RAILPORT DESIGN
1. INFRASTRUCTURE OPERATION & MAINTENANCE:
-OHE (Over Head Electricals) operation and maintenance.
-Signal operation and maintenance.
-Track maintenance.
-Electricity supply for Traction, Signal, Coach and locomotive
maintenance depot area.
LITERATURE STUDY
2. COACH MAINTENANCE :
• Washing Line Operation
• Sick Line Operation
• Watering of coaches
• Pre-cooling and battery charging of coaches in platform lines and washing and
stabling lines.
• Toilet discharge collection facilities
LITERATURE STUDY
3.LOCOMOTIVE OPERATION:
• Fuelling of locomotives
• Locomotive out pit operation and maintenance
• Attaching/detaching locomotive
LITERATURE STUDY
1.TRAIN OPERATION:
• Train reception/Dispatch
• Traction changing
• Placement/removal of coaching rake in/from washing lines
and stabling lines including releasing of rake by TXR
• Shunting operation including loco movement
LITERATURE STUDY
2. Train Services
• Provision for fire extinguishers, stretcher, first aid box to the guard
• Battery store
• Posting of charts and delivery of chart to train conductor
• Feeding of Platform nomination in Coach Guidance system
• Handling of driver /guard boxes
• Electrician’s room
• Switch room
LITERATURE STUDY
3. SECURITY & SAFETY:
• Security of Railway installations
• Crime prevention/control
• Access control systems including passenger check point
• Security surveillance system
• Fire safety
• Luggage & parcel scanners.
• Cloak room
LITERATURE STUDY
4. SUPPORTING SPACES:
• Porting area
• Trolley storage
• Break even equipment
• Main store & sub store
• Waiting areas & halls
• Refreshment rooms
• Public toilets
LITERATURE STUDY
1. INFORMATION SYSTEM:
• Coaching operation Information system
• Coach cabinet office working
• Announcements on Passenger Address (PA) system
• Train Enquiry
LITERATURE STUDY
2. TICKETING/BOOKING:
• Parcel booking
• Unreserved/reserved ticketing
• Luggage booking
• Ticket Checking
• Sorting room
• Room for chief booking surveyor
• Cash
• Stocks
• Office of head ticket collector
LITERATURE STUDY
3. TOURISM & CATERING:
• On-board Catering including base-kitchen and servicing
facilities for onboard catering.
• Bed-roll storage and services to AC
coaches in trains (both originating and terminating).
• Specified catering stalls, book stalls &miscellaneous passenger
related stall in the passenger in the platforms/ concourse area.
• Tourist reception center management
• Yatri Niwas and budget hotels built by railways
• Supply and distribution of bottle drinking water
• Food courts, catering stalls of IRCTC relocated in the
redeveloped station.
• Dispensary
LITERATURE STUDY
LITERATURE STUDY
4. PARCEL ACTIVITES:
• Parcel handling
• Activities of SLR (Seat cum Luggage Rack) lease holders.
• Office& storage for mail service
5. RAILWAY STAFF SERVICE:
• Maintenance and cleaning of railway staff office
• Crew running room management including house keeping,
maintenance & catering.
• Rest rooms for staff, Porters, Ticket collection train drivers &
Guards.
LITERATURE STUDY
LIVE CASE STUDY
LIVE CASE STUDY
CHENNAI CENTRAL
 Coach car washing room (near platforms)
 Washing line (near platforms)
 Sick line (Separate track leading to LOCO)
 Toilet discharge collection (mostly done by workers)
 Over Head Electricals Maintenance ( done manually)
 Signal operation room ( for each platform)
 Railway track maintenance (done manually)
LIVE CASE STUDY
CHENNAI CENTRAL
1. SECURITY SYSTEM:
 CCTV Monitoring rooms (Concourse)
 Bomb squad ( at platform 1 near admin spaces)
 Luggage parcel scanners (Entry check point)
 Cloak room ( waiting areas)
 Police booth ( Entry check point , waiting areas , platform, parking)
2. RAILWAY SERVICES:
 Porting area (concourse level)
 Ladies A/C dormitories (first floor)
 Waiting halls :
1) Concourse level -243 seats
2) Pre paid waiting halls-84 seats attached with toilets
3) First floor- A/c retiring rooms& waiting halls attached with toilets
 Public toilets – 5 IC/ 1 WC / 2 Wash basins ( 2 IC/2WC for physically challenged)
 Shuttle service ( concourse level)
LIVE CASE STUDY
CHENNAI CENTRAL
LIVE CASE STUDY
CHENNAI CENTRAL
3. OTHER SERVICES:
 Fire extinguishers hoes in platforms and at base kitchen
 Train running room
 Electrician’s room
 Switch room
LIVE CASE STUDY
CHENNAI CENTRAL
1.ADMIN: ( Spaces are located in platform no.1)
 Store rooms
 Contractor rooms
 Staff rooms attached with toilets
 Cash chest room
 Catering inspector room
 Loco inspector room
