SlideShare a Scribd company logo
NOT FOR CONSTRUCTION
16151413121110987654321
M
L
K
J
H
G
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
J
K
L
M
DRAWN BY
NAME
CHECKED BY
NAME NAME
CONSULTANT / SUB-CONTRACTOR
PAPER
SIZE
SCALE
APPROVED BY
DATE DATE DATE
PROJECT BACS CONSORTIUM
APPROVED BY LDE
NAME
DATE
www.bacsrmp.com
© 2016 High Commission for the Development of ArRiyadh
LEAD DESIGN ENTITY (LDE) REVISION
DRAWING TITLE
DRAWING NUMBER
BIMMODELTIMESTAMPElectronicdrawingsonceprinted,areuncontrolledandmaybecomeout-dated.RefertoAconexforcurrentrevision.DONOTSCALEFROMTHISDRAWING
A1
REVISIONS
No Date Description Drawn Checked Approved
RIYADH METRO PROJECTRIYADH METRO PROJECTRIYADH METRO PROJECTRIYADH METRO PROJECT
DRAWING STATUS
BACS APPROVAL
This drawing has been Approved and
Certified as acceptable on behalf of the
BACS Consortium.
BECHTEL
NTS
Bechtel, Taiwan Execution Unit
4/21/20168:39:53PM
C:UsersCCHIANG1DocumentsM-BD6-2E2SS0-CA00-BIM-000001_CCHIANG-20150828.rvt
BD6 - SHALLOW STATION
LINE 2 - STATION 2E2
ARCHITECTURE
FINISHED 3D VIEW SHEET 4
M-BD6-2E2SS0-CA00-EDR-005013B. Farhadi-Ganjeh
v02
JC BL TL
J. Chiang B.Lin T. Lee
JC BL TL
90% DRAFT FINAL DESIGN
00B
00B
21/04/16 21/04/16 21/04/1621/04/16
00B
00A
21/04/16
3/3/2016
ISSUED FOR 90% REVIEW
ISSUED FOR 60% REVIEW

More Related Content

What's hot

Wd 08.1 experiences in rotterdam
Wd 08.1 experiences in rotterdamWd 08.1 experiences in rotterdam
Wd 08.1 experiences in rotterdam
Henk Wolfert
 
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARDwedway
 
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWT
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWTPreliminary project of a Post Panamax Bulk Carrier of 90000 DWT
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWT
Sonia Escales Ruf
 
any angle clamp plug-Layout1
any angle clamp plug-Layout1any angle clamp plug-Layout1
any angle clamp plug-Layout1Kristopher Thorpe
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANKSherif Azab
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANKSherif Azab
 

What's hot (10)

Wd 08.1 experiences in rotterdam
Wd 08.1 experiences in rotterdamWd 08.1 experiences in rotterdam
Wd 08.1 experiences in rotterdam
 
Grid map
Grid mapGrid map
Grid map
 
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
 
AlwynSamuel-Design Eng
AlwynSamuel-Design EngAlwynSamuel-Design Eng
AlwynSamuel-Design Eng
 
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWT
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWTPreliminary project of a Post Panamax Bulk Carrier of 90000 DWT
Preliminary project of a Post Panamax Bulk Carrier of 90000 DWT
 
4D OVERVIEW-2016
4D OVERVIEW-20164D OVERVIEW-2016
4D OVERVIEW-2016
 
any angle clamp plug-Layout1
any angle clamp plug-Layout1any angle clamp plug-Layout1
any angle clamp plug-Layout1
 
J0017227-1
J0017227-1J0017227-1
J0017227-1
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
 

Similar to M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)

Due diligence builders
Due diligence  builders Due diligence  builders
Due diligence builders
IndoAsia Partners
 
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdfPR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
SumanDey924642
 
Monthly cost report may 15
Monthly cost report may 15Monthly cost report may 15
Monthly cost report may 15
Riyas Sainulabdeen
 
Hesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Elsawy
 
My final AutoCAD project
My final AutoCAD projectMy final AutoCAD project
My final AutoCAD project
Tanvir Araf
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
CV CAD ENGINEER IQBAL 01
CV CAD ENGINEER IQBAL 01CV CAD ENGINEER IQBAL 01
CV CAD ENGINEER IQBAL 01Mudassar Iqbal
 
