Jim Markey
Commercial/Industrial
Construction
Professional
A brief review of
some of the projects I
have directed since
2000.
Grand Rapids, MI
FedEx Freight – New Distribution Facility, 2011
 Size: 55,489 s.f.
 Land: 23.8 acres
 Cost: $3.8 mil
 Features:
 Precast concrete exterior wall at offices
 Pre-engineered metal building warehouse
 6,969 s.f. finished office and 1,880 s.f. office pod
 93 dock doors
 4-bay mechanic’s shop, wash bay and 2-lane fuel island
FXF-Grand Rapids – Precast office facility for 93 door distribution facility
FXF-Grand Rapids – View of interior of dock facility looking towards office
FXF-Grand Rapids – Mechanic’s Shop and 2-lane Fuel Island at site
So. Brunswick N.J.
FedEx Ground Distribution Ctr, 2008
 Size: 219,092 s.f.
 Land: 27 acres
 Cost: $29.5 mil
 Features:
 Precast concrete
 Structural steel frame and roof
 Finished office
 Vehicle maintenance facility
 Truck fueling island
 Security facility
FXG-So. Brunswick – Aerial View to SW
FXG-So. Brunswick – SW Office Entrance
FXG-So. Brunswick – North Truck Dock
FXG-So. Brunswick – Fuel Island
Orion Township, MI
FedEx Ground Distribution Ctr, 2007
 Size: 193,660 s.f.
 Land: 25.7 acres
 Cost: $13.9 mil
 Features:
 Precast concrete
 Structural steel frame
 Finished office
 Vehicle maintenance facility
 Truck fueling island
 Security facility
FXG-Orion Twnp – Aerial of Truck Docks
FXG-Orion Twnp – Package Sorting and Truck Loading
FXG-Orion Twnp – Vehicle Maintenance Facility
FXG-Orion Twnp – Vehicle Fueling Island
Clarksburg, WV
FedEx Ground Distribution Ctr, 2006
 Size: 39,383 s.f.
 Land: 7.5 acres
 Cost: $3.3 mil
 Features:
 Pre-engineered metal building
 Split-face masonry office façade
 Infrared warehouse heating
 T5 Fluorescent warehouse lighting
 Abbreviated construction schedule
FXG-Clarksburg – Entrance to facility and view of docks and office
FXG-Clarksburg – Masonry façade of finished offices
FXG-Clarksburg – Corridor of the finished office area.
FXG-Clarksburg – Sorting line and interior of completed warehouse.
Kansas City, MO
Bunzl Distribution Center, 2004
 Size: 102,119 s.f.
 Land: 8.1 acres
 Cost: $3.7 mil
 Features:
 Cast-on-site Tilt-up concrete exterior walls
 Conventional structural steel framing
 12 trailer positions with adjustable docks
 1 drive-in door
 ESFR Sprinkler system
Bunzl Project – West side and office entrance of Bunzl facility
Bunzl Project – Office entrance to facility
Bunzl Project – Trailer docks and drive-in door to warehouse
Birmingham, AL
FedEx Ground Distribution Ctr, 2004
 Size: 96,406 s.f.
 Land: 14.3 acres
 Cost: $3.8 mil
 Features:
 Cast-on-site Tilt-up concrete wall exterior
 Conventional steel frame and roof
 4,524 s.f. of finished office
 24 dock doors and 7 drive-in doors
FXG-Birmingham – Auto parking and distribution facility
FXG-Birmingham – Office entrance and view from NE
FXG - Birmingham – Package sorting facility in warehouse
Kansas City, MO
Palestine Missionary Baptist Church, 2003
 Overall project consisted of expansion and
improvements in the sanctuary, including construction
of a balcony for additional seating, installation of a lift
to the choir stand for handicapped choir members, and
relocation of the sound and media room. Exterior
renovations included construction of a new two-story
classroom addition and an adjoining two-tier concrete
parking facility. The following photos illustrate
construction of the temporary retaining wall erected to
protect adjacent residences while building new parking
and education facilities at the site.
