MONTHLY COST REPORT
REPORTING PERIOD 01-MAY-15 TO 31-MAY-15
By
Riyas Sainulabdeen
Sr. Cost Director
INTRODUCTION
• CLIENT :
• CONSULTANT : MORGANTI GROUP
• CONTRACTOR :
• COMPLETION DATE : 21ST MARCH 2016
• CONTRACT VALUE : SR. 500 MILLION
• APPROVED VO : NIL
• ANTICIPATED VARIATIONS : NIL
• EXTENTION OF TIME : NIL
• CURRENT ANTICIPATED FINAL ACCOUNT : SR. 500M
1.1 MAIN COST SUMMARY
• MAIN CONTRCT COST SUMMARY AND PROJECT BUDGET STATUS ARE GIVEN IN
BELOW SLIDES.
SCOPE
CONTRACT VARIATION PROJECTED VARIANCE AGAINST
BASE BUDGET REVISED BUDGET VALUE ORDERS FINAL COST REVISED BUDGET
(SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000)
Tower 105,666.76 97,214.74 97,214.74 97,214.74 -8,452.02
Facade 92,271.99 86,841.42 86,841.42 86,841.42 -5,430.57
Basement 23,379.28 21,353.72 21,353.72 21,353.72 -2,025.56
Fit-out 66,046.75 67,917.27 67,917.27 67,917.27 1,870.52
MEP Services 168,221.76 188,226.70 188,226.70 188,226.70 20,004.94
Site works 7,288.43 1,346.12 1,346.12 1,346.12 -5942.31
Provisional Sum 4,125.00 4,100.00 4,100.00 4,100.00 -25.00
Design & Engineering 33,000.00 33,000.00 33,000.00 33,000.00
TOTAL 500,000.00 500,000.00 500,000.00 500,000.00 0.00
PRJECT NAME: CONSTRUCTION
PRJECT NO:
DATE: 30/4/2015
LEVEL 1 - PORTFOLIO REPORT
TABLE 1 - PROJECT BUDGET STATUS
CATEGORY BUDGET TENDERING CONTRACTS
Budget Category
Description
Approved
Budget
(SAR x 1000)
Approved
Budget
Overrun
(SAR
x1000)
Rev
Latest
Revised
Budget (SAR
x1000)
Awarded
Packages
(SAR
x1000)
Packages
Yet to
be
Awarded
(SAR
x1000)
Tendering
Early
Warnings &
Risk
Allowance
(SAR
x1000)
Estimate to
Complete
(SAR x1000)
Variance to
Latest
Approved
Budget
(SAR
x1000)
Approved
Variation
Orders
(SAR
x1000)
Contract
Dept.
Early
Warnings &
Risk
Allowance
(SAR
x1000)
Anticipated
Final
Account
(SAR x1000)
Building Construction 500,000.00 500,000.00
500,000.00 500,000.00
Car Parking TBA
Consultancy Fee 23,089.00 23,089.00 23,089.00 23,089.00
Authority fees
Others
Contigency
TOTAL (SR) 523,089.00 0.00 523,089.00 523,089.00
-
523,089.00
2. CHANGE MANAGEMENT
• CURRENTLY THERE IS NO APPROVED VARIATION TO MAIN CONTRACT PACKAGE
2.2 PROVISIONAL SUMS
• THE CONTRACT PRICE INCLUDE PROVISIONAL SUM OF 4 MILLION SAUDI RIYAL
FOR THE FOLLOWING ITEMS.
PROVISIONAL SUM CONTRACT ALLOWANCE AWARDED VALUE
BALANCE TO
PLACE
STATUS
Internal lighting fixtures for ground floor
lobby
1,000,000.00
Internal features stairs 1,000,000.00
Increasing CAM unit capacity 30% more
than the existing capacity
1,000,000.00
Hard & Soft Landscaping 1,000,000.00
TOTAL 4,000,000.00
3. CLAIMS
• THERE IS NO AGREED CLAIM UNDER THE MAIN CONTRACT
4. CONTRACTS
• CONTRACTS FOR MAIN WORKS HAS BEEN SIGNED EXECUTED BY THE PARTIES
ON 4TH DECEMBER 2013
• CONTRACT FOR DESIGN & CONSTRUCTION OF CAR PARKING HAS TO BE
FINALIZED FOR THE PROJECT.
NO. DESCRIPTION AWARDED DATE CONTRACT TYPE VENDOR SIGNATURE
EMPLOYER
SIGNATURE
COMMENTS
1 Main Works 27/Oct/13
Re-Measured
Contract
4/Dec/13 4/Dec/13
Contract documents signed &
executed by the parties
2
Design & construction of Car
Parking
TBA
5. INSURANCES / BONDS
• THERE IS NO ANY SUBMISSION OF INSURANCE / BONDS DURING THE
REPORTING PERIOD
• NO ANY DUE DATE FOR THE EXTENTION / RENEWAL OF EXISTING INSURANCE /
BONDS WITHIN THE PERIOD
• DETALS OF SUMMARY IS BELOW
NO. DESCRIPTION CONTRACT PROVIDED VALUE EXPIRY
1
Advance Payment Guarantee No. ------
