Construction Site Report
CHUANG JING 0322934
CONSTRUCTION SITE VISIT REPORT
INDIVIDUAL ASSIGNMENT
JULY’15
By
1Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
TABLE OF CONTENT
A. Cover 0
B. Table of Content 1
C. Objective 2
D. Introduction 3
E. Content / Technical Observations 4~8
F. Photo and Description 9~20
G. Learning outcome / Conclusion 21
2Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
OBJECTIVE
Witness the actual construction process and the usage of
construction equipment on site.
Understand the practical aspect of construction techniques and its
application on site in comparison to the theory aspect in books.
Understand the importance of teamwork in the building team and
able to communicate well with the construction team members
on site
Able to identify various types of building materials and
construction technology on site.
Awareness of the importance of safety and rules on site
3Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Introduction
In this individual assignment, we are required to make a site report of the combination
of three subjects: Measurement I, Construction Technology I and Building Material. The site
that we visit is organized by Ms. Ang, my Measurement I lecturer, at the same time she is
our program director. It is called The Andes which is a free hold development located in
Jalan Mas 1, Bukit Jalil, 58200 Kuala Lumpur.
We had visited the site on 26th
June 2015 by 2 buses. As the constructor demanded us to
divide into two groups for safety reasons, I had attended at the time of 9am to 10am and
another group is from 10am to 11am. 53 students and 3 lecturers had attended this site
visit. Besides, safety helmet, long pants, sport shoe were required while enter the
construction area.
After a brief talk given by the project manager, James Siow, we were being leaded to
visit around the site by project supervisors and relevant skilled workers. They had explained
to us about the construction progress and we can just ask them if we have any questions.
The Andes is made of two residential unit types, condominium and villa terrace.
Standing at a height of 25 storeys, there are two condominium blocks will be seen beside the
triple-storey villa terrace which will have extra garden space. The condominiums consist of
353 units, all with built-up sizes from 1,105 to 1,842 sf; the villa terrace consist of 22 units
with dimension sizes in 22 ft x 100 ft and 33 ft x 100 ft. The land area is 6.25 acres. The
launch price of condominium is about RM685,000 - RM1,652,000 and RM1,600,000 -
RM2,249,061 for villa terrace.
We were lucky to have the opportunity to observe the site clearance, earthworks,
construction of bored piles and pile caps works. But we were not be able to investigate in
the built-up building as it is just the starting works. It is currently expected to be completed
in 2018.
Figure 1. Artist impression of The
Andes Condo
Figure 2. The Andes Condo site plan
4Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Content / Technical Observations
Construction Technology I
Type of foundation
The foundation they used (for the two blocks of condominium) is pile foundation. At the
time we visit, we can only see a few pile foundation there and luckily, that was the largest
pile cap in the site which is rare to be seen in construction site – 24BP1200A – 24 piles
1200m2 each size in a pile cap.
Foundation for the villa terrace haven’t been construct yet, we didn’t get the project report
for villa terrace hence we don’t know what is the type of its foundation.
Pile foundation
A deep foundation where the transfer of load to the soil is at a level much below the lowest
floor of a building.
Use when
1. The ground conditions are incapable of supporting structural loads (impractical to
use shallow foundation at an economic depth)
2. The load of the super structure is heavy and its distribution is uneven
3. The top soil has poor bearing capacity
4. The subsoil water level is high
5. There is large fluctuations in subsoil water level
6. Canal or deep drainage lines exist near the foundation
7. The structure is situated at the sea shore or river bed
Advantages and disadvantages of pile foundation:
Advantages Disadvantages
1. Suitability in soft, unstable
environments and its maximum
drilling depth
2. Prevent uplift force
3. Reduce excessive settlement
(consolidation)
4. High load capacities, corrosion
resistance can be attained, hard
driving possible
5. Cylinder piles in particular are
suited for bending resistance
1. Alternate freezing thawing causing
concrete piles damages in the
underground
2. If the piles is not driven deep in the
underground, it will lead to need to
be removed out and thus resulting
in concrete aggregates form
3. Noisy installation method can
cause environmental impact
4. Vibration can cause neighboring
properties
5. Costly
5Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
As we can see in the progress report no.28, the type of piling work used in this project is
bored piling.
What is Bored Pile?
1. Another type of reinforced concrete pile
2. Used to support tall building, massive industrial complexes or bridge work which
require foundations that can bear the load of thousands of tons
3. Used most probably in unstable or difficult soil conditions.
4. Cast-in-place concrete pile where the bored piles have to be cast on the
construction site, while other concrete piles like Spun Pile and Reinforced Concrete
Square Pile are precast concrete piles.
5. Cast by using bored piling machine which has specially designed drilling tools,
buckets and grabs, it is used to remove the soil and rock.
6. Required specialist bored piling contractor, normal piling contractor cannot execute
these type of work without experience and knowledge about bored piles.
7. Produces little vibration and lower noise level.
Figure 3. A field of
bored piles – A
bored piling
machine was
drilling a pile shaft
– Foundation of a
new bridge
abutment
Figure 4. Stages in the
construction of large
diameter bored pile with
under ream
6Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 1. The biggest pile cap in site –
24BP1200A
Photo 2. The detail photo of a precast
concrete piles – The reinforcement
bars exposed on the pile
