Hilong Group is a large oilfield services company headquartered in Shanghai, China. It has over 2000 employees across 40 branches and offices globally. The company provides a wide range of oilfield equipment and integrated services including drilling tools, pipeline technology, coating, offshore engineering, and marine services. A key asset is its DP3 derrick pipelay barge that can install large diameter pipelines in deep waters. Hilong has completed several major offshore pipeline projects for Chinese oil companies.
Lining is an integral part of Tunneling. Once the Shotcrete line ,i.e the B-line,is laid, the Kerb/Kicker or Say Beam is executed. Next Comes the Geotextile/Waterproofing Membrane. After that, C-line is laid which is referred to as inner lining.
Lining is an integral part of Tunneling. Once the Shotcrete line ,i.e the B-line,is laid, the Kerb/Kicker or Say Beam is executed. Next Comes the Geotextile/Waterproofing Membrane. After that, C-line is laid which is referred to as inner lining.
A wall or upright or vertical faced breakwater is defined as a big regular wall raised to construct a harbor basin on solid natural or/and artificial foundation to resist the forces and their components generated by incoming water and waves.
A wall or upright or vertical faced breakwater is defined as a big regular wall raised to construct a harbor basin on solid natural or/and artificial foundation to resist the forces and their components generated by incoming water and waves.
Mapa Mental: Presupuesto De Producción
Mapa Conceptual: Presupuesto De Venta
Caligrama: Entrada de Caja
Acrostico: Desembolso de Efectivo
Cicloprograma: Presupuesto de Caja
ELAAU, Dankuni executed on very fast track by RVNLRajesh Prasad
Electric Loco Assembly and Ancillary unit of CLW at Dankuni has been implemented on a very fast track by RVNL and the aim is to augument production capacity of Electric Locos in Indian Railways. The project was implemented by the team of CPM M RVNL Kolkata- Rajesh Prasad and this coffee table book has been conceived and concluded by him only.
2. Where Hilong office locates
Where Hilong brand popular
60%
Overseas
Income
30
Countries
Presence
40
Branches
and Bases
2000
EmployeesHQ
Shanghai, China
Our Capacity
Hilong Group of Companies (Hilong Holdings, 01623.HK)
is a large-scale listed corporate group specializing in
high-end oilfield equipment and integrated oil services for
petroleum and natural gas development.
Annual Revenue
(million USD)
2015 382 -3%
2014 396 +7%
2013 372 +7%
2012 348
3. Where Hilong office locates
Where Hilong brand popular
Technological Innovation
Exploration Transmission Refinery
Pipeline Integration Supply Chain – Product and Services
Our Value
4. 2005
2008
2011
From first OCTG coating plant built
in 2002, several plants in pipeline
technology and drill pipe business
were set up to form Hilong Group
of Companies.
Quickly expanded business and
established companies in major oil &
gas producer countries. By 2011,
Hilong Holding Limited (#01623) public
listed in Hong Kong.
Began international development,
founded first plant in Abu Dhabi and
set up oil services division to transform
from product provider to service
provider.
Revenue booming from USD 300m to
450m in 3 years, marched into offshore
T & I service by purchasing 3000Mton
Derrick pipelay barge.
2002
Start Business 2014
2016
Our History
5. Petroleum Tubular
1 2 3
Petrochemical Offshore EngineeringR&D
Institute
Service Provided
• Well Drilling
• Well Workover
• Oil Bailing
• Wellbore Technical Services
Onshore Oilfield
Services
Drilling Tools
• Top 3 supplier in the world.
• In-house supply of core raw materials.
• Most Critical NS-1 certified quality control and assurance
Pipeline
Technology and
Services
Certified supplier to BP, BG, PDO, SHELL, Fluor, Saipem
CWC
Anti-
Corrosion
NDT
Pigging
CRA
Coating
and Services
Coating material and application to OCTG
Annual output over 6.5 million meters.
75% Domestic market share.
