Low Cost Sanitation Systems
Unit-III
Septic Tanks
• Septic tanks are generally provided in the
area where there is no sewerage System.
Highway Hotels, Guest Houses, Isolated
Colonies, Rural Areas, etc. are several
examples where septic tanks are used for
treatment of wastewater and subsequently
their disposal in Soak Pits.
Septic Tanks
Septic Tank
Septic Tank
• Septic tanks are Suitable under following
Situations :
• There is no Sewerage System
• It is Costly and Uneconomical to carry
wastewater to sewerage system which is far
away.
• Soil is relatively Porous and it is possible to
dispose wastewater in underground disposal
facilities like Soak Pit dispersion trenches etc.
Septic Tank
Dispersion Trenches
Septic Tank
• A Septic tank is defined as a Sedimentation
tank with detention Period of 12 to 36
Hours and with extra provision for anaerobic
digestion of settled sludge. Septic tank is
anaerobic treatment unit and therefore foul
gases will be evolved, and that is the reason
why Septic tanks are kept away from the
buildings.
Septic Tank
Septic Tank
Advantages & Disadvantages of
Septic Tanks
Advantages
• It is Cheaper
• There is no need of skilled supervision and
hence maintenance is negligible
• There is no need of sewerage system if the soil is
pervious. The septic tanks effluent can be
disposed in Soak Pit or Distribution trenches.
• Large Cleaning Period Can be allowed.
• It Removes Considerable amount of BOD & SS
Septic Tanks
Advantages & Disadvantages of
Septic Tanks
• Disadvantages of Septic Tanks
• It has to be provided at some distance from buildings
because it being anaerobic Treatment Unit generates
foul gases like H2S, Methane, etc. Which are
Hazardous.
• The effluent from septic tank contains high BOD
and needs proper disposal.
• If the soil permeability is poor, It is difficult to
dispose effluent of septic tank, larger distribution
trenches are required which again involves large land
requirement and thus greater cost.
Septic Tanks
Construction Details
• Following are features of the Septic Tank:
• It is rectangular in plan the length is usually 2 to 4
times breadth.
• For smaller tanks 100 cm of wastewater depth is
provided. For larger tanks, it may be up to 180 cm.
Freeboard is 30 to 45 cm.
• T shaped outlet as well as inlet pipe ends are
provided
Construction Details
Construction Details
• In smaller tanks one baffle of hanging type is
enough and is provided at about 30 cm from inlet
pipe and remains 30 cm above and 30 cm below the
wastewater surface.
• Tank is covered with RCC Slabs having Thickness
of not less than 10 cm
• Ventilation pipe can be 10 cm dia plastic pipe with
a cowl at top. Cowl of Plastic is also easily available
in the market.
Construction Details
Design Criteria for Septic Tanks
Capacity of Tank
• The Volume of Waste water a septic tank
can accommodate is called its Capacity. A
septic tank should be capable of storing
wastewater flow during detention period and
an additional volume of sludge accumulated
for period of 6 months to 3 years depending
upon frequency of cleaning.
Design Criteria for Septic Tanks
• If only water closets are connected the per capita
sewage shall be around 40 to 70 litres per day.
But if sullage is also to be discharged per capita
wastewater may be 90 to 150 liters per day.
• The sludge accumulation rate is normally taken as
30 litres/capita/year. This means that every
person shall contribute 30 litre sludge in a year.
• Free board can be taken between 30 to 45 cm.
• Detention Period= 12 to 36 hours
• Length/ breadth ratio can be taken as 2 to 4.
Design Criteria for Septic Tanks
Design of Septic Tank
• Design the dimensions of a septic tank for a
small colony of 150 persons. The rate of
water supply is 125 litre/capita/day
Design of Septic Tank
Solution:
• Quantity of Water Supplied
• = 150 x 135
• = 20250 litres/day
• Assume 80 % of water supplied goes to the
house sewer
• Waste water Quantity
• = 20250 x 0.8
• = 16200 litres /day
Design of Septic Tank
• Assume Detention time 24 hrs. (one day) the
capacity of tank