dated 18. 12. 2013 from -------Bank
Till complete recovery of
Advance Payment
50,000,000.00 15-Feb-16
2
Advance Payment Guarantee No. ------
dated 04. 05. 2014 from ------Bank
Till recovery of Advance
Payment
50,000,000.00 15-Feb-16
3
Bank Guarantee No. ------- dated
05.11.2013 from -------Bank.
Till the end of DLP 25,000,000.00 15-Feb-16
4
Contractors All Risk Policy No. -------
dated 06. 01. 2014 from -----
Cooperative Insurance Company
Construction Period 1/1/14 to 1/4/16 1-Apr-16
Maintenance Period 2/4/16 to 1/4/17 1-Apr-16
6. VALUATION / INTERIM PAYMENTS
• CYRRENTLY THERE IS NO OVERDUE PAYMENT TO ----------.
• PAYMENT FOR THE MONTH OF JANUARY WILL BE DUE ON 16TH MARCH 2015
• COMPLETE SUMMARY OF PAYMENTS BELOW
NO. CUMULATIVE VALUE CONTRACT VALUE
% CERTIFIED COMPLETION
STATUS
TO DATE DATE
1 86,500,000.00 500,000,000.00 Payment (Advance) released
2 21,788,973.60 500,000,000.00 17.30%
7. CASHFLOW
• CURRENTLY THERE IS SLIGHT VARIATION IN ACTUAL AND FORECASTED
CASHFLOWS
• HISTGRAM FOR FORECASTED, ACTUAL AND CUMULATIVE CASHFLOWS SHOWN
BELOW
86,500.00
21,789.00
15,389.00
14,563.00
15,839.00
11,206.00
19,007.00
21,934.00
33,063.00
43,736.00
28,808.00
27,689.00
28,269.00
42,636.00
15,414.00
11,993.00
12,165.00
50,000.00
86,500.00
0.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00
0.00
10,000.00
20,000.00
30,000.00
40,000.00
50,000.00
60,000.00
70,000.00
80,000.00
90,000.00
100,000.00
Cash
Advance
May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 (Rtn.
Rls.)
Plan Actual Cum.Plan Cum.Actual (ALL VALUES IN SARx1000)
8. RISKS
CURRENTLY THE FOLLOWING RISKS WERE NOTICED FOR THE PROJECT.
• PROVIDING UTILITIES SUCH AS POWER & CHILLED WATER FOR THE BUILDING
• FINALIZATION OF REVISED SCHEDULE
• FINALIZATION OF IFC DRAWINGS
ITEM
NO.
DESCRIPTION MITIGATION DATE RAISED VALUE (SR) STATUS
1
Providing utilities such as power &
chilled water for the building
TBA TBC On going
2 Finalization Revised schedule TBA TBC On going
3 Finalization of IFC drawings TBA TBC On going
PROJECT NAME:
CONSTRUCTION
PROJECT NO:
PIC F 8101
DATE
ISSUES AND RISK TRACKING LOG
Date
Raised Vendor
Scope of
Contract
Description of
Issue/Risk
Mitigation
Required
Probability of
Occurance
Commercial
Impact if
Occurs
Estimated
Cost if
Ouuurs (EW)
Aount to
include in
Cost Report
Source of
Risk
Responsible
for Action
Comments
Date High/Medium
/Low
High/Mediu
m/Low
SR SR
Providing utilities Low High TBC TBC Client
Finalization of revised
schedule
Low Low TBC TBC
Cont/Cons
ultant
Finalization IFC
Drawings
Low Medium TBC TBC Consultant
10. PENALTIES & DELAY DAMAGES
• ARTICLE 39 OF THE CONDITIONS OF CONTRACT DESCRIBES THE
CIRCUMSTANCES WHEN THE CONTRACTOR SHALL BE LAIBLE FOR DELAY
DAMAGES.
• THE PENALTY SHALL BE APPLIED IN 3 STAGES DEPENDING ON DELAY PERIOD.
• TOTAL FINE IMPOSED MAY NOT EXCEED 10% OF THE CONTRACT VALUE.
• IN THE EVENT OF A DELAY EXCEEDS A PERIOD OF 132 DAYS, THE EMPLOYER
RESERVES THE RIGHT TO RECOVER THE MAXIMUM OF DELAY DAMAGE WITH
IMMEDIATE EFFECT.
• CURRENTLY THE CONTRACTOR IS NOT LAIBLE FOR ANY PENALTIES.
STAGE START DATE SAR/DAY TOTAL SAR COMMENTS
MAIN WORKS
0 - 41 Days of delay 22-Mar-16 154,321.00 6,327,161.00
42 - 81 Days delay 2-May-16 308,642.00 12,345,680.00
More than 81 - 132 Days 11-Jun-16 617,284.00 31,327,159.00
TOTAL 50,000,000.00
Monthly Cost Report May 15

