YOBE STATE
2010-2011
Contributions of Adamu Sariki
Excavation and
taking level along
4km from Kandaha
00km
Buckling of the channel walls due to excess water settlement behind the rip
rap
Excess rain water in the channel and
sectional pumping out to continue work
Demolition of existing bridge, inside creating
a temporary way for water flow
Inside taking of
Level for channel
walls, surveyor
using a GPS to
locate the centre
line and direction
of channel flow
Temporary water flow
Laying of
Geotextile for
stabilization and
blinding
CONTRIBUTIONS OF SARIKI
ADAMU TO THE PROJECT IN
ENGINEERING IMPLEMENTATION
SECTION
SARIKI ADAMU
ID: 10122888
Civil Engineer
Engineering Implementation section
Region (Abuja, Enugu, Bayelsa, Imo,
Abia, Rivers, Kogi, Cross River, Akwa
Ibom)
Enugu BTS sites with Mr wang
Enu-p4
Enu-P10
Enu-P1 TOWER
Enugu-P10 foundation casting and Enu-P1
Fndn on the hill
Abia BTS sites and switch room (18 sites)
Curing 35m tower
foundation
Iron work in Foundation
35m, setting of template
Casting of Riv-N8
Fixing of Abia N10 cable tray Abia state
university uturu
Casting of River-P8 and Rivers_p19 pile cap
Compaction of Umuahia
switch room tower fnd. Rumukpakani pile fdn 1
Resolving community
Issues
Collapsed excavated wallRemoval of existing foundation
Abia state switch room
Rivers N7 state model primary school rukpoku portharcort
Fndn rebar, fixing form work and casting
Thank you
Sariki Adamu
10122888
Real Estate Development, Life camp
Estate.
Construction of Duplex and 4 Bedroom
terrace Buildings with facilities
 FEB. 2014 - DATE
Fixing and alignment of columns
Fixing of reinforcements for base and columns alignment
Fixing of reinforcements for base and
columns alignment
Casting of conc. In fndn
Casting of conc. In fndn
Laying of block work in fndn.
Block work in foundation
Casting of starter columns
Casting of tie beams, and block work to
FGL
Casting of tie beams, and block work to
FGL
Ground floor block work
 Ground floor block work, form work to lintels
Block work in foundation,
Hollow filling, casting of
starter columns
Block work to
second floor
Scaffoldings
/Roofbeam
iron work
Column alignment
Land reclamation
Construction of estate roads and line
drains
Construction of Box culverts
COMPANY
FOUNTAIN CONSTRUCTION COMPANY
Location: Warewa Ogun State(lagos-
Ibadan express way)
Using a swamp
buggy to clear
and sandfill to
reclaim the land
for the project
40hecters
FCC yard and batching plant, vitalvox project
WAWA Ogun state
Reclaimed land for Vitalvox project Filled area ready for
compaction
Dry mix Blinding for
laying of line drains
Excavation for line drains
Laying of line
drains
Connection of
line drain to Box
culvert
Connection of line drain to Box culvert
Casting of base
for precast box
culvert
Swamp buggy working on the
canal and embankment to the
line drains
Laying of precast line drains
Sub-Base along C1 vitalvox prject
Laying of stone-Base
Stone-Base and cover
slab vitalvox project
Stone base first layer @
vitalvox project
Sub-Base along C4 vitalvox prject
Line drain
connections through
intersections and
round about
Work way and roundabout drains
Kerbs at intersections, vitalvox project (the gardens estate)

sariki profile

Editor's Notes

  • #41 Casting of ring beams, and block work to FGL