active service, the plant will not only be able to be operated safely
and as specified in the design criteria, but also ensure continued
safe and satisfactory operational performance at the design level
from then on.
“Operational Readiness is a continuum and at any point in
time throughout the life cycle of an asset, the asset must be in an
Operationally Ready mode to maximise returns to the shareholders
and to ensure safety and environmentally friendly operations,”
says Mr Autar.
The scope of Operational Readiness programs include putting in
place processes and procedures to sustain satisfactory performance
throughout the life of assets. So in essence, Operational Readiness
means achieving a configuration and/or state which will place the
right people in the right places at the right times working with
the right tools and equipment
according to the right
procedures and management
controls. If this state is in
place and adhered to, then
safe and proper operation
of the plant can reasonably
be assured. At a secondary
level, this implies that these
elements will be functioning
in a proper physical and
psychological environment.
“Rightness” in achieving
Operational Readiness
is based on two kinds of
criteria - namely functional
criteria and regulatory
criteria. Functional criteria
are concerned with the plant
operating and accomplishing
its functions in an acceptable
manner and operating at
acceptable risk levels in
relation to the requirements
imposed by the business
plan. Regulatory criteria, on the other hand, are concerned with
the plant and its operating capability meeting all the mandatory
requirements prior to and during its active service.
In a nutshell, Operational Readiness is a state where the three
P’s (Plant, People, Processes) are all deemed competent and
the interfaces between the three P’s are satisfactory for them
to function interactively. Mr Autar emphasises the distinction
between the Mintrex Operational Readiness model and the more
common models in industry, pointing out the importance that
Mintrex places on the interfaces between the three P’s, for it is at
these interfaces that detail generally is lacking when designing
processes for people to use, recruiting and training people to
work on specific plant, and ensuring that processes are designed
specifically for the correct plant.
THE CONTINUUMOF
MINTREX ASSISTED WITH OPERATIONAL READINESS WORKS
FOR THE PORT HEDLAND PORT AUTHORITY IN 2010
RAMAN AUTAR
MANAGER – ASSET MANAGEMENT AND RELIABILITY
MINTREX
‘OPERATIONAL READINESS’
The interface between people, plant and processes continues to be
one of the key imperatives in any mining project, and successful
modelling of their interplay is a vital ingredient to maximising
project viability and shareholder return. Mintrex’s Manager of Asset
Management and Reliability, Raman Autar, presents some of the
company’s insights into the importance of identifying where you are
on the Operational Readiness continuum, and what distinguishes
the Mintrex model from others in optimising that place.
With $170 billion worth of projects in the pipeline or currently
in progress in Western Australia, bringing these projects online
most effectively and efficiently requires careful planning and
resourcing. Project delivery, if not well planned, can cause
significant losses to operations, and it is therefore important to
apply the appropriate models when delivering projects.
Mintrex has been involved in Operational Readiness projects
and has gained significant expertise over the past 18 months to
configure and fine-tune its Operational Readiness model to ensure
expedient and successful deliveries.
What is Operational Readiness? Raman Autar at Mintrex
defines Operational Readiness as a state when, at the onset of the
hand-over of the plant to operations and maintenance teams for
MINESITE 2011 • 135
Page 1 of 1Page 137 - Minesite 2011
17/03/2017file:///C:/Users/Raman%20Autar/Personal/Minesite%202011%20Raman%20Autar%20Operational%20Readiness.html

More Related Content

What's hot

dfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgdfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fg
shahimulk Khattak
 
Amur2016
Amur2016Amur2016
Amur2016
Amur Sultan
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
Aashish Chaudhary
 
Jerry Willis Resume
Jerry Willis ResumeJerry Willis Resume
Jerry Willis Resume
JD Willis (L.I.O.N)
 
Sr. Utility Operator
Sr. Utility OperatorSr. Utility Operator
Sr. Utility Operator
Raees Aslam
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
Ricky Smith CMRP, CMRT
 
Conduct Of Operations
Conduct Of OperationsConduct Of Operations
Conduct Of Operations
Maurice Rhoades
 
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management SystemUnleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
carterava89
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
Rajeev Sharan
 
AMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data SheetAMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data Sheet
Paul Harrison J.P.
 
TISBrochure1
TISBrochure1TISBrochure1
TISBrochure1
PJ Pieters
 

What's hot (11)

dfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgdfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fg
 
Amur2016
Amur2016Amur2016
Amur2016
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
 
Jerry Willis Resume
Jerry Willis ResumeJerry Willis Resume
Jerry Willis Resume
 
Sr. Utility Operator
Sr. Utility OperatorSr. Utility Operator
Sr. Utility Operator
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
 
Conduct Of Operations
Conduct Of OperationsConduct Of Operations
Conduct Of Operations
 
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management SystemUnleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
AMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data SheetAMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data Sheet
 
TISBrochure1
TISBrochure1TISBrochure1
TISBrochure1
 

Similar to Minesite 2011 Raman Aautar operational readiness

Viziya
ViziyaViziya
Analysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instrumentsAnalysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instruments
Projects Kart
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010
Pierre Latour
 
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
Ossama Tawfick
 
ConOps: A control system ...
ConOps: A control system ...ConOps: A control system ...
ConOps: A control system ...
PMHaas
 
LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)
Charles Chesterfield
 
Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14
Cal Chapman, P. E.
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope opt
Arya Wirabhuana
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET Journal
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET Journal
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
Ricky Smith CMRP, CMRT
 
Arrelic Services | TRF
Arrelic Services | TRFArrelic Services | TRF
Arrelic Services | TRF
Arrelic
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
Santhosh Thangaraj
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
ramduttkholia
 
Understanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset managementUnderstanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset management
Irsan Suryadi Saputra
 
Application of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety ManagementApplication of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety Management
IJERA Editor
 
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing HazardsRisk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
IRJET Journal
 
James L Harris CV
James L Harris CVJames L Harris CV
James L Harris CV
James Harris
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
Abhineet Bhardwaj
 
CV-Ruad Adwan
CV-Ruad AdwanCV-Ruad Adwan
CV-Ruad Adwan
ruad adwan
 

Similar to Minesite 2011 Raman Aautar operational readiness (20)

Viziya
ViziyaViziya
Viziya
 
Analysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instrumentsAnalysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instruments
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010
 
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
 
ConOps: A control system ...
ConOps: A control system ...ConOps: A control system ...
ConOps: A control system ...
 
LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)
 
Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope opt
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Arrelic Services | TRF
Arrelic Services | TRFArrelic Services | TRF
Arrelic Services | TRF
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Understanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset managementUnderstanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset management
 
Application of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety ManagementApplication of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety Management
 
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing HazardsRisk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
 
James L Harris CV
James L Harris CVJames L Harris CV
James L Harris CV
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
CV-Ruad Adwan
CV-Ruad AdwanCV-Ruad Adwan
CV-Ruad Adwan
 

Recently uploaded

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 

Recently uploaded (20)

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 

Minesite 2011 Raman Aautar operational readiness

  • 1. Page 137 - Minesite 2011 Basic HTML Version View Full VersionTable of Contents Page 136 Page 138 active service, the plant will not only be able to be operated safely and as specified in the design criteria, but also ensure continued safe and satisfactory operational performance at the design level from then on. “Operational Readiness is a continuum and at any point in time throughout the life cycle of an asset, the asset must be in an Operationally Ready mode to maximise returns to the shareholders and to ensure safety and environmentally friendly operations,” says Mr Autar. The scope of Operational Readiness programs include putting in place processes and procedures to sustain satisfactory performance throughout the life of assets. So in essence, Operational Readiness means achieving a configuration and/or state which will place the right people in the right places at the right times working with the right tools and equipment according to the right procedures and management controls. If this state is in place and adhered to, then safe and proper operation of the plant can reasonably be assured. At a secondary level, this implies that these elements will be functioning in a proper physical and psychological environment. “Rightness” in achieving Operational Readiness is based on two kinds of criteria - namely functional criteria and regulatory criteria. Functional criteria are concerned with the plant operating and accomplishing its functions in an acceptable manner and operating at acceptable risk levels in relation to the requirements imposed by the business plan. Regulatory criteria, on the other hand, are concerned with the plant and its operating capability meeting all the mandatory requirements prior to and during its active service. In a nutshell, Operational Readiness is a state where the three P’s (Plant, People, Processes) are all deemed competent and the interfaces between the three P’s are satisfactory for them to function interactively. Mr Autar emphasises the distinction between the Mintrex Operational Readiness model and the more common models in industry, pointing out the importance that Mintrex places on the interfaces between the three P’s, for it is at these interfaces that detail generally is lacking when designing processes for people to use, recruiting and training people to work on specific plant, and ensuring that processes are designed specifically for the correct plant. THE CONTINUUMOF MINTREX ASSISTED WITH OPERATIONAL READINESS WORKS FOR THE PORT HEDLAND PORT AUTHORITY IN 2010 RAMAN AUTAR MANAGER – ASSET MANAGEMENT AND RELIABILITY MINTREX ‘OPERATIONAL READINESS’ The interface between people, plant and processes continues to be one of the key imperatives in any mining project, and successful modelling of their interplay is a vital ingredient to maximising project viability and shareholder return. Mintrex’s Manager of Asset Management and Reliability, Raman Autar, presents some of the company’s insights into the importance of identifying where you are on the Operational Readiness continuum, and what distinguishes the Mintrex model from others in optimising that place. With $170 billion worth of projects in the pipeline or currently in progress in Western Australia, bringing these projects online most effectively and efficiently requires careful planning and resourcing. Project delivery, if not well planned, can cause significant losses to operations, and it is therefore important to apply the appropriate models when delivering projects. Mintrex has been involved in Operational Readiness projects and has gained significant expertise over the past 18 months to configure and fine-tune its Operational Readiness model to ensure expedient and successful deliveries. What is Operational Readiness? Raman Autar at Mintrex defines Operational Readiness as a state when, at the onset of the hand-over of the plant to operations and maintenance teams for MINESITE 2011 • 135 Page 1 of 1Page 137 - Minesite 2011 17/03/2017file:///C:/Users/Raman%20Autar/Personal/Minesite%202011%20Raman%20Autar%20Operational%20Readiness.html