Low Cost Bridges
 Low cost bridges may be defined as bridges constructed and
maintained at low cost.
 Necessity
1. Lack of resources, time, money and skill
2. Repairs to permanent works
3. To facilitate the execution of permanent works
4. Temporary need
5. Undertaking project surveys in the interiors
 Constructed using locally available materials like stone, bricks
and timber
 Causeway: A road causeway is a pucca dip which allows floods
to pass over it.
 Known as Irish bridge
 On river which remains dry for most times
 Involves heavy earthwork – should with easy slope
 Road with stone or brick paving
 Cut off wall (Dwarf wall) – To prevent scour and undermining
 Cut off wall 60 cm deep on u/s and 120 to 150 cm on d/s
 For steep slope – Road at higher level with masonry wall at
each end
 It is submersible road bridge
 Having sufficient number of opening
 Opening –with abutments, piers, floors, slabs and arches
 Approaches with slope 1 in 20
 Apron of Concrete or Masonry - velocity is high and stream
bed is soft
 Road – CC slab or stone blocks set in mortar
 Bed level causeway
Provided where interruption to traffic less than 24 hour
Generally 12 to 25 cm above bed
 For sound and economic design
Afflux
Scour on u/s and d/s
Upstream pressure
 Factors considered to upgrade existing causeway to high level
bridge
Number of interruptions
Duration of interruptions
Type of flow
Type and amount of traffic
Importance of road
 Culvert : A culvert is a small bridge for carrying water
beneath a road or railway.
 Road culvert – span limited to 5 m
 Railway culvert – span limited to 6 m
 Types of culverts:
1. Arch culvert
2. Slab culvert
3. Pipe culvert
4. Box culvert
 Consists of abutments, wing walls, arches, parapets and the
foundations.
 Constructed – Brickwork or Concrete
 Floor and curtain wall – velocity of flow and nature of soil
 Consists of RCC slab with or without beams or a stone slab,
with or without steel girder
 Deck slab – one way slab
 Design – One lane of IRC class AA track vehicle or one lane
of IRC class AA wheeled loading or two lanes of class A
loading
 Provided – discharge is small and sufficient headway is not
available
 Pipes –diameter not less than 60 cm
 No. and dia. Of pipes – discharge and height of bank
 Concrete bedding
 Gradient – not less than 1 in 1000
 Consists of one or more no. of rectangular or square openings
 Provided – soil is soft and load to be spread over wide area
 RCC box culvert – abutments, top and bottom slabs cast
monolithically
 Height of vent – rarely exceed 3 m
 For single span up to 3 m and double span up to 6 m
 Height of box – at road level or at depth below road
level
 Splayed wing wall at 450 – retain earthwork, guide
water flow

More Related Content

What's hot

bridge design
 bridge design bridge design
presentation
presentationpresentation
presentation
Shivam Upadhyay
 
Bridge pier
Bridge pierBridge pier
Bridge pier
Pritesh Parmar
 
Classification and importance of hill roads
Classification and importance of hill roadsClassification and importance of hill roads
Classification and importance of hill roads
Surpal Zala
 
Highway Projects
Highway Projects Highway Projects
Highway Projects
RAMPRASAD KUMAWAT
 
Rbte Drainage system in tunnel
 Rbte Drainage system in tunnel Rbte Drainage system in tunnel
Rbte Drainage system in tunnel
Sukhvinder Singh
 
Inspection and maintenance of bridge
Inspection and maintenance of bridgeInspection and maintenance of bridge
Inspection and maintenance of bridge
AKASH SHAH
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Labour Based Method vs Equipment Based Method
 Labour Based Method  vs Equipment Based Method Labour Based Method  vs Equipment Based Method
Labour Based Method vs Equipment Based Method
Tseringodrub Gurung
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineering
holegajendra
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
Mohamed Yassin
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
Gowtham G
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
Deven Diran
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
RAMPRASAD KUMAWAT
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
Robin Nirwal
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
Amit Yadav
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
RAMPRASAD KUMAWAT
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfs
Prakash Kumar Sekar
 
Formwork
FormworkFormwork
Formwork
Sneha Kaira
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
Shantanu Patil
 

What's hot (20)

bridge design
 bridge design bridge design
bridge design
 
presentation
presentationpresentation
presentation
 
Bridge pier
Bridge pierBridge pier
Bridge pier
 
Classification and importance of hill roads
Classification and importance of hill roadsClassification and importance of hill roads
Classification and importance of hill roads
 
Highway Projects
Highway Projects Highway Projects
Highway Projects
 
Rbte Drainage system in tunnel
 Rbte Drainage system in tunnel Rbte Drainage system in tunnel
Rbte Drainage system in tunnel
 
Inspection and maintenance of bridge
Inspection and maintenance of bridgeInspection and maintenance of bridge
Inspection and maintenance of bridge
 
Formwork
FormworkFormwork
Formwork
 
Labour Based Method vs Equipment Based Method
 Labour Based Method  vs Equipment Based Method Labour Based Method  vs Equipment Based Method
Labour Based Method vs Equipment Based Method
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineering
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfs
 
