The document provides general notes for a construction project, including:
- Contractors must verify all dimensions in the field and notify the architect of any discrepancies before proceeding.
- Contractors are responsible for investigating field conditions and providing temporary supports/protection of existing structures as needed.
- All work must conform to local and state codes.
- Relevant dimensions for equipment installations must be verified against manufacturer drawings.
- All new wall, floor, and ceiling penetrations must be fire stopped to the required fire rating.
- Drawings not marked "Issued for Construction" shall not be used for construction purposes.
TechTown vision for the first-floor redesign is to create a more open, collaborative environment for entrepreneurs, along with a best-in-class conference center to serve the expanding need for sophisticated and flexible meeting space in this building.
My duties on this project include:
- Field measurements & existing condition verification.
- Project document setup.
- Construction documentation & detailing utilizing Revit.
TechTown vision for the first-floor redesign is to create a more open, collaborative environment for entrepreneurs, along with a best-in-class conference center to serve the expanding need for sophisticated and flexible meeting space in this building.
My duties on this project include:
- Field measurements & existing condition verification.
- Project document setup.
- Construction documentation & detailing utilizing Revit.
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Damon Thomas
Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Aadhar Homes
106 Golf Avenue presents the perfect opportunity to exercise supreme affluence with the splendor and awe of a golf life.
Call Now: +91-9811750130
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price floor plan construction status project specifications and amenities.
Call Now: +91-9811750130
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Damon Thomas
Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Aadhar Homes
106 Golf Avenue presents the perfect opportunity to exercise supreme affluence with the splendor and awe of a golf life.
Call Now: +91-9811750130
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price floor plan construction status project specifications and amenities.
Call Now: +91-9811750130
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Damon Thomas
Please view the latest slideshare of the 1st floor renovation project at TechTown - Detroit. There is a lot of excitement happening around TechTown now that finishes are being installed. If you view the May construction photos you will see the progress is amazing! You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Damon Thomas
As this year comes to a close, I reflect back on all of our projects this year. All of our projects presented great opportunities for creative design solutions but the one that stands out the most is TechTown’s 1st Floor Renovation project. This involved renovating nearly 26,000sf of existing office space and transforming the floor into Detroit’s premier Co-Working Space named Junction440 (opening in January 2014). I started posting these slideshares to capture the construction progress of this project every month starting back in May 2013. As the construction for this project finishes up I encourage everyone to view all of progress posted on my slideshare profile. We are blessed & proud of this accomplishment at Centric Design Studio. Enjoy!
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Damon Thomas
Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Damon Thomas
Progress continues despite this late posting of month number three of TechTown’s 1st Floor Renovation Project. Every month I track and post the construction progress of this project. My firm Centric Design Studio designed this space for Detroit based TechTown. You can view the previous two slide share months of progress (starting in May 2013) to see how far we’ve come. Come back next month and see the progress. Thanks for viewing.
is Single -Family Home located at 1070 Lombard Street, San Francisco CA. 1070 Lombard St has 3 baths and approximately 3,597 square feet. e property has a lot size of 3,244 sq ft and was built in 1939. e average listing price for similar homes for sale is $4,567,427 and the average
sales price for similar recently sold homes is $1,896,233. 1070 Lombard St is in the Russian Hill neighborhood in San Francisco, CA. e average price per square foot for homes for sale in Russian Hill is $1,041.
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95MaximaSheffield592
CE 444 Contracts and Specifications
Assignment 7 - Conduct a 95% Design Review
Due Date: 11:59 pm (Central Time) 23 March
Points: 15
BACKGROUND: You are a newly hired engineer within the Corps of Engineers. As your first assignment, your boss hands you the attached document (95% Design Review 030222) and says, “We want to put this contract out for solicitation in two weeks. Go through it and see if you find any errors or omissions that need correcting. Unless you find something critical, it’ll go out ‘as-is.’ Put any comments you have on the excel spreadsheet. Good luck…”
PROJECT BACKGROUND: Nine road closures have been constructed in the City of East Grand Forks, MN, since 1998. These road closures are installed during severe flooding to prevent floodwaters from inundating the City. However, since installation, a number of the sill plates have become loose; a few have cracks; some sound hollow, and may have voids in the concrete beneath the sill plate. The City wants to ensure the voids beneath the plates are filled in order to ensure optimum performance and reduce maintenance issues. A small contract is about to be advertised to correct these problems. (Pictures are attached for reference.)
