BY
SARATH KUMAR M
Meenakshi Sundararajan Engineering College
OBJECTIVE
 This is the case study on 11 storey building
collapse at moulivakkam, porur.
 One building collapsed on its own during
construction.
 While the other one, semi built was
demolished by imploding.
 Hope this study will enhance the correct
reason for the collapse so that non-
recurrence of such things in future can be
made.
BUILDIN
G
DETAILS
 Builder – Prime sristi Housing Pvt,
Ltd.
 The project consist of two towers
i. The Faith Tower
ii. The Belief Tower
 Location – Kundrathur road near
porur junction
(Moulivakkam)
 Faith – 2BHK (4) in each floor
 Belief – 3BHK (4) in each floor
 Price – 5250/ sq.ft
TIME OF OCCURRENCE
 Belief Tower Collapse took place
in June 28
@ 5.30 PM
 Faith Tower razed to the ground
In three second
In November 2
@ 6.50 PM
REASON FOR THE
COLLAPSE
 Thunder Bolt
 Poor Quality of Construction
 Negligence of Soil Condition
BACKGROUND OF THE
BUILDER
 Prime sristi housing Pvt, Ltd (Madurai) has
nearly two decades of real estate
development experience.
 Their Motto
“Building should Stand apart and should
reflect Engineering Marvel”
 Whereas the actual thing seems to be vice
versa.
Contd.,
 Manoharan (builder) and his 2 Engineer has been
authentically verified.
 While the architect (Vijay Bargotra) was not
registered with them as stated by the council of
architecture, New Delhi.
 As per section 2 (a) 35,36&37 of a architects Act,
1972.
“Only a person registered as an architect with the
council can call himself as an architect”.
 So Mr.Vijay Bargotra has been arrested along
with manoharan.
ACTUAL REASON FOR THE
COLLAPSE
1.The actual study at the
site clearly showed that
it was not due to lightning
and poorness in construction
in all aspects, that leads to
Collapse.
2. Since porur lake is only at
a stone throw distance from
the collapsed building.
KEY ASPECTS
 Previous incidents also proved that whenever
the lake was full & overflowing these areas
were always inundated.
 Before applying for plan approval the first &
foremost activity to have done is
“Site Clearance”
 Whenever the nature of soil requires such
action, the ground surface of the site to be
erected shall be rendered damp proof to the
satisfaction of the authority.
Contd.,
 On considering all these circumstances it is a
common question that would arises in everyone’s
mind is
“ How the permission was
obtained at such a risky site
totally unsuitable for high rise
building”
 Other point made is that the
quality of material used in the
construction was not good.
TALE OF A DOOMED PROJECT
June 2013
CMDA issued planning permission to Prime sristi
Housing Pvt Ltd.
June 28, 2014
Tower belief crumbles after a heavy downpour,
Killing 61 construction workers.
Contd.,
July 3, 2014
State Govt constitutes a one main inquiry
commission headed by juctice R Regupathy.
August 2015
Commission report is in the Assembly.
The report holds six persons responsible for the
collapse. It also states that “hidden and underground
transactions” made b/w officials at various level.
Contd.,
October 2015
Kancheepuram collector orders demolition of the
second tower.
Builder approaches high court seeking a stay.
December 2015
Madras High court stays demolition
May 2016
Supreme court upholds District Collector’s orders to
demolish second tower of the complex.
November 2, 2016
The second Tower brought down using Implosion
Technique.
Second Tower Before Implosion
Implosion Technique Is In Process
Surrounding Area Covered By Dust
EXPERT POINT OF VIEW
 Expert says that the lack of geotechnical
investigation and a focus only on deadlines are
the major reasons for building collapse.
 He also says that the builder reduces the time
taken for construction , for the purpose of
reduction in cost.
 Geotechnical investigation and foundation
engineering is perhaps, the weakest of the links.
 Expert- Aswath M U, Professor & HOD civil IIT
Bangalore.
VIOLATION OF LAW
A. The plan approved by CMDA has not been used for
actual construction.
B. The structural design given for the foundation is Raft
& pile which is inadequate to bear the entire weight
of basement + building weight.
C. The column design are also inadequate to bear the
dead weight of such heavy structure.
D. The foundation was not designed as per the nature of
the soil.
E. The provision of anchorage, length to reinforcement
and column ties are inadequate to cover the
reinforcement.
Contd.,
i. The design and construction of the building
in all aspects are in violation of national
building code.
ii. The materials such as concrete, steel and
bricks used for the construction were not
properly tested.
iii. It also stated that the builder removed many
columns in the CMDA approved plan at the
basement level for the convenience to
create more space for car parking.
STATEMENT MADE BY EXPERTS
1. Dr. Devadas structural Engineering
department – IIT Chennai.
“ The applicant should obtain EIA Clearance
and the same has to be produced at the time of
completion certificate”.
2. Dr. Devadas Faculty of Architecture - Anna
university.
“ The Collapse of the building is primarily due to
gross deficiency in the structural design of the
RC column”
Contd.,
3. Dr. Muttharam Assistant Professor, Department
of soil Mechanics – Anna university.
“He states that the soil investigation was
conducted thoroughly but the raft foundation is
inadequate to carry the total load from the storied
building”.
4. Dr. Umarani C Structural Engineering – Anna
university.
“She also states that the gross deficiency in the
structural design of RC column is the major
causes”.
CONCLUSION
From the above, it is clearly evidenced that the right
construction procedures were not followed for such
high rise buildings.
The materials right from bricks to sand were found
to be not of proper quality.
The soil test was not conducted in true sense. It is
expected that for the plots, particularly near the
lakes, soil test would be given prominent
importance as they very foundation is involved.
The hasty construction coupled with poor quality
materials and people led to this deplorable
collapse.
REFERENCE
I. National Crime Records Bureau
II. National building code of India 2005 – point
no.6 requirement of plots: clause 6.2 Damp
sites and 6.3 surface water drains.
III. The Hindu Chennai dated 3rd November 2016.
IV. 2014 Chennai building collapse from
Wikipedia, the free encyclopedia.
V. Trust height porur by prime sristi housing pvt
Ltd in Chennai central.
Moulivakkam tower seminar