Photo 3. Prefabricated reinforcement
bars for pile cap was being put at the
corner side
Photo 4. Pile foundation was covered
by slab after completed – After that,
column was constructed above the
slab – No column stump in this project
7Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Figure5.PilecapplanofBlockAand
BlockB(forcondominiumonly)
8Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Building Material
Reinforced Concrete
In reinforced concrete, the components works together to resist many types of loading.
Concrete resists compression and steel reinforcement resists tension forces.
According to Yunusa (2011) every concrete has its strength in N/mm2 when subject to test
after 28 days of curing in any medium. The choice of concrete grade, depends on the usage:
Concrete Grade
N/mm2
Ratio Cement, Sand and
Aggregates
Usage
10 1 : 4 : 8 Blinding concrete
15 1 : 3 : 6 Mass concrete
20 1 : 2 : 5 : 5 Light reinforced concrete
25 1 : 2 : 4 Reinforced concrete/precast
30 1 : 1 : 5 : 3 Heavy Reinforced concrete/pre-cast
35 1 : 1 : 5 : 2 Pre-stressed/pre-cast concrete
40 1 : 1 : 1 Very heavy reinforced concrete/pre-cast/pre-
stressed
Figure 6. Concrete Grade Designation
Different building elements may use different type of reinforced concrete grade, in this
project:
1. Column : Reinforced concrete grade 45
2. Beam : Reinforced concrete grade 35
3. Slab : Reinforced concrete grade 35
4. Pile cap : Reinforced concrete grade 30
5. Concrete cover : Reinforced concrete grade 35
Advantages and disadvantages of high grade reinforced concrete:
Advantages Disadvantages
1. Have high compressive strength
compared to other lower grade
reinforced concrete.
2. Lesser reinforcement bar
3. Due to the provided reinforcement,
reinforced concrete can also
withstand a better amount of
tensile stress.
4. Fire and weather resistance of
reinforced concrete is fairer than
lower grade reinforced concrete.
5. As high grade reinforced concrete
is more widely used in precast
structural components.
6. It yields more rigid members with
minimum apparent deflection.
1. The tensile strength of reinforced
concrete is about one-tenth of its
compressive strength.
2. The main steps of using reinforced
concrete are mixing, casting, and
curing. All of this affect the final
strength.
3. The cost of the forms used for
casting high grade reinforced
concrete is relatively higher.
4. For multistoried building the
RCC(Reinforced Cement Concrete)
column section for is larger than
steel section as the compressive
strength is lower in the case of RCC.
9Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photos and Descriptions
Photo 5. Main entrance – This is the
back entrance, the front entrance
which is at another side have a
problem of the road are too narrow
Photo 6. Project information board
Photo 7. The project manager, James
Siow were greeting us, shaking hands
with our lecturer, Ms. Ang
Photo 9. Overall look of Block B – Two
rows of aluminium stairs going down
to the excavated area of block B –
Work below lowest floor level
Photo 8. Overall look from road
entrance – Surrounded by condos,
terrace, factories, so it is important to
prevent disturbance to the residence
Photo 10. Guard house beside the
main entrance – Security concerns –
Allow someone to monitor the
location
10Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 11. Site office (left) and
temporary accommodation for
workers (right)
Photo 12. Steel mat for
vehicle/machine wheel wash – Ensure
the public road is clean when the
vehicle/machine leave from site
Photo 13. Barricade tape is tightened
with wood strips warning the passers-
by of the site containing a possible
hazard.
Photo 14. Wood strips, sawn timber
board for formwork and some treated
timber are gathered on an area of the
site
Photo 16. Separation layer (blue
panel) for formwork – Saves on waste
concrete and used as a base to
support insulation materials
Photo 15. Sheet piling – an earth
retention and excavation support
technique that retains soil, using steel
sheet sections with interlocking edges
11Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 17. An upside-down water tank
in front of the entrance with some
pipes.
Photo 18. Tower crane base
Photo 19. Big size of stirrups 24d Photo 20. Some wood strips covering a
hole to avoid people accidentally step
in
Photo 22. Hoarding as temporary
fencing – Solid panels – Keeps
unauthorized personnel out of a site –
Prevent injuries and theft
Photo 21. A lot of tools and equipment
were put on the table in site office
12Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 23. Wheelbarrow – Enabling the
convenient carriage of heavier and
bulkier concrete, sand, stone or bricks
Photo 24. A bunch of very long straight
reinforcement bars
Photo 25. Concrete Spacers – Prevent
rebars from fire to certain length of
time – Provide proper transfer of
stresses from concrete to steel rebars
Photo 26. Rebar is tied together using
wire to hold the perpendicular bars in
columns tight – Prevent the rebars
from racking or moving diagonally
Photo 28. After scribing the size of the
column, foot rim are nailed on the
bottom to mark the line of the area of
the column – Using thick strip wood
Photo 27. Traditional timber formwork
for column
13Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 29. Adequate bracing and
shoring is necessary to prevent
formwork collapse
Photo 30. Construction grade plastic
sheet – Moisture barrier – laid above
completed slab – Protect it from water
which is poured on the surface of site
Photo 31. High speed cut off machine
with abrasive blade used for cutting
masonry, tile or steel materials
Photo 32. Power float – Instead of
hand trowel to apply a smooth finish
to concrete slabs
Photo 34. An independent links 24d
were founded on site
Photo 33. Reinforcement bar mat for
basement floor slab – Minimum 25mm
spacer shall be placed between layers
if there are two layers or more
14Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 35. Reinforcement bent bars 5d
for basement floor slab
Photo 36. Hand-made timber cutter
Photo 37. Starter bar 40d/42d of a
completed half-way column
Photo 38. Hollow square bar are fixed
to timber formwork to strengthen the
support to avoid displacement
Photo 40. Different length of hollow
