.171 0.470 0.194 Drawer 0.155 0.150 0.150 0.349 cabinet Shelf handle handle ribs 18mm laminated 0.935 0.100 0.835 0.030 0.804 1.204 0.050 1.122 0.174 0.470 0.191 1 C-07.2-1 Plan Detail 2 C-07.2-1 Plan Detail1 0.100 0.835 0.935 0.027 0.739 0.069 0.057 0.056 0.057 0.057 0.027 0.187 0.377 0.193 0.051 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.060 0.100 Variable as top plan 6 0 . 9 0 ° 60.90° 0.050 0.735 0.050 0.045 0.012 0.470 0.010 5 8 . 1 9 ° 0.359 0.018 0.359 0.173 0.192 0.470 marble 3 cm marble 5 cm ribs 18mm laminated onyx marble 1cm LED Profile 2cm Laminted shelf 18 mm Notes :- Scale : As indicated Date : 01/02/24 No : C-07.2-2 Sheet : Bar - B1 -2 Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 10 Detail Section A1 1 1 : 10 Detail Section A3 2 1 : 10 Elevation Front 3 1 : 5 Detail 4 4 * Furniture Schedule Type Mark :B1
  • 51. PC1 WPC1 MC1 MG1 MG1 MC1 WPC1 WL2 5 C-07.2-3 Detail 1 4 C-07.2-3 Detail 2 3 C-07.2-3 Detail 3 0.216 0.148 3.209 0.857 3.573 1.082 0.644 1.150 1.415 0.100 0.875 0.107 2.817 0.216 0.057 2.544 0.297 1.150 1.098 0.832 0.245 0.582 67.93° marble 3 cm marble 3 cm 5 C-07.2-3 Detail 1 4 C-07.2-3 Detail 2 3 C-07.2-3 Detail 3 1.162 1.146 0.354 0.216 3.501 1.082 0.300 0.782 0.216 2.662 1.168 1.154 1 C-07.2-3 Plan Detail 2 C-07.2-3 Plan Detail1 0.900 1.047 0.800 0.100 0.050 0.700 0.050 drawer cabinet handle 1 C-07.2-3 Plan Detail 0.100 0.770 0.030 Laminted wood 18mm Marble 3cm Marble 2cm Laminted wood 18mm 1 C-07.2-3 Plan Detail 2 C-07.2-3 Plan Detail1 0.404 0.584 0.059 sticker 0.900 0.147 Notes :- Scale : 1 : 20 Date : 01/02/24 No : C-07.2-3 Sheet : Bar - B2 Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho 3D Ortho 1 : 20 Plan Detail 1 1 : 20 Plan Detail1 2 1 : 20 Detail 3 3 1 : 20 Detail 1 5 1 : 20 Detail 2 4 * Furniture Schedule Type Mark :B2
  • 52. SB1 FO1 FO1 RF1 C1 SS1 0.723 0.010 0.627 0.053 0.033 0.377 0.040 0.014 0.323 0.630 0.015 0.600 0.015 0.618 0.013 0.156 0.015 0.409 0.015 0.812 0.055 0.045 0.581 0.0450.086 0.017 0.314 0.015 0.351 0.015 0.010 0.713 0.586 0.226 0.540 0.187 0.215 0.193 0.180 0 . 0 0 6 sponge customize 0.132 0. 33 6 metal grid 0.630 0.812 0.190 0.212 0.410 0.209 0.177 0.426 0.030 0.030 0.690 Notes :- Scale : 1 : 5 Date : 01/02/24 No : C-07.3 Sheet : The Wing Armchair Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho 1 : 5 Elevation Back 3 1 : 5 Elevation Right 2 1 : 5 Elevation Front 4 1 : 5 Plan Detail 1 * Furniture Schedule Type Mark :C1 **all copyrights reserved to Dmitry Kozachyshyn
  • 53. 3.785 1.125 1.790 3.175 1.000 1.725 2.450 2.630 1.900 0.365 0.920 1.505 0.995 0.665 2.120 0.995 0.365 3.420 0.365 0.365 0.670 0 . 6 0 6 0.350 0.700 0.117 0 . 3 0 3 0.350 0.142 0.350 0 . 3 0 3 0.142 Notes :- Scale : As indicated Date : 01/02/24 No : C-07.4 Sheet : flower pots wall Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 20 Section P-P * Furniture Schedule Type Mark :FP1 , FP2, FP3 flower pots Schedule Type Mark Count FP1 11 FP2 58 FP3 26 FP1 FP2 FP3
