1. Page 1 of 6
CURRICULUM VITAE
Mohamed Ali Fathy Ali Askar
Jeddah - KSA
Mobile: 00966-056- 0360130 - KSA until now
Email: 4maskar@gmail.com/ mmmmask@gmail.com
PERSONAL INFORMATION
Nationality :- Egyptian
Date of Birth :- 31/07/1971
Marital Status :- Married
Education :-
B. Sc in Civil Engineering Zagazig University,
Egypt 1995.
Post graduate degree.( Diploma 2 years in
Construction Management) Ain Shams
University 2002
General graduation grade :- Good B.Sc. & Good Diploma
General project grade :- Excellent B.Sc. & Good Diploma
Driving License :- License EGYPT ,UAE Valid
COMPUTER SKILLS
AutoCAD-2014, MS Office, Primavera, Internet research skills
STRENGTH
☼ Good team working skills
☼ Bilingual – Fluent in Arabic & English
☼ Good supervisory skills
☼ Ability to take quick decisions
KEY EXPERIENCE
22 Years’ experience in Mega construction Projects in
Egypt, Algeria, UAE and KSA (High Rise
Building, infrastructural work, steel
structure with thorough knowledge
about all aspects of Project
management from mobilization till
handing over
2. Page 2 of 6
JOB RESPONSIBILITIES.
• Checking and following – up on the progress of work at
different stages, sites to ensure proper implementation
timely completion & technical compliance with specification.
• Preparing the Monthly Payments for the Client and
Subcontractors.
• Follow up Engineering Department to design and prepare
shop drawings and method statements.
• Selection, Controlling and directing of the sub-contractors.
• Financial analysis and cost control of construction project.
• Follow up the Project time schedule and preparing the progress
weekly reports.
• Contract administration, Correspondences ( Letters Preparation )
and variation order analysis
• Contact with consultant. Site Management and Labour Control.
• Checking measurement sheets based on BOQs.
• Follow up the QC Staff.
PROFESSIONAL EXPERIENCE KSA
BULGU INSAT VE TICART LIMITED SERKETY CONTRACTING.
Feb 2010 – Till March. 014. Country : KSA
POSITION: Senior Project Manager
- Reporting to projects Director
SANG Area AL- HASA, KSA
DISCRIPTION
:- (AMTT) Air Defence BN., Military Police BN., Training Centre &
TSMDU “TRAINING SUPPORT MILITARY DOCTRINE UNIT”.
PURPOSE : - Battalions
DISCRIPTION
: - 183 Buildings (concrete structural, steel structural, roods,
infrastructural, car parking’s ,landscaping , Football Play Ground ) –
AREA : - 1,200,000 square meters/ 5 Battalions.
LOCATION : - SANG Area AL- HASSA, KSA.
OWNER :- Saudi Arabian National Guard (SANG)
CONSULTANT
: - JET (Joint Engineering Team).
American Arm & Saudi Arabian National Guard
TOTAL BUDJECT :- 563,924,700 SR
SPECS REFRENCES :- American standard (ASTM)
3. Page 3 of 6
PROJECT NAME :- Military Police, Air Defence, Training Centre, TSMDU
PURPOSE : - Military Battalions
.Alan Riyadh, KSAKhashm
DISCRIPTION : - 151 Buildings (concrete structural, steel structural, roods,
infrastructural, car parking’s ,landscaping , Football Play Ground ) –
AREA : - 1,000,000 square meters/ 3 Battalions.
LOCATION : - khashm Alan Riyadh, KSA.
OWNER :- Saudi Arabian National Guard (SANG)
CONSULTANT
: - JET (Joint Engineering Team).
American Arm & Saudi Arabian National Guard
TOTAL BUDJECT :- 210,000,000.00 (210 Million) SR
SPECS REFRENCES :- American standard (ASTM)
MABANI STEEL K.S.A.
March.014 – Till Now. Country : KSA
POSITION: Projects Director -KSA
Jeddah Air Port
DISCRIPTION
: - Supply and erection steel structure for KSA projects
Projects
: - Jeddah Air Port 60,000 square meters/ 13,000 Tons.