PERTINENT INFORMATION: East Grand Forks is located in Polk County, Minnesota, at the confluence of the Red and Red Lake Rivers. This is a real-time assignment – you are reviewing this in March 2022 for immediate advertisement. Flood season generally occurs between late March – late April. Four of the last fourteen years, the Demers Ave, North and South River Road and 4th Street closures have been installed to prevent flooding. All of the other closures have been installed at least once in the last ten years. Current flood predictions from the NWS indicate flooding may be similar to 2009 – in that year, all closures were installed and two of three bridges across the Red River were closed.
ASSIGNMENT DOCUMENTS: The assignment documents include the solicitation document (SF 1442), the Scope of Work, project sketches/designs and referenced specifications. I have removed the Federal Acquisition Register clauses because they add another 100 pages without adding content to the assignment. I have also provided a sample comment spreadsheet. This explanation document includes photos and a map of East Grand Forks, MN.
ASSIGNMENT: Review the Document titled “95% Design Review” and note comments on an excel spreadsheet. I’ve provided an example spreadsheet and an example comment. Conduct a design review and identify issues. Provide a minimum of 15 comments of value. No more than one comment may refer to spelling, grammar or spacing of the contract document.
PICTURES:
Demers Road Closure under assembly
Construction of the extension walls which
tie into the sill plate (note anchor baskets
Demers Ave sill plate in both the extension walls and within the
sill plates.)
C ...
This is project done for my Electronic Design class during the beginning of my Sophomore year at SCAD. The objective was to reinforce basic and In-Place modeling techniques and to work with CAD STANDARDS using accurate sheet naming and title blocks.
This is a four story family home for 5 built on a hill like topography consisting of a river, a walkway to a balcony from the basement level and fully furnished interiors.
The sheet includes Project Data, Notes, Floor Plans, Finish Plans, Colored Plans, Ceiling Plans, Exterior Elevations, Interior Elevations, Sections, Poche Sections, Enlarged Sections, Enlarged Plans, Details, Room Finish Schedule, User Define, Renderings, Interior Camera views, Exterior Camera views, Exploded Axon and Exploded Section. The final presentation was displayed on an Architectural D sheet.
Application used: Revit
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
1. UP
UP
GENERAL NOTES
1. VERIFY ALL DIMENSIONS IN THE FIELD. DO NOT SCALE DRAWINGS.
2. IT SHALL BE EACH TRADE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE
AND FAMILIARIZE HIMSELF/HERSELF WITH ALL EXISTING CONDITIONS. EACH
CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND
OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION
CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS. SHOULD ANY
ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED
WITH THE WORK AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE
ARCHITECT AND THE OWNERS REPRESENTATIVE FOR CLARIFICATION
AND/OR CORRECTION.
3. DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWED AND ALL NECESSARY
ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF
WORK. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
4. ALL EXISTING CONSTRUCTION AND SURFACES WHICH ARE TO REMAIN BUT
ARE AFFECTED BY THE WORK UNDER THIS CONTRACT SHALL BE RESTORED
AND REFINISHED TO MATCH THE CONSTRUCTION, FINISH AND ALIGNMENT OF
THE EXISTING ADJACENT CONSTRUCTION AND FINISHES.
5. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS,
MEETING OWNER'S REQUIREMENTS.
6. THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL
UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION.
