ELIMINATE & PREVENT
MUDA
MUDA
Content
1)The concept of MUDA/Waste
2)Methods for categorizing types of Muda
3)MUDA identification
4)Elimination of Muda
5)Methods for Muda prevention
1) The concept of Muda
What is Value?
Value is defined by your customer.
There are two types of Customers:-
-Internal customer
-External customer
Then Value is the activity/effect
what the customer exactly is
going to pay for/needs.
What is Waste/MUDA?
• Waste/MUDA is any activity of
workers/machines which consumes
resources such as money, time, energy,
materials, etc without adding value.
The main elements of
KAIZEN management
• Quality (Customer) Safety
• Cost (Company) Morale
• Delivery(Customer)
• QCD is the source of
productivity improvement
5
The concept of cost
Cost minimization
• Determination of the sales price of the product
Sales price=(manufacturing)cost + profit
• Manufacturing cost=(material + labor +
facility + utility + others)cost
C O S T
M
I
N
I
M
I
Z
E
Better Quality
On time
Delivery
Higher
Profit
Profit=Price-
Cost
ምን ይሻላል???
CUSTOMER
የትም ፍጭው
ዱቄቱን
አምጭው
Reasonable
Price
7
PRICE=COST + PROFIT
PROFIT= PRICE - COST
Company sets price(Demand>Supply)
Market sets price (Demand≤Supply)
TraditionalThinking
KaizenThinking
8
9
• Therefore, since today’s
economy is market based, we
should focus on minimizing our
COST to get higher profit.
• Do we have any choice?
10
The three categories of
Operations
• Value Adding/Net Operation
• Non Value Adding Operation
• Muda/Waste
The three categories of
Operations
(1) Net Operation
• Part of the operation that adds
value to make parts and products
Examples, Milling, Turning,
Grinding, Assembling and
Welding
12
(2) Non-Value adding Operations
• Operation that adds no value but
cannot be avoided
Example Setting up, Inspecting,
Picking up parts, Removing drill
chips
The three categories of
Operations
13
The three categories of Operations(Cntd)
(3) “Muda”
• Muda is a Japanese word meaning
Wasteful Activity
• Is anything unnecessary in operation.
• Can be eliminated immediately
14
(3) “Muda”
• It increases Production cost
• Muda affects the quality of the
product and also delivery time
The three categories of
Operations(Cntd)
15
Non-value adding
and wastes
• movements
• searching for
tools
• transporting
materials
• over production
• waiting /idle time
• making defects
etc
Value adding
• assembling
• molding
• spinning
• mixing
• building
• milling etc
“Muda” are activities which use resources,
time or cost without adding value.
16
Value Chain Consumers
Suppliers
Reduce Lead Time
Non Value Added & Waste activities
17
Product Lead-Time
freeleansite.com
Raw
Materials
Finished
Goods
Value Added
Time
Non- Value
Added Time
TIME
• Operation to staple two papers
using a stapler when work place
is disorganized
• Materials and tools
–Two pieces of paper
–Stapler
–Staples
Very Simple Drill
19
Very Simple Drill
Result in a disorganized environment
N0. Activities Time Type of
Operation
Measure How
1 Searching for
Stapler
35
Sec
Muda Eliminate 5S(Set-in-
order)
2 Searching for
Staples
30
Sec
Muda Eliminate 5S(Set-in
order)
3 Putting the
Staples into the
stapler
8 Sec Non-Value
adding
Minimize Load staples
ahead
4 Putting the two
papers
together
3 Sec Non-Value
adding - -
5 Staple the papers 2 sec Net Operation
(Value Adding) - -
20
Lessons from the drill
• Total time of operation=78 Sec
Net Operation(Value adding)=2 Sec(2.6%)
Non-Value adding operation=11 Sec(14.1%)
Muda(Unnecessary
operation)=65Sec(83.3%)
21
• Can you imagine by how much the total
time of the operation can be improved if
we try to eliminate the Muda and minimize
non value adding operations by applying
5S?
• What if the job order was to produce a
car?
Imagine the MUDA.
Lessons from the drill
22
MUDA = Anything Unnecessary
23
2)Methods For Categorizing
Types of Muda/Wastes
Classification of waste
A number of methods for classification of waste have