• = volume of wastewater per day
• = 16200 litres
• Assume Sludge deposition rate= 30 l/c/day
• Therefore Sludge Produced in a year
• = 150 x 30
• = 4500 litres
Design of Septic Tank
• Assume that the Cleaning Period is one Year
• Total Capacity of Tank
• = Volume of Wastewater formed in 24 hrs. +
Volume of Sludge formed in one year
• = 16200 + 4500 litres
• = 20700 litres
• = 20.7 cubic meters
Design of Septic Tank
• Assume Depth of Tank = 1.8 m
• Surface area of the tank= Volume= 20.7
Depth 1.8
Design of Septic Tank
= 11.5 m2
Now let us keep L/B = 3
Therefore L= 3 B
Therefore 3 B x B = 11.7
Therefore B2 = 11.5 / 3 = 3.833
Therefore B= 1.957 say 2 m
Now as L= 3 B
L= 2 x 3 = 6 m
Therefore Provide tank with dimensions
6m x 2m x 1.8m
Soak Pits
• Septic tank effluent is having foul odour and
contains biodegradable organic Matter. The
BOD 5 of the Septic effluent may be from 200
to 250 mg/l It is therefore necessary to dispose
septic tank effluent carefully so that there is
minimum nuisance and risk to the health of
people.
Soak Pits
Soak Pits
Soak Pits
• There are three methods of disposal of septic
tank effluent, they are :
• Soil Absorption System
• Biological filters
• Up flow anaerobic filters
Soil Absorption
• Soil absorption System is based on the
characteristics of the soil to absorb water or
wastewater because of its porosity.
Wastewater is poured or applied on wide
area of land and it slowly percolates and
disappears. This type of system is only
applicable when soil is pervious and has a
high rate of percolation
Soil Absorption
Soak Pits
Soil absorption system are classified as :
• Seepage Pit or Soak Pit
• Dispersion Trenches
Seepage Pit or Soak Pit
• It is a Circular Covered Pit. The effluent is
discharged in the pit. Because of porosity soil
absorbs the wastewater.
• Lined & Unlined Soak Pits are Provided in
the Permeable Soil. It is not advisable to
provide Soak Pit at the sites having percolation
rate more than 30 min.
Seepage Pit or Soak Pit
Disposal in Absorption Trenches
• Septic tank effluent is allowed to enter in to
a masonry chamber in this method. The
Masonry chamber distributes the effluent
into various chambers through porous pipe
lines
Disposal in Absorption Trenches
Disposal in Absorption Trenches
• Dispersion Trenches may be adopted in areas where
percolation rate is not exceeding 60 minutes.
• The minimum absorption area of the trenches can be
calculated on the basis of maximum allowable effluent
discharge q. The value of q
• Q= 130 𝒕
• Where,
• Q= Maximum rate of effluent applied in litres /day/
sq. m of leaching area.
• t= Standard Percolation rate in minutes
Disposal in Absorption Trenches
Disposal in Absorption Trenches
• The standard percolation rate is the rate of
percolation determined by excavating a hole up to
the depth of the trench and measuring fall in level
of water by 1 cm and measuring time taken. The test
hole diameter can be 10 to 30 cm.
Disposal in Absorption Trenches
• Is 2470 Part-II 1985 gives another formula for
determining maximum discharges and is given by
• Q = 204
𝒕
Where,
Q= max rate of discharge of effluent applied in
l/m2/min
t= Standard Percolation Rate in Minute
From the above equation we can find out the area of
trench if we know the maximum rate of effluent applied to
the trench.
Example
• Calculate the bottom area of trenches for
septic tank effluent discharges (Maximum)
equal to 1.0 litre/ Sec and Standard
Percolation Rate of 36 minutes.
• Q = 204 , Q is in l/m 2/day
𝑡
• Where t= Standard Percolation rate= 2
Disposal in Absorption Trenches
• Q = 204 = 143 litres/day/m2
2
Maximum effluent Discharge= 1 lit/ sec
= 60 lit/ min
Therefore Area= Maximum Effluent Discharges
Effluent Discharge Rate
= 86400 lit/day
143 lit/min/m 2
• = 604 m2
Disposal in Absorption Trenches
• We can Provide trenches Having one meter
width length of trenches
• = 604 = 604 m
1
Provide 51 m long 12 trenches having width =
1.0 m
Disposal in Absorption Trenches
References
• Environmental Engineering : By Prof B.R.Shah
Prof A M Malek
• Internet Websites
Thanks …