square bar put on site
Photo 39. Reinforcement bars for
scaffolding – They erects scaffolding
themselves instead of buying – Save
more cost
15Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 41. Independent scaffolding -
Does not supported by building – Two
parallel rows of standards at about 1m
apart tied by transoms
Photo 42. Plump bob – Used as a
vertical reference line – To secure the
formwork is vertical (90 degree)
Photo 43. Lift formwork construction –
The timber formwork are ready to be
dismantled as the concrete is already
cured
Photo 44. Scaffolding bracing
Photo 46. The skilled labour was
demonstrating the use of an anchor
bolts
Photo 45. There were many holes
created purposely on the column to
insert and tie anchor bolts – Make the
column more firm
16Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 47. Dumpy level – A surveying
tool which must situated horizontally –
Use to measure height differences and
so transfer, measure and set heights
Photo 48. Hollow steel shaft
Photo 49. Wilding generator machine–
Offered provide for practical usage as
auxiliary generating sets for meeting
the supply demands of electricity
Photo 50. A bunch of binders were
prepared there
Photo 52. Air compressor – Provide
efficient power to construction tools
and machinery – Pressurize air enables
power to be transmitted via hoses
Photo 51. Heavy duty steel wire –
Heavy industrial use, marine rope
rigging, cable railing, architectural
cables, balustrades, cable display
systems
17Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 53. Gravel / sand strainer - to
separate a particular size of stones
present in the sand
Photo 54. Blinding concrete plate –
Molds to make own concrete bar
spacers for the project – Save
development costs
Photo 55. Blinding concrete after
curing will be cut into standard size of
a concrete spacer
Photo 56. Silver-color cured concrete
on the surface of site
Photo 58. An opened cement bag is
used as mixture for concrete of
spacers
Photo 57. Different thickness of
concrete spacers – 30~35mm:
construction above ground level;
>50mm: construction below ground lv
18Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 59. Concrete piles left on site Photo 60. Geometrical form of beam –
Selection of beams are based on span,
loading conditions: I cross section
(left), channel cross section (right)
Photo 61. Site progress report sheet
no.28
Photo 62. Overall look of Block A –
Reinforcement bar for column
formwork – No column stumps in this
project
Photo 64. Bar bender cutter – Cut and
bend reinforcement bars into various
forms of round bar – Minimized the
use of manual labor, save cost
Photo 63. Water disposal on site
19Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 65. Mass disposal on site Photo 66. Steel beam
Photo 67. Power shovel – Excavate the
earth to load the trucks – Capable of
digging very hard material
Photo 68. Crawler crane – Allow to lift
such enormous loads is a
counterweight– Versatile on all types
of ground and weather
Photo 70. Rotational hydraulic shears
and rock breakers attached to
excavators
Photo 69. Dump trucks – Modern
dumpers have payloads of up to 10
tons and usually steer by articulating
at the middle of the chassis
20Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Photo 71. Oxy-fuel cutter – Cutting
process by chemical reaction
with oxygen at high temperatures for
cutting mild steels, low alloyed steels
Photo 72. Excavator – Heavy
construction equipment for digging of
trenches or pit, landscaping, river
dredging
Photo 73. Fuel injector gun stand in
fuel barrel – Fuel for construction
equipment / machine
Photo 74. Uninstalled components of a
tower crane
21Construction Site Report
Measurement I, Construction Technology I, Building Material
CJg
Learning Outcome / Conclusion
For site visit, this is my first time experience. I am able to practice what I have learnt
from all lecture classes on the actual working construction site. Theory and application
of construction techniques from lecture notes and lecturers combined with this practical
experience are really precious to me as I can apply the knowledge more proficiently
from time to time when I visit more. Besides, I get to know more about construction
like their safety and rules, soil test, site investigation, water level system, job of
contractor, project management, and subcontractor etc. what I should know as being a
future quantity surveyor. I am happy that I was able to identify the building material
and construction technology on site. Also, I was lucky to get the opportunities to chat
with a subcontractor. His name is CJ which is same as me, what a coincidence! He tell us
a lot, about his experience and some QS job details. So appreciate his generosity and I
learnt a lot which cannot be acquired from books. Hopefully I can meet him in the
future. On the other hand, the environment on site is hot and dusty, it seems so
unhealthy to the workers who staying there, but it’s another exposure for me to the
actual working environment. Hope that we can have more opportunity to participate
in site visit even after semester one.
For site report after the visit, I have been more curious about all the tools and
equipment used in construction. Although it take times to learn and see, I am excited
that one day I could know everything in site when I visit the site again. It also improve
my searching technique. But English standard is very important, right key words lead to
great results. As a Chinese high school student, I didn’t try hard to learn English
language that time and I am regretting. Now it’s time to me to learn my English
better!
To conclude this individual assignment (last assignment in semester one, it is like
conclude the whole semester what I have learnt), I appreciate it very much. Appreciate
for the exposure I gained this time. Appreciate to have good quality lecturers in
semester one so I have learnt so much. Appreciate friends I have met along my
university life which always help me a lot. Appreciate Taylors’ University provide
quantity surveying course and I had the chance to choose it. Appreciate my parents
letting me study. Appreciate I done my first individual report and received so many
things!!! Thank you.
2th July 2015