Bridge Solution BIMWIKA.pdf
Bridge Solution BIMWIKA.pdfBridge Solution BIMWIKA.pdf
Bridge Solution BIMWIKA.pdf
RiyuRaze
 
train civil engineering courses for professionals and dimmies the trainingvguide
train civil engineering courses for professionals and dimmies the trainingvguidetrain civil engineering courses for professionals and dimmies the trainingvguide
train civil engineering courses for professionals and dimmies the trainingvguide
bestrambestam1
 
Mohd rashed ali (Senior Surveyor)
Mohd rashed ali (Senior Surveyor)Mohd rashed ali (Senior Surveyor)
Mohd rashed ali (Senior Surveyor)RASHED ALI
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAhamed Mohideen
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif KhanMUHAMMAD KHAN
 
Saes q-012
Saes q-012Saes q-012
Saes q-012
ahmedhashem483214
 

Similar to M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1) (20)

Due diligence builders
Due diligence  builders Due diligence  builders
Due diligence builders
 
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdfPR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
 
Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
 
Monthly Cost Report May 15
Monthly Cost Report May 15Monthly Cost Report May 15
Monthly Cost Report May 15
 
Monthly cost report may 15
Monthly cost report may 15Monthly cost report may 15
Monthly cost report may 15
 
Hesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Mohamed Elsawy
Hesham Mohamed Elsawy
 
My final AutoCAD project
My final AutoCAD projectMy final AutoCAD project
My final AutoCAD project
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
RCB CV2015
RCB CV2015RCB CV2015
RCB CV2015
 
civil engineer
civil engineercivil engineer
civil engineer
 
CV CAD ENGINEER IQBAL 01
CV CAD ENGINEER IQBAL 01CV CAD ENGINEER IQBAL 01
CV CAD ENGINEER IQBAL 01
 
Bridge Solution BIMWIKA.pdf
Bridge Solution BIMWIKA.pdfBridge Solution BIMWIKA.pdf
Bridge Solution BIMWIKA.pdf
 
BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2
 
train civil engineering courses for professionals and dimmies the trainingvguide
train civil engineering courses for professionals and dimmies the trainingvguidetrain civil engineering courses for professionals and dimmies the trainingvguide
train civil engineering courses for professionals and dimmies the trainingvguide
 
Mohd rashed ali (Senior Surveyor)
Mohd rashed ali (Senior Surveyor)Mohd rashed ali (Senior Surveyor)
Mohd rashed ali (Senior Surveyor)
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_original
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif Khan
 
Saes q-012
Saes q-012Saes q-012
Saes q-012
 
YOONAS_CV
YOONAS_CVYOONAS_CV
YOONAS_CV
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 

M-BD6-2E2SS0-CA00-EDR-005013_00Bv02 (1)

  • 1. NOT FOR CONSTRUCTION 16151413121110987654321 M L K J H G F E D C B A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A B C D E F G H J K L M DRAWN BY NAME CHECKED BY NAME NAME CONSULTANT / SUB-CONTRACTOR PAPER SIZE SCALE APPROVED BY DATE DATE DATE PROJECT BACS CONSORTIUM APPROVED BY LDE NAME DATE www.bacsrmp.com © 2016 High Commission for the Development of ArRiyadh LEAD DESIGN ENTITY (LDE) REVISION DRAWING TITLE DRAWING NUMBER BIMMODELTIMESTAMPElectronicdrawingsonceprinted,areuncontrolledandmaybecomeout-dated.RefertoAconexforcurrentrevision.DONOTSCALEFROMTHISDRAWING A1 REVISIONS No Date Description Drawn Checked Approved RIYADH METRO PROJECTRIYADH METRO PROJECTRIYADH METRO PROJECTRIYADH METRO PROJECT DRAWING STATUS BACS APPROVAL This drawing has been Approved and Certified as acceptable on behalf of the BACS Consortium. BECHTEL NTS Bechtel, Taiwan Execution Unit 4/21/20168:39:53PM C:UsersCCHIANG1DocumentsM-BD6-2E2SS0-CA00-BIM-000001_CCHIANG-20150828.rvt BD6 - SHALLOW STATION LINE 2 - STATION 2E2 ARCHITECTURE FINISHED 3D VIEW SHEET 4 M-BD6-2E2SS0-CA00-EDR-005013B. Farhadi-Ganjeh v02 JC BL TL J. Chiang B.Lin T. Lee JC BL TL 90% DRAFT FINAL DESIGN 00B 00B 21/04/16 21/04/16 21/04/1621/04/16 00B 00A 21/04/16 3/3/2016 ISSUED FOR 90% REVIEW ISSUED FOR 60% REVIEW