More Related Content

What's hot

Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
Js Cheok
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
Pui Chun Shian
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
tfkc1212
 
Job site notice jsn
Job site notice jsnJob site notice jsn
Job site notice jsn
Ahmed Sakr
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Chong Yi Hui
 
Contract adminstration and planning
Contract adminstration and planningContract adminstration and planning
Contract adminstration and planning
awad suliman
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
ashleyyeap
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
Pang Khai Shuen
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
LY97
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
Arissa Loh
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
 
Img 20180619 0001
Img 20180619 0001Img 20180619 0001
Img 20180619 0001
makakeli
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
ashleyyeap
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ahmong4
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
Aditi Shah
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
Bt Lee
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
Waqas Aslam
 

What's hot (17)

Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
Job site notice jsn
Job site notice jsnJob site notice jsn
Job site notice jsn
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Contract adminstration and planning
Contract adminstration and planningContract adminstration and planning
Contract adminstration and planning
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
Img 20180619 0001
Img 20180619 0001Img 20180619 0001
Img 20180619 0001
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 

Viewers also liked

Making use of data visualization for software development
Making use of data visualization for software developmentMaking use of data visualization for software development
Making use of data visualization for software development
Mingzhi Huang
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
Rockon0017i5
 
Visualization Cost per Case
Visualization Cost per CaseVisualization Cost per Case
Visualization Cost per Case
Ed Gonzalez
 
Fnt software company profile
Fnt software company profileFnt software company profile
Fnt software company profile
fntsofttech
 
Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
Brad Keithley
 
Cost analysis of project
Cost analysis of projectCost analysis of project
Cost analysis of project
VARSHAAWASAR
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
Seth Familian
 

Viewers also liked (7)

Making use of data visualization for software development
Making use of data visualization for software developmentMaking use of data visualization for software development
Making use of data visualization for software development
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Visualization Cost per Case
Visualization Cost per CaseVisualization Cost per Case
Visualization Cost per Case
 
Fnt software company profile
Fnt software company profileFnt software company profile
Fnt software company profile
 
Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
 
Cost analysis of project
Cost analysis of projectCost analysis of project
Cost analysis of project
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 

Similar to Monthly Cost Report May 15

CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
MaximaSheffield592
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
César del Riego y Fuentes
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
Sumaiya Jabin
 