More Related Content

What's hot

Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
Tulsiram Bhattarai
 

What's hot (20)

Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & Layout
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Sewer appurtenances
Sewer appurtenances Sewer appurtenances
Sewer appurtenances
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
 
Sanitaion methods & technologies
Sanitaion methods & technologiesSanitaion methods & technologies
Sanitaion methods & technologies
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank oza
 
02 water demand
02 water demand02 water demand
02 water demand
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Water demand
Water demandWater demand
Water demand
 
Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer
 
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Sources of wastewater
Sources of wastewaterSources of wastewater
Sources of wastewater
 

Viewers also liked

Viewers also liked (20)

Building Stones
Building StonesBuilding Stones
Building Stones
 
Physical Unit Operations
Physical Unit OperationsPhysical Unit Operations
Physical Unit Operations
 
Demand and supply
Demand and supplyDemand and supply
Demand and supply
 
Varnishes
VarnishesVarnishes
Varnishes
 
Limes
LimesLimes
Limes
 
Hardened Concrete
Hardened ConcreteHardened Concrete
Hardened Concrete
 
Plastic
PlasticPlastic
Plastic
 
Aggregates of Concrete
Aggregates of ConcreteAggregates of Concrete
Aggregates of Concrete
 
Admixtures
AdmixturesAdmixtures
Admixtures
 
Vampire Electricity-Standby Power
Vampire Electricity-Standby PowerVampire Electricity-Standby Power
Vampire Electricity-Standby Power
 
Slums
SlumsSlums
Slums
 
Engineering Economics (Cost Function)
Engineering Economics  (Cost Function)Engineering Economics  (Cost Function)
Engineering Economics (Cost Function)
 
Air Purifying Plants
Air Purifying PlantsAir Purifying Plants
Air Purifying Plants
 
Green Cities
Green CitiesGreen Cities
Green Cities
 
Properties of Cement
Properties of CementProperties of Cement
Properties of Cement
 
Fresh Concrete
Fresh ConcreteFresh Concrete
Fresh Concrete
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Smart Villages
Smart VillagesSmart Villages
Smart Villages
 
Environmental Engineering-I
Environmental Engineering-IEnvironmental Engineering-I
Environmental Engineering-I
 
Building stones II
Building stones IIBuilding stones II
Building stones II
 

Similar to Low Cost Sanitation Systems

Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
kalyanmaji
 

Similar to Low Cost Sanitation Systems (20)

Septictankprocessdesign
SeptictankprocessdesignSeptictankprocessdesign
Septictankprocessdesign
 
Human waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanismsHuman waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanisms
 
Septic tank
Septic tankSeptic tank
Septic tank
 
Unit-II disposal of Excreta b.sc II year ppt.pptx
Unit-II disposal of Excreta b.sc II year ppt.pptxUnit-II disposal of Excreta b.sc II year ppt.pptx
Unit-II disposal of Excreta b.sc II year ppt.pptx
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 
Disposal of excreta
Disposal of excretaDisposal of excreta
Disposal of excreta
 
Disposal of excreta
Disposal of excretaDisposal of excreta
Disposal of excreta
 
Waste water treatment plant
Waste water treatment plantWaste water treatment plant
Waste water treatment plant
 
ASP.pptx
ASP.pptxASP.pptx
ASP.pptx
 
Activated Sludge process
Activated Sludge processActivated Sludge process
Activated Sludge process
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Unit III Quality and Treatment
Unit  III Quality and TreatmentUnit  III Quality and Treatment
Unit III Quality and Treatment
 
Sewage Treatment: Primary Treatment
Sewage Treatment: Primary TreatmentSewage Treatment: Primary Treatment
Sewage Treatment: Primary Treatment
 
Methods of Rainwater Harvesting, Types of Rural Sanitation and Types of Plumb...
Methods of Rainwater Harvesting, Types of Rural Sanitation and Types of Plumb...Methods of Rainwater Harvesting, Types of Rural Sanitation and Types of Plumb...
Methods of Rainwater Harvesting, Types of Rural Sanitation and Types of Plumb...
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
 
Wwwe
WwweWwwe
Wwwe
 
sedimentation
sedimentationsedimentation
sedimentation
 
Trickling filter
Trickling filterTrickling filter
Trickling filter
 
Module VI Rural Sanitation
Module VI Rural SanitationModule VI Rural Sanitation
Module VI Rural Sanitation
 
Wastewater
WastewaterWastewater
Wastewater
 

More from GAURAV. H .TANDON

More from GAURAV. H .TANDON (20)

Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Premerital Sceening .pptx
Premerital Sceening .pptxPremerital Sceening .pptx
Premerital Sceening .pptx
 
Polymath(Renaissance man)
Polymath(Renaissance man)Polymath(Renaissance man)
Polymath(Renaissance man)
 
Crash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxCrash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptx
 
Voting Age .pptx
Voting Age .pptxVoting Age .pptx
Voting Age .pptx
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptx
 
Urban Heat Island Effect
Urban Heat Island EffectUrban Heat Island Effect
Urban Heat Island Effect
 