  • 54. MR1 MRR WF1 0.515 0.025 0.420 0.025 0.385 0.470 1.375 1:0.03 1:0.026 Notes :- Scale : As indicated Date : 01/02/24 No : C-07.5 Sheet : Sink Mirror Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho 1 : 5 Elevation Back 1 : 5 Elevation Front 1 : 10 Mirror Parts _ Laser cut * Furniture Schedule Type Mark :MR1
  • 55. MR2 MRR WF1 2.220 0.965 Notes :- Scale : 1 : 10 Date : 01/02/24 No : C-07.6 Sheet : Wall Mirror Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 10 Elevation Front 1 : 10 Elevation Back 1 : 10 Mirror Parts _ Laser cut * Furniture Schedule Type Mark :MR2
  • 56. P1 WL3 0.900 9.557 9.557 0.459 5.973 0.475 3.108 0.410 0.049 5.617 0.259 0.100 0.100 0.256 0.100 2.808 0.100 0.201 0.259 5.973 0.475 3.108 0.900 0.900 0.100 0.800 Notes :- Scale : 1 : 25 Date : 01/02/24 No : C-07.7 Sheet : Fixed Flower box Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 Flower box 1 : 25 Elevation Front 1 : 25 Plan Detail 1 : 25 Elevation Back 1 : 25 Elevation Right * Furniture Schedule Type Mark :P1
  • 57. S1 LG1 FG1 0.954 0.993 0.560 0.280 0.065 0.609 0.346 0.302 0.346 0.280 0.065 0.200 0.954 2.200 0.609 0.345 0.400 1.400 0.400 0.345 Sponge Height 0.215 0.394 2.200 0.954 0.400 1.540 0.0400.220 Notes :- Scale : 1 : 10 Date : 01/02/24 No : C-07.8 Sheet : Deconstructivism Sofa Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 1 : 10 Plan Detail 1 1 : 10 Detail 2 2 1 : 10 Elevation Front 3 1 : 10 Elevation Back 4 sponge detail * Furniture Schedule Type Mark :S1
  • 58. LG1 LG1 FG1 3.960 2.894 0.500 0.100 0.600 S2 GW1 1.800 1.966 1.891 2.177 1.889 1.880 2.166 1.920 2.077 2.060 1.965 LG1 WL3 FG1 Laminated part back base cushion outlins main base Notes :- Scale : As indicated Date : 01/02/24 No : C-07.9 Sheet : Deconstructivism Sofa Left corner Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 * Furniture Schedule Type Mark :S2 3D Ortho 1 : 20 Plan Detail 1 1 : 20 Elevation Back 2 1 : 20 Elevation Front 3 1 : 20 Elevation Left 4 1 : 20 Elevation Right 5 3D Ortho 1 : 50 Sofa outlines
  • 59. S3 2.090 2.084 1.882 1.884 2.104 2.088 2.191 2.179 1.937 1.920 LG1 FG1 GW1 LG1 FG1 WL3 LG1 LG1 4.172 3.077 0.434 2.368 0.275 0.411 3.214 0.547 0.600 0.500 0.100 Laminated part back base cushion outlines main base 4.172 3.077 Notes :- Scale : As indicated Date : 01/02/24 No : C-07.10 Sheet : Deconstructivism Sofa Right corner Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 * Furniture Schedule Type Mark :S2 3D Ortho 3D Ortho 1 : 20 Plan Detail 1 1 : 20 Elevation Back 4 1 : 20 Elevation Front 2 1 : 20 Elevation Left 3 1 : 20 Elevation Right 5 1 : 50 Sofa outlines
  • 60. SZ WP1 WP1 Soft close 0.410 3.220 3.630 0.275 4.200 4.475 0.560 3.069 0.644 3.831 2.100 2 C-07.11 Detail 0 1.159 0.960 0.591 0.573 2.702 2.931 2.285 0.900 0.058 0.750 0.092 0.915 0.850 0.063 0.425 0.426 0.900 0.500 0.400 Notes :- Scale : 1 : 15 Date : 01/02/24 No : C-07.11 Sheet : Social zone seats Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D View 1 : 15 Plan Detail 1 1 : 15 Detail Section 2 Furniture marking * Furniture Schedule Type Mark :SZ