Final march ir presentation 3.24.17
Final march ir presentation 3.24.17Final march ir presentation 3.24.17
Final march ir presentation 3.24.17
SandRidgeIR
 
QS. Gitonga BORAQS candidates 2018.pptx
QS. Gitonga  BORAQS candidates  2018.pptxQS. Gitonga  BORAQS candidates  2018.pptx
QS. Gitonga BORAQS candidates 2018.pptx
briothug1
 
SandRidge Feb 2017 IR Presentation
SandRidge Feb 2017 IR PresentationSandRidge Feb 2017 IR Presentation
SandRidge Feb 2017 IR Presentation
SandRidgeIR
 
January Investor Presentation
January Investor Presentation January Investor Presentation
January Investor Presentation
SandRidgeIR
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore France
Bluesign
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Dispute resolution & dispute avoidance
Dispute resolution & dispute avoidanceDispute resolution & dispute avoidance
Dispute resolution & dispute avoidance
Sean Gibbs DipArb, FCIARB, FCIOB, FRICS, MICE
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
irkportal
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
ashleyyeap
 
Tanmay presentation
Tanmay presentationTanmay presentation
Tanmay presentation
TanmayBhatt22
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
syedaliabl2023
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate Presentation
Viral Network Inc
 
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
Zahy Haddad
 
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
Zahy Haddad
 
Lick Creek Wastewater Treatment Plant Expansion
Lick Creek Wastewater Treatment Plant Expansion Lick Creek Wastewater Treatment Plant Expansion
Lick Creek Wastewater Treatment Plant Expansion
City of College Station
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
Akhtar Rasul
 
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdfFIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
BayuDarma4
 

Similar to Monthly Cost Report May 15 (20)

CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Final march ir presentation 3.24.17
Final march ir presentation 3.24.17Final march ir presentation 3.24.17
Final march ir presentation 3.24.17
 
QS. Gitonga BORAQS candidates 2018.pptx
QS. Gitonga  BORAQS candidates  2018.pptxQS. Gitonga  BORAQS candidates  2018.pptx
QS. Gitonga BORAQS candidates 2018.pptx
 
SandRidge Feb 2017 IR Presentation
SandRidge Feb 2017 IR PresentationSandRidge Feb 2017 IR Presentation
SandRidge Feb 2017 IR Presentation
 
January Investor Presentation
January Investor Presentation January Investor Presentation
January Investor Presentation
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore France
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Dispute resolution & dispute avoidance
Dispute resolution & dispute avoidanceDispute resolution & dispute avoidance
Dispute resolution & dispute avoidance
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Tanmay presentation
Tanmay presentationTanmay presentation
Tanmay presentation
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate Presentation
 
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)
 
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005014_00Bv02 (1)
 
Lick Creek Wastewater Treatment Plant Expansion
Lick Creek Wastewater Treatment Plant Expansion Lick Creek Wastewater Treatment Plant Expansion
Lick Creek Wastewater Treatment Plant Expansion
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdfFIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
 

