Movable Scaffolding System
-Design and engineering,
- Fabrication and quality control,
- Supervision & operation.
Overhead
MSS
Underslung
MSS
Underslung
MSS
MENU
NEXT
Box cross section deck solution
• Used in situ casting of full spans
• Currently used on road and railway
decks
• Special solutions for special bridge
projects
• Hydraulic operated main functions
• Labor saving solutions
• Easy to adjust to radius, slope and
span variations
• Easy installation of the rebar
prefabricated parts
END
Movable Scaffolding System
Underslung Solution
MENU
Main Components:
• A- Main girder
• B- Noses
• C- Suspension gallows
• D- Transverse beams
• E- Supporting brackets
• I- External formwork
• L- Counterweight
NEXTPREVIOUS
END
Movable Scaffolding System
Underslung Solution
MENU
Main Components:
• A- Main girder
• C- Suspension gallows
• D- Transverse beams
• E- Supporting brackets
• F- Launching wagons
• G- Main cylinders
• H- Platforms and ladders
• I- External formwork
• J- Internal formwork
• L- Counterweight
• K- Transport trolley
NEXTPREVIOUS
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
Main cycle steps:
• Columns showing the blockouts where
to fix the supporting brackets
• When no blockouts can be used we
use a saw tooth plate solution or struts
to the column foundation
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Two pairs of supporting brackets
installed at columns(threaded bars
connecting the 2 brackets of each pair
– not shown)
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Main girders and noses installed on
top of the launching wagons
• The launching wagons are placed on
top of the supporting brackets
• The system is made by 2 symmetrical
halves
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Transverse beams are installed
connecting the 2 main girders
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Suspension gallows is installed at the
tip of the previous span and suspends
the main girders rear end during
casting.
• Two hydraulic cylinders transmit the
loads at the rear from the suspension
gallows to the deck webs during
casting
• During casting, system is suspended at
the rear and is supported to the
brackets at the front trough the
hydraulic cylinders
• Two hydraulic cylinders transmit the
loads at front from the main girders to
the supporting brackets
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• External formwork installed on top of
the main structure
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Internal formwork is installed
• The internal formwork transport
trolley is shown
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Deck casted
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Previous to the MSS launching to the
next span the 3th supporting brackets
pair is installed at the front column
• Launching wagons are installed on top
of the 3th supporting brackets pair
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• After deck is pre-stressed the MSS can
be lowered at the 2 rear and 2 front
main hydraulic cylinders
• Transverse beams central connections
are removed
• Both MSS halves are then open to the
end of the supporting brackets, using
the launching wagons
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• Both MSS halves can now be launched
to the next span using the launching
cylinders located at the launching
wagons
• Both MSS halves will pass outside the
columns
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
• When both MSS halves reach the
longitudinal position at next span
system is closed by moving the
launching wagons towards the
columns and transverse beams are
connected again
• MSS is now lifted to the casting
elevation using the 2 rear and the 2
front hydraulic cylinders
• Rebar works can start and transport of
the internal formwork will be made
simultaneous to that operation
END
Movable Scaffolding System
Underslung Solution
MENU END
NEXTPREVIOUS
General project views
• Different columns and
hammerhead geometries
• Variable horizontal and vertical
deck radius
• Unfill bottom formwork elements
can be used to cast height variation
decks
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
General project views
• Can be used at parallel decks with
reduced space in between them
• Installing tower cranes and
concrete pumps at the main girders
END
Movable Scaffolding System
Underslung Solution
MENU
Internal Formwork and Rebar works
• The internal formwork doesn’t move
together with the MSS main structure.
• The opening and closing internal
movements are made hydraulically
through an internal formwork
transport trolley.
• The internal formwork panels are
transported one at a time.
• Diaphragm opening to be big enough
to pass
NEXTPREVIOUS
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
Cambering & Nose adjustment
• Few adjustable screw jacks to be
adjusted
• Split the main structure into 3 sections
(front nose-main girder-rear nose) and
design a unique hinged connection
between the parts has made it
possible to use the MSS with as small
