1. A study was conducted to assess the compatibility of STS LNG transfer between an FSRU and LNGCs for a project in West Java. 2. The study found the FSRU design would be compatible with 85% of LNGCs in the market. It determined design parameters for jetty structures including a length offset/overlap range of +/-26m. 3. While most LNGCs have manifolds amidships as recommended, some further vessel compatibility assessment is still needed on individual STS plans. The study provides confidence for using the STS option for the West Java FSRU.