2. PARCEL ACTIVITIES: ( Spaces are located in platform no.1)
 Office & storage rooms for mail service
 Exports despatch counter
LIVE CASE STUDY
CHENNAI CENTRAL
3. CATERING&TOURISM:
 Base kitchen (located in platform 1 with other admin spaces)
 Bed roll section (platform 1 & concourse level)
 Linen section (concourse level)
 Restaurants(concourse level)
 ATM (concourse level)
 Book stalls & exhibition centre (concourse)
 Drinking water taps (platforms , waiting areas)
 Tourist management centre (concourse)
 Public utility cell ( waiting areas)
 Medical shops and Emergency Medical centre (concourse)
LIVE CASE STUDY
CHENNAI CENTRAL
LIVE CASE STUDY
LIVE CASE STUDY
 Signalling room (platform)- end of the platform
 UPS room (concourse level)- adjacent to signalling & telecommunication
room
 Refuse ( ground level)
 Water supply & Drainage system (platform level)
 Chilling cooling plant room ( Ground level)
 Over Track Exhaust shaft (Platform)
LIVE CASE STUDY
 TVS room (Tunnel Ventilation System – on concourse or platform level)
 Tunnel ventilation is provided for the following reasons:
1) Remove the pressure during the operation of train
2) Removal of smoke during fire
3) Ventilation during maintenance period
4) For smoke free evacuation
 Tunnel ventilation exhaust shaft ( a shaft provided at the each end of the
station from ground to concourse level)
 Tunnel ventilation supply shaft ( a shaft provided at the each end of the
station from ground to concourse level)
 Mechanical Equipment room ( TVS control, AHU room – concourse level)
LIVE CASE STUDY
 Station control room (concourse level)-accessible from the non paid area
 Ticketing room (concourse level)
 Ticket store room (concourse level)
 Audit & cash room (concourse level)
 Public toilets (concourse level , platforms)
 Janitor’s room ( attached to toilets)
 Lunch room ( with other admin spaces)
 Staff toilets ( concourse level)
 Tele communication (concourse level near station control room)
LIVE CASE STUDY
 Entry check point (concourse level)
 AFC gates (Auto Fare Collection gates – located adjacent to ticket counters)
 Automatic Vending machine ( concourse and platform level)
 Ticket Vending machine ( un paid area)
 ATM (concourse level , platform level)
 Firemen emergency staircase ( 4 staircases with toilets in central metro)

Literature study

  • 1.
  • 2.
    1. INFRASTRUCTURE OPERATION& MAINTENANCE: -OHE (Over Head Electricals) operation and maintenance. -Signal operation and maintenance. -Track maintenance. -Electricity supply for Traction, Signal, Coach and locomotive maintenance depot area. LITERATURE STUDY
  • 3.
    2. COACH MAINTENANCE: • Washing Line Operation • Sick Line Operation • Watering of coaches • Pre-cooling and battery charging of coaches in platform lines and washing and stabling lines. • Toilet discharge collection facilities LITERATURE STUDY
  • 4.
    3.LOCOMOTIVE OPERATION: • Fuellingof locomotives • Locomotive out pit operation and maintenance • Attaching/detaching locomotive LITERATURE STUDY
  • 5.
    1.TRAIN OPERATION: • Trainreception/Dispatch • Traction changing • Placement/removal of coaching rake in/from washing lines and stabling lines including releasing of rake by TXR • Shunting operation including loco movement LITERATURE STUDY
  • 6.
    2. Train Services •Provision for fire extinguishers, stretcher, first aid box to the guard • Battery store • Posting of charts and delivery of chart to train conductor • Feeding of Platform nomination in Coach Guidance system • Handling of driver /guard boxes • Electrician’s room • Switch room LITERATURE STUDY
  • 7.
    3. SECURITY &SAFETY: • Security of Railway installations • Crime prevention/control • Access control systems including passenger check point • Security surveillance system • Fire safety • Luggage & parcel scanners. • Cloak room LITERATURE STUDY
  • 8.
    4. SUPPORTING SPACES: •Porting area • Trolley storage • Break even equipment • Main store & sub store • Waiting areas & halls • Refreshment rooms • Public toilets LITERATURE STUDY
  • 9.
    1. INFORMATION SYSTEM: •Coaching operation Information system • Coach cabinet office working • Announcements on Passenger Address (PA) system • Train Enquiry LITERATURE STUDY
  • 10.
    2. TICKETING/BOOKING: • Parcelbooking • Unreserved/reserved ticketing • Luggage booking • Ticket Checking • Sorting room • Room for chief booking surveyor • Cash • Stocks • Office of head ticket collector LITERATURE STUDY
  • 11.