as 200m radius
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
Special solutions
• Big working areas at front of the MSS
formwork
• Special supporting brackets
installations
• Rebar transport solutions
END
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
Main Components:
• A- Main girder
• B- Rear nose
• C- Suspension gallows/rolling
support
• D- Transverse beams
• E- Supporting brackets
• F- Launching wagons
• I- External formwork
END
Movable Scaffolding System
Underslung Selflaunching Solution
MENU
NEXTPREVIOUS
Main Components:
• A- Main girder
• D- Transverse beams
• E- Supporting brackets
• F- Launching wagons
• G- Main cylinders
• H- Working platforms and ladders
• I- External formwork
• J- Internal formwork
• K- Transport trolley
END
Movable Scaffolding System
Underslung Selflaunching Solution
MENU
Selflaunching MSS
• Supporting brackets self
relocation without the need for
cranes
• Easy to use on the water or with
very high columns
NEXTPREVIOUS
END
Movable Scaffolding System
Underslung Selflaunching Solution
MENU
Internal Formwork and Rebar works
• Suspension gallows/rear support
equipped with powered wheels and
rails
• Internal formwork transported by a
trolley
• Supporting brackets self relocated by a
winch system
PREVIOUS
END
Movable Scaffolding System
Underslung Selflaunching Solution
NEXT
MENU
NEXT
TT section deck solution
• Used in situ casting of full spans
• Currently used on road decks
• Special solutions for special bridge
projects
• Hydraulic operated main functions
• Labor saving solutions
• Easy to adjust to radius, slope and
span variations
• Easy installation of the rebar
prefabricated parts
END
Movable Scaffolding System
Underslung Solution
PREVIOUS
MENU
NEXT
Main Components:
• A- Main girder
• B- Noses
• C- Suspension gallows
• D- Transverse beams
• E- Supporting brackets
• I- External formwork
• L- Counterweight
END
PREVIOUS
Movable Scaffolding System
Underslung Solution
MENU
NEXTPREVIOUS
Main Components:
• A- Main girder
• C- Suspension gallows
• D- Transverse beams
• E- Supporting brackets
• F- Launching wagons
• G- Main cylinders
• H- Platforms and ladders
• I- External formwork
• J- Internal formwork
• L- Counterweight
END
Movable Scaffolding System
Underslung Solution
MENU
PREVIOUS
General Project views
• Internal formwork travelling with the
MSS main structure
• Internal formwork folding system
hydraulic operated
• Hinge transverse beams allowing
rotation and folding of internal
formwork
NEXT
END
Movable Scaffolding System
Underslung Solution
MENU END
PREVIOUS
General project views
• Folded internal formwork passing
outside the hammerhead
• Different column and hammerhead
geometries
• Internal formwork supported by struts
to the transverse beams
Movable Scaffolding System
Underslung Solution
Overhead
MSS
MENU END
NEXT
Box cross section deck solution
• Used in situ casting of full spans
• Currently used on road and railway
decks
• Special solutions for special bridge
projects
• Hydraulic operated main functions
• Labor saving solutions
• Easy to adjust to radius, slope and
span variations
• Easy installation of the rebar
prefabricated parts
Movable Scaffolding System
Overhead Solution
MENU END
Main Components:
• A- Main girder
• B- Noses
• C- Rear Support
• E- Main Supports
• F- Launching wagons
• I- External formwork
• L-Bottom platform
NEXTPREVIOUS
Movable Scaffolding System
Overhead Solution
MENU END
NEXTPREVIOUS
Main Components:
• A- Main girder
• D- Transverse beams
• E- Main Supports
• F- Launching wagons
• G- Main cylinders
• H- Working platforms and ladders
• I- External formwork
• J- Internal formwork
• K- Hangers
• L-Bottom platform
Movable Scaffolding System
Overhead Solution
MENU END
NEXTPREVIOUS
General project views
• Easy to install behind the abutment
• Easy to move transversally from
one deck to the other
• Few formwork suspensions
• Formwork folding system hydraulic
operated
Movable Scaffolding System
Overhead Solution
MENU END
NEXTPREVIOUS
General project views
• Many different main support solutions
• Main support splited in several parts
to easy the installation at
hammerhead
• Easy to use with horizontal and vertical
deck curves
Movable Scaffolding System
Overhead Solution
MENU END
NEXTPREVIOUS
Formwork
• Formwork supported on a bottom
platform
• Cambering introduced on the
adjustable screw jacks, struts and
suspensions
Movable Scaffolding System
Overhead Solution
MENU
Selflaunching MSS
• Main supports self relocation
without the need for cranes
• Easy to use above water or with
very high columns
Movable Scaffolding System
Overhead Selflaunching Solution
PREVIOUS
END
Strukturas can design and
deliver Bridge Building
Equipment covering all the
cast in situ and precast bridge
deck constructions methods
Strukturas is a regular
partner of the specialized
world bridge contractors,
during the development
process and pro current
stages. Contributing with
optimized and integrated
package solutions Strukturas is committed to quality OVER 200 projects world
wide!
END

