What is CMM?
The Capability Maturity Model (CMM) is a
methodology used to develop and refine an
organization's software development process. The
model describes a five-level evolutionary path of
increasingly organized and systematically more
mature processes.
History of CMM
• In the 1960s, the use of computers grew more
widespread, more flexible and less costly
• Organizations began to adopt computerized
information systems, and the demand for software
development grew significantly
• As a result, the growth was accompanied by
growing pains: project failure was common, the
field of computer science was still in its early years,
and the ambitions for project scale and complexity
exceeded the market capability to deliver
adequate products within a planned budget
History of CMM
• In the 1980s, several US military projects involving
software subcontractors ran over-budget and were
completed far later than planned, if at all. In an
effort to determine why this was occurring, the
United States Air Force funded a study at the SEI
• Originally developed as a tool for objectively
assessing the ability of US government
contractors‘s processes to implement a contracted
software project
• The model is based on the process maturity
framework first described in the 1989 book
Managing the Software Process by Watts
Humphrey
Development at Software Engineering Institute
• Active development of the model by the US
Department of Defence Software Engineering Institute
(SEI) began in 1986 when Humphrey joined the
Software Engineering Institute located at Carnegie
Mellon University in Pittsburgh, Pennsylvania after
retiring from IBM
• The full representation of the Capability Maturity
Model as a set of defined process areas and practices
at each of the five maturity levels was initiated in
1991, with Version 1.1 being completed in January
1993
• The CMM was published as a book in 1995
Levels of CMM
Levels 1: Initial (Chaotic)
It is characteristic of processes at this level that they
are undocumented and in a state of dynamic
change, tending to be driven in an ad hoc,
uncontrolled and reactive manner by users or
events. This provides a chaotic or unstable
environment for the processes
Levels 2 : Repeatable
It is characteristic of processes at this level that
some processes are repeatable, possibly with
consistent results. Process discipline is unlikely to be
rigorous, but where it exists it may help to ensure
that existing processes are maintained during times
of stress.
Levels 3: Defined
It is characteristic of processes at this level that
there are sets of defined and documented standard
processes established and subject to some degree of
improvement over time. These standard processes
are in place (i.e., they are the AS-IS processes) and
used to establish consistency of process
performance across the organization
Levels 4: Managed
It is characteristic of processes at this level that,
using process metrics, management can effectively
control the AS-IS process for software development .
In particular, management can identify ways to
adjust and adapt the process to particular projects
without measurable losses of quality or deviations
from specifications. Process Capability is established
from this level
Levels 5 : Optimizing
It is a characteristic of processes at this level that the
focus is on continually improving process
performance through both incremental and
innovative technological changes/improvements
The CMM Levels
Manish tripathi-se-cmm-5 feb2017

More Related Content

Similar to Manish tripathi-se-cmm-5 feb2017

Introduction To Cmm1
Introduction To Cmm1Introduction To Cmm1
Introduction To Cmm1
suhas deshpande
 
Cmmi and its level
Cmmi and its levelCmmi and its level
Cmmi and its level
Minhal Zafar
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
Roy Antony Arnold G
 
Blending Agile with CMMI®
Blending Agile with CMMI®Blending Agile with CMMI®
Blending Agile with CMMI®
Glen Alleman
 
4. essence of capability maturity model (1)
4. essence of capability maturity model (1)4. essence of capability maturity model (1)
4. essence of capability maturity model (1)
PROF. PUTTU GURU PRASAD
 
The SEI Capability Maturity Model CMM) Lecture 10.docx
The SEI Capability Maturity Model CMM) Lecture 10.docxThe SEI Capability Maturity Model CMM) Lecture 10.docx
The SEI Capability Maturity Model CMM) Lecture 10.docx
KonkoboUlrichArthur
 
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Reetesh Gupta
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
Ali Sadhik Shaik
 
Chap03
Chap03Chap03
CMM
CMMCMM
Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
PerumalPitchandi
 
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENTMS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
Dr. Durgaprasad Navulla
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises
Moutasm Tamimi
 
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptxSYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
OkianWarner
 
