SlideShare a Scribd company logo
Dinesh Kumar
(Mechanical Engineer)
Room No:- 01
Shree Shai Hotel
Bijnor (Uttar Pradesh- 246701)
Mobile:- +91 9720072017
E-Mail:- dinesh2vikas@gmail.com
CAREER OBJECTIVE
To have a challenging career as a mechanical engineer, wherein I can utilize my skill-set effectively
in the field of engineering while contributing and benefiting in synchronization with the growth of
the organization.
WORKING EXPERIENCE
 Company Name :- Vapco Engineers (P) Limited, Navi Mumbai
(The Company providing sustainable & environment friendly designs & EPC solutions in the field of
Ethanol, Starch, Chemical & Pharma Industries)
Designation :- Mechanical Site Engineer
Cost to Company :- 5.27 Lacs/Annum
Notice Period :- 1 Month
Site :- Mohit Petrochemicals Pvt. Ltd., Bijnor
Project :- 100 KLPD Ethanol,103 KLPD ENA, 106 KLPD RS & 1100 m3
/day
integrated MEE Plant.
Duration :- Jan 21th
, 2019 to Present.
Responsibilities:
» Fabrication, Erection & Installation of Steel Structure, Equipment and Piping for MEE, ENA
and Ethanol Plant.
» Conceptual design & engineering activity
» Preparation of Project report.
» Project scheduling and bar chart preparation.
» Managing parts of fabrication & Erection.
» Setting out sites and organizing facilities.
» Checking drawings and discuss with client to ensure that they are followed correctly.
» Providing technical advice and solving problems on site.
» Preparing site reports and paperwork related to site.
» Interface with other department on project related issue.
» Responsible for Safety, Productivity and Project Coordination.
 Company Name :- Bajaj Hindusthan Sugar Limited (Distillery Division), Meerut.
(A part of the 'Bajaj Group', is India's Top Sugar and alcohol manufacturing company)
Designation :- Maintenance Engineer
Duration :- Feb 06th
, 2017 to Jan 18 th
, 2019.
Responsibilities:
» Maintenance of Bi-Drum dumping grate Bagasse fired Boiler having capacity of 40 TPH at
pressure 45 Kg/cm2
.
» Working knowledge of combustion control.
» Fabrication, Erection and Installation of Structure, Piping, Pumps and Equipments for
Decanter plant having capacity of 1450 m3
/day and induced draft cross flow FRP cooling
tower having capacity 850 m3
/hr.
» Preventive, Corrective maintenance and overhauling of petrochemical plant, equipment and
utilities.
» Working Knowledge of SAP (Material Management module) to manage inventory and
providing material to project and general maintenance.
» Responsible for Operation and Maintenance of MEE Plant.
» Inspection of fabrication, erection, piping & valves installation and commissioning of multi-
effect evaporation plant having capacity of 1535 m3
/day and induced draft cross flow timber
cooling tower having capacity 900 m3
/hr.
» Supervision of execution of complete project for timely completion of project as per bar chart.
» Prepare project Specifications and technical Data-sheets.
» Maintaining inspection and testing reports.
» Assistance in successfully commissioning of MEE plant.
» Developed a strong working knowledge of Gland and Mechanical Sealed Pumps, Air
Compressors and Vacuum System.
» Overhauling of different types of Pumps as:-
Non-Positive Displacement Pumps as Centrifugal Pumps (Volute & Split Casing)
Positive Displacement Pumps as Gear Pumps, Progressive Cavity Pumps, Reciprocating
Pumps (Plunger Type), Diaphragm Pumps And Liquid Ring Vacuum Pumps.
» Overhauling of different types of Displacement Air Compressor as:-