More Related Content

What's hot (20)

Footing and Its Types
Footing and Its TypesFooting and Its Types
Footing and Its Types
 
Factors to consider in foundation design
Factors to consider in foundation designFactors to consider in foundation design
Factors to consider in foundation design
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanation
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Pile Foundation presentation
Pile Foundation presentationPile Foundation presentation
Pile Foundation presentation
 
Shallow foundation
Shallow foundationShallow foundation
Shallow foundation
 
Shallow foundations
Shallow foundationsShallow foundations
Shallow foundations
 
Building materials - Soil
Building materials - SoilBuilding materials - Soil
Building materials - Soil
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Roof truss
Roof trussRoof truss
Roof truss
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
foundation
foundationfoundation
foundation
 
Deep foundation.types and design
Deep foundation.types and designDeep foundation.types and design
Deep foundation.types and design
 
Types Of Foundation
Types Of FoundationTypes Of Foundation
Types Of Foundation
 
Types of deep foundation
Types of deep foundationTypes of deep foundation
Types of deep foundation
 
Introduction to Types of Foundation
Introduction to Types of FoundationIntroduction to Types of Foundation
Introduction to Types of Foundation
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 

Viewers also liked

Assignment brief-for-site-report
Assignment brief-for-site-reportAssignment brief-for-site-report
Assignment brief-for-site-reportPui San
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
Construction technology-report
Construction technology-reportConstruction technology-report
Construction technology-reportPui San
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Pang Shuen
 

Viewers also liked (8)