More Related Content

What's hot

VectorBloc Data Centres July 2016
VectorBloc Data Centres July 2016VectorBloc Data Centres July 2016
VectorBloc Data Centres July 2016Julian Bowron
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
GOKULACHANDRASAHOO
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
David H Moloney
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan Bisht
ChetanBisht16
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC Members
Fawad Najam
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
Fawad Najam
 
Susppension bridges
Susppension bridges Susppension bridges
Susppension bridges
Muhammad Essam
 
Bridges precast
Bridges precastBridges precast
Bridges precast
Dr Fereidoun Dejahang
 
Formwork by chakamba john
Formwork by chakamba johnFormwork by chakamba john
Formwork by chakamba john
John Chakamba
 
Modeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub StructureModeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub Structure
AIT Solutions
 
Precast elements
Precast elementsPrecast elements
Precast elements
Shrividhyah
 
Catalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete MoldtechCatalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete Moldtech
Moldtech SL
 
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy MachineryBuy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
jcbheavymachinery
 
Introduction to Capacity-based Seismic Design
Introduction to Capacity-based Seismic DesignIntroduction to Capacity-based Seismic Design
Introduction to Capacity-based Seismic Design
Fawad Najam
 
Construction of post tension slab
Construction of post tension slabConstruction of post tension slab
Construction of post tension slab
Arvind Vishwakarma
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
Aluhisadin La Ode
 
Slip form
Slip formSlip form
Slip form
Aglaia Connect
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
Hajee Mohammad Danesh Science & Technology University, Dinajpur
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of building
vikas mishra
 

What's hot (20)

VectorBloc Data Centres July 2016
VectorBloc Data Centres July 2016VectorBloc Data Centres July 2016
VectorBloc Data Centres July 2016
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan Bisht
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC Members
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
 
Susppension bridges
Susppension bridges Susppension bridges
Susppension bridges
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Formwork by chakamba john
Formwork by chakamba johnFormwork by chakamba john
Formwork by chakamba john
 
Modeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub StructureModeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub Structure
 
Precast elements
Precast elementsPrecast elements
Precast elements
 
Catalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete MoldtechCatalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete Moldtech
 
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy MachineryBuy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
Buy JCB JS205LC Tracked Excavator in India - JCB Heavy Machinery
 
Introduction to Capacity-based Seismic Design
Introduction to Capacity-based Seismic DesignIntroduction to Capacity-based Seismic Design
Introduction to Capacity-based Seismic Design
 
Construction of post tension slab
Construction of post tension slabConstruction of post tension slab
Construction of post tension slab
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
Slip form
Slip formSlip form
Slip form
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of building
 

Similar to MSS presentation (200ppi)

FT presentation (200ppi)
FT presentation (200ppi)FT presentation (200ppi)
FT presentation (200ppi)
Strukturas
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
Strukturas
 
Trulift presentation
Trulift presentationTrulift presentation
Trulift presentation
RMD Kwikform Ltd
 
BMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptxBMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptx
AnoHossey
 
Essentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersEssentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designers
jose bonifacio de souza leite cuadros
 
Types of cranes
Types of cranesTypes of cranes
Types of cranes
Dakshil Patel
 
Escalators uol (1)
Escalators uol (1)Escalators uol (1)
Escalators uol (1)
Hashimammar
 
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIGPRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
OKORIE1
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
Anees Khan
 
A roller-cone bit is a drill bit used for drilling through rock that features...
A roller-cone bit is a drill bit used for drilling through rock that features...A roller-cone bit is a drill bit used for drilling through rock that features...
A roller-cone bit is a drill bit used for drilling through rock that features...
subhashsingh766459
 
item North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applicationsitem North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applications
MB Kit Systems Inc.
 
