2. Meeting 9
Meeting Minutes for Triple S
Productions:
• Date: 14/11/2013
• Start Time: 13:46
• Place: Oaks Park High School –
Media Department – Room A31
• Present: Sahra, Serife, Shania
• Minutes taken by: Sahra
• End Time: 14:01
3. Throughout this meeting, as a group we discussed
what type of sound should be used for our final
production, our final thoughts were that
although we do not want the music to be too
cliché and predictable, we would like for the
sound/music to bring tension around whilst
our viewers are watching, we would also like
for the viewers to be frightened as that is the
main aim for a horror film. I, the director, had
done some research recently and found a few
sound clips on the website we had discussed
would be good to use, this website is
‘SoundCloud’. I had found decent and possible
choices however I felt they were much too
cliché. Moreover, paperwork is indeed up to
date, so far Shania, one of our group members
has definitely ensured that she is keeping on
top of her work and as is the editor, Serife,
despite having to juggle both editing and
paperwork, she seems to be coping finely.
Already we have set a date for the final editing
session which is to be Monday 25th, by then
we should have completed all post production
work and the final production.
Also discussed was that our blog could be
improved by having our logo as the background
as opposed to having a black and white,
hopefully this should be done soon by me as I
am in charge of keeping the blog maintained.
4. POINTS FOR NEXT MEETING:
• DISCUSS EVALUATION POINTS
• DISCUSS STRENGTHS AND WEAKNESSES
OF ENTIRE PRODUCTION
• DISCUSS ANYTHING THAT COULD BE
IMPROVED IN RELATION TO THE FINAL
PRODUCTION
• ANT FURTHER POINTS ARE TO BE
ADDED DURING THE MEETING.
NEXT MEETING DATE: 21/11/2013