Cba Ipi Cmm Intro Session 1.1
Cba   Ipi   Cmm Intro   Session 1.1Cba   Ipi   Cmm Intro   Session 1.1
Cba Ipi Cmm Intro Session 1.1
Phuong Vy
 
CMMi & IT Governance
CMMi & IT GovernanceCMMi & IT Governance
CMMi & IT Governance
Raveesh Goswami
 
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
Fiona Phillips
 
A Survey Of Agile Development Methodologies
A Survey Of Agile Development MethodologiesA Survey Of Agile Development Methodologies
A Survey Of Agile Development Methodologies
Abdul Basit
 
Contemporary management practices
Contemporary management practicesContemporary management practices
Contemporary management practices
VVS PRASAD ANAPARTHI
 
QAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction pptQAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction ppt
QAIites
 

Similar to Manish tripathi-se-cmm-5 feb2017 (20)

Introduction To Cmm1
Introduction To Cmm1Introduction To Cmm1
Introduction To Cmm1
 
Cmmi and its level
Cmmi and its levelCmmi and its level
Cmmi and its level
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
Blending Agile with CMMI®
Blending Agile with CMMI®Blending Agile with CMMI®
Blending Agile with CMMI®
 
4. essence of capability maturity model (1)
4. essence of capability maturity model (1)4. essence of capability maturity model (1)
4. essence of capability maturity model (1)
 
The SEI Capability Maturity Model CMM) Lecture 10.docx
The SEI Capability Maturity Model CMM) Lecture 10.docxThe SEI Capability Maturity Model CMM) Lecture 10.docx
The SEI Capability Maturity Model CMM) Lecture 10.docx
 
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
 
Chap03
Chap03Chap03
Chap03
 
CMM
CMMCMM
CMM
 
Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
 
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENTMS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
MS VIII UNIT MATERIAL : CONTEMPORARY ISSUES OF MANAGEMENT
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises
 
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptxSYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
 
Cba Ipi Cmm Intro Session 1.1
Cba   Ipi   Cmm Intro   Session 1.1Cba   Ipi   Cmm Intro   Session 1.1
Cba Ipi Cmm Intro Session 1.1
 
CMMi & IT Governance
CMMi & IT GovernanceCMMi & IT Governance
CMMi & IT Governance
 
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
 
A Survey Of Agile Development Methodologies
A Survey Of Agile Development MethodologiesA Survey Of Agile Development Methodologies
A Survey Of Agile Development Methodologies
 
Contemporary management practices
Contemporary management practicesContemporary management practices
Contemporary management practices
 
QAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction pptQAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction ppt
 

More from A P

Social media-workplace-13 september2015
Social media-workplace-13 september2015Social media-workplace-13 september2015
Social media-workplace-13 september2015
A P
 
Rote wto-it-diffusion
Rote wto-it-diffusionRote wto-it-diffusion
Rote wto-it-diffusion
A P
 
Role of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goalsRole of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goals
A P
 
Microsoft nokia-acquisition
Microsoft nokia-acquisitionMicrosoft nokia-acquisition
Microsoft nokia-acquisition
A P
 
Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016
A P
 
Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017
A P
 
Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -
A P
 
Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017
A P
 
Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015
A P
 
Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016
A P
 
Manish tripathi-itim-incident-management
Manish tripathi-itim-incident-managementManish tripathi-itim-incident-management
Manish tripathi-itim-incident-management
A P
 
Manish tripathi-itim-dr
Manish tripathi-itim-drManish tripathi-itim-dr
Manish tripathi-itim-dr
A P
 
Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016
A P
 
Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016
A P
 
Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016
A P
 
Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016
A P
 
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gasManish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
A P
 
Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016
A P
 
Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016
A P
 
Manish tripathi-group ware
Manish tripathi-group wareManish tripathi-group ware
Manish tripathi-group ware
A P
 

More from A P (20)

Social media-workplace-13 september2015
Social media-workplace-13 september2015Social media-workplace-13 september2015
Social media-workplace-13 september2015
 
Rote wto-it-diffusion
Rote wto-it-diffusionRote wto-it-diffusion
Rote wto-it-diffusion
 
Role of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goalsRole of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goals
 