Automobile module iii
Automobile module iiiAutomobile module iii
Automobile module iii
ANOOP P
 
Automobile module iii
Automobile module iiiAutomobile module iii
Automobile module iii
ANOOP P
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013
wesseln
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
Abhishek Mewada
 
Foot bridge presentation
Foot bridge presentationFoot bridge presentation
Foot bridge presentation
Tausif Kauswala
 
M.P- II-UNIT II CENTRE LATHE AND SPECIAL PURPOSE LATHES..ppt
M.P- II-UNIT II  CENTRE LATHE AND SPECIAL PURPOSE  LATHES..pptM.P- II-UNIT II  CENTRE LATHE AND SPECIAL PURPOSE  LATHES..ppt
M.P- II-UNIT II CENTRE LATHE AND SPECIAL PURPOSE LATHES..ppt
Mohanumar S
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
ManviVarshney2
 

Similar to MSS presentation (200ppi) (20)

FT presentation (200ppi)
FT presentation (200ppi)FT presentation (200ppi)
FT presentation (200ppi)
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Trulift presentation
Trulift presentationTrulift presentation
Trulift presentation
 
BMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptxBMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptx
 
Essentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersEssentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designers
 
Types of cranes
Types of cranesTypes of cranes
Types of cranes
 
Escalators uol (1)
Escalators uol (1)Escalators uol (1)
Escalators uol (1)
 
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIGPRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
PRINCIPLES BEHIND THE ROTARY-SYSTEM OF A DRILLING RIG
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
A roller-cone bit is a drill bit used for drilling through rock that features...
A roller-cone bit is a drill bit used for drilling through rock that features...A roller-cone bit is a drill bit used for drilling through rock that features...
A roller-cone bit is a drill bit used for drilling through rock that features...
 
item North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applicationsitem North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applications
 
Automobile module iii
Automobile module iiiAutomobile module iii
Automobile module iii
 
Automobile module iii
Automobile module iiiAutomobile module iii
Automobile module iii
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Foot bridge presentation
Foot bridge presentationFoot bridge presentation
Foot bridge presentation
 
M.P- II-UNIT II CENTRE LATHE AND SPECIAL PURPOSE LATHES..ppt
M.P- II-UNIT II  CENTRE LATHE AND SPECIAL PURPOSE  LATHES..pptM.P- II-UNIT II  CENTRE LATHE AND SPECIAL PURPOSE  LATHES..ppt
M.P- II-UNIT II CENTRE LATHE AND SPECIAL PURPOSE LATHES..ppt
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

MSS presentation (200ppi)

