1. CURRICULUM VITAE
ABID ULLAH
Electrical Site Engineer
Electrical QA/QC Engineer
Electrical SeniorInspector
Total Experience : 11 Years
Contact details : RiyadhCity - Kingdomof Saudi Arabia
Mobile:+966-597392923, 966500883503
Email:sherkhan_611@yahoo.com; abidullah992@yahoo.com
PERSONAL PROFILE:
Date of birth : 15 March 1986
Nationality : Pakistani
Current Position : Sr. Electrical Inspectorat(KAFD Project) Riyadh, KSA
Languages known : English,Arabic& Urdu (Fluent)
Drivinglicense: : ValidSaudi drivinglicense.
Iqama Status: : Transferable
Marital Status: : Married with(1 child)
PROFESSIONAL QUALIFICATION :
B-Tech(Hons.) Electrical (Power) TechnologyAl- Khair University(AJK) Pakistan
03 yearsdiplomaof associate engineeringinElectrical technologyfrom
PeshawarTechnical Boardof Pakistan.
TRAINING:
COURSE NAME: Period Year
HS& E - SafetyTool Box Training 53 Days 2014
Microsoftoffice 3- months 2007
OBJECTIVE:
A challenging and progressive position in the field of electrical engineering for buildings,
industrial and infrastructure projects, where my 11 years multi-experience, education and
skills would be of benefit. My consulting experience includes Electrical Design works,
supervision and preparing projects tender documents.
Contracting experience includes design-build works, preparing shop drawings, electrical
execution works, procurement and estimation works.
EXPERIENCE PROFILE:
Performs the receiving inspection on all parts received and ensures shipping
documents and certificates are complete and correct to ensure the timely processing
of parts and material through the system.
Performs the receiving inspection on all parts received and ensures shipping
documents and certificates are complete and correct to ensure the timely processing
of parts and material through the system.
Ensures the implementation and maintenance of the Quality Management System
(QMS) Procedures and Work Instructions.
Ensures the plan for the work load through receiving inspection and Bench
Inspection is complied with.
Ensures that periodic checks are performed on Bench Inspection tools and that the
calibration of the precision measurement test equipment is current and calibrated to
approved standards by an approved source.
Ensures that rejected and unserviceable parts are properly identified and marked in
such a way as to prevent their reuse and installed in any article released by MEPC.
2. Conducts the following: preliminary, hidden damage, continuity, and final inspection
sections of the work order; all articles processed by MEPC, record the results on the
work order or other approved document.
Ensures that all inspections are performed on completed work.
Performs the ‘shakedown’ inspection of the delivery engine, module, or accessory
and issues a Certificate of Compliance (COC) and ensures the COC and appropriate
serviceable tags are completed correctly.
Reports for non-conformance parts IAW MEPC procedures.
Operates the Coordinate Measuring Machine (CMM) and other precision
measurement and calibration devices.
Performs calibration on precision measurement equipment.
Performs carbon seal cleaning, inspection, and lapping.
Performs cleaning, inspection, and repacking of module bearings
Performs other duties as required by Inspector Supervisor-Engine Maintenance.
PROFESSIONAL EXPERIENCE PREVIEW:
EMPLOYER - 01
POSITION AS A : Sr. Electrical Inspector Duration: From March 2011 upto date
COMPANY : Dar Al Riyadh Consultants (Engineering & Architecture) Riyadh, KSA
PROJECTS : King Abdullah Finance District (KAFD) Riyadh, KSA
DURATION : 5 Years
TYPE OF PROJECT : Residential buildingsandcommercial buildings.
CLIENT : RIC - RayadahInvestmentcompany,Saudi Arabia
SCOPE OF WORK : Supervisionof installationworksof Electrical services.
SPECIFICDUTIES AND RESPONSIBILITIES IN THIS PROJECT :
Undertake inspectionsonsite inaccordance withthe discipline relatedinspectionsandtest
plans(ITP's)
AttendtoInspectionRequests(IR's) submittedbythe contractorandtake appropriate
actionin a timelymanner.
Reviewsubmittedshopdrawingsagainstcontractdrawingsandspecifications,local codes
and statutoryrequirementsandinternationalbestpractice.
Reportany workscarriedout bycontractor foundto not be inaccordance withapproved
drawingandspecificationsandreporttoimmediatesupervisorforappropriate actionand
discharge instructiontothe contractor.
Monitorqualityof worksand assessthe safetyatsite includinghealthandenvironmental
issues,ensuringthe same complieswithcontracts/QCS specifications,safetyandhealth
riskassessmentandenvironmental mitigatingmeasuresrespectivelyonadailybasis.