  • 61. T1 SB2 CW1 MG2 0.356 0.356 0.356 0.356 ø 0 . 1 0 0 RF1 0.050 0.650 ø 1.000 Notes :- Scale : 1 : 5 Date : 01/02/24 No : C-07.12 Sheet : Main Table Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 3D Ortho * Furniture Schedule Type Mark :T1 1 : 5 Base paln 1 : 5 Elevation Front 1 : 5 Plan Detail Copy 1
  • 62. T2 WL2 SS1 0.415 1.760 0.210 1.300 0.250 14 .9 9° 4 3 . 9 5 ° 121.07° 6 3 . 4 3 ° 101.58° 14 .9 9° 0.415 0.415 0.900 1.760 0.055 1.245 0.240 0.015 0.400 0.445 0.445 0.445 Notes :- Scale : 1 : 10 Date : 01/02/24 No : C-07.13 Sheet : Low Table Drawn By : Mohannad Rabea A.Ullah Project : Links Cafe Owner : C.L.C. Project Number : S-03 * Furniture Schedule Type Mark :T2 3D Ortho 1 : 10 Elevation Front 2 1 : 10 Elevation Right 3 1 : 10 Plan Detail 1 1 : 10 Elevation Left 4 1 : 10 Wireframe View 5
  • 63. Notes :- Date : 01/02/24 No : C-07.D1 Sheet : Furniture Materials Scale : - Project : Links Cafe Owner : C.L.C. Project Number : S-03 Prep. by :Mohannad Rabea A.Ullah Furniture Materials Schedule Name Mark Description Image wooden cilynder CW1 wooden cilynder finish Wooden sheild paint as selected sample. Fabric grey FG1 Fabric grey matt Finish as selected sample. off-white fabric FO1 off-white fabric fabric with a matt texture as selected sample. light grey leather LG1 light grey leather matt finish as selected sample. Calacatta White Marble MC1 Calacatta White Marble Variable thickness Polished finish as selected sample. Piazza Grigio Marble MG1 Piazza Grigio Matt Marble Variable thickness as selected sample. white gold gray marble MG2 Natural white gold gray marble texture as selected sample. Furniture Materials Schedule Name Mark Description Image Orange Onyx Marble MO1 Orange Onyx Marble light through thick 1cm as selected sample. MIROR MRR Mirror Tempered glass with high reflection as selected sample. paint or sticker PC1 Void area with paint or sticker orange as selected sample. Rubber Feet RF1 Rubber Polyamide Feet rectangle as selected sample. black steel rectangular tube SB1 black steel 1.5x30cm rectangular tube electrostatic painting costmuzed shape ablack steel 1.5x 30 cm rectangular tube electrostatic painting as selected sample. custom shape & Welded as drawings. black steel polish tube SB2 black steel 1.5x30cm rectangular tube electrostatic painting costmuzed shape ablack steel 1.5x 30 cm rectangular tube electrostatic painting as selected sample. custom shape & Welded as drawings black steel square tube SS1 black steel 1.5x1.5cm square tube electrostatic painting as selected sample.costmuzed shape a black steel 1.5x 1.5 cm rectangular tube electrostatic painting custom shape & Welded as drawings ADDITNAL ACSESORIS Furniture Materials Schedule Name Mark Description Image wooden frame WF1 painted wooden frame Wooden Texture Ribs WL1 wooden texture ribs 1.8 x 1.8 cm Polished finish as selected sample. Wooden Texture 2 WL2 wooden texture panels Matt finish as selected sample. Wooden Texture 3 WL3 cladding wooden texture panels Matt finish as selected sample. Wooden sheild paint WP1 Block Board Wooden sheild paint as selected sample. Wood painting textured concrete WPC1 Block Board painting textured concrete 1.8 cm as selected sample. handle