CTec1 Assi
CTec1 AssiCTec1 Assi
CTec1 Assi
 
Ct report
Ct reportCt report
Ct report
 
Assignment brief-for-site-report
Assignment brief-for-site-reportAssignment brief-for-site-report
Assignment brief-for-site-report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Construction technology-report
Construction technology-reportConstruction technology-report
Construction technology-report
 
CT 2
CT 2CT 2
CT 2
 
Site report
Site reportSite report
Site report
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1
 

Similar to M1 CTec1 BMat Rep1

Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Site report
Site reportSite report
Site reportHuiYik
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Site report
Site reportSite report
Site reportvaylu
 
Site report
Site reportSite report
Site reportEric Teo
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
Site visit report
Site visit reportSite visit report
Site visit reportshensin1015
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 

Similar to M1 CTec1 BMat Rep1 (20)

Site visit report
Site visit reportSite visit report
Site visit report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site report
Site reportSite report
Site report
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Final Report
Final Report Final Report
Final Report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report 1
Site report 1Site report 1
Site report 1
 
Ez
EzEz
Ez
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
SITE REPORT
SITE REPORTSITE REPORT
SITE REPORT
 
Site report
Site reportSite report
Site report
 
Report
ReportReport
Report
 
Site report
Site reportSite report
Site report
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Site visit report
Site visit reportSite visit report
Site visit report
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site report
Site reportSite report
Site report
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

