A mud mixing plant was fabricated and installed onboard the MV Trinity Supporter for a client in Indonesia. The plant included a 2250 barrel main tank, 250 barrel brine mixing tank, generators, circuit breakers, mud guns, agitators, pumps, mixers, a centrifuge, conveyors, and a mud lab housed in a storage container. The fabrication began in Singapore and the plant was installed over several days before commissioning at the anchorage offshore Singapore.
Rhino tanks presentation for stp & etpMaxpromotion
Established in the year 2000, we, “Pragmatic Sales & Services”, are involved in offering a wide range of Industrial Equipment, as well as Automobile Workshop equipments.
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctDubai Quality Group
Kaizen case study submitted by Emirates Aluminium during 3rd Continual Improvement & Innovation Symposium organized by Dubai Quality Group's Continual Improvement Subgroup to celebrate World Quality Day 2011.
Ted Warren offers an example of RCC dam construction in his poster display featuring 7 projects he has been involved with.
he can be contacted at damted2000@yahoo.com for further information and assistance in providing RCC expertise
The companies of Altra Industrial Motion offer many critical drivetrain products utilized in marine applications including clutches & brakes, couplings, universal joints, linear actuators and turning, locking and braking systems
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
KAUST engaged Maritime Survey Australia to act as a project manager to oversee a major refit of the vessel, RV Thuwal which involved wiring upgrades, installation of new navigational equipment, a new galley, a scientific survey room and a vessel upgrade of the hydraulics, heating, ventilation and cooling systems.
Similar to Mud Mixing plant installed onboard Trinity Supporter for NIKO (20)
RV Thuwal - Refit project overview by Maritime Survey Australia
Mud Mixing plant installed onboard Trinity Supporter for NIKO
1. Mud Mixing Plant from start of fabrication to
installation onboard MV Trinity Supporter
(Singapore) End client NIKO Indonesia
This was a capital sale project not a rental project
2250 bbl Tank
capacity with separate
250 bbl Brine mixing
tank
2 x 585Kw
Generators
1 x air conditioned
Circuit Breaker
Module
12 x mud guns
20 x 11Kw Agitators
3 x 8 x 6 x 14
Centrifugal Pumps
2 x Big Bag Mixer
2 x Hi - Ride Mixers
1 x CD 500 Centrifuge
2 x 9.2Kw Conveyors
1 x Mud Lab
1 x Storage Container
7. Installed mixer pumps / Pipe work / Lighting / Electrics prior to commissioning phase
8. Utilities: Brine / Sea water / drill water / mixing pump transfer lines and
equalization upper and lower manifolds, conveyor for centrifuge solids
transfer to future cuttings box lay down area.
9. The top of tanks were designed to have a modular grated deck eliminating trip hazards
for the operators all valves shafts were extended so the operators had easy access
during operation, all agitator starters were mounted on easy reach stands directly next
to each agitator,
The centrifuge could take suction from any tank and discharge to any tank
10. Looking Forward to Aft with access stairs to Port and Starboard side of tanks and
Starboard Aft view of the Centrifuge package / mixing and equalization manifolds
pictures taken prior to commissioning and hand over to client the final commissioning
was carried out at Anchorage East Coast Bay Singapore.
Editor's Notes
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period. From start of fabrication to commissioning and hand over to client was 14 weeks.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.