2. Meeting 10
Meeting Minutes for Triple S
Productions:
• Date: 21/11/2013
• Start Time: 16:13
• Place: Oaks Park High School –
Media Department – Room A31
• Present: Sahra, Serife, Shania
• Minutes taken by: Sahra
• End Time: 17:00
3. This meeting consisted of each group member
contributing their thoughts so far of our
production. Firstly, we discussed evaluation
points, we have come a long way and the
deadline for the production is very near, as
a result, we had to gather ideas and talk
about our strengths and weaknesses that
should be made in our evaluation points;
one of our main weaknesses is that our
timing – for our production – was not as
successful as we would have liked for it to
be, for instance, many times we had to refilm parts and scenes that just were not
good enough, however I, as the director,
believe that this will just make the outcome
of our production, polished and made to
the best standard that we could possibly
make it to. These things will all make is
possible for us as a group to improve our
work. Also, a few further points that were
discussed were that despite all the rough
patches we have had to overcome, we will
be extremely pleased with the outcome as
we put so much effort in to each and every
single shooting date.
4. POINTS FOR NEXT MEETING:
• THIS MEETING IS ONLY FOR POINTS
THAT ARE NEEDED TO BE MADE,
FURTHER INFORMATION WILL BE
INCLUDED IN THE NEXT MEETING.
NEXT MEETING DATE: 28/11/2013