M1 CTec1 BMat Rep1

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) MARCH INTAKE 2015 SEMESTER 1 MEASUREMENT I (QSB60104) MS. ANG FUEY LIN CONSTRUCTION TECHNOLOGY I (BLD60104) MS. AZRINA MD YAAKOB BULDING MATERIALS (BLD62003) MS. MYZATUL AISHAH KAMARAZRLY Construction Site Report CHUANG JING 0322934 CONSTRUCTION SITE VISIT REPORT INDIVIDUAL ASSIGNMENT JULY’15 By
  • 2. 1Construction Site Report Measurement I, Construction Technology I, Building Material CJg TABLE OF CONTENT A. Cover 0 B. Table of Content 1 C. Objective 2 D. Introduction 3 E. Content / Technical Observations 4~8 F. Photo and Description 9~20 G. Learning outcome / Conclusion 21
  • 3. 2Construction Site Report Measurement I, Construction Technology I, Building Material CJg OBJECTIVE Witness the actual construction process and the usage of construction equipment on site. Understand the practical aspect of construction techniques and its application on site in comparison to the theory aspect in books. Understand the importance of teamwork in the building team and able to communicate well with the construction team members on site Able to identify various types of building materials and construction technology on site. Awareness of the importance of safety and rules on site
  • 4. 3Construction Site Report Measurement I, Construction Technology I, Building Material CJg Introduction In this individual assignment, we are required to make a site report of the combination of three subjects: Measurement I, Construction Technology I and Building Material. The site that we visit is organized by Ms. Ang, my Measurement I lecturer, at the same time she is our program director. It is called The Andes which is a free hold development located in Jalan Mas 1, Bukit Jalil, 58200 Kuala Lumpur. We had visited the site on 26th June 2015 by 2 buses. As the constructor demanded us to divide into two groups for safety reasons, I had attended at the time of 9am to 10am and another group is from 10am to 11am. 53 students and 3 lecturers had attended this site visit. Besides, safety helmet, long pants, sport shoe were required while enter the construction area. After a brief talk given by the project manager, James Siow, we were being leaded to visit around the site by project supervisors and relevant skilled workers. They had explained to us about the construction progress and we can just ask them if we have any questions. The Andes is made of two residential unit types, condominium and villa terrace. Standing at a height of 25 storeys, there are two condominium blocks will be seen beside the triple-storey villa terrace which will have extra garden space. The condominiums consist of 353 units, all with built-up sizes from 1,105 to 1,842 sf; the villa terrace consist of 22 units with dimension sizes in 22 ft x 100 ft and 33 ft x 100 ft. The land area is 6.25 acres. The launch price of condominium is about RM685,000 - RM1,652,000 and RM1,600,000 - RM2,249,061 for villa terrace. We were lucky to have the opportunity to observe the site clearance, earthworks, construction of bored piles and pile caps works. But we were not be able to investigate in the built-up building as it is just the starting works. It is currently expected to be completed in 2018. Figure 1. Artist impression of The Andes Condo Figure 2. The Andes Condo site plan
  • 5. 4Construction Site Report Measurement I, Construction Technology I, Building Material CJg Content / Technical Observations Construction Technology I Type of foundation The foundation they used (for the two blocks of condominium) is pile foundation. At the time we visit, we can only see a few pile foundation there and luckily, that was the largest pile cap in the site which is rare to be seen in construction site – 24BP1200A – 24 piles 1200m2 each size in a pile cap. Foundation for the villa terrace haven’t been construct yet, we didn’t get the project report for villa terrace hence we don’t know what is the type of its foundation. Pile foundation A deep foundation where the transfer of load to the soil is at a level much below the lowest floor of a building. Use when 1. The ground conditions are incapable of supporting structural loads (impractical to use shallow foundation at an economic depth) 2. The load of the super structure is heavy and its distribution is uneven 3. The top soil has poor bearing capacity 4. The subsoil water level is high 5. There is large fluctuations in subsoil water level 6. Canal or deep drainage lines exist near the foundation 7. The structure is situated at the sea shore or river bed Advantages and disadvantages of pile foundation: Advantages Disadvantages 1. Suitability in soft, unstable environments and its maximum drilling depth 2. Prevent uplift force 3. Reduce excessive settlement (consolidation) 4. High load capacities, corrosion resistance can be attained, hard driving possible 5. Cylinder piles in particular are suited for bending resistance 1. Alternate freezing thawing causing concrete piles damages in the underground 2. If the piles is not driven deep in the underground, it will lead to need to be removed out and thus resulting in concrete aggregates form 3. Noisy installation method can cause environmental impact 4. Vibration can cause neighboring properties 5. Costly
  • 6. 5Construction Site Report Measurement I, Construction Technology I, Building Material CJg As we can see in the progress report no.28, the type of piling work used in this project is bored piling. What is Bored Pile? 1. Another type of reinforced concrete pile 2. Used to support tall building, massive industrial complexes or bridge work which require foundations that can bear the load of thousands of tons 3. Used most probably in unstable or difficult soil conditions. 4. Cast-in-place concrete pile where the bored piles have to be cast on the construction site, while other concrete piles like Spun Pile and Reinforced Concrete Square Pile are precast concrete piles. 5. Cast by using bored piling machine which has specially designed drilling tools, buckets and grabs, it is used to remove the soil and rock. 6. Required specialist bored piling contractor, normal piling contractor cannot execute these type of work without experience and knowledge about bored piles. 7. Produces little vibration and lower noise level. Figure 3. A field of bored piles – A bored piling machine was drilling a pile shaft – Foundation of a new bridge abutment Figure 4. Stages in the construction of large diameter bored pile with under ream