More Related Content

What's hot

Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studiesYogi Yogesh
 
Industrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringIndustrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringRAVI KUMAR
 
Demolition of Structures.
Demolition of Structures.Demolition of Structures.
Demolition of Structures.Chintan Varia
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro projectAkshathaBhandary
 
Penetration resistance test
Penetration resistance testPenetration resistance test
Penetration resistance testAyaz khan
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.Shariful Haque Robin
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresShahrukh Niaz
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING Ram1239
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
The Whys, The Hows of Structural Audit of Buildings
The Whys, The Hows of Structural Audit of BuildingsThe Whys, The Hows of Structural Audit of Buildings
The Whys, The Hows of Structural Audit of BuildingsRenuka Consultants
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESbrijlata sharma
 
Summer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringSummer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringZakaria Yahya
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structuresAbdallah Shaheen
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTemily9199
 
Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction SAURABH GUPTA
 

What's hot (20)

Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
Industrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringIndustrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil Engineering
 
Demolition of Structures.
Demolition of Structures.Demolition of Structures.
Demolition of Structures.
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
Penetration resistance test
Penetration resistance testPenetration resistance test
Penetration resistance test
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.Super-Structural Construction Work of a Six Storied Residential Building.
Super-Structural Construction Work of a Six Storied Residential Building.
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Signature bridge
Signature bridgeSignature bridge
Signature bridge
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
The Whys, The Hows of Structural Audit of Buildings
The Whys, The Hows of Structural Audit of BuildingsThe Whys, The Hows of Structural Audit of Buildings
The Whys, The Hows of Structural Audit of Buildings
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Summer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringSummer Internship Report Civil Engineering
Summer Internship Report Civil Engineering
 
Structural audit
Structural auditStructural audit
Structural audit
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structures
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction
 

Similar to Moulivakkam tower seminar

M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1Jing Chuang
 
A case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_toA case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_toasmatullah90
 
1 1 9-bhavar-dadasaheb-o.-et-al (2)
1 1 9-bhavar-dadasaheb-o.-et-al (2)1 1 9-bhavar-dadasaheb-o.-et-al (2)
1 1 9-bhavar-dadasaheb-o.-et-al (2)Riddhi Patel
 