PMBC – Temporary retaining wall utilizing oak timbers and I-beams was
constructed during excavation for the new two-tier Parking Garage and two-
story Classroom Facility.
PMBC – I-beams were placed in drilled shafts then wall sections were
constructed as excavation was completed.
PMBC – Wall sections were constructed on the ground then set during
excavation.
Independence, MO
Shops at Eastland Center, 2002
 Cast-on-site Tilt-up concrete exterior walls
 Thinset brick inlay on all exterior panels
 Conventional steel frame and roof
 20,000 s.f. retail center
 Tenant finish for banking client
Eastland Center – Anchor tenant is a banking client with drivethrough
Blue Springs, MO
Lunar Bowl Recreation Facility, 2001
 39,000 s.f. Recreation Center
 32 Lane Bowling Facility
 Game room
 Full-service restaurant
 Cast-on-site Tilt-up concrete exterior walls
 Glass curtain entries
 Pre-engineering frame and roof
Lunar Bowl Project – Main entry to recreation center
Lunar Bowl Project – Separate entry to restaurant
Lunar Bowl Project – Professional bowling facilities
Sugar Creek, MO
LaFarge New Cement Production Facility, 2000
 Multiple slipform concrete storage towers
 Tallest finished structure over 400 ft
 Precast exterior wall office facility
 Two deepshaft mines for raw materials
 Production facilities constructed of structural steel, cast
concrete and masonry
 Constructed over hundreds of acres
LaFarge Project – View of facility near midway point of construction
LaFarge Project – Slip-formed storage facilities and cement finishing facility
LaFarge Project – Office facility on left and kiln equipment on right
LaFarge Project – Raw material conveyor from mine to cement facility
Thank you.
This has been a sampling of the projects I
have managed since the year 2000. Thanks
for viewing my slideshow.
Feel free to contact me at:
jpmarkey@att.net

Jim markey thru 2011

  • 1.
    Jim Markey Commercial/Industrial Construction Professional A briefreview of some of the projects I have directed since 2000.
  • 2.
    Grand Rapids, MI FedExFreight – New Distribution Facility, 2011  Size: 55,489 s.f.  Land: 23.8 acres  Cost: $3.8 mil  Features:  Precast concrete exterior wall at offices  Pre-engineered metal building warehouse  6,969 s.f. finished office and 1,880 s.f. office pod  93 dock doors  4-bay mechanic’s shop, wash bay and 2-lane fuel island
  • 3.
    FXF-Grand Rapids –Precast office facility for 93 door distribution facility
  • 4.
    FXF-Grand Rapids –View of interior of dock facility looking towards office
  • 5.
    FXF-Grand Rapids –Mechanic’s Shop and 2-lane Fuel Island at site
  • 6.
    So. Brunswick N.J. FedExGround Distribution Ctr, 2008  Size: 219,092 s.f.  Land: 27 acres  Cost: $29.5 mil  Features:  Precast concrete  Structural steel frame and roof  Finished office  Vehicle maintenance facility  Truck fueling island  Security facility
  • 7.
    FXG-So. Brunswick –Aerial View to SW
  • 8.
    FXG-So. Brunswick –SW Office Entrance
  • 9.
    FXG-So. Brunswick –North Truck Dock
  • 10.
  • 11.
    Orion Township, MI FedExGround Distribution Ctr, 2007  Size: 193,660 s.f.  Land: 25.7 acres  Cost: $13.9 mil  Features:  Precast concrete  Structural steel frame  Finished office  Vehicle maintenance facility  Truck fueling island  Security facility
  • 12.
    FXG-Orion Twnp –Aerial of Truck Docks
  • 13.
    FXG-Orion Twnp –Package Sorting and Truck Loading
  • 14.
    FXG-Orion Twnp –Vehicle Maintenance Facility
  • 15.
    FXG-Orion Twnp –Vehicle Fueling Island
  • 16.
    Clarksburg, WV FedEx GroundDistribution Ctr, 2006  Size: 39,383 s.f.  Land: 7.5 acres  Cost: $3.3 mil  Features:  Pre-engineered metal building  Split-face masonry office façade  Infrared warehouse heating  T5 Fluorescent warehouse lighting  Abbreviated construction schedule
  • 17.
