Mazen cv 2011.doc mazen mahfouz for working outside (1)
1. CURRICULUM VITAE
Name: Mazen Farid Mahfouz
Sr. Period Position / Designation Employer’s Name Project Description
No. From To & Address & Duties
Page 1/4
1. Aug. 2006 Dec. 2015 Senior Project Manager Qatar Petroleum –
ASTAD /QP JV QF
QATAR
Education City –Doha
Al-Shaqab Project.
Science and Technology Project.
National Convention Car park.
Student Centre complex.
Qatar National Museum.
The responsibilities for following up the
construction with smooth and efficient operation
to Qatar Petroleum / ASTAD engineering, as well
as the related resources associated with the
Engineering department & Projects Management.
2. 2005 2006 Project Manager Mimar Consultants Engineering
Dr. Al-Awadhi
KUWAIT
The Avenues” stage 1 & 2 '
Mimar is involved in Consultation & constructing of
outstanding real estate projects that reflect a clear
vision of innovation and affordable style.
Construction Management :
1. Full management for project activities in pre-
tendering stage & executive stage.
2. Implementation of CM process from initiation to
closing.
3.Risk Management
4.Procurement Management
5. Quality Assurance and control.
Contract Management:
1. Tender Conditions.
2. Tender document preparation.
3. Contracts management.
4. Change Management Tracking.
6. Claims and counter claim.
7. Disptes Resolution and attributes.
8. Contracts closeout.
2. CURRICULUM VITAE
Name: Mazen Farid Mahfouz
Sr. Period Position / Designation Employer’s Name Project Description
No. From To & Address & Duties
Page 2/4
3. 2003 2005 Student-MBA
USA
ycteoeviWe yotyslc tseWoo
o#lsvvoeviWe yoli lliW 1593
Humble, Texas 77338-8167
USA
Degree - Master of Business Administration
MBA
4. 2001 2003 Project Manager Mishref Trading & Cont. Co.
KUWAIT
Construction and maintenance different
projects in JAHRA , KUWAIT CITY
Project Management & consulting, administration
of contractors and evaluation of their performance.
Super structure concrete works external and
internal finishes, external works and utilities.
5. 1999 2001 Head of Projects Manager Dept.
Owner Reps.
Kuwait Comm. Real Estate
Center Co.
Mr.Mubarak Al-Hassawy
KUWAIT
Al-Eyoon Sport Youth Club -Jahra
Real estate NEW construction, Maintenances.
Project Management. Construction Management
1. Full management for project activities in pre-
tendering stage & executive stage.
2. Implementation of CM process from initiation to
closing.
3.Risk Management
4.Procurement Management
5. Quality Assurance and control
6. 1996 1999 Senior Project Engineer
( Construction Manager )
Al-Ahmadia Cont. & Trading
Co.
KUWAIT
Water Front , Gulf Street-Sharq
Jahra Mall & Vegetable & Fish Market.
Gulf Investment Corporation Co.
Tracking the project schedule and supervising the
construction onsite co-ordination and structural/
architectural inspection
Quality control inspections were undertaken in
3. CURRICULUM VITAE
Name: Mazen Farid Mahfouz
Sr. Period Position / Designation Employer’s Name Project Description
No. From To & Address & Duties
Page 3/4
accordance with the approved quality plan
prepared and implemented by the Ministry of
Public works with extensive co-ordination for
structural and architectural detailing and
modifications to suit the requirements of the
Client.
7. 1993 1995 Project Engineer Burhan Kuwait Trading &
Const. Co.
KUWAIT
1st Ring Motorway
RA/136 MPW
6th Ring Motorway
Cost KD 13,500,000.00 Re-construction and
maintenance of 1st & Six Ring Motorway.
Construction of 4Nos. bridges with all services.
8. 1992 1993 Construction Manager Mohd. Abdul Mohsin Al-Khorafi
Co.
KUWAIT
NHA / 591-93-22.D2
National Housing Authority –Kuwait Government
Construction houses. Construction Management
1. Full management for project activities in pre-
tendering stage & executive stage.
2. Implementation of CM process from initiation to
closing.
3.Risk Management
4.Procurement Management
5. Quality Assurance and control
9. 1991 1992 Owner Representative Manager Turki Al-Dabhous & Sons Co.
KUWAIT
KOC -Kuwait Oil Company
of KOC Super structure concrete works external
and internal finishes external works
10. 1984 1990 Planning Projects Engineer. Ministry of Public Works [M.P.W.]
Kuwait
SHOUWAKH District - 2
Al-Ahmadi District - 4
Various Projects, construction, maintenance,
Supervising so many contracts responsible for
4. CURRICULUM VITAE
Name: Mazen Farid Mahfouz
Sr. Period Position / Designation Employer’s Name Project Description
No. From To & Address & Duties
Page 4/4
studying tenders, planning, supervision and
managing the Ministry Projects.
11. 1983 1984 Project Manager. "Owner
Reps."
Babel Tower Construction Est.
Kuwait
KOC –Water distillation second stage
gathering center 17, 18, 24.
And building the Gathering Center No. 17, 18
and 24. Salt reducing contract (Second Stage)
which belong to K.O.C.
12. 1981 1983 Site Engineer Naif Hamad Al-Dabbous
Construction Co.
KUWAIT
National Housing Authority
Jahra Project. Kuwait
Worked in the in Construction building houses
and construction of all utilities (services)