  • 7. 6Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 1. The biggest pile cap in site – 24BP1200A Photo 2. The detail photo of a precast concrete piles – The reinforcement bars exposed on the pile Photo 3. Prefabricated reinforcement bars for pile cap was being put at the corner side Photo 4. Pile foundation was covered by slab after completed – After that, column was constructed above the slab – No column stump in this project
  • 8. 7Construction Site Report Measurement I, Construction Technology I, Building Material CJg Figure5.PilecapplanofBlockAand BlockB(forcondominiumonly)
  • 9. 8Construction Site Report Measurement I, Construction Technology I, Building Material CJg Building Material Reinforced Concrete In reinforced concrete, the components works together to resist many types of loading. Concrete resists compression and steel reinforcement resists tension forces. According to Yunusa (2011) every concrete has its strength in N/mm2 when subject to test after 28 days of curing in any medium. The choice of concrete grade, depends on the usage: Concrete Grade N/mm2 Ratio Cement, Sand and Aggregates Usage 10 1 : 4 : 8 Blinding concrete 15 1 : 3 : 6 Mass concrete 20 1 : 2 : 5 : 5 Light reinforced concrete 25 1 : 2 : 4 Reinforced concrete/precast 30 1 : 1 : 5 : 3 Heavy Reinforced concrete/pre-cast 35 1 : 1 : 5 : 2 Pre-stressed/pre-cast concrete 40 1 : 1 : 1 Very heavy reinforced concrete/pre-cast/pre- stressed Figure 6. Concrete Grade Designation Different building elements may use different type of reinforced concrete grade, in this project: 1. Column : Reinforced concrete grade 45 2. Beam : Reinforced concrete grade 35 3. Slab : Reinforced concrete grade 35 4. Pile cap : Reinforced concrete grade 30 5. Concrete cover : Reinforced concrete grade 35 Advantages and disadvantages of high grade reinforced concrete: Advantages Disadvantages 1. Have high compressive strength compared to other lower grade reinforced concrete. 2. Lesser reinforcement bar 3. Due to the provided reinforcement, reinforced concrete can also withstand a better amount of tensile stress. 4. Fire and weather resistance of reinforced concrete is fairer than lower grade reinforced concrete. 5. As high grade reinforced concrete is more widely used in precast structural components. 6. It yields more rigid members with minimum apparent deflection. 1. The tensile strength of reinforced concrete is about one-tenth of its compressive strength. 2. The main steps of using reinforced concrete are mixing, casting, and curing. All of this affect the final strength. 3. The cost of the forms used for casting high grade reinforced concrete is relatively higher. 4. For multistoried building the RCC(Reinforced Cement Concrete) column section for is larger than steel section as the compressive strength is lower in the case of RCC.
  • 10. 9Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photos and Descriptions Photo 5. Main entrance – This is the back entrance, the front entrance which is at another side have a problem of the road are too narrow Photo 6. Project information board Photo 7. The project manager, James Siow were greeting us, shaking hands with our lecturer, Ms. Ang Photo 9. Overall look of Block B – Two rows of aluminium stairs going down to the excavated area of block B – Work below lowest floor level Photo 8. Overall look from road entrance – Surrounded by condos, terrace, factories, so it is important to prevent disturbance to the residence Photo 10. Guard house beside the main entrance – Security concerns – Allow someone to monitor the location
  • 11. 10Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 11. Site office (left) and temporary accommodation for workers (right) Photo 12. Steel mat for vehicle/machine wheel wash – Ensure the public road is clean when the vehicle/machine leave from site Photo 13. Barricade tape is tightened with wood strips warning the passers- by of the site containing a possible hazard. Photo 14. Wood strips, sawn timber board for formwork and some treated timber are gathered on an area of the site Photo 16. Separation layer (blue panel) for formwork – Saves on waste concrete and used as a base to support insulation materials Photo 15. Sheet piling – an earth retention and excavation support technique that retains soil, using steel sheet sections with interlocking edges
  • 12. 11Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 17. An upside-down water tank in front of the entrance with some pipes. Photo 18. Tower crane base Photo 19. Big size of stirrups 24d Photo 20. Some wood strips covering a hole to avoid people accidentally step in Photo 22. Hoarding as temporary fencing – Solid panels – Keeps unauthorized personnel out of a site – Prevent injuries and theft Photo 21. A lot of tools and equipment were put on the table in site office
  • 13. 12Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 23. Wheelbarrow – Enabling the convenient carriage of heavier and bulkier concrete, sand, stone or bricks Photo 24. A bunch of very long straight reinforcement bars Photo 25. Concrete Spacers – Prevent rebars from fire to certain length of time – Provide proper transfer of stresses from concrete to steel rebars Photo 26. Rebar is tied together using wire to hold the perpendicular bars in columns tight – Prevent the rebars from racking or moving diagonally Photo 28. After scribing the size of the column, foot rim are nailed on the bottom to mark the line of the area of the column – Using thick strip wood Photo 27. Traditional timber formwork for column
  • 14. 13Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 29. Adequate bracing and shoring is necessary to prevent formwork collapse Photo 30. Construction grade plastic sheet – Moisture barrier – laid above completed slab – Protect it from water which is poured on the surface of site Photo 31. High speed cut off machine with abrasive blade used for cutting masonry, tile or steel materials Photo 32. Power float – Instead of hand trowel to apply a smooth finish to concrete slabs Photo 34. An independent links 24d were founded on site Photo 33. Reinforcement bar mat for basement floor slab – Minimum 25mm spacer shall be placed between layers if there are two layers or more