Exported to more than 40 countries.
8. Hilong 106 – Derrick Pipe Lay Barge
Main Crane (Fixed & Rotary Mode)
• 3000 Ton (85m height, 14m outboard span)
• 2000 Ton (35m radius, 12m outboard span)
Pipelay Firing Line
• 4” to 60” (incl. coating)
• Single/Double Joint Mode
• 2 * 100 Ton Tensioner
• 5 * Serimax Welding Machine
• 40 Ton Pipe Handling Crane
• 6 * 50 Ton Davit Crane
Deck
• 12 * 12 Ton Mooring Anchor
• 302 berths
• 2 Surau for Muslim
• 1700m2 deck space
• 4 * 3125 KVA Generator
Other Upgrades
• ROV/Diving Platform
• Grouting machine purchased
• 1 Gangway at the stern
• 2 * 15Ton crane at the bow
9. Heavy Lift
Fixed Mode: 3000 Mton
Rotary Mode: 2000 Mton
Pipe Lay
Single/Double Joint
Up to 60” in shallow water
Pipeline Repair
6 * 50 Davit Crane
2 * 100 Mton Tensioner
1 2 3
Main Function
10. Key Personnel
General Manager
Shawn Xiao
28 years of exp in offshore
GM of HYSY 201 building project
GM of major oilfield development
project in CNOOC
Project Management
Bill Geng
18 years of exp in offshore
10 years as PM manager of
major offshore project in CNOOC
Project Management
Siwei Zhang
30 years of exp in offshore
Specialized in heavy lifting and
pipelay installation project.
Superintendent
Xin Zhao
19 years of exp in offshore
Previous Superintendent of Lanjiang
vessel completd 13 project.
12. Award
The Excellent Contractor Award
&
The Excellent QHSE Performance Award
for
Huangyan EPIC Poject - 2015
Hilong 106 Safety High Quality High
Productivity Award
&
Project Safety Award
for
WeiZhou EPC Poject - 2015
13. Huangyan Gas Complex Development
E P I C of Subsea Pipeline
| East China Sea, CNOOC, completed by July, 2015
• 38KM pipeline including CRA & Carbon Steel
• 80m – 100m water depth
• Starting March in the end of monsoon season with 1.7m wave height
• International subcontractor including Serimax and Fugro involved
Track Record
Engineering
Procurement
Installation
Commissioning
1 | FIRST
First offshore project
First to apply ISOLATION PIPE
between CRA & Carbon Steel.
First new vessel perform smoothly
in virgin campaign.
Vessel Reliability
Only 2 hours mechanical down
time during 54 days
construction.
RELIABLE
Domestic Record
61 joints/day (1.5km/day) for 8”
OD CRA clad pipeline in
double jointing mode.
PROFESSIONAL
KQT-B KQT-A
BYT
Raw Material Delivery
Both CRA clad pipe and CWC
supplied in-house to ensure
delivery on time.
INTEGRATED
Efficiency
3 months preparation time
offshore campaign.
ORGANIZED
14. Weizhou 12-2/11-4N Phase II Development
Subsea Pipeline Installation
| South China Sea, CNOOC, completed by October, 2015
• 38km Pipe-in-Pipe in 8 different OD
• 7 segments of pipeline connecting 8 platforms
• 12 crossover free span
• 40 meter water depth.
Domestic Record
16”/20” PIP Double Joint Mode
77 joints/day = 1.9 km/day
Track Record
Engineering
Installation
Commissioning
49
35
77
43 40
76
84
0
20
40
60
80
100
8“/12" 22"/26" 16"/20" 12"/16" 10"/14" 12"/16" 6"/10"
Joints/day
16. Presented By:
Derek Wang
Commercial Manager
Suite 20-12, Level 20,
GTower, 199 Jalan Tun Razak
50400 Kuala Lumpur
Malaysia
wangyi@hilonggroup.com
http://en.hilonggroup.com