emerged. Here are some of them:-
The 3MU’s
5M+Q+S
The flow of goods
The Seven deadly wastes
Muda
Muri
Mura
1) The 3MU’s
MUDA-Capacity exceeds load.
MURA (imbalance or variation) =
capacity sometimes exceeds the load
and the load sometimes exceeds
capacity.
MURI(Physical or mental overburden)-
Load exceeds capacity .
Productivity improvement does not
mean hard work.
The Three MU’s
26
The Three M’s
Muda
• Production factors that increase
cost, in other words, all
unnecessary things
27
Muri
• Mental and physical overburden on
operators, and overburden on
production machinery
The Three M’s (Cntd)
29
Muri
We should not force hard work on
Employees in the name of
productivity improvement
Value added work
Working density =
Actual work
The Three M’s (Cntd)
30
Muri : overburden
የስራ ጫና Muri
የስራ ጫና
Muri
Mura
• Variation in work distribution,
production capacity of machinery, and
material specifications
The Three M’s
34
IN OUT
Relationship between the 3 M’s
• Usually Mura creates Muri which in
turn lead to generation of Muda
36
• Therefore, mura creates muri that
undercuts previous efforts to
eliminate muda.
• Eliminating mura is fundamental to
the complete elimination of muri
and muda
Relationship between the 3 M’s
37
2) 5M+Q+S
• Is another way of thinking in the areas
where waste may occurs 5M(man,
material,machine, method and
management), plus Quality and Safety.
Contd…
Material
Waste of:- Parts, Bolts, Welds, Functions, Storage &
Handling.
Man/Workers
Waste of:- Walking, Waiting, Searching, Unnecessary
movements
Management
Waste of:- Materials, Meetings, Management control,
Communications, Vouchers
Machine
Waste of:- Large machines, General purpose machines,
Conveyors, Machines with wasteful movements,
Breakdowns,
Contd….
Method
Waste of:- Large lot production, Inventory,
Conveyance, Retention, Non
standardization, Picking up setting down
work pieces.
Contd…
Quality
Waste in:- Making defective goods, Fixing
defects, errors, Inspection, Quality control.
Safety
Waste of:- Disaster prevention methods,
Fixing defects.
3) The Flow of Goods
• A third way of thinking about waste is to
focus on the flow of goods in production.
Materials are procured Materials are retained
Materials are conveyed to processes on production line
Materials are retained at the process equipment(WIP)
Materials are picked up for processing Materials are
processed Processed goods are set down and
retained on the other side of the processing
machine(WIP) Goods are conveyed to inspection
point Goods are retained until inspection Goods
are picked up and inspected Goods are set down and
retained on the other side of inspection process
Inspected goods are conveyed to the finished goods
warehouse Finished goods are retained prior to
shipment
Cont…..
If we look carefully at the flow of goods, you will
see four things going on:-
Retention, Conveyance, Processing and
Inspection
Retention-means stopping the flow of goods
producing inventory without adding value.
-It adds cost without adding value.
Conveyance-movement b/n retention points
without adding value.
Material handling movement b/n a retention
point & a process.
Contd……..
Processing-means adding value or altering
raw materials/parts /assemble parts to add
value.
Inspection-identifies defects from production
flow. It doesn’t add value b/c it doesn’t
eliminate the source.
4)The Seven deadly wastes
1) “Muda” of Overproduction
2) “Muda” of Inventory
3) “Muda” of Waiting
4) “Muda” in Transporting
5) “Muda” of Defect-making
6) “Muda” of Motion
7) “Muda” in Processing
Cost Reduction by
Elimination of muda
7 Categories
of Waste
Defect Making
Transportation
Over Produced
Motion
Inventory
Over Processed
Waiting
47
Steps to effective Muda identification
1. Making waste visible
2. Be conscious of the waste
3. Be accountable for the waste
4. Measure the waste
5. Eliminate or reduce the waste
50