Formwork
FormworkFormwork
Formwork
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
 

Similar to low cost bridge.pptx

LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAY
Ghulam Yasin
 
H & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gatesH & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gates
Hasna Hassan
 
17. Dams and its Types.pdf
17. Dams and its Types.pdf17. Dams and its Types.pdf
17. Dams and its Types.pdf
MuhammadAjmal326519
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
ShrafatBalti
 
Bridge
BridgeBridge
Bridge
Vamshi Krish
 
Bridges in hilly areas
Bridges in hilly areasBridges in hilly areas
Bridges in hilly areas
Anant Prakashrakash Verma
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
Assad ULlah
 
Bridge,types of bridges
Bridge,types of bridgesBridge,types of bridges
Bridge,types of bridges
jitendra malviya
 
study\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.pptstudy\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.ppt
pavik13
 
Coffer dams
Coffer damsCoffer dams
Coffer dams
JNTUK
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU
VATSAL PATEL
 
Damconstruction 1
Damconstruction 1Damconstruction 1
Damconstruction 1
soenarto soendjaja
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
Gaurav Rawat
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
KHUSHBU SHAH
 
multi swing bridges
multi swing bridgesmulti swing bridges
multi swing bridges
Gaurav Shukla
 
Cofferdam
CofferdamCofferdam
Cofferdam
ubaidpvkd
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
Gaurang Kakadiya
 
Chapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptxChapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptx
Chhagan2
 
Bridge
Bridge Bridge
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
srinivas cnu
 

Similar to low cost bridge.pptx (20)

LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAY
 
H & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gatesH & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gates
 
17. Dams and its Types.pdf
17. Dams and its Types.pdf17. Dams and its Types.pdf
17. Dams and its Types.pdf
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Bridge
BridgeBridge
Bridge
 
Bridges in hilly areas
Bridges in hilly areasBridges in hilly areas
Bridges in hilly areas
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
 
Bridge,types of bridges
Bridge,types of bridgesBridge,types of bridges
Bridge,types of bridges
 
study\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.pptstudy\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.ppt
 
Coffer dams
Coffer damsCoffer dams
Coffer dams
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU
 
Damconstruction 1
Damconstruction 1Damconstruction 1
Damconstruction 1
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
multi swing bridges
multi swing bridgesmulti swing bridges
multi swing bridges
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Chapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptxChapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptx
 
Bridge
Bridge Bridge
Bridge
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
 

Recently uploaded

Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
A Brief Introduction About Hanying Chen_
A Brief Introduction About Hanying Chen_A Brief Introduction About Hanying Chen_
A Brief Introduction About Hanying Chen_
Hanying Chen
 
Portfolio Update 18.06.2024 Vienna, Austria.pdf
Portfolio Update 18.06.2024 Vienna, Austria.pdfPortfolio Update 18.06.2024 Vienna, Austria.pdf
Portfolio Update 18.06.2024 Vienna, Austria.pdf
hosseiniliya666
 
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
19rmjonz
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
dxtmnb3y
 
Call Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
Call Girls Ahmedabad 7426014248 Independent Call Girl Service AhmedabadCall Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
Call Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
namratasinha41
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
SSG Boorman Purple Heart found research.pdf
SSG Boorman Purple Heart found research.pdfSSG Boorman Purple Heart found research.pdf
SSG Boorman Purple Heart found research.pdf
rbakerj2
 
239_FiveStarRestaurant_extract__________
239_FiveStarRestaurant_extract__________239_FiveStarRestaurant_extract__________
239_FiveStarRestaurant_extract__________
Nora Meek
 
Maryoku_Yummy_Episode_01_Storyboard example_01
Maryoku_Yummy_Episode_01_Storyboard example_01Maryoku_Yummy_Episode_01_Storyboard example_01
Maryoku_Yummy_Episode_01_Storyboard example_01
acostaanimation
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result
 
Class 12 Geography Practical file PDF.pdf
Class 12 Geography Practical file PDF.pdfClass 12 Geography Practical file PDF.pdf
Class 12 Geography Practical file PDF.pdf
ravisekhwat866
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➑➌➋➑➒➎➑➑➊➍
 
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result
 
Word stress for students_with KEY_Advanced.pdf
Word stress for students_with KEY_Advanced.pdfWord stress for students_with KEY_Advanced.pdf
Word stress for students_with KEY_Advanced.pdf
dolinh2711
 
Have a Nice Day Scene 3 .pdf
Have a Nice Day Scene 3              .pdfHave a Nice Day Scene 3              .pdf
Have a Nice Day Scene 3 .pdf
ElenaKrasteva9
 
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdfMr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
Frank Fluegel
 
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
a0pr7yf1
 

Recently uploaded (20)

Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
A Brief Introduction About Hanying Chen_
A Brief Introduction About Hanying Chen_A Brief Introduction About Hanying Chen_
A Brief Introduction About Hanying Chen_
 
Portfolio Update 18.06.2024 Vienna, Austria.pdf
Portfolio Update 18.06.2024 Vienna, Austria.pdfPortfolio Update 18.06.2024 Vienna, Austria.pdf
Portfolio Update 18.06.2024 Vienna, Austria.pdf
 