Rotary Compressor as Rotary Screw air Compressor and Root Blower (Twin Lobe Type).
Reciprocating Compressor as Single Acting air Compressor (Piston Type).
» Repair and Maintenance of all Heat Ex-changers, Condensers, Evaporators and cooling towers.
» Coordinated the repair and improvement of all water and steam utilities and related system
including: Pumps, Gauges, Piping & Valves, Strainers, Foam Traps and Steam Traps.
» Perform maintenance including but not limited to mechanical power transmission and
lubrication.
» Revamping, modification in existing plant.
» Prepare Checklist of Equipment, daily monitoring report and maintaining the records with
inputs and outputs data of MEE Plant.
» Responsible for Specifying and ordering engineering parts by SAP.
 Company Name :- Precision Automats, Delhi
(Manufacturing high precision turned and milled parts and components)
Designation :- Quality Control Cum Production Engineer
Duration :- Nov 17th
, 2014 to Feb 01st
, 2017
Responsibilities:
» Maintained Quality Records & Documentation, Product Inspection and Lean Manufacturing.
» Demonstrate the working knowledge of GD&T and DMAIC.
» Maintained plant 5S, 5S-Red Tag Standards.
» Perform Six Big Losses to reduce equipment based productivity loss in Manufacturing.
» Design Manufacturing Tools, Fixtures and Indirect Gauges.
» Attend customer Complaint, Analytical problem Solving and Implementing the Manufacturing
Parameters or Process.
EXPERIENTIAL LEARNING
 Six Sigma & Root Cause Analysis (5why & 5M)
 Lean Manufacturing (5S, Kaizen & Six Big Losses)
BASIC ACADEMIC CREDENTIALS
Qualification Board/University Year Percentage
B.Tech
(Mechanical)
Mangalayatan University 2014 72.9%
Intermediate Uttar Pradesh Board 2010 69.8%
High School Uttar Pradesh Board 2006 62.0%
INTERNSHIP PROGRAM
 Company Name :- NBESON Tools (India), Ludhiana
(A part of ‘NTI Group’, is manufacturing different types of threading and cutting tools)
Title :- Quality Control
Duration :- 02 Months (Feb 15th
, 2014 to Apr 14th
, 2014)
 Company Name :- TATA Motors, Aligarh.
Title :- Maintenance of TATA Diesel Cars
Duration :- 1 Month (June 10, 2013 to July 09, 2013)
ACHIEVEMENTS
 Overall topper of CNC Programming
 100% attendance during my tenure of B.Tech
TECHNICAL SKILLS
 SAP (Industrial Software)
 AutoCAD Drafting
 CNC Lathe & VMC Programming
IT PROFICIENCY
 C & C+ Programming Language
 Microsoft Word, PowerPoint & Excel
INTERPERSONAL SKILL
 Good level of grasping new things
 Adaptable to any environment
 Ability to work in a team
 Punctual & Hardworking
EXTRA CURRICULAR ACTIVITIES
 Participated in blood donation camp held at M.U
ACADEMIC PROJECT
Title:- Making and Using a Carving Pantograph 2X Drafting Mechanism.
References:
Ritesh Shrivastva, Head of Department, Department of Mechanical Engineering, MU.
Nidhi Singh, Assistant Professor, Department of Mechanical Engineering, MU.
PERSONAL DETAILS
 Father’s Name :- Kumar Pal Singh
 Permanent Address :- Village & Post-Firojpur
District-Bulandshahr
Uttar Pradesh-203141
 Date of Birth :- August 12th
,1990
 Language Known :- Hindi & English
 Marital Status / Sex :- Single / Male
 Interest & Hobbies :- Travelling and Problem Solving.
DECLARATION
I hereby declare that the above mentioned information is correct, up to my knowledge and I
bear the responsibility for the correctness of the above mentioned particulars.
Date:- 01/11/2019 Dinesh Kumar
(Signature)

