2. Construct Airfield Traffic Control Towers
2
Construct two Airfield Traffic Control Towers
Waldron Field & Cabaniss Field, U.S. Navy
Contract Sum: $2.8M
Partner in Development Firm; Design/Build
Oakbrooke Professional Center, PH I;
Chesapeake, VA
3. D/B Wash Rack Reservoir
3
Project features included methods for a rapid & economical
system for washing tracked and wheeled tactical
vehicles. The project encompassed a large infrastructure
installation for servicing the facility and consisted of
3,900,000 SF property, 385,009 SF of a 9” thick concrete
hardstand, several large concrete structures (bird bath, wash
water reservoir, sedimentation basin and equalization
basin). A control building to house the digital controls for
the facility, electrical gear, and a restrooms and lounge area.
4. Renovate Best Buy Bldg. for the New Administrative Offices, Conference Room and Studios for KIII-TV
4
5. D/B ORTC Barracks
Design/Build New ORTC Barracks, Ft. Bliss, TX
This new construction of four two-story barracks complex includes
office areas, dorms, HVAC, sanitary sewer, parking lots, access drives,
sidewalks, lighting, communication systems. Each barrack has an area
of 30,346 SF; and the total area of the four barracks is 121,504 SF.
Contract Sum: $22M