ALL DISCREPANCIES SHALL BE DOCUMENTED AND FORWARDED TO
ARCHITECT AND OWNER OR OWNER'S REPRESENTATIVE FOR ACTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE FIELD
CONDITIONS AND PROVIDE, AS NEEDED, TEMPORARY SUPPORTS, SHORING,
AND/OR PROTECTION OF EXISTING STRUCTURES AND UNDERGROUND
UTILITIES DURING EXECUTION OF WORK.
8. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE
CODES.
9. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS
SHALL BE VERIFIED AGAINST MANUFACTURER'S CERTIFIED EQUIPMENT
DRAWINGS.
10. ALL PENETRATIONS TO FLOORS, CEILINGS, AND WALLS SHALL BE SEALED
AND FIRE STOPPED TO A FIRE RATING EQUAL TO THE CONSTRUCTION BEING
PENETRATED AT NEWLY CREATED ROOMS.
11. DRAWINGS THAT DO NOT BEAR THE MARK ISSUED FOR CONSTRUCTION
SHALL NOT BE USED FOR CONSTRUCTION PURPOSES.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:24PM
A0.00
Cover Sheet
12-51
Palmer Woods
09/25/12
CM,SL
SL
17550 Fairway Dr.
Detroit, MI 48221
17550 FAIRWAY DRIVE
DETROIT, MI 48221
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
SHEET
ISSUE
DATE
A0.00 Cover Sheet 09/25/12
A0.01 Demolition Plan - First Level 09/25/12
A0.02 Demolition Plan - Second Floor 09/25/12
A1.01 First Floor Plan 09/25/12
A1.02 Second Floor Plan 09/25/12
A1.03 ROOF PLAN 09/25/12
A3.01 North + West Elevations 09/25/12
A3.01D Demo North + West Elevation 09/25/12
A3.02 South + East Elevations 09/25/12
A3.02D Demo South + East Elevations 09/25/12
A5.1 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12
A5.2 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12
A6.1 DETAILS SHEET 09/25/12
S1.0 SITE PLAN 09/25/12
3/64" = 1'-0"
KEY PLAN
SITE LOCATION MAP
PROJECT INFORMATION
RENOVATION OF KITCHEN, MASTERSUITE AND ADDING A SECOND
STORY BALCONY TO AN EXISTING 4,000 SQ.FT HOME IN PALMER
WOODS GOLF COURSE SUBDIVION. CONVERTING A 5 BEDROOM
RESIDENCE INTO A 3 BEDROOM ON THE SECOND LEVEL. RENOVATION
INCLUDES 1,995 SQ.FT OF THE TOTAL 4,000 SQ. FT RESIDENTIAL
SPACE, RESIDENTIAL USE (R1).
SITE
GOLF
COURSE
Burkeen Construction
39740 Warren Rd. Canton, MI
(734) 673-7111
CONTRACTOR:
ERA Majestic Realty
23350 Greenfield, Suite 101
Oak Park, MI
(313) 399-9538
REAL ESTATE DEELOPER
Date: Submitted for:
9/25/2012 PERMITS
2. UP
UP
UP
9'-10"
EXISTING GARAGE TO REMAIL
STONE VENEER AND SIDING TO BE REMOVED
REMOVE EXISTING PILASTER
EXISTING PLUMBING SEWER
& WATER LINES TO REMAIN
REMOVE & CAP EXISTING
PLUMBING LINES BELOW
FLOOR LINE
EXISTING PORCH TO REMAIN
REMOVE EXISTING COUNTER TOP,
BASE CABINETS AND SOFFIT ABOVE
RELOCATE EXISTING
SINK
SALVAGE EXISTING
WALL CABINETS
(TYP)
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:35PM
A0.01
Demolition Plan - First
Level
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION FIRST FLOOR PLAN
EXISTING BRICK
PATIO TO REMAIN
EXISTING BRICK
WINDOW WELL
TO REMAIN
DEMO EXISTING
BOW WINDOW
REMOVE LOAD BEARING
WALL AND SHORE PER
STRUCTURAL DRAWINGS
N.I.C.