  • 2. Strukturas, your partner for turnkey projects, worldwide. Strukturas company in recent decades became Norwegian leading provider of Movable Scaffolding System equipment, being present in more than 200 projects. We strive for creating solutions that exceed the expectations of our customers.
  • 3. Movable Scaffolding System -Design and engineering, - Fabrication and quality control, - Supervision & operation.
  • 4.
  • 7. MENU NEXT Box cross section deck solution • Used in situ casting of full spans • Currently used on road and railway decks • Special solutions for special bridge projects • Hydraulic operated main functions • Labor saving solutions • Easy to adjust to radius, slope and span variations • Easy installation of the rebar prefabricated parts END Movable Scaffolding System Underslung Solution
  • 8. MENU Main Components: • A- Main girder • B- Noses • C- Suspension gallows • D- Transverse beams • E- Supporting brackets • I- External formwork • L- Counterweight NEXTPREVIOUS END Movable Scaffolding System Underslung Solution
  • 9. MENU Main Components: • A- Main girder • C- Suspension gallows • D- Transverse beams • E- Supporting brackets • F- Launching wagons • G- Main cylinders • H- Platforms and ladders • I- External formwork • J- Internal formwork • L- Counterweight • K- Transport trolley NEXTPREVIOUS END Movable Scaffolding System Underslung Solution
  • 10. MENU NEXTPREVIOUS Main cycle steps: • Columns showing the blockouts where to fix the supporting brackets • When no blockouts can be used we use a saw tooth plate solution or struts to the column foundation END Movable Scaffolding System Underslung Solution
  • 11. MENU NEXTPREVIOUS • Two pairs of supporting brackets installed at columns(threaded bars connecting the 2 brackets of each pair – not shown) END Movable Scaffolding System Underslung Solution
  • 12. MENU NEXTPREVIOUS • Main girders and noses installed on top of the launching wagons • The launching wagons are placed on top of the supporting brackets • The system is made by 2 symmetrical halves END Movable Scaffolding System Underslung Solution
  • 13. MENU NEXTPREVIOUS • Transverse beams are installed connecting the 2 main girders END Movable Scaffolding System Underslung Solution
  • 14. MENU NEXTPREVIOUS • Suspension gallows is installed at the tip of the previous span and suspends the main girders rear end during casting. • Two hydraulic cylinders transmit the loads at the rear from the suspension gallows to the deck webs during casting • During casting, system is suspended at the rear and is supported to the brackets at the front trough the hydraulic cylinders • Two hydraulic cylinders transmit the loads at front from the main girders to the supporting brackets END Movable Scaffolding System Underslung Solution
  • 15. MENU NEXTPREVIOUS • External formwork installed on top of the main structure END Movable Scaffolding System Underslung Solution
  • 16. MENU NEXTPREVIOUS • Internal formwork is installed • The internal formwork transport trolley is shown END Movable Scaffolding System Underslung Solution
  • 17. MENU NEXTPREVIOUS • Deck casted END Movable Scaffolding System Underslung Solution
  • 18. MENU NEXTPREVIOUS • Previous to the MSS launching to the next span the 3th supporting brackets pair is installed at the front column • Launching wagons are installed on top of the 3th supporting brackets pair END Movable Scaffolding System Underslung Solution
  • 19. MENU NEXTPREVIOUS • After deck is pre-stressed the MSS can be lowered at the 2 rear and 2 front main hydraulic cylinders • Transverse beams central connections are removed • Both MSS halves are then open to the end of the supporting brackets, using the launching wagons END Movable Scaffolding System Underslung Solution
  • 20. MENU NEXTPREVIOUS • Both MSS halves can now be launched to the next span using the launching cylinders located at the launching wagons • Both MSS halves will pass outside the columns END Movable Scaffolding System Underslung Solution
  • 21. MENU NEXTPREVIOUS • When both MSS halves reach the longitudinal position at next span system is closed by moving the launching wagons towards the columns and transverse beams are connected again • MSS is now lifted to the casting elevation using the 2 rear and the 2 front hydraulic cylinders • Rebar works can start and transport of the internal formwork will be made simultaneous to that operation END Movable Scaffolding System Underslung Solution
  • 22. MENU END NEXTPREVIOUS General project views • Different columns and hammerhead geometries • Variable horizontal and vertical deck radius • Unfill bottom formwork elements can be used to cast height variation decks Movable Scaffolding System Underslung Solution
  • 23. MENU NEXTPREVIOUS General project views • Can be used at parallel decks with reduced space in between them • Installing tower cranes and concrete pumps at the main girders END Movable Scaffolding System Underslung Solution
  • 24. MENU Internal Formwork and Rebar works • The internal formwork doesn’t move together with the MSS main structure. • The opening and closing internal movements are made hydraulically through an internal formwork transport trolley. • The internal formwork panels are transported one at a time. • Diaphragm opening to be big enough to pass NEXTPREVIOUS END Movable Scaffolding System Underslung Solution