Communication Skills
Communication SkillsCommunication Skills
Communication Skills
 
The unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesThe unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companies
 
Compassionate Cities
Compassionate CitiesCompassionate Cities
Compassionate Cities
 
Gamification of Smart Cities
Gamification of Smart Cities Gamification of Smart Cities
Gamification of Smart Cities
 
Anti-Microbial Copper
Anti-Microbial Copper Anti-Microbial Copper
Anti-Microbial Copper
 
Smart Forest City
Smart Forest City Smart Forest City
Smart Forest City
 
Smart forest cities
Smart forest cities Smart forest cities
Smart forest cities
 
Automotive Hacking
Automotive Hacking Automotive Hacking
Automotive Hacking
 
Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters
 
Cyber Security in Smart Buildings
Cyber Security in Smart Buildings Cyber Security in Smart Buildings
Cyber Security in Smart Buildings
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 

Low Cost Sanitation Systems

  • 1. Low Cost Sanitation Systems Unit-III
  • 2. Septic Tanks • Septic tanks are generally provided in the area where there is no sewerage System. Highway Hotels, Guest Houses, Isolated Colonies, Rural Areas, etc. are several examples where septic tanks are used for treatment of wastewater and subsequently their disposal in Soak Pits.
  • 5. Septic Tank • Septic tanks are Suitable under following Situations : • There is no Sewerage System • It is Costly and Uneconomical to carry wastewater to sewerage system which is far away. • Soil is relatively Porous and it is possible to dispose wastewater in underground disposal facilities like Soak Pit dispersion trenches etc.
  • 8. Septic Tank • A Septic tank is defined as a Sedimentation tank with detention Period of 12 to 36 Hours and with extra provision for anaerobic digestion of settled sludge. Septic tank is anaerobic treatment unit and therefore foul gases will be evolved, and that is the reason why Septic tanks are kept away from the buildings.
  • 11. Advantages & Disadvantages of Septic Tanks Advantages • It is Cheaper • There is no need of skilled supervision and hence maintenance is negligible • There is no need of sewerage system if the soil is pervious. The septic tanks effluent can be disposed in Soak Pit or Distribution trenches. • Large Cleaning Period Can be allowed. • It Removes Considerable amount of BOD & SS
  • 13. Advantages & Disadvantages of Septic Tanks • Disadvantages of Septic Tanks • It has to be provided at some distance from buildings because it being anaerobic Treatment Unit generates foul gases like H2S, Methane, etc. Which are Hazardous. • The effluent from septic tank contains high BOD and needs proper disposal. • If the soil permeability is poor, It is difficult to dispose effluent of septic tank, larger distribution trenches are required which again involves large land requirement and thus greater cost.
  • 15. Construction Details • Following are features of the Septic Tank: • It is rectangular in plan the length is usually 2 to 4 times breadth. • For smaller tanks 100 cm of wastewater depth is provided. For larger tanks, it may be up to 180 cm. Freeboard is 30 to 45 cm. • T shaped outlet as well as inlet pipe ends are provided
  • 17. Construction Details • In smaller tanks one baffle of hanging type is enough and is provided at about 30 cm from inlet pipe and remains 30 cm above and 30 cm below the wastewater surface. • Tank is covered with RCC Slabs having Thickness of not less than 10 cm • Ventilation pipe can be 10 cm dia plastic pipe with a cowl at top. Cowl of Plastic is also easily available in the market.
  • 19. Design Criteria for Septic Tanks Capacity of Tank • The Volume of Waste water a septic tank can accommodate is called its Capacity. A septic tank should be capable of storing wastewater flow during detention period and an additional volume of sludge accumulated for period of 6 months to 3 years depending upon frequency of cleaning.
  • 20. Design Criteria for Septic Tanks • If only water closets are connected the per capita sewage shall be around 40 to 70 litres per day. But if sullage is also to be discharged per capita wastewater may be 90 to 150 liters per day. • The sludge accumulation rate is normally taken as 30 litres/capita/year. This means that every person shall contribute 30 litre sludge in a year. • Free board can be taken between 30 to 45 cm. • Detention Period= 12 to 36 hours • Length/ breadth ratio can be taken as 2 to 4.
  • 21. Design Criteria for Septic Tanks