N.I.C.N.I.C.
REMOVE LOAD
BEARING WALL
AND SHORE PER
STRUCTURAL
DRAWINGS
EXTERIOR WINDOWS
REMOVED FOR
WINDOW REPLACEMENT
(TYP.) FIRST LEVEL PLAN
18 TOTAL - VERIFY IN FIELD
STUDYLIVING ROOM
LIBRARY
WINDOWS REMOVED FOR
REPLACMENT TO SAME SIZED
WINDOWS.
N.I.C.
BATH
Date: Submitted for:
3. DN
DN
UP
8'-10"
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:42PM
A0.02
Demolition Plan -
Second Floor
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION SECOND LEVEL PLAN
REMOVE EXISTING
CANOPY + ROOF
REMOVE EXISTING
LOW SLOPED ROOF
OVER GARAGE
EXTERIOR WINDOWS
REMOVED FOR
WINDOW REPLACEMENT
(TYP.) SECOND LEVEL
24 TOTAL - VERIFY IN FIELD
BEDROOM #2
N.I.C.
BEDROOM #1
N.I.C.
BEDROOM #3 BEDROOM #4
REMOVE LOAD
BEARING WALL
AND SHORE PER
STRUCTURAL
DRAWINGS
BEDROOM #5
REMOVE NON-LOAD BEARING WALLS
(TYP.) FOR MASTER SUITE NEW LAYOUT
Date: Submitted for:
4. UP
REF.
UP
UP
19' - 1"
19'-6"
20' - 11"
2'-7"
28'-5"
13' - 4"
13' - 2"
4'-0"
Library
1
227 SF
Sun Room
3
1S
A5.1
1
2
A1.03
A6.1
5
A6.1
3
A6.1
1
10
A6.1
17
A6.1
2
A6.1
---
-
99
1J
A6.1
12
112
14' - 7"
12'-8"
54
RISE WINDOW WELL
TO BE FLUSH WITH
PATIO SURFACE
224 SF
Kitchen
10
181 SF
Dining Room
11
Living Room
12
95 SF
Foyer
13
97
EXISTING FIREPLACE
TO REMAIN
NEW
PATIO
EXISTING
PATIO
9' - 3"
1'-5"6'-1"1'-3"
0' - 10" 2' - 9"
1'-3"2'-7"1'-5"6'-9"
EXISTING PLUMBING
LINES TO REMAIN (TYP)
PATCH & REPAIR
EXISTING FLOOR
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:04PM
A1.01
First Floor Plan
12-51
Palmer Woods
09/25/12
C. B., C. M., S.L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
New First Floor
NEW BRICK PATIO
TO MATCH SIMILIARLY
TO EXISTING
NEW CONCRETE
PAVER PATIO TO
MATCH OPPOSITE
HAND
Date: Submitted for:
5. DN
DN
UP
D W
1
A4.1
7'-8"
242 SF
Master Closet
4
379 SF
Master Suite
5
Bath
6
Bed Room
7
Bath
8
Bed Room
9
A5.2
1
2
A1.03
17
A6.1
51 52
7'-7"
34' - 7"
OPEN UP EXISTING
CHIMNEY TO NEW
DOUBLE SIDED
FIREPLACE
47
48
NEW PORCH
CANOPY (BELOW)
NEW RAIL 2'-0" &
BALUSTER FENCING
ON TOP OF FLAT ROOF
102 SF
Master Suite
14
N.I.C.
N.I.C.
N.I.C.