    3. TOURISM &CATERING: • On-board Catering including base-kitchen and servicing facilities for onboard catering. • Bed-roll storage and services to AC coaches in trains (both originating and terminating). • Specified catering stalls, book stalls &miscellaneous passenger related stall in the passenger in the platforms/ concourse area. • Tourist reception center management • Yatri Niwas and budget hotels built by railways • Supply and distribution of bottle drinking water • Food courts, catering stalls of IRCTC relocated in the redeveloped station. • Dispensary LITERATURE STUDY
  • 12.
  • 13.
    4. PARCEL ACTIVITES: •Parcel handling • Activities of SLR (Seat cum Luggage Rack) lease holders. • Office& storage for mail service 5. RAILWAY STAFF SERVICE: • Maintenance and cleaning of railway staff office • Crew running room management including house keeping, maintenance & catering. • Rest rooms for staff, Porters, Ticket collection train drivers & Guards. LITERATURE STUDY
  • 14.
  • 15.
    LIVE CASE STUDY CHENNAICENTRAL  Coach car washing room (near platforms)  Washing line (near platforms)  Sick line (Separate track leading to LOCO)  Toilet discharge collection (mostly done by workers)  Over Head Electricals Maintenance ( done manually)  Signal operation room ( for each platform)  Railway track maintenance (done manually)
  • 16.
    LIVE CASE STUDY CHENNAICENTRAL 1. SECURITY SYSTEM:  CCTV Monitoring rooms (Concourse)  Bomb squad ( at platform 1 near admin spaces)  Luggage parcel scanners (Entry check point)  Cloak room ( waiting areas)  Police booth ( Entry check point , waiting areas , platform, parking)
  • 17.
    2. RAILWAY SERVICES: Porting area (concourse level)  Ladies A/C dormitories (first floor)  Waiting halls : 1) Concourse level -243 seats 2) Pre paid waiting halls-84 seats attached with toilets 3) First floor- A/c retiring rooms& waiting halls attached with toilets  Public toilets – 5 IC/ 1 WC / 2 Wash basins ( 2 IC/2WC for physically challenged)  Shuttle service ( concourse level) LIVE CASE STUDY CHENNAI CENTRAL
  • 18.
    LIVE CASE STUDY CHENNAICENTRAL 3. OTHER SERVICES:  Fire extinguishers hoes in platforms and at base kitchen  Train running room  Electrician’s room  Switch room
  • 19.
    LIVE CASE STUDY CHENNAICENTRAL 1.ADMIN: ( Spaces are located in platform no.1)  Store rooms  Contractor rooms  Staff rooms attached with toilets  Cash chest room  Catering inspector room  Loco inspector room 2. PARCEL ACTIVITIES: ( Spaces are located in platform no.1)  Office & storage rooms for mail service  Exports despatch counter
  • 20.
    LIVE CASE STUDY CHENNAICENTRAL 3. CATERING&TOURISM:  Base kitchen (located in platform 1 with other admin spaces)  Bed roll section (platform 1 & concourse level)  Linen section (concourse level)  Restaurants(concourse level)  ATM (concourse level)  Book stalls & exhibition centre (concourse)  Drinking water taps (platforms , waiting areas)  Tourist management centre (concourse)  Public utility cell ( waiting areas)  Medical shops and Emergency Medical centre (concourse)
  • 21.
  • 22.
  • 23.
    LIVE CASE STUDY Signalling room (platform)- end of the platform  UPS room (concourse level)- adjacent to signalling & telecommunication room  Refuse ( ground level)  Water supply & Drainage system (platform level)  Chilling cooling plant room ( Ground level)  Over Track Exhaust shaft (Platform)
  • 24.
    LIVE CASE STUDY TVS room (Tunnel Ventilation System – on concourse or platform level)  Tunnel ventilation is provided for the following reasons: 1) Remove the pressure during the operation of train 2) Removal of smoke during fire 3) Ventilation during maintenance period 4) For smoke free evacuation  Tunnel ventilation exhaust shaft ( a shaft provided at the each end of the station from ground to concourse level)  Tunnel ventilation supply shaft ( a shaft provided at the each end of the station from ground to concourse level)  Mechanical Equipment room ( TVS control, AHU room – concourse level)
  • 26.
    LIVE CASE STUDY Station control room (concourse level)-accessible from the non paid area  Ticketing room (concourse level)  Ticket store room (concourse level)  Audit & cash room (concourse level)  Public toilets (concourse level , platforms)  Janitor’s room ( attached to toilets)  Lunch room ( with other admin spaces)  Staff toilets ( concourse level)  Tele communication (concourse level near station control room)
  • 27.
    LIVE CASE STUDY Entry check point (concourse level)  AFC gates (Auto Fare Collection gates – located adjacent to ticket counters)  Automatic Vending machine ( concourse and platform level)  Ticket Vending machine ( un paid area)  ATM (concourse level , platform level)  Firemen emergency staircase ( 4 staircases with toilets in central metro)