Monthly Cost Report May 15

  • 1. MONTHLY COST REPORT REPORTING PERIOD 01-MAY-15 TO 31-MAY-15 By Riyas Sainulabdeen Sr. Cost Director
  • 2. INTRODUCTION • CLIENT : • CONSULTANT : MORGANTI GROUP • CONTRACTOR : • COMPLETION DATE : 21ST MARCH 2016 • CONTRACT VALUE : SR. 500 MILLION • APPROVED VO : NIL • ANTICIPATED VARIATIONS : NIL • EXTENTION OF TIME : NIL • CURRENT ANTICIPATED FINAL ACCOUNT : SR. 500M
  • 3. 1.1 MAIN COST SUMMARY • MAIN CONTRCT COST SUMMARY AND PROJECT BUDGET STATUS ARE GIVEN IN BELOW SLIDES.
  • 4. SCOPE CONTRACT VARIATION PROJECTED VARIANCE AGAINST BASE BUDGET REVISED BUDGET VALUE ORDERS FINAL COST REVISED BUDGET (SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000) (SAR X 1000) Tower 105,666.76 97,214.74 97,214.74 97,214.74 -8,452.02 Facade 92,271.99 86,841.42 86,841.42 86,841.42 -5,430.57 Basement 23,379.28 21,353.72 21,353.72 21,353.72 -2,025.56 Fit-out 66,046.75 67,917.27 67,917.27 67,917.27 1,870.52 MEP Services 168,221.76 188,226.70 188,226.70 188,226.70 20,004.94 Site works 7,288.43 1,346.12 1,346.12 1,346.12 -5942.31 Provisional Sum 4,125.00 4,100.00 4,100.00 4,100.00 -25.00 Design & Engineering 33,000.00 33,000.00 33,000.00 33,000.00 TOTAL 500,000.00 500,000.00 500,000.00 500,000.00 0.00
  • 5. PRJECT NAME: CONSTRUCTION PRJECT NO: DATE: 30/4/2015 LEVEL 1 - PORTFOLIO REPORT TABLE 1 - PROJECT BUDGET STATUS CATEGORY BUDGET TENDERING CONTRACTS Budget Category Description Approved Budget (SAR x 1000) Approved Budget Overrun (SAR x1000) Rev Latest Revised Budget (SAR x1000) Awarded Packages (SAR x1000) Packages Yet to be Awarded (SAR x1000) Tendering Early Warnings & Risk Allowance (SAR x1000) Estimate to Complete (SAR x1000) Variance to Latest Approved Budget (SAR x1000) Approved Variation Orders (SAR x1000) Contract Dept. Early Warnings & Risk Allowance (SAR x1000) Anticipated Final Account (SAR x1000) Building Construction 500,000.00 500,000.00 500,000.00 500,000.00 Car Parking TBA Consultancy Fee 23,089.00 23,089.00 23,089.00 23,089.00 Authority fees Others Contigency TOTAL (SR) 523,089.00 0.00 523,089.00 523,089.00 - 523,089.00
  • 6. 2. CHANGE MANAGEMENT • CURRENTLY THERE IS NO APPROVED VARIATION TO MAIN CONTRACT PACKAGE
  • 7. 2.2 PROVISIONAL SUMS • THE CONTRACT PRICE INCLUDE PROVISIONAL SUM OF 4 MILLION SAUDI RIYAL FOR THE FOLLOWING ITEMS. PROVISIONAL SUM CONTRACT ALLOWANCE AWARDED VALUE BALANCE TO PLACE STATUS Internal lighting fixtures for ground floor lobby 1,000,000.00 Internal features stairs 1,000,000.00 Increasing CAM unit capacity 30% more than the existing capacity 1,000,000.00 Hard & Soft Landscaping 1,000,000.00 TOTAL 4,000,000.00
  • 8. 3. CLAIMS • THERE IS NO AGREED CLAIM UNDER THE MAIN CONTRACT
  • 9. 4. CONTRACTS • CONTRACTS FOR MAIN WORKS HAS BEEN SIGNED EXECUTED BY THE PARTIES ON 4TH DECEMBER 2013 • CONTRACT FOR DESIGN & CONSTRUCTION OF CAR PARKING HAS TO BE FINALIZED FOR THE PROJECT. NO. DESCRIPTION AWARDED DATE CONTRACT TYPE VENDOR SIGNATURE EMPLOYER SIGNATURE COMMENTS 1 Main Works 27/Oct/13 Re-Measured Contract 4/Dec/13 4/Dec/13 Contract documents signed & executed by the parties 2 Design & construction of Car Parking TBA