Microsoft nokia-acquisition
Microsoft nokia-acquisitionMicrosoft nokia-acquisition
Microsoft nokia-acquisition
 
Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016
 
Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017
 
Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -
 
Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017
 
Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015
 
Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016
 
Manish tripathi-itim-incident-management
Manish tripathi-itim-incident-managementManish tripathi-itim-incident-management
Manish tripathi-itim-incident-management
 
Manish tripathi-itim-dr
Manish tripathi-itim-drManish tripathi-itim-dr
Manish tripathi-itim-dr
 
Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016
 
Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016
 
Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016
 
Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016
 
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gasManish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
 
Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016
 
Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016
 
Manish tripathi-group ware
Manish tripathi-group wareManish tripathi-group ware
Manish tripathi-group ware
 

Recently uploaded

From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
Rokibul Hasan
 
Project Management Infographics . Power point projet
Project Management Infographics . Power point projetProject Management Infographics . Power point projet
Project Management Infographics . Power point projet
SAMIBENREJEB1
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdfLeading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Enterprise Wired
 
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
ssuserf63bd7
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
Samirsinh Parmar
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Alexey Krivitsky
 

Recently uploaded (12)

From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
 
Project Management Infographics . Power point projet
Project Management Infographics . Power point projetProject Management Infographics . Power point projet
Project Management Infographics . Power point projet
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdfLeading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
 
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
 

Manish tripathi-se-cmm-5 feb2017

  • 1. CAPABILITY MATURITY MODEL (CMM) Presented by Mr. Manish Tripathi ( I – 15-18-19) Thakur Institute of Management Studies & Research (Sunday 5 February, 2017)
  • 2. What is CMM? The Capability Maturity Model (CMM) is a methodology used to develop and refine an organization's software development process. The model describes a five-level evolutionary path of increasingly organized and systematically more mature processes.
  • 3. History of CMM • In the 1960s, the use of computers grew more widespread, more flexible and less costly • Organizations began to adopt computerized information systems, and the demand for software development grew significantly • As a result, the growth was accompanied by growing pains: project failure was common, the field of computer science was still in its early years, and the ambitions for project scale and complexity exceeded the market capability to deliver adequate products within a planned budget
  • 4. History of CMM • In the 1980s, several US military projects involving software subcontractors ran over-budget and were completed far later than planned, if at all. In an effort to determine why this was occurring, the United States Air Force funded a study at the SEI • Originally developed as a tool for objectively assessing the ability of US government contractors‘s processes to implement a contracted software project • The model is based on the process maturity framework first described in the 1989 book Managing the Software Process by Watts Humphrey
  • 5. Development at Software Engineering Institute • Active development of the model by the US Department of Defence Software Engineering Institute (SEI) began in 1986 when Humphrey joined the Software Engineering Institute located at Carnegie Mellon University in Pittsburgh, Pennsylvania after retiring from IBM • The full representation of the Capability Maturity Model as a set of defined process areas and practices at each of the five maturity levels was initiated in 1991, with Version 1.1 being completed in January 1993 • The CMM was published as a book in 1995
  • 7. Levels 1: Initial (Chaotic) It is characteristic of processes at this level that they are undocumented and in a state of dynamic change, tending to be driven in an ad hoc, uncontrolled and reactive manner by users or events. This provides a chaotic or unstable environment for the processes
  • 8. Levels 2 : Repeatable It is characteristic of processes at this level that some processes are repeatable, possibly with consistent results. Process discipline is unlikely to be rigorous, but where it exists it may help to ensure that existing processes are maintained during times of stress.
  • 9. Levels 3: Defined It is characteristic of processes at this level that there are sets of defined and documented standard processes established and subject to some degree of improvement over time. These standard processes are in place (i.e., they are the AS-IS processes) and used to establish consistency of process performance across the organization
  • 10. Levels 4: Managed It is characteristic of processes at this level that, using process metrics, management can effectively control the AS-IS process for software development . In particular, management can identify ways to adjust and adapt the process to particular projects without measurable losses of quality or deviations from specifications. Process Capability is established from this level
  • 11. Levels 5 : Optimizing It is a characteristic of processes at this level that the focus is on continually improving process performance through both incremental and innovative technological changes/improvements