  • 22. Design of Septic Tank • Design the dimensions of a septic tank for a small colony of 150 persons. The rate of water supply is 125 litre/capita/day
  • 23. Design of Septic Tank Solution: • Quantity of Water Supplied • = 150 x 135 • = 20250 litres/day • Assume 80 % of water supplied goes to the house sewer • Waste water Quantity • = 20250 x 0.8 • = 16200 litres /day
  • 24. Design of Septic Tank • Assume Detention time 24 hrs. (one day) the capacity of tank • = volume of wastewater per day • = 16200 litres • Assume Sludge deposition rate= 30 l/c/day • Therefore Sludge Produced in a year • = 150 x 30 • = 4500 litres
  • 25. Design of Septic Tank • Assume that the Cleaning Period is one Year • Total Capacity of Tank • = Volume of Wastewater formed in 24 hrs. + Volume of Sludge formed in one year • = 16200 + 4500 litres • = 20700 litres • = 20.7 cubic meters
  • 26. Design of Septic Tank • Assume Depth of Tank = 1.8 m • Surface area of the tank= Volume= 20.7 Depth 1.8
  • 27. Design of Septic Tank = 11.5 m2 Now let us keep L/B = 3 Therefore L= 3 B Therefore 3 B x B = 11.7 Therefore B2 = 11.5 / 3 = 3.833 Therefore B= 1.957 say 2 m Now as L= 3 B L= 2 x 3 = 6 m Therefore Provide tank with dimensions 6m x 2m x 1.8m
  • 28. Soak Pits • Septic tank effluent is having foul odour and contains biodegradable organic Matter. The BOD 5 of the Septic effluent may be from 200 to 250 mg/l It is therefore necessary to dispose septic tank effluent carefully so that there is minimum nuisance and risk to the health of people.
  • 31. Soak Pits • There are three methods of disposal of septic tank effluent, they are : • Soil Absorption System • Biological filters • Up flow anaerobic filters
  • 32. Soil Absorption • Soil absorption System is based on the characteristics of the soil to absorb water or wastewater because of its porosity. Wastewater is poured or applied on wide area of land and it slowly percolates and disappears. This type of system is only applicable when soil is pervious and has a high rate of percolation
  • 34. Soak Pits Soil absorption system are classified as : • Seepage Pit or Soak Pit • Dispersion Trenches
  • 35. Seepage Pit or Soak Pit • It is a Circular Covered Pit. The effluent is discharged in the pit. Because of porosity soil absorbs the wastewater. • Lined & Unlined Soak Pits are Provided in the Permeable Soil. It is not advisable to provide Soak Pit at the sites having percolation rate more than 30 min.
  • 36. Seepage Pit or Soak Pit
  • 37. Disposal in Absorption Trenches • Septic tank effluent is allowed to enter in to a masonry chamber in this method. The Masonry chamber distributes the effluent into various chambers through porous pipe lines
  • 39. Disposal in Absorption Trenches • Dispersion Trenches may be adopted in areas where percolation rate is not exceeding 60 minutes. • The minimum absorption area of the trenches can be calculated on the basis of maximum allowable effluent discharge q. The value of q • Q= 130 𝒕 • Where, • Q= Maximum rate of effluent applied in litres /day/ sq. m of leaching area. • t= Standard Percolation rate in minutes
  • 41. Disposal in Absorption Trenches • The standard percolation rate is the rate of percolation determined by excavating a hole up to the depth of the trench and measuring fall in level of water by 1 cm and measuring time taken. The test hole diameter can be 10 to 30 cm.
  • 42. Disposal in Absorption Trenches • Is 2470 Part-II 1985 gives another formula for determining maximum discharges and is given by • Q = 204 𝒕 Where, Q= max rate of discharge of effluent applied in l/m2/min t= Standard Percolation Rate in Minute From the above equation we can find out the area of trench if we know the maximum rate of effluent applied to the trench.
  • 43. Example • Calculate the bottom area of trenches for septic tank effluent discharges (Maximum) equal to 1.0 litre/ Sec and Standard Percolation Rate of 36 minutes. • Q = 204 , Q is in l/m 2/day 𝑡 • Where t= Standard Percolation rate= 2
  • 44. Disposal in Absorption Trenches • Q = 204 = 143 litres/day/m2 2 Maximum effluent Discharge= 1 lit/ sec = 60 lit/ min Therefore Area= Maximum Effluent Discharges Effluent Discharge Rate = 86400 lit/day 143 lit/min/m 2 • = 604 m2
  • 45. Disposal in Absorption Trenches • We can Provide trenches Having one meter width length of trenches • = 604 = 604 m 1 Provide 51 m long 12 trenches having width = 1.0 m
  • 47. References • Environmental Engineering : By Prof B.R.Shah Prof A M Malek • Internet Websites