This document provides information on OC Consultants, including their vision, mission, organization chart, and an example project. The key details are:
1) OC Consultants is located in Subang Jaya, Selangor, Malaysia and their vision is to become pre-eminent quantity surveyors, cost consultants, and project managers in the markets they serve.
2) Their mission is to provide quality service and advice to customers, especially those with little experience in the building industry.
3) Their organization chart shows Leonard Kombo as the Director, with several senior and assistant quantity surveyors reporting to him.
4) An example project is provided for a proposed semi-detached house with details
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Presentation measurement part 2
1. Company Profile
OC CONSULTANTS
No.1 , Jalan Taylor’s
47500 Subang Jaya,
SELANGOR DARUL EHSAN
Tel: +601133255596 Fax: +603-5629 5477
Email: one1ccmalaysia@gmail.com
2. Our vision is to become the pre-eminent
Chartered Quantity Surveyors, Construction
Cost Consultants and Project Managers in the
markets we serve.
VISION
3. This company's mission is to provide quality
service to the satisfaction of its customers. To
provide advice to those of little experience in
the building industry.
MISSION
7. Syafiq Zariful
Senior QS
Muhd. Hakim
Senior QS
Rachel Ernesta
Senior QS
Leonard Kombo
Director
Parham Farhadpoor
Assistant QS
Alisha Darya
Assistant QS
Evan Callum
Assistant QS
Han Lin
Assistant QS
Paul Dimitri
Assistant QS
Abang Azrin
Assistant QS
{Organisation Chart
8. PROPOSED ONE (1) UNIT DOUBLE STOREY
SEMI-DETACHED HOUSE FOR SR.LOO
CONSULTANTS AT SS19, JALAN
KEMAJUAN SUBANG JAYA, SELANGOR,
MALAYSIA
PERIOD: 7 MONTHS
Project Details
18. Unit rate per GFA of building for :-
• Cold water of Sanitary Plumbing – RM35/m2 x
111.52m2 = RM3903.20
• M&E – RM30/m2 x 111.52m2 = RM3345.60
PC Sum
19. Builder’s work in connection with M&E services &
Sanitary Plumbing :-
• Total of (i) + (ii) x 10% = RM7248.80 x 10% = RM724.88
Contingency Sum : Total GFA x 1200 x 10% = 111.52 x
1200 x 10% = RM13382.40
Provisional Sum
20. THE CONSTRUCTION AND COMPLETION OF ONE (1) UNIT OF SEMI DETACHED HOUSING
CONTENT PAGE NO.
PART A DECLARATION OF NON CONCLUSION
PART B FORM OF TENDER
PART C INSTRUCTION TO TENDERERS/ CONDITIONS OF TENDERING
PART D GENERAL SUMMARY OF TENDER
PART E FORM OF CONTRACT
PART F PRELIMINARIES
PART G PREAMBLES
PART H MATERIALS AND WORKMANSHIP
PART J BILLS OF QUANTITIES
BILL NO 1- MAIN BUILDING WORKS
BILL NO 2- EXTERNAL WORKS
BILL NO 3- PC AND PROVISIONAL SUM
APPENDIX A LIST OF DRAWINGS
APPENDIX B SCHEDULE OF FINISHES
APPENDIX C LIST OF PC AND PROVISIONAL SUMS
APPENDIX D SCHEDULE OF DAYWORK RATES
APPENDIX E PRICES OF BASIC MATERIALS
APPENDIX F PARTICULARS OF WORKERS
APPENDIX G PARTICULARS OF TENDERERS ORGANISATION
APPENDIX H FORM OF BANK GUARANTEE FOR EARNEST MONEY
APPENDIX J FORM OF BANK GUARANTEE FOR PERFORMANCE BOND
Table of Contents for Tender
21. Programme of Works
9/16/15
9/16/15
9/26/15
10/1/15
10/2/15
10/26/15
10/9/15
11/9/15
11/23/15
5
12
2
1
24
11
42
14
5
8/4/15 8/24/15 9/13/15 10/3/15 10/23/15 11/12/15 12/2/15 12/22/15
Coordination and Allocation of duties
Finalisation/ approval of taking off drawings
Commencement of project/ approval of drawings
Request for engineering drawings-Receipt of…
Main building taking off
External works taking off
Preparation of Bills of quantitis
Preparation of tender document
Compilation-submission
Start