  • 10. 5. INSURANCES / BONDS • THERE IS NO ANY SUBMISSION OF INSURANCE / BONDS DURING THE REPORTING PERIOD • NO ANY DUE DATE FOR THE EXTENTION / RENEWAL OF EXISTING INSURANCE / BONDS WITHIN THE PERIOD • DETALS OF SUMMARY IS BELOW
  • 11. NO. DESCRIPTION CONTRACT PROVIDED VALUE EXPIRY 1 Advance Payment Guarantee No. ------ dated 18. 12. 2013 from -------Bank Till complete recovery of Advance Payment 50,000,000.00 15-Feb-16 2 Advance Payment Guarantee No. ------ dated 04. 05. 2014 from ------Bank Till recovery of Advance Payment 50,000,000.00 15-Feb-16 3 Bank Guarantee No. ------- dated 05.11.2013 from -------Bank. Till the end of DLP 25,000,000.00 15-Feb-16 4 Contractors All Risk Policy No. ------- dated 06. 01. 2014 from ----- Cooperative Insurance Company Construction Period 1/1/14 to 1/4/16 1-Apr-16 Maintenance Period 2/4/16 to 1/4/17 1-Apr-16
  • 12. 6. VALUATION / INTERIM PAYMENTS • CYRRENTLY THERE IS NO OVERDUE PAYMENT TO ----------. • PAYMENT FOR THE MONTH OF JANUARY WILL BE DUE ON 16TH MARCH 2015 • COMPLETE SUMMARY OF PAYMENTS BELOW
  • 13. NO. CUMULATIVE VALUE CONTRACT VALUE % CERTIFIED COMPLETION STATUS TO DATE DATE 1 86,500,000.00 500,000,000.00 Payment (Advance) released 2 21,788,973.60 500,000,000.00 17.30%
  • 14. 7. CASHFLOW • CURRENTLY THERE IS SLIGHT VARIATION IN ACTUAL AND FORECASTED CASHFLOWS • HISTGRAM FOR FORECASTED, ACTUAL AND CUMULATIVE CASHFLOWS SHOWN BELOW
  • 16. 8. RISKS CURRENTLY THE FOLLOWING RISKS WERE NOTICED FOR THE PROJECT. • PROVIDING UTILITIES SUCH AS POWER & CHILLED WATER FOR THE BUILDING • FINALIZATION OF REVISED SCHEDULE • FINALIZATION OF IFC DRAWINGS
  • 17. ITEM NO. DESCRIPTION MITIGATION DATE RAISED VALUE (SR) STATUS 1 Providing utilities such as power & chilled water for the building TBA TBC On going 2 Finalization Revised schedule TBA TBC On going 3 Finalization of IFC drawings TBA TBC On going
  • 18. PROJECT NAME: CONSTRUCTION PROJECT NO: PIC F 8101 DATE ISSUES AND RISK TRACKING LOG Date Raised Vendor Scope of Contract Description of Issue/Risk Mitigation Required Probability of Occurance Commercial Impact if Occurs Estimated Cost if Ouuurs (EW) Aount to include in Cost Report Source of Risk Responsible for Action Comments Date High/Medium /Low High/Mediu m/Low SR SR Providing utilities Low High TBC TBC Client Finalization of revised schedule Low Low TBC TBC Cont/Cons ultant Finalization IFC Drawings Low Medium TBC TBC Consultant
  • 19. 10. PENALTIES & DELAY DAMAGES • ARTICLE 39 OF THE CONDITIONS OF CONTRACT DESCRIBES THE CIRCUMSTANCES WHEN THE CONTRACTOR SHALL BE LAIBLE FOR DELAY DAMAGES. • THE PENALTY SHALL BE APPLIED IN 3 STAGES DEPENDING ON DELAY PERIOD. • TOTAL FINE IMPOSED MAY NOT EXCEED 10% OF THE CONTRACT VALUE. • IN THE EVENT OF A DELAY EXCEEDS A PERIOD OF 132 DAYS, THE EMPLOYER RESERVES THE RIGHT TO RECOVER THE MAXIMUM OF DELAY DAMAGE WITH IMMEDIATE EFFECT. • CURRENTLY THE CONTRACTOR IS NOT LAIBLE FOR ANY PENALTIES.
  • 20. STAGE START DATE SAR/DAY TOTAL SAR COMMENTS MAIN WORKS 0 - 41 Days of delay 22-Mar-16 154,321.00 6,327,161.00 42 - 81 Days delay 2-May-16 308,642.00 12,345,680.00 More than 81 - 132 Days 11-Jun-16 617,284.00 31,327,159.00 TOTAL 50,000,000.00