  • 25. MENU NEXTPREVIOUS Cambering & Nose adjustment • Few adjustable screw jacks to be adjusted • Split the main structure into 3 sections (front nose-main girder-rear nose) and design a unique hinged connection between the parts has made it possible to use the MSS with as small as 200m radius END Movable Scaffolding System Underslung Solution
  • 26. MENU NEXTPREVIOUS Special solutions • Big working areas at front of the MSS formwork • Special supporting brackets installations • Rebar transport solutions END Movable Scaffolding System Underslung Solution
  • 27. MENU NEXTPREVIOUS Main Components: • A- Main girder • B- Rear nose • C- Suspension gallows/rolling support • D- Transverse beams • E- Supporting brackets • F- Launching wagons • I- External formwork END Movable Scaffolding System Underslung Selflaunching Solution
  • 28. MENU NEXTPREVIOUS Main Components: • A- Main girder • D- Transverse beams • E- Supporting brackets • F- Launching wagons • G- Main cylinders • H- Working platforms and ladders • I- External formwork • J- Internal formwork • K- Transport trolley END Movable Scaffolding System Underslung Selflaunching Solution
  • 29. MENU Selflaunching MSS • Supporting brackets self relocation without the need for cranes • Easy to use on the water or with very high columns NEXTPREVIOUS END Movable Scaffolding System Underslung Selflaunching Solution
  • 30. MENU Internal Formwork and Rebar works • Suspension gallows/rear support equipped with powered wheels and rails • Internal formwork transported by a trolley • Supporting brackets self relocated by a winch system PREVIOUS END Movable Scaffolding System Underslung Selflaunching Solution NEXT
  • 31. MENU NEXT TT section deck solution • Used in situ casting of full spans • Currently used on road decks • Special solutions for special bridge projects • Hydraulic operated main functions • Labor saving solutions • Easy to adjust to radius, slope and span variations • Easy installation of the rebar prefabricated parts END Movable Scaffolding System Underslung Solution PREVIOUS
  • 32. MENU NEXT Main Components: • A- Main girder • B- Noses • C- Suspension gallows • D- Transverse beams • E- Supporting brackets • I- External formwork • L- Counterweight END PREVIOUS Movable Scaffolding System Underslung Solution
  • 33. MENU NEXTPREVIOUS Main Components: • A- Main girder • C- Suspension gallows • D- Transverse beams • E- Supporting brackets • F- Launching wagons • G- Main cylinders • H- Platforms and ladders • I- External formwork • J- Internal formwork • L- Counterweight END Movable Scaffolding System Underslung Solution
  • 34. MENU PREVIOUS General Project views • Internal formwork travelling with the MSS main structure • Internal formwork folding system hydraulic operated • Hinge transverse beams allowing rotation and folding of internal formwork NEXT END Movable Scaffolding System Underslung Solution
  • 35. MENU END PREVIOUS General project views • Folded internal formwork passing outside the hammerhead • Different column and hammerhead geometries • Internal formwork supported by struts to the transverse beams Movable Scaffolding System Underslung Solution
  • 37. MENU END NEXT Box cross section deck solution • Used in situ casting of full spans • Currently used on road and railway decks • Special solutions for special bridge projects • Hydraulic operated main functions • Labor saving solutions • Easy to adjust to radius, slope and span variations • Easy installation of the rebar prefabricated parts Movable Scaffolding System Overhead Solution
  • 38. MENU END Main Components: • A- Main girder • B- Noses • C- Rear Support • E- Main Supports • F- Launching wagons • I- External formwork • L-Bottom platform NEXTPREVIOUS Movable Scaffolding System Overhead Solution
  • 39. MENU END NEXTPREVIOUS Main Components: • A- Main girder • D- Transverse beams • E- Main Supports • F- Launching wagons • G- Main cylinders • H- Working platforms and ladders • I- External formwork • J- Internal formwork • K- Hangers • L-Bottom platform Movable Scaffolding System Overhead Solution
  • 40. MENU END NEXTPREVIOUS General project views • Easy to install behind the abutment • Easy to move transversally from one deck to the other • Few formwork suspensions • Formwork folding system hydraulic operated Movable Scaffolding System Overhead Solution
  • 41. MENU END NEXTPREVIOUS General project views • Many different main support solutions • Main support splited in several parts to easy the installation at hammerhead • Easy to use with horizontal and vertical deck curves Movable Scaffolding System Overhead Solution
  • 42. MENU END NEXTPREVIOUS Formwork • Formwork supported on a bottom platform • Cambering introduced on the adjustable screw jacks, struts and suspensions Movable Scaffolding System Overhead Solution
  • 43. MENU Selflaunching MSS • Main supports self relocation without the need for cranes • Easy to use above water or with very high columns Movable Scaffolding System Overhead Selflaunching Solution PREVIOUS END
  • 44. Strukturas can design and deliver Bridge Building Equipment covering all the cast in situ and precast bridge deck constructions methods Strukturas is a regular partner of the specialized world bridge contractors, during the development process and pro current stages. Contributing with optimized and integrated package solutions Strukturas is committed to quality OVER 200 projects world wide!
  • 45. END