More Related Content

Similar to E&P M.ppt

LEAN
LEANLEAN
Operation Management KG Ousl
Operation Management KG Ousl Operation Management KG Ousl
Operation Management KG Ousl
Upananda Witta
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
Mohamed EL-Sayed
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
Pruek Pinyo
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
videoaakash15
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
freelean
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigma
MD SALMAN ANJUM
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
shahrool
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsley Aduma
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
Varmahk
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
Faizaddin Shaikh
 
Production and management
Production and managementProduction and management
Production and management
MohammadWasique
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditing
PECB
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 
Operation Management ( ICWA Inter)
Operation Management  ( ICWA Inter)Operation Management  ( ICWA Inter)
Operation Management ( ICWA Inter)
Ulhas Wadivkar
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
Abhishek Raj
 
production and operations management(POM) Complete note
production and operations management(POM) Complete note production and operations management(POM) Complete note
production and operations management(POM) Complete note
kabul university
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
Pramod A
 
Production Management
Production ManagementProduction Management
Production Management
Umar Khan
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
PERUMALSAMY M
 

Similar to E&P M.ppt (20)

LEAN
LEANLEAN
LEAN
 
Operation Management KG Ousl
Operation Management KG Ousl Operation Management KG Ousl
Operation Management KG Ousl
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigma
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptx
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Production and management
Production and managementProduction and management
Production and management
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditing
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Operation Management ( ICWA Inter)
Operation Management  ( ICWA Inter)Operation Management  ( ICWA Inter)
Operation Management ( ICWA Inter)
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
production and operations management(POM) Complete note
production and operations management(POM) Complete note production and operations management(POM) Complete note
production and operations management(POM) Complete note
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Production Management
Production ManagementProduction Management
Production Management
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 

Recently uploaded

PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 

Recently uploaded (20)

PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 

E&P M.ppt

  • 2. Content 1)The concept of MUDA/Waste 2)Methods for categorizing types of Muda 3)MUDA identification 4)Elimination of Muda 5)Methods for Muda prevention
  • 3. 1) The concept of Muda What is Value? Value is defined by your customer. There are two types of Customers:- -Internal customer -External customer Then Value is the activity/effect what the customer exactly is going to pay for/needs.
  • 4. What is Waste/MUDA? • Waste/MUDA is any activity of workers/machines which consumes resources such as money, time, energy, materials, etc without adding value.
  • 5. The main elements of KAIZEN management • Quality (Customer) Safety • Cost (Company) Morale • Delivery(Customer) • QCD is the source of productivity improvement 5
  • 6. The concept of cost Cost minimization • Determination of the sales price of the product Sales price=(manufacturing)cost + profit • Manufacturing cost=(material + labor + facility + utility + others)cost
  • 7. C O S T M I N I M I Z E Better Quality On time Delivery Higher Profit Profit=Price- Cost ምን ይሻላል??? CUSTOMER የትም ፍጭው ዱቄቱን አምጭው Reasonable Price 7
  • 8. PRICE=COST + PROFIT PROFIT= PRICE - COST Company sets price(Demand>Supply) Market sets price (Demand≤Supply) TraditionalThinking KaizenThinking 8
  • 9. 9
  • 10. • Therefore, since today’s economy is market based, we should focus on minimizing our COST to get higher profit. • Do we have any choice? 10
  • 11. The three categories of Operations • Value Adding/Net Operation • Non Value Adding Operation • Muda/Waste
  • 12. The three categories of Operations (1) Net Operation • Part of the operation that adds value to make parts and products Examples, Milling, Turning, Grinding, Assembling and Welding 12
  • 13. (2) Non-Value adding Operations • Operation that adds no value but cannot be avoided Example Setting up, Inspecting, Picking up parts, Removing drill chips The three categories of Operations 13
  • 14. The three categories of Operations(Cntd) (3) “Muda” • Muda is a Japanese word meaning Wasteful Activity • Is anything unnecessary in operation. • Can be eliminated immediately 14
  • 15. (3) “Muda” • It increases Production cost • Muda affects the quality of the product and also delivery time The three categories of Operations(Cntd) 15
  • 16. Non-value adding and wastes • movements • searching for tools • transporting materials • over production • waiting /idle time • making defects etc Value adding • assembling • molding • spinning • mixing • building • milling etc “Muda” are activities which use resources, time or cost without adding value. 16
  • 17. Value Chain Consumers Suppliers Reduce Lead Time Non Value Added & Waste activities 17
  • 19. • Operation to staple two papers using a stapler when work place is disorganized • Materials and tools –Two pieces of paper –Stapler –Staples Very Simple Drill 19
  • 20. Very Simple Drill Result in a disorganized environment N0. Activities Time Type of Operation Measure How 1 Searching for Stapler 35 Sec Muda Eliminate 5S(Set-in- order) 2 Searching for Staples 30 Sec Muda Eliminate 5S(Set-in order) 3 Putting the Staples into the stapler 8 Sec Non-Value adding Minimize Load staples ahead 4 Putting the two papers together 3 Sec Non-Value adding - - 5 Staple the papers 2 sec Net Operation (Value Adding) - - 20
  • 21. Lessons from the drill • Total time of operation=78 Sec Net Operation(Value adding)=2 Sec(2.6%) Non-Value adding operation=11 Sec(14.1%) Muda(Unnecessary operation)=65Sec(83.3%) 21
  • 22. • Can you imagine by how much the total time of the operation can be improved if we try to eliminate the Muda and minimize non value adding operations by applying 5S? • What if the job order was to produce a car? Imagine the MUDA. Lessons from the drill 22
  • 23. MUDA = Anything Unnecessary 23
  • 24. 2)Methods For Categorizing Types of Muda/Wastes Classification of waste A number of methods for classification of waste have emerged. Here are some of them:- The 3MU’s 5M+Q+S The flow of goods The Seven deadly wastes
  • 26. MUDA-Capacity exceeds load. MURA (imbalance or variation) = capacity sometimes exceeds the load and the load sometimes exceeds capacity. MURI(Physical or mental overburden)- Load exceeds capacity . Productivity improvement does not mean hard work. The Three MU’s 26
  • 27. The Three M’s Muda • Production factors that increase cost, in other words, all unnecessary things 27
  • 28.
  • 29. Muri • Mental and physical overburden on operators, and overburden on production machinery The Three M’s (Cntd) 29
  • 30. Muri We should not force hard work on Employees in the name of productivity improvement Value added work Working density = Actual work The Three M’s (Cntd) 30
  • 34. Mura • Variation in work distribution, production capacity of machinery, and material specifications The Three M’s 34
  • 36. Relationship between the 3 M’s • Usually Mura creates Muri which in turn lead to generation of Muda 36
  • 37. • Therefore, mura creates muri that undercuts previous efforts to eliminate muda. • Eliminating mura is fundamental to the complete elimination of muri and muda Relationship between the 3 M’s 37
  • 38.
  • 39. 2) 5M+Q+S • Is another way of thinking in the areas where waste may occurs 5M(man, material,machine, method and management), plus Quality and Safety.
  • 40. Contd… Material Waste of:- Parts, Bolts, Welds, Functions, Storage & Handling. Man/Workers Waste of:- Walking, Waiting, Searching, Unnecessary movements Management Waste of:- Materials, Meetings, Management control, Communications, Vouchers Machine Waste of:- Large machines, General purpose machines, Conveyors, Machines with wasteful movements, Breakdowns,
  • 41. Contd…. Method Waste of:- Large lot production, Inventory, Conveyance, Retention, Non standardization, Picking up setting down work pieces.
  • 42. Contd… Quality Waste in:- Making defective goods, Fixing defects, errors, Inspection, Quality control. Safety Waste of:- Disaster prevention methods, Fixing defects.
  • 43. 3) The Flow of Goods • A third way of thinking about waste is to focus on the flow of goods in production. Materials are procured Materials are retained Materials are conveyed to processes on production line Materials are retained at the process equipment(WIP) Materials are picked up for processing Materials are processed Processed goods are set down and retained on the other side of the processing machine(WIP) Goods are conveyed to inspection point Goods are retained until inspection Goods are picked up and inspected Goods are set down and retained on the other side of inspection process Inspected goods are conveyed to the finished goods warehouse Finished goods are retained prior to shipment
  • 44. Cont….. If we look carefully at the flow of goods, you will see four things going on:- Retention, Conveyance, Processing and Inspection Retention-means stopping the flow of goods producing inventory without adding value. -It adds cost without adding value. Conveyance-movement b/n retention points without adding value. Material handling movement b/n a retention point & a process.
  • 45. Contd…….. Processing-means adding value or altering raw materials/parts /assemble parts to add value. Inspection-identifies defects from production flow. It doesn’t add value b/c it doesn’t eliminate the source.
  • 46. 4)The Seven deadly wastes 1) “Muda” of Overproduction 2) “Muda” of Inventory 3) “Muda” of Waiting 4) “Muda” in Transporting 5) “Muda” of Defect-making 6) “Muda” of Motion 7) “Muda” in Processing Cost Reduction by Elimination of muda
  • 47. 7 Categories of Waste Defect Making Transportation Over Produced Motion Inventory Over Processed Waiting 47
  • 48. Steps to effective Muda identification 1. Making waste visible 2. Be conscious of the waste 3. Be accountable for the waste 4. Measure the waste 5. Eliminate or reduce the waste
  • 49. 50