  • 15. 14Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 35. Reinforcement bent bars 5d for basement floor slab Photo 36. Hand-made timber cutter Photo 37. Starter bar 40d/42d of a completed half-way column Photo 38. Hollow square bar are fixed to timber formwork to strengthen the support to avoid displacement Photo 40. Different length of hollow square bar put on site Photo 39. Reinforcement bars for scaffolding – They erects scaffolding themselves instead of buying – Save more cost
  • 16. 15Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 41. Independent scaffolding - Does not supported by building – Two parallel rows of standards at about 1m apart tied by transoms Photo 42. Plump bob – Used as a vertical reference line – To secure the formwork is vertical (90 degree) Photo 43. Lift formwork construction – The timber formwork are ready to be dismantled as the concrete is already cured Photo 44. Scaffolding bracing Photo 46. The skilled labour was demonstrating the use of an anchor bolts Photo 45. There were many holes created purposely on the column to insert and tie anchor bolts – Make the column more firm
  • 17. 16Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 47. Dumpy level – A surveying tool which must situated horizontally – Use to measure height differences and so transfer, measure and set heights Photo 48. Hollow steel shaft Photo 49. Wilding generator machine– Offered provide for practical usage as auxiliary generating sets for meeting the supply demands of electricity Photo 50. A bunch of binders were prepared there Photo 52. Air compressor – Provide efficient power to construction tools and machinery – Pressurize air enables power to be transmitted via hoses Photo 51. Heavy duty steel wire – Heavy industrial use, marine rope rigging, cable railing, architectural cables, balustrades, cable display systems
  • 18. 17Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 53. Gravel / sand strainer - to separate a particular size of stones present in the sand Photo 54. Blinding concrete plate – Molds to make own concrete bar spacers for the project – Save development costs Photo 55. Blinding concrete after curing will be cut into standard size of a concrete spacer Photo 56. Silver-color cured concrete on the surface of site Photo 58. An opened cement bag is used as mixture for concrete of spacers Photo 57. Different thickness of concrete spacers – 30~35mm: construction above ground level; >50mm: construction below ground lv
  • 19. 18Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 59. Concrete piles left on site Photo 60. Geometrical form of beam – Selection of beams are based on span, loading conditions: I cross section (left), channel cross section (right) Photo 61. Site progress report sheet no.28 Photo 62. Overall look of Block A – Reinforcement bar for column formwork – No column stumps in this project Photo 64. Bar bender cutter – Cut and bend reinforcement bars into various forms of round bar – Minimized the use of manual labor, save cost Photo 63. Water disposal on site
  • 20. 19Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 65. Mass disposal on site Photo 66. Steel beam Photo 67. Power shovel – Excavate the earth to load the trucks – Capable of digging very hard material Photo 68. Crawler crane – Allow to lift such enormous loads is a counterweight– Versatile on all types of ground and weather Photo 70. Rotational hydraulic shears and rock breakers attached to excavators Photo 69. Dump trucks – Modern dumpers have payloads of up to 10 tons and usually steer by articulating at the middle of the chassis
  • 21. 20Construction Site Report Measurement I, Construction Technology I, Building Material CJg Photo 71. Oxy-fuel cutter – Cutting process by chemical reaction with oxygen at high temperatures for cutting mild steels, low alloyed steels Photo 72. Excavator – Heavy construction equipment for digging of trenches or pit, landscaping, river dredging Photo 73. Fuel injector gun stand in fuel barrel – Fuel for construction equipment / machine Photo 74. Uninstalled components of a tower crane
  • 22. 21Construction Site Report Measurement I, Construction Technology I, Building Material CJg Learning Outcome / Conclusion For site visit, this is my first time experience. I am able to practice what I have learnt from all lecture classes on the actual working construction site. Theory and application of construction techniques from lecture notes and lecturers combined with this practical experience are really precious to me as I can apply the knowledge more proficiently from time to time when I visit more. Besides, I get to know more about construction like their safety and rules, soil test, site investigation, water level system, job of contractor, project management, and subcontractor etc. what I should know as being a future quantity surveyor. I am happy that I was able to identify the building material and construction technology on site. Also, I was lucky to get the opportunities to chat with a subcontractor. His name is CJ which is same as me, what a coincidence! He tell us a lot, about his experience and some QS job details. So appreciate his generosity and I learnt a lot which cannot be acquired from books. Hopefully I can meet him in the future. On the other hand, the environment on site is hot and dusty, it seems so unhealthy to the workers who staying there, but it’s another exposure for me to the actual working environment. Hope that we can have more opportunity to participate in site visit even after semester one. For site report after the visit, I have been more curious about all the tools and equipment used in construction. Although it take times to learn and see, I am excited that one day I could know everything in site when I visit the site again. It also improve my searching technique. But English standard is very important, right key words lead to great results. As a Chinese high school student, I didn’t try hard to learn English language that time and I am regretting. Now it’s time to me to learn my English better! To conclude this individual assignment (last assignment in semester one, it is like conclude the whole semester what I have learnt), I appreciate it very much. Appreciate for the exposure I gained this time. Appreciate to have good quality lecturers in semester one so I have learnt so much. Appreciate friends I have met along my university life which always help me a lot. Appreciate Taylors’ University provide quantity surveying course and I had the chance to choose it. Appreciate my parents letting me study. Appreciate I done my first individual report and received so many things!!! Thank you. 2th July 2015