2. Meeting 2
Meeting Minutes for Triple S
Productions:
• Date: 20/09/2013
• Start Time: 15:25
• Place: Oaks Park High School –
Media Department – Room A31
• Present: Sahra, Serife, Shania
• Minutes taken by: Sahra
• End Time: 16:01pm
3. This meeting was shorter than the last and only
a few things were discussed, such as:
Final actor/actress decision – we had finally
decided that our lead actress would be a
young, blonde female.
Camera shots – we spoke about camera shots
that we could visualise before actually going
to film.
Location of production – the final decision
was the production will be filmed in a two
storey house with a rather large kitchen.
First filming date – also we all agreed on
filming a draft so that we can get an idea of
how we would like the final production to
look – this will take place on Wednesday 25th
September, after school hours.
Throughout the meeting, as a group we decided
everything together and there were no
issues.
4. POINTS FOR NEXT MEETING:
• FINAL LOGO DECISIONS TO BE
CONFIRMED
• EXTRA WORK TO BE DISCUSSED
• OUTSTANDING WORK TO BE DISCUSSED
• PICTURES TO BE TAKEN
• PREVIOUS WORK TO BE UPDATED
• PRODUCTION SCHEDULE TO BE
DISCUSSED
NEXT MEETING DATE: 03/10/2013