59
60
1' - 6"
5' - 0"
3'-11"
NEW GARAGE ROOF
HIP 4:12 PITCH
(BELOW)
NEW DECORATIVE RAILING
3'-6" HEIGHT
NEW BALCONY
NEW LAUNDRY
CLOSET
62
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:23PM
A1.02
Second Floor Plan
12-51
Palmer Woods
09/25/12
C. B., C. M., S. L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
NEW Second Floor
Date: Submitted for:
6. First Floor
0' - 0"
Second Floor
9' - 3"
Foundation
-1' - 3"
Ceiling 1
8' - 4"1' - 0"
12" OVERHANG
EXISTING GARAGE
ENGINEERED TRUSS
RE: STRUCTURAL SHEETS
26' - 6"
23'-6"
21' - 1"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:32PM
A1.03
ROOF PLAN
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
2
SECTION THRU NEW ROOF
1/4" = 1'-0"
3
Garage Roof Framing
Date: Submitted for:
7. First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Foundation
-1' - 3"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
REMOVE EXISTING
BAY WINDOW
REMOVE PORTION
OF EXISTING MASONRY
TO MATCH NEW COIN
INSTALLATION
REMOVE EXISTING SIDING
(TYP)
REMOVE EXISTING
PILASTER & CANOPY
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
REMOVE WINDOW & BRICKS
& SALVAGE BRICKS BELOW
WINDOW
REMOVE EXISTING
SIDING
WINDOW REPLACEMENT FOR
ALL WINDOWS & DOORS (TYP.)
REMOVE EXISTING BRICK, PICTURE WINDOW,
& FRAME. MAKE SURE TO SALVAGE BRICKS
BELOW WINDOW
CREATE OPENING
FOR NEW DOOR
REMOVE EXISTING DOOR
REPLACE WITH NEW CASEMENT
WINDOW
REMOVE EXISTING SIDING
(TYP)
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:27:50PM
A3.02D
Demo South + East
Elevations
12-51
Palmer Woods
09/25/12
C. B., C. M., S. L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION SOUTH ELEVATION
1/4" = 1'-0"
2
Demolition East Elevation
Date: Submitted for:
NOTE: SEE SHEET A3.01D
FOR TYPICAL DEMOLITION NOTES
8. First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
112
NEW LIMESTONE
VENEER
NEW LIMESTONE
DECORATIVE COIN
TYP
NEW EIFS
WALL SYSTEM
NEW BAY WINDOW
2'-0"
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
NEW EIFS
WALL SYSTEM
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:27:03PM
A3.01
North + West
Elevations
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
3
New West
1/4" = 1'-0"
4
New North Elevation
NEW POST, TOP &
BOTTOM RAILING, AND
BALUSTER FENCE
2'-0" HEIGHT
NEW REPLACEMENT
WINDOWS TYPICAL
NEW FIBERGLASS
STRUCTURAL COLUMN
& DECK (ALSO SEE
DECK MANUFACTURER
DRAWINGS.
NEW GUTTER &
DOWNSPOUT
NEW REPLACEMENT
WINDOWS (TYPICAL)
NEW EIFS EXTERIOR
WALL SYSTEM
NEW LIMESTONE
VENEER SURFACE
WITH STONE CAP
NEW EIFS EXTERIOR
WALL SYSTEM
Date: Submitted for:
9. First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7" NEW ROOF SHINGLES
12
4
99 971S
5152
1R
1R
NEW VINYL RAILING
TO MATCH EXISTING
NEW DECORATIVE
RAIL 3'-6"
NEW STRUCTURAL
POST W/ VINYL COVER
LIMESTONE VENEER WAINSCOTT
3'-8"
NEW EIFS WALL SYSTEM
NEW STONE
SILL
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
NEW DECORATIVE
EXTERIOR WALL COIN
EVERY 3RD & 6TH COURSE
IN HEIGHT
0'-8"0'-8"
NEW EIFS WALL SYSTEM
1' - 4"
0' - 8"
NEW LIMESTONE
VENEER
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:27:37PM
A3.02
South + East
Elevations
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
3
New East
1/4" = 1'-0"
4
New South Elevation
Date: Submitted for: