SlideShare a Scribd company logo
1 of 18
Developing a Logical
     Framework
Public Sector Improvement Facility
         Project Resources
What is a Logframe?

A logical framework (or logframe) is a
management tool that assists in project
design by clearly stating the key components,
how the project is expected to work and how
success will be measured
What is in a logframe?
A logframe is presented as a matrix with:
• The project structure
  (goal, purpose, outputs and activities)
• Indicators of performance
• Means of verifying the indicators
• Important risks and assumptions
The Logframe Matrix
Project       Indicators of   Means of       Risks and
Structure     performance     verification   Assumptions
Goal

Purpose

Outputs

Activities
A Hierarchy of Objectives
Goal –         greater why
The long-term impact of the project
Purpose – why
What we hope to achieve – the immediate impact of the
  project
Outputs – what
Specific results produced by activities. The TOR &
  deliverables
Activities – how
Units of work undertaken to produce outputs
Objectives should be “SMART

Specific      to avoid differing expectations
Measurable    to monitor and evaluate progress
Appropriate   to the problems, goal & organisation
Realistic     achievable, challenging & meaningful
Time-bound    with a specific time for achievement
Writing good Objectives
1. Use future             Train                      Trained
   completed action to     Activity                    Objective
   describe the
   objective:

2. Use strong action       Strong Verbs         Weak Verbs
   verbs                 Decrease/Increase   Provide
                         Strengthen          Produce
                         Improve             Establish/Create
                         Enhance             Conduct
Defining the Goal
This is the rationale for the project and will
have been defined when the Project
Identification Brief (PIB) was prepared
Check that the goal is:
• Referring to the focal problem identified in the
  problem analysis phase
• Specific to the stakeholder/client group
  concerned
• Written in clear, appropriate terminology
Define the Purpose
What is the intended direct impact and effect of
  the project on:
• The clients or stakeholders?
• The capacity of the staff?
• The service(s) provided by the agency?
• The agencies operating systems or work
  methods?
Identify the Outputs
• This is a summary of the expected
  accomplishments of the project
  Note: the outputs will already have been
  outlined in the Project Identification Brief
• Outputs are a set of necessary conditions that
  must exist or products that have been created to
  achieve the Purpose of the project
Choosing the Activities
• Activities are linked to specific outputs
• The activities are what needs to be done to
  achieve the output
• Activities are usually specific tasks that are
  allocated to individuals or groups
• Activities should be designed having regard to
  the skills and expertise of the agency and
  stakeholders
• Activities should be listed in chronological order
  under each output in the logframe
Check the If/Then Logic
Project Structure

Goal
                           then
Purpose
                    then    if
Outputs
             then    if
Activities
              if
Identify important
            assumptions/risks
• Conditions which are important to the outcome
  of the project but may not be controlled by the
  project
• May be external to the project
• Important to the project success
• Closely related to sustainability issues
Check the If/And/Then Logic
Project      Indicators of   Means of     Risks and
Structure    performance     verification Assumptions
Goal

Purpose

Outputs
                      then
Activities
       If                                      and
Characteristics of Good Indicators
1. Valid: they should actually measure what they
   are supposed to measure
2. Reliable: conclusions based on them should
   be the same if measured by different people at
   different times i.e. they are repeatable
3. Relevant: they should be relevant to the
   project objectives.
Characteristics of Good Indicators
             (continued)
5. Sensitive: they should be sensitive to the
   situation under measurement
6. Cost effective: the results should be worth the
   money, time and effort needed to apply them
7. Timely: data should be able to be collected
   quickly
8. Targeted: they should be specific in terms of
   quantity, quality, target group time & location
Steps in defining the indicators
1. Identify indicator/target group
      “Improve accuracy of Samoan travel documents”
2. Set quantity
      “Reduce processing errors in Samoan travel documents by 95%”
3. Set quality
      “Ensure the error rate in Samoan travel documents is less than 1 in 100
      documents”
4. Set time
      “By the end of 2006 reduce the processing errors in Samoan travel
      documents by 95% to ensure the error rate is less than I in 100”
Define the means of verification
What are the sources of information/data to verify
  outcomes and accomplishments?
These may include:
• Publications;
• Surveys;
• Project notes, minutes, reports and records;
• Photographs, tapes, videos etc.

More Related Content

What's hot

Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework AnalysisJFM Lohith Shetty
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Muthuraj K
 
Policy Monitoring and Evaluation
Policy Monitoring and EvaluationPolicy Monitoring and Evaluation
Policy Monitoring and EvaluationOECD Governance
 
Public Policy - Implementation
Public Policy - ImplementationPublic Policy - Implementation
Public Policy - ImplementationIna Melodias
 
project monitoring and evaluation
 project monitoring and evaluation project monitoring and evaluation
project monitoring and evaluationMir Mosharraf Hosain
 
Performance Management in Public Sector
Performance Management in Public SectorPerformance Management in Public Sector
Performance Management in Public Sectorskazka
 
Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Gus Prakash
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Evaluation Capacity Development
Evaluation Capacity DevelopmentEvaluation Capacity Development
Evaluation Capacity DevelopmentOlivier Serrat
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMichelle Joja
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Changeclearsateam
 
Monitoring And Evaluation
Monitoring And EvaluationMonitoring And Evaluation
Monitoring And EvaluationNick Nyamapfeni
 

What's hot (20)

Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework Analysis
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
 
Policy Monitoring and Evaluation
Policy Monitoring and EvaluationPolicy Monitoring and Evaluation
Policy Monitoring and Evaluation
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Public Policy - Implementation
Public Policy - ImplementationPublic Policy - Implementation
Public Policy - Implementation
 
project monitoring and evaluation
 project monitoring and evaluation project monitoring and evaluation
project monitoring and evaluation
 
Theory of change
Theory of changeTheory of change
Theory of change
 
Performance Management in Public Sector
Performance Management in Public SectorPerformance Management in Public Sector
Performance Management in Public Sector
 
What is a policy?
What is a policy?What is a policy?
What is a policy?
 
Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Evaluation Capacity Development
Evaluation Capacity DevelopmentEvaluation Capacity Development
Evaluation Capacity Development
 
GRB Strategies and Tools
GRB Strategies and Tools GRB Strategies and Tools
GRB Strategies and Tools
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
 
Monitoring And Evaluation
Monitoring And EvaluationMonitoring And Evaluation
Monitoring And Evaluation
 

Viewers also liked

الحكومة الشفافة
الحكومة الشفافةالحكومة الشفافة
الحكومة الشفافةMoamen Abu Nada
 
Project Logframe for planning and administration
Project Logframe for  planning and administrationProject Logframe for  planning and administration
Project Logframe for planning and administrationSudhir Kumar Soam
 
Situational analysis in health care industry
Situational analysis in health care industrySituational analysis in health care industry
Situational analysis in health care industryAbhi Manu
 
critical review of RNTCP
critical review of RNTCPcritical review of RNTCP
critical review of RNTCPAbhi Manu
 
Proposal writing resource the logframe approach
Proposal writing  resource   the logframe approachProposal writing  resource   the logframe approach
Proposal writing resource the logframe approachtccafrica
 
Critical review of idsp
Critical review of idspCritical review of idsp
Critical review of idspAbhi Manu
 
Logical Framework Analysis draft work 1
Logical Framework Analysis draft work 1Logical Framework Analysis draft work 1
Logical Framework Analysis draft work 1Melesse Zenebework
 
Situation analysis of a Health Problem
Situation analysis of a Health Problem Situation analysis of a Health Problem
Situation analysis of a Health Problem Dr. Anees Alyafei
 
RPP PAUD KURIKULUM 2013 PPT
RPP PAUD KURIKULUM 2013 PPT RPP PAUD KURIKULUM 2013 PPT
RPP PAUD KURIKULUM 2013 PPT ILMA NAFIA
 
Situational analysis in health care industry
Situational analysis in health care industrySituational analysis in health care industry
Situational analysis in health care industryAbhi Manu
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysisMoamen Abu Nada
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKMADHUR VERMA
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011photomatt
 

Viewers also liked (15)

الحكومة الشفافة
الحكومة الشفافةالحكومة الشفافة
الحكومة الشفافة
 
Project Logframe for planning and administration
Project Logframe for  planning and administrationProject Logframe for  planning and administration
Project Logframe for planning and administration
 
Situational analysis in health care industry
Situational analysis in health care industrySituational analysis in health care industry
Situational analysis in health care industry
 
M&E of the Malaysian 10th Development plan at the Economic Planning Unit
M&E of the Malaysian 10th Development plan at the Economic Planning UnitM&E of the Malaysian 10th Development plan at the Economic Planning Unit
M&E of the Malaysian 10th Development plan at the Economic Planning Unit
 
critical review of RNTCP
critical review of RNTCPcritical review of RNTCP
critical review of RNTCP
 
Proposal writing resource the logframe approach
Proposal writing  resource   the logframe approachProposal writing  resource   the logframe approach
Proposal writing resource the logframe approach
 
Critical review of idsp
Critical review of idspCritical review of idsp
Critical review of idsp
 
Logical Framework Analysis draft work 1
Logical Framework Analysis draft work 1Logical Framework Analysis draft work 1
Logical Framework Analysis draft work 1
 
Situation analysis of a Health Problem
Situation analysis of a Health Problem Situation analysis of a Health Problem
Situation analysis of a Health Problem
 
RPP PAUD KURIKULUM 2013 PPT
RPP PAUD KURIKULUM 2013 PPT RPP PAUD KURIKULUM 2013 PPT
RPP PAUD KURIKULUM 2013 PPT
 
Situational analysis in health care industry
Situational analysis in health care industrySituational analysis in health care industry
Situational analysis in health care industry
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysis
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Pemetaan kriteria pokja 2
Pemetaan kriteria pokja 2Pemetaan kriteria pokja 2
Pemetaan kriteria pokja 2
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 

Similar to Logical frameworks

7 Themes of Prince2
7 Themes of Prince27 Themes of Prince2
7 Themes of Prince2Barry Hodge
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailBarbara Franks
 
Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3BrianKilpatrick
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project StandardsUjjwal Joshi
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheederKarin Rheeder
 
Project Management Process
Project Management ProcessProject Management Process
Project Management ProcessSaqib Raza
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxGagan331641
 
Developing indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadDeveloping indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadAlo Lacsamana
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices Ali Zeeshan
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedTerje Sæbø
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxANDREANIKKAOCHIA
 

Similar to Logical frameworks (20)

7 Themes of Prince2
7 Themes of Prince27 Themes of Prince2
7 Themes of Prince2
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
 
Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3
 
6396901
63969016396901
6396901
 
Project Management
Project ManagementProject Management
Project Management
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
 
Project management
Project managementProject management
Project management
 
Project Management
Project ManagementProject Management
Project Management
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheeder
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
3 project life cycle
3   project life cycle3   project life cycle
3 project life cycle
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Developing indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadDeveloping indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidad
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expected
 
Topic for Organization and Management 'Planning'
Topic for Organization and Management 'Planning'Topic for Organization and Management 'Planning'
Topic for Organization and Management 'Planning'
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptx
 

Recently uploaded

/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Recently uploaded (20)

/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 

Logical frameworks

  • 1. Developing a Logical Framework Public Sector Improvement Facility Project Resources
  • 2. What is a Logframe? A logical framework (or logframe) is a management tool that assists in project design by clearly stating the key components, how the project is expected to work and how success will be measured
  • 3. What is in a logframe? A logframe is presented as a matrix with: • The project structure (goal, purpose, outputs and activities) • Indicators of performance • Means of verifying the indicators • Important risks and assumptions
  • 4. The Logframe Matrix Project Indicators of Means of Risks and Structure performance verification Assumptions Goal Purpose Outputs Activities
  • 5. A Hierarchy of Objectives Goal – greater why The long-term impact of the project Purpose – why What we hope to achieve – the immediate impact of the project Outputs – what Specific results produced by activities. The TOR & deliverables Activities – how Units of work undertaken to produce outputs
  • 6. Objectives should be “SMART Specific to avoid differing expectations Measurable to monitor and evaluate progress Appropriate to the problems, goal & organisation Realistic achievable, challenging & meaningful Time-bound with a specific time for achievement
  • 7. Writing good Objectives 1. Use future Train Trained completed action to Activity Objective describe the objective: 2. Use strong action Strong Verbs Weak Verbs verbs Decrease/Increase Provide Strengthen Produce Improve Establish/Create Enhance Conduct
  • 8. Defining the Goal This is the rationale for the project and will have been defined when the Project Identification Brief (PIB) was prepared Check that the goal is: • Referring to the focal problem identified in the problem analysis phase • Specific to the stakeholder/client group concerned • Written in clear, appropriate terminology
  • 9. Define the Purpose What is the intended direct impact and effect of the project on: • The clients or stakeholders? • The capacity of the staff? • The service(s) provided by the agency? • The agencies operating systems or work methods?
  • 10. Identify the Outputs • This is a summary of the expected accomplishments of the project Note: the outputs will already have been outlined in the Project Identification Brief • Outputs are a set of necessary conditions that must exist or products that have been created to achieve the Purpose of the project
  • 11. Choosing the Activities • Activities are linked to specific outputs • The activities are what needs to be done to achieve the output • Activities are usually specific tasks that are allocated to individuals or groups • Activities should be designed having regard to the skills and expertise of the agency and stakeholders • Activities should be listed in chronological order under each output in the logframe
  • 12. Check the If/Then Logic Project Structure Goal then Purpose then if Outputs then if Activities if
  • 13. Identify important assumptions/risks • Conditions which are important to the outcome of the project but may not be controlled by the project • May be external to the project • Important to the project success • Closely related to sustainability issues
  • 14. Check the If/And/Then Logic Project Indicators of Means of Risks and Structure performance verification Assumptions Goal Purpose Outputs then Activities If and
  • 15. Characteristics of Good Indicators 1. Valid: they should actually measure what they are supposed to measure 2. Reliable: conclusions based on them should be the same if measured by different people at different times i.e. they are repeatable 3. Relevant: they should be relevant to the project objectives.
  • 16. Characteristics of Good Indicators (continued) 5. Sensitive: they should be sensitive to the situation under measurement 6. Cost effective: the results should be worth the money, time and effort needed to apply them 7. Timely: data should be able to be collected quickly 8. Targeted: they should be specific in terms of quantity, quality, target group time & location
  • 17. Steps in defining the indicators 1. Identify indicator/target group “Improve accuracy of Samoan travel documents” 2. Set quantity “Reduce processing errors in Samoan travel documents by 95%” 3. Set quality “Ensure the error rate in Samoan travel documents is less than 1 in 100 documents” 4. Set time “By the end of 2006 reduce the processing errors in Samoan travel documents by 95% to ensure the error rate is less than I in 100”
  • 18. Define the means of verification What are the sources of information/data to verify outcomes and accomplishments? These may include: • Publications; • Surveys; • Project notes, minutes, reports and records; • Photographs, tapes, videos etc.