Introduction to Site Investigation Methods
Introduction to Site Investigation MethodsIntroduction to Site Investigation Methods
Introduction to Site Investigation MethodsMohdBilal430488
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE VISHNU VIJAYAN
 
field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.AskafAhamed
 
Site report
Site reportSite report
Site reportHuiYik
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete reportBudhramKamait1
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...Mary Montoya
 
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy   igc 2013 roorkeeAbhishek, tarachand and satyanarayana reddy   igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkeeTarachand Veeragattapu
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
A Review on Progressive Collapse of the Bridge
A Review on Progressive Collapse of the BridgeA Review on Progressive Collapse of the Bridge
A Review on Progressive Collapse of the BridgeIRJET Journal
 
Ground engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsGround engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsAbhishek Mangukiya
 
IRJET- Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...
IRJET-  	  Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...IRJET-  	  Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...
IRJET- Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...IRJET Journal
 
Well foundations
Well foundationsWell foundations
Well foundationsganesh6561
 

Similar to Moulivakkam tower seminar (20)

M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1
 
A case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_toA case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_to
 
1 1 9-bhavar-dadasaheb-o.-et-al (2)
1 1 9-bhavar-dadasaheb-o.-et-al (2)1 1 9-bhavar-dadasaheb-o.-et-al (2)
1 1 9-bhavar-dadasaheb-o.-et-al (2)
 
Introduction to Site Investigation Methods
Introduction to Site Investigation MethodsIntroduction to Site Investigation Methods
Introduction to Site Investigation Methods
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.
 
Site report
Site reportSite report
Site report
 
100026031
100026031100026031
100026031
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
 
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy   igc 2013 roorkeeAbhishek, tarachand and satyanarayana reddy   igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
 
Site visit report
Site visit reportSite visit report
Site visit report
 
A Review on Progressive Collapse of the Bridge
A Review on Progressive Collapse of the BridgeA Review on Progressive Collapse of the Bridge
A Review on Progressive Collapse of the Bridge
 
CV of Engr. Habibullah_1.5 DEC 2014
CV  of Engr. Habibullah_1.5 DEC 2014CV  of Engr. Habibullah_1.5 DEC 2014
CV of Engr. Habibullah_1.5 DEC 2014
 
Ground engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsGround engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projects
 
Strengthening of concrete block
Strengthening of concrete blockStrengthening of concrete block
Strengthening of concrete block
 
Pile footing
Pile footingPile footing
Pile footing
 
IRJET- Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...
IRJET-  	  Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...IRJET-  	  Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...
IRJET- Seismic Analysis of RCC Building Resting on Sloping Ground Adjacen...
 
simplex report 2
simplex report 2simplex report 2
simplex report 2
 
Well foundations
Well foundationsWell foundations
Well foundations
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Moulivakkam tower seminar