    FXG-Clarksburg – Entranceto facility and view of docks and office
  • 18.
    FXG-Clarksburg – Masonryfaçade of finished offices
  • 19.
    FXG-Clarksburg – Corridorof the finished office area.
  • 20.
    FXG-Clarksburg – Sortingline and interior of completed warehouse.
  • 21.
    Kansas City, MO BunzlDistribution Center, 2004  Size: 102,119 s.f.  Land: 8.1 acres  Cost: $3.7 mil  Features:  Cast-on-site Tilt-up concrete exterior walls  Conventional structural steel framing  12 trailer positions with adjustable docks  1 drive-in door  ESFR Sprinkler system
  • 22.
    Bunzl Project –West side and office entrance of Bunzl facility
  • 23.
    Bunzl Project –Office entrance to facility
  • 24.
    Bunzl Project –Trailer docks and drive-in door to warehouse
  • 25.
    Birmingham, AL FedEx GroundDistribution Ctr, 2004  Size: 96,406 s.f.  Land: 14.3 acres  Cost: $3.8 mil  Features:  Cast-on-site Tilt-up concrete wall exterior  Conventional steel frame and roof  4,524 s.f. of finished office  24 dock doors and 7 drive-in doors
  • 26.
    FXG-Birmingham – Autoparking and distribution facility
  • 27.
    FXG-Birmingham – Officeentrance and view from NE
  • 28.
    FXG - Birmingham– Package sorting facility in warehouse
  • 29.
    Kansas City, MO PalestineMissionary Baptist Church, 2003  Overall project consisted of expansion and improvements in the sanctuary, including construction of a balcony for additional seating, installation of a lift to the choir stand for handicapped choir members, and relocation of the sound and media room. Exterior renovations included construction of a new two-story classroom addition and an adjoining two-tier concrete parking facility. The following photos illustrate construction of the temporary retaining wall erected to protect adjacent residences while building new parking and education facilities at the site.
  • 30.
    PMBC – Temporaryretaining wall utilizing oak timbers and I-beams was constructed during excavation for the new two-tier Parking Garage and two- story Classroom Facility.
  • 31.
    PMBC – I-beamswere placed in drilled shafts then wall sections were constructed as excavation was completed.
  • 32.
    PMBC – Wallsections were constructed on the ground then set during excavation.
  • 33.
    Independence, MO Shops atEastland Center, 2002  Cast-on-site Tilt-up concrete exterior walls  Thinset brick inlay on all exterior panels  Conventional steel frame and roof  20,000 s.f. retail center  Tenant finish for banking client
  • 34.
    Eastland Center –Anchor tenant is a banking client with drivethrough
  • 35.
    Blue Springs, MO LunarBowl Recreation Facility, 2001  39,000 s.f. Recreation Center  32 Lane Bowling Facility  Game room  Full-service restaurant  Cast-on-site Tilt-up concrete exterior walls  Glass curtain entries  Pre-engineering frame and roof
  • 36.
    Lunar Bowl Project– Main entry to recreation center
  • 37.
    Lunar Bowl Project– Separate entry to restaurant
  • 38.
    Lunar Bowl Project– Professional bowling facilities
  • 39.
    Sugar Creek, MO LaFargeNew Cement Production Facility, 2000  Multiple slipform concrete storage towers  Tallest finished structure over 400 ft  Precast exterior wall office facility  Two deepshaft mines for raw materials  Production facilities constructed of structural steel, cast concrete and masonry  Constructed over hundreds of acres
  • 40.
    LaFarge Project –View of facility near midway point of construction
  • 41.
    LaFarge Project –Slip-formed storage facilities and cement finishing facility
  • 42.
    LaFarge Project –Office facility on left and kiln equipment on right
  • 43.
    LaFarge Project –Raw material conveyor from mine to cement facility
  • 44.
    Thank you. This hasbeen a sampling of the projects I have managed since the year 2000. Thanks for viewing my slideshow. Feel free to contact me at: jpmarkey@att.net