Maintainrecordsfor dailyactivitiesonsite includingprogressphotosandensure theyare
readilyavailable forinspectionasandwhenrequired.
Prepare Surveillance Report(s)fordeficienciesof workfoundatsite that are believedto
have failedorif the contractor is notcomplyingwithverbal instructionsandsubsequently
complete aNonConformance Report(NCR) if requiredinview of the developmentof
events.
Checkand ensure effectiveco-ordinationbetweendiscipline relatedworksandall other
disciplines.
Provide technical inputandexperiencestoresolve anydisciplinerelatedissuesonsite that
may arise.
Monitorthe contractor’s(ITP's) andqualityplan(s) inregardstodiscipline related works.
Inspectmaterialsdeliveredandreportonquantityandtechnical compliance.
Ensure site progressinformationiscommunicatedregularly.
Undertake anysurveychecksas and whenrequired.
Coordinate the workstoensure successful hand-overof the project
3. Maintaina dailydiary.
Performall otherdutiesthatmaybe requestedbyteamleadership.
EMPLOYER - 02
POSITION AS A : Electrical Site Engineer Duration: From March 2010 to March 2011
COMPANY : Sharqawi Electro-Mechanical Company,JeddahSaudi Arabia
PROJECTS : PrincessNouraBintAbdurRahmanUniversityfor WomenRiyadhKSA
DURATION : 1.0 Years
TYPE OF PROJECT : Constructionof universitybuildings,sportsgrounds andresidential
apartments.
CLIENT : Ministryof educationKSA.
SCOPE OF WORK : Supervisionof installationworksof Electrical services.
SPECIFICDUTIES AND RESPONSIBILITIES IN THIS PROJECT :
Monitoringthe phase of QualityControl of workas perSpecificationsandDrawings.
Developandmaintaininspectionproceduresandtechniques,throughoutthe construction,
Pre-commissioningandcommissioningstages.
Material requestasper Dar-al-handasahapprovedshopdrawing.
Maintaininspectionandtestingreports.
Coordinate withconsultantonall aspectsof site inspectionbyinitiatingRFI(RequestFor
Inspection) withrelatedattacheddocuments.
Lookingafterthe control wiringterminationandinstallationof control devicesof HVAC
system.
Installationof EMT Conduits,RGSConduits,Cable TrayforLightingandPowercircuitsasper
the Daral-handasahstandards.
EMPLOYER - 02
POSITION AS A : Electrical Site Engineer Duration: From July2008 to March 2010
COMPANY : Sharqawi Electro-Mechanical Company,JeddahSaudi Arabia
PROJECTS : KingAbdullahUniversityOf Science andTechnology,Rabigh,KSA.
DURATION : 1.6 Years
TYPE OF PROJECT : Constructionof universitybuildings,sportsgrounds andresidential
apartments.
CLIENT : Ministryof educationKSA.
SCOPE OF WORK : Supervisionof installationworksof Electrical services.
SPECIFICDUTIES AND RESPONSIBILITIES IN THIS PROJECT :
Monitoringthe phase of QualityControl of workas perSpecificationsandDrawings.
Developandmaintaininspectionproceduresandtechniques,throughoutthe construction,
Pre-commissioningandcommissioningstages.
Material requestasper Aramco approvedshopdrawing.
Maintaininspectionandtestingreports.
Coordinate withconsultantonall aspectsof site inspectionbyinitiatingRFI(RequestFor
Inspection) withrelatedattacheddocuments.
Lookingafterthe control wiringterminationandinstallationof control devicesof HVAC
system.
Installationof EMT Conduits,RGSConduits,Cable TrayforLightingandPowercircuitsasper
the Aramcostandards.
4. EMPLOYER - 03
POSITION AS A : Maintenance Supervisor Duration: From June 2006 to April 2008
COMPANY : RahmanCotton MillsinPakistan
PROJECTS : RahmanCotton Mills
DURATION : 2.0 Years
TYPE OF PROJECT : Industries.
SCOPE OF WORK : Maintenance andtroubleshootingof 3phase motors,electrical panels,
control circuitsetc
SPECIFICDUTIES AND RESPONSIBILITIES IN THIS PROJECT :
Maintenance for3-Phase motors.
Maintaininspectionandtestingreports
Monitoringthe progressof all electrical activitiesandfollow upthe dailyworkschedules.
Estimationof requiredmanpowerandtime forthe completionof job.
Installationandterminationof Panel boardandcontrol circuitsforall machinesaswell as
equipments.