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
哪里办理(sjsu毕业证书)美国圣何塞州立大学毕业证硕士文凭证书原版一模一样
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA |
 
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
原版制作(UNITO毕业证书)都灵大学毕业证Offer一模一样
 
Call Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
Call Girls Ahmedabad 7426014248 Independent Call Girl Service AhmedabadCall Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
Call Girls Ahmedabad 7426014248 Independent Call Girl Service Ahmedabad
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
SSG Boorman Purple Heart found research.pdf
SSG Boorman Purple Heart found research.pdfSSG Boorman Purple Heart found research.pdf
SSG Boorman Purple Heart found research.pdf
 
239_FiveStarRestaurant_extract__________
239_FiveStarRestaurant_extract__________239_FiveStarRestaurant_extract__________
239_FiveStarRestaurant_extract__________
 
Maryoku_Yummy_Episode_01_Storyboard example_01
Maryoku_Yummy_Episode_01_Storyboard example_01Maryoku_Yummy_Episode_01_Storyboard example_01
Maryoku_Yummy_Episode_01_Storyboard example_01
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
➒➌➍➑➊➑➏➍➋➒ Satta Matka sattamatka sattamatka result
 
Class 12 Geography Practical file PDF.pdf
Class 12 Geography Practical file PDF.pdfClass 12 Geography Practical file PDF.pdf
Class 12 Geography Practical file PDF.pdf
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
➒➌➍➑➊➑➏➍➋➒ Satta Matka Satta result marka result Satta Matka Satta result mar...
 
Word stress for students_with KEY_Advanced.pdf
Word stress for students_with KEY_Advanced.pdfWord stress for students_with KEY_Advanced.pdf
Word stress for students_with KEY_Advanced.pdf
 
Have a Nice Day Scene 3 .pdf
Have a Nice Day Scene 3              .pdfHave a Nice Day Scene 3              .pdf
Have a Nice Day Scene 3 .pdf
 
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdfMr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
Mr. Brainwash ❤️ Beautiful Girl _ FRANK FLUEGEL GALERIE.pdf
 
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
哪里购买(ucr毕业证书)美国加州大学河滨分校毕业证研究生文凭证书原版一模一样
 

low cost bridge.pptx

  • 2.  Low cost bridges may be defined as bridges constructed and maintained at low cost.  Necessity 1. Lack of resources, time, money and skill 2. Repairs to permanent works 3. To facilitate the execution of permanent works 4. Temporary need 5. Undertaking project surveys in the interiors  Constructed using locally available materials like stone, bricks and timber  Causeway: A road causeway is a pucca dip which allows floods to pass over it.
  • 3.  Known as Irish bridge
  • 4.  On river which remains dry for most times
  • 5.  Involves heavy earthwork – should with easy slope
  • 6.  Road with stone or brick paving  Cut off wall (Dwarf wall) – To prevent scour and undermining  Cut off wall 60 cm deep on u/s and 120 to 150 cm on d/s  For steep slope – Road at higher level with masonry wall at each end
  • 7.
  • 8.  It is submersible road bridge  Having sufficient number of opening  Opening –with abutments, piers, floors, slabs and arches  Approaches with slope 1 in 20
  • 9.  Apron of Concrete or Masonry - velocity is high and stream bed is soft  Road – CC slab or stone blocks set in mortar
  • 10.
  • 11.  Bed level causeway Provided where interruption to traffic less than 24 hour Generally 12 to 25 cm above bed  For sound and economic design Afflux Scour on u/s and d/s Upstream pressure  Factors considered to upgrade existing causeway to high level bridge Number of interruptions Duration of interruptions Type of flow Type and amount of traffic Importance of road
  • 12.  Culvert : A culvert is a small bridge for carrying water beneath a road or railway.  Road culvert – span limited to 5 m  Railway culvert – span limited to 6 m  Types of culverts: 1. Arch culvert 2. Slab culvert 3. Pipe culvert 4. Box culvert
  • 13.  Consists of abutments, wing walls, arches, parapets and the foundations.  Constructed – Brickwork or Concrete  Floor and curtain wall – velocity of flow and nature of soil
  • 14.
  • 15.  Consists of RCC slab with or without beams or a stone slab, with or without steel girder  Deck slab – one way slab  Design – One lane of IRC class AA track vehicle or one lane of IRC class AA wheeled loading or two lanes of class A loading
  • 16.
  • 17.  Provided – discharge is small and sufficient headway is not available  Pipes –diameter not less than 60 cm  No. and dia. Of pipes – discharge and height of bank  Concrete bedding  Gradient – not less than 1 in 1000
  • 18.  Consists of one or more no. of rectangular or square openings  Provided – soil is soft and load to be spread over wide area  RCC box culvert – abutments, top and bottom slabs cast monolithically  Height of vent – rarely exceed 3 m
  • 19.  For single span up to 3 m and double span up to 6 m
  • 20.  Height of box – at road level or at depth below road level
  • 21.  Splayed wing wall at 450 – retain earthwork, guide water flow