  • 1. BY SARATH KUMAR M Meenakshi Sundararajan Engineering College
  • 2. OBJECTIVE  This is the case study on 11 storey building collapse at moulivakkam, porur.  One building collapsed on its own during construction.  While the other one, semi built was demolished by imploding.  Hope this study will enhance the correct reason for the collapse so that non- recurrence of such things in future can be made.
  • 3. BUILDIN G DETAILS  Builder – Prime sristi Housing Pvt, Ltd.  The project consist of two towers i. The Faith Tower ii. The Belief Tower  Location – Kundrathur road near porur junction (Moulivakkam)  Faith – 2BHK (4) in each floor  Belief – 3BHK (4) in each floor  Price – 5250/ sq.ft
  • 4. TIME OF OCCURRENCE  Belief Tower Collapse took place in June 28 @ 5.30 PM  Faith Tower razed to the ground In three second In November 2 @ 6.50 PM
  • 5. REASON FOR THE COLLAPSE  Thunder Bolt  Poor Quality of Construction  Negligence of Soil Condition
  • 6. BACKGROUND OF THE BUILDER  Prime sristi housing Pvt, Ltd (Madurai) has nearly two decades of real estate development experience.  Their Motto “Building should Stand apart and should reflect Engineering Marvel”  Whereas the actual thing seems to be vice versa.
  • 7. Contd.,  Manoharan (builder) and his 2 Engineer has been authentically verified.  While the architect (Vijay Bargotra) was not registered with them as stated by the council of architecture, New Delhi.  As per section 2 (a) 35,36&37 of a architects Act, 1972. “Only a person registered as an architect with the council can call himself as an architect”.  So Mr.Vijay Bargotra has been arrested along with manoharan.
  • 8. ACTUAL REASON FOR THE COLLAPSE 1.The actual study at the site clearly showed that it was not due to lightning and poorness in construction in all aspects, that leads to Collapse. 2. Since porur lake is only at a stone throw distance from the collapsed building.
  • 9. KEY ASPECTS  Previous incidents also proved that whenever the lake was full & overflowing these areas were always inundated.  Before applying for plan approval the first & foremost activity to have done is “Site Clearance”  Whenever the nature of soil requires such action, the ground surface of the site to be erected shall be rendered damp proof to the satisfaction of the authority.
  • 10. Contd.,  On considering all these circumstances it is a common question that would arises in everyone’s mind is “ How the permission was obtained at such a risky site totally unsuitable for high rise building”  Other point made is that the quality of material used in the construction was not good.
  • 11. TALE OF A DOOMED PROJECT June 2013 CMDA issued planning permission to Prime sristi Housing Pvt Ltd. June 28, 2014 Tower belief crumbles after a heavy downpour, Killing 61 construction workers.
  • 12.
  • 13. Contd., July 3, 2014 State Govt constitutes a one main inquiry commission headed by juctice R Regupathy. August 2015 Commission report is in the Assembly. The report holds six persons responsible for the collapse. It also states that “hidden and underground transactions” made b/w officials at various level.
  • 14. Contd., October 2015 Kancheepuram collector orders demolition of the second tower. Builder approaches high court seeking a stay. December 2015 Madras High court stays demolition May 2016 Supreme court upholds District Collector’s orders to demolish second tower of the complex. November 2, 2016 The second Tower brought down using Implosion Technique.
  • 15. Second Tower Before Implosion
  • 18. EXPERT POINT OF VIEW  Expert says that the lack of geotechnical investigation and a focus only on deadlines are the major reasons for building collapse.  He also says that the builder reduces the time taken for construction , for the purpose of reduction in cost.  Geotechnical investigation and foundation engineering is perhaps, the weakest of the links.  Expert- Aswath M U, Professor & HOD civil IIT Bangalore.
  • 19. VIOLATION OF LAW A. The plan approved by CMDA has not been used for actual construction. B. The structural design given for the foundation is Raft & pile which is inadequate to bear the entire weight of basement + building weight. C. The column design are also inadequate to bear the dead weight of such heavy structure. D. The foundation was not designed as per the nature of the soil. E. The provision of anchorage, length to reinforcement and column ties are inadequate to cover the reinforcement.
  • 20. Contd., i. The design and construction of the building in all aspects are in violation of national building code. ii. The materials such as concrete, steel and bricks used for the construction were not properly tested. iii. It also stated that the builder removed many columns in the CMDA approved plan at the basement level for the convenience to create more space for car parking.
  • 21. STATEMENT MADE BY EXPERTS 1. Dr. Devadas structural Engineering department – IIT Chennai. “ The applicant should obtain EIA Clearance and the same has to be produced at the time of completion certificate”. 2. Dr. Devadas Faculty of Architecture - Anna university. “ The Collapse of the building is primarily due to gross deficiency in the structural design of the RC column”
  • 22. Contd., 3. Dr. Muttharam Assistant Professor, Department of soil Mechanics – Anna university. “He states that the soil investigation was conducted thoroughly but the raft foundation is inadequate to carry the total load from the storied building”. 4. Dr. Umarani C Structural Engineering – Anna university. “She also states that the gross deficiency in the structural design of RC column is the major causes”.
  • 23. CONCLUSION From the above, it is clearly evidenced that the right construction procedures were not followed for such high rise buildings. The materials right from bricks to sand were found to be not of proper quality. The soil test was not conducted in true sense. It is expected that for the plots, particularly near the lakes, soil test would be given prominent importance as they very foundation is involved. The hasty construction coupled with poor quality materials and people led to this deplorable collapse.
  • 24. REFERENCE I. National Crime Records Bureau II. National building code of India 2005 – point no.6 requirement of plots: clause 6.2 Damp sites and 6.3 surface water drains. III. The Hindu Chennai dated 3rd November 2016. IV. 2014 Chennai building collapse from Wikipedia, the free encyclopedia. V. Trust height porur by prime sristi housing pvt Ltd in Chennai central.