More Related Content

What's hot

Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEAKSHAY SHARMA
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceSameh Sameh
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument TechnicianPANDI MUTHU
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Mechanical engineer resume
Mechanical engineer resumeMechanical engineer resume
Mechanical engineer resumeTaher EL-massry
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)Pramodbhai More
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 

What's hot (20)

Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
BMS Engineer
BMS EngineerBMS Engineer
BMS Engineer
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Electrical engineer cv
Electrical engineer cvElectrical engineer cv
Electrical engineer cv
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Mechanical engineer resume
Mechanical engineer resumeMechanical engineer resume
Mechanical engineer resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 

Similar to Maintenance Engineer (20)

Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
vijay cv
vijay cvvijay cv
vijay cv
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
CV 2015_3
CV 2015_3CV 2015_3
CV 2015_3
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanical
 
varun singh expereicd resume
varun singh expereicd resumevarun singh expereicd resume
varun singh expereicd resume
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 

Recently uploaded

A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineJulioCesarSalazarHer1
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 

Recently uploaded (20)

A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 

Maintenance Engineer

  • 1. Dinesh Kumar (Mechanical Engineer) Room No:- 01 Shree Shai Hotel Bijnor (Uttar Pradesh- 246701) Mobile:- +91 9720072017 E-Mail:- dinesh2vikas@gmail.com CAREER OBJECTIVE To have a challenging career as a mechanical engineer, wherein I can utilize my skill-set effectively in the field of engineering while contributing and benefiting in synchronization with the growth of the organization. WORKING EXPERIENCE  Company Name :- Vapco Engineers (P) Limited, Navi Mumbai (The Company providing sustainable & environment friendly designs & EPC solutions in the field of Ethanol, Starch, Chemical & Pharma Industries) Designation :- Mechanical Site Engineer Cost to Company :- 5.27 Lacs/Annum Notice Period :- 1 Month Site :- Mohit Petrochemicals Pvt. Ltd., Bijnor Project :- 100 KLPD Ethanol,103 KLPD ENA, 106 KLPD RS & 1100 m3 /day integrated MEE Plant. Duration :- Jan 21th , 2019 to Present. Responsibilities: » Fabrication, Erection & Installation of Steel Structure, Equipment and Piping for MEE, ENA and Ethanol Plant. » Conceptual design & engineering activity » Preparation of Project report. » Project scheduling and bar chart preparation. » Managing parts of fabrication & Erection. » Setting out sites and organizing facilities. » Checking drawings and discuss with client to ensure that they are followed correctly. » Providing technical advice and solving problems on site. » Preparing site reports and paperwork related to site. » Interface with other department on project related issue. » Responsible for Safety, Productivity and Project Coordination.  Company Name :- Bajaj Hindusthan Sugar Limited (Distillery Division), Meerut. (A part of the 'Bajaj Group', is India's Top Sugar and alcohol manufacturing company) Designation :- Maintenance Engineer Duration :- Feb 06th , 2017 to Jan 18 th , 2019. Responsibilities: » Maintenance of Bi-Drum dumping grate Bagasse fired Boiler having capacity of 40 TPH at pressure 45 Kg/cm2 . » Working knowledge of combustion control. » Fabrication, Erection and Installation of Structure, Piping, Pumps and Equipments for Decanter plant having capacity of 1450 m3 /day and induced draft cross flow FRP cooling tower having capacity 850 m3 /hr. » Preventive, Corrective maintenance and overhauling of petrochemical plant, equipment and utilities. » Working Knowledge of SAP (Material Management module) to manage inventory and providing material to project and general maintenance. » Responsible for Operation and Maintenance of MEE Plant.