Pepsi Factory in Jeddah, etc….
LOCATION : -Jeddah, Riyadth , Dammam , etc.. KSA.
4. Page 4 of 6
Jul.06 – Till Date . Dec. 2009 : UAE
S.S. LOOTAH CONTRACTING CO.( MEMBER S.S LOOTAH GROUP)
POSITION: Project manager- Reporting to projects manager
09FROM JUL.06 TO JUN.
PROJECT NAME :- PALM 3 ( ALQASBA TOWER )
PURPOSE : - Residential Tower
DISCRIPTION : - GROUND+7 PARKING+HEALTHCLUB+42 RESIDENTIAL.
AREA : - 2100.00 square meters/ 585 flats.
LOCATION : - ALQasba Tunnel /ALkhan ST., Majaz 3, Sharjah, UAE.
OWNER :- SKH Sultan Bin Ahmed ELQassemi
CONSULTANT :- HORIZON International Consulting Engineers L.C.C.
TOTAL BUDJECT :- 215,000,000.00 (215 Million) AED
SPECS REFRENCES :- British standard & SEWA regulations
POSITION: Project manager
. 09MAYTOFROM FEB.08
PROJECT NAME :- AL SAJAA
PURPOSE : - LABOR ACCOMMODATION
DISCRIPTION : - 18 BUILDING (G + 1).
AREA : - 10800 square meters.
LOCATION : - AL SAGAA- Sharjah- UAE.
OWNER :- SALEEM EL MOQARAB
CONSULTANT :- Port Saeed Engineering Consulting L.C.C.
TOTAL BUDJECT :- 30,000,000.00 (30 Million) AED
SPECS REFRENCES :- British standard & SEWA regulations
5. Page 5 of 6
POSITION: Project manager
. 09JANTOFROM DEC.07
PROJECT NAME :- SALEEM EL MOQARAB BUILDING
PURPOSE : - Residential
DISCRIPTION : - BUILDING (G + 3).
AREA : - 500 square meters.
LOCATION : - AL MOAYLAH- Sharjah- UAE.
OWNER :- SALEEM EL MOQARAB
CONSULTANT :- Port Saeed Engineering Consulting L.C.C.
TOTAL BUDJECT :- 8,000,000.00 (8 Million) AED
SPECS REFRENCES :- British standard & SEWA regulations
TECHNICAL EXPERIENCE: - Climbing system for structural core walls.
Post tension system for slabs.
Fully curtainwall & alpolic cladding for elevations
Dec.97 TO Jul.06
Country: - Egypt.
Company: - Arab Contractors – Osman Ahmed Osman & co.
Position: Construction manager.
Job responsibilities.
• Execution of project with international specification
• Controlling and directing sub-contractors.
• Financial analysis and cost control of construction project.
• Preparing time – schedule and weekly reports.
• Contact with consultant.
02/12/2004 TO 18/07/2006
The project of Relocation of Military Factory no.27 in Abu Zable - Egypt.
Project value: 560 million L.E - Egypt Standard
15/11/2002 TO 01/12/2004
The project of 44 Residential Building (12 RESIDENTIAL) - Awlad Fayet - Algeria.
Project value: 80 million $ - French Standard
6. Page 6 of 6
01/10/2000 TO 14/11/2002
Position: coordinator Engineer
The project of Sewage treatment plant- Al gable al asfar project stage II- Egypt
Project value: 250 million $ - Egyptian Standard
02/10/1999 TO 30/09/2000
Position: project Engineer
The project of 6 October Bridge Stage III - Egypt
Project value: 450 million LE - Egyptian Standard
28/12/1997 TO 1/10/1999
Position: Design Engineer.
Metallic shuttering Dept. - Egypt
• Formwork design ( media 6 October city – El sheikh zayed hospital - Elmoneeb
Bridge – 9 D Bridge – Suez Canal Bridge – 6 October Bridge )
• Contracts with client & prices proposals.
• Formwork calculation & shop drawing with computer software
• Time Scheduling by Primavera.
1/03/1997 TO 27/12/1997
Position: Technical office Engineer
At general company for constructing (ROLAN) computing & revision Dept. - Egypt