  • 2. » Inspection of fabrication, erection, piping & valves installation and commissioning of multi- effect evaporation plant having capacity of 1535 m3 /day and induced draft cross flow timber cooling tower having capacity 900 m3 /hr. » Supervision of execution of complete project for timely completion of project as per bar chart. » Prepare project Specifications and technical Data-sheets. » Maintaining inspection and testing reports. » Assistance in successfully commissioning of MEE plant. » Developed a strong working knowledge of Gland and Mechanical Sealed Pumps, Air Compressors and Vacuum System. » Overhauling of different types of Pumps as:- Non-Positive Displacement Pumps as Centrifugal Pumps (Volute & Split Casing) Positive Displacement Pumps as Gear Pumps, Progressive Cavity Pumps, Reciprocating Pumps (Plunger Type), Diaphragm Pumps And Liquid Ring Vacuum Pumps. » Overhauling of different types of Displacement Air Compressor as:- Rotary Compressor as Rotary Screw air Compressor and Root Blower (Twin Lobe Type). Reciprocating Compressor as Single Acting air Compressor (Piston Type). » Repair and Maintenance of all Heat Ex-changers, Condensers, Evaporators and cooling towers. » Coordinated the repair and improvement of all water and steam utilities and related system including: Pumps, Gauges, Piping & Valves, Strainers, Foam Traps and Steam Traps. » Perform maintenance including but not limited to mechanical power transmission and lubrication. » Revamping, modification in existing plant. » Prepare Checklist of Equipment, daily monitoring report and maintaining the records with inputs and outputs data of MEE Plant. » Responsible for Specifying and ordering engineering parts by SAP.  Company Name :- Precision Automats, Delhi (Manufacturing high precision turned and milled parts and components) Designation :- Quality Control Cum Production Engineer Duration :- Nov 17th , 2014 to Feb 01st , 2017 Responsibilities: » Maintained Quality Records & Documentation, Product Inspection and Lean Manufacturing. » Demonstrate the working knowledge of GD&T and DMAIC. » Maintained plant 5S, 5S-Red Tag Standards. » Perform Six Big Losses to reduce equipment based productivity loss in Manufacturing. » Design Manufacturing Tools, Fixtures and Indirect Gauges. » Attend customer Complaint, Analytical problem Solving and Implementing the Manufacturing Parameters or Process. EXPERIENTIAL LEARNING  Six Sigma & Root Cause Analysis (5why & 5M)  Lean Manufacturing (5S, Kaizen & Six Big Losses) BASIC ACADEMIC CREDENTIALS Qualification Board/University Year Percentage B.Tech (Mechanical) Mangalayatan University 2014 72.9% Intermediate Uttar Pradesh Board 2010 69.8% High School Uttar Pradesh Board 2006 62.0% INTERNSHIP PROGRAM  Company Name :- NBESON Tools (India), Ludhiana
  • 3. (A part of ‘NTI Group’, is manufacturing different types of threading and cutting tools) Title :- Quality Control Duration :- 02 Months (Feb 15th , 2014 to Apr 14th , 2014)  Company Name :- TATA Motors, Aligarh. Title :- Maintenance of TATA Diesel Cars Duration :- 1 Month (June 10, 2013 to July 09, 2013) ACHIEVEMENTS  Overall topper of CNC Programming  100% attendance during my tenure of B.Tech TECHNICAL SKILLS  SAP (Industrial Software)  AutoCAD Drafting  CNC Lathe & VMC Programming IT PROFICIENCY  C & C+ Programming Language  Microsoft Word, PowerPoint & Excel INTERPERSONAL SKILL  Good level of grasping new things  Adaptable to any environment  Ability to work in a team  Punctual & Hardworking EXTRA CURRICULAR ACTIVITIES  Participated in blood donation camp held at M.U ACADEMIC PROJECT Title:- Making and Using a Carving Pantograph 2X Drafting Mechanism. References: Ritesh Shrivastva, Head of Department, Department of Mechanical Engineering, MU. Nidhi Singh, Assistant Professor, Department of Mechanical Engineering, MU. PERSONAL DETAILS  Father’s Name :- Kumar Pal Singh  Permanent Address :- Village & Post-Firojpur District-Bulandshahr Uttar Pradesh-203141  Date of Birth :- August 12th ,1990  Language Known :- Hindi & English  Marital Status / Sex :- Single / Male  Interest & Hobbies :- Travelling and Problem Solving. DECLARATION I hereby declare that the above mentioned information is correct, up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars. Date:- 01/11/2019 Dinesh Kumar (Signature)