Awanish Shukla
Vision
To construct the nations’ metro rail services in most efficient
manner with the aim to be the largest company to do such.

Mission
Providing construction in the metro rail arena with quality
assurance and with the economic construction aim; the
company seeks to be specialized in metro rail services.
CERTIFICATE
 Company Started

:

Year 1980

 Current situation

:

EPC company

 Specialized in

:

Metro Rails construction

 Total Company value

:

INR 2000 crores

 Assets status

:

500 crores (Highest in India)

 Head office

:

Mumbai
Human Resources

 15000 permanent employee.
 6000 qualified Engineers.
 200 Registered supplier, subcontractor, labour
contractors.
Projects completed
 Phase 1 & 2 of Delhi Metro rail (Dec. 2002).

 Kolkata Metro (Oct.1984).

Projects in progress
 Riyadh Metro.
 Hyderabad Metro.
 Banglore Metro.
Balance sheet for last five years
NSE
52 WK

BSE

LOW/HIGH 677.15/1138.33

LOW/HIGH 678.10/1138.33

Mar '13

Mar '12

Mar '11

Mar '10

Mar '09

12 mths

12 mths

12 mths

12 mths

12 mths

Total Share Capital

123.08

122.48

121.77

120.44

117.14

Equity Share Capital

123.08

122.48

121.77

120.44

117.14

Share Application Money

0.00

0.00

0.00

25.09

0.00

Preference Share Capital

0.00

0.00

0.00

0.00

0.00

25,100.54
21,724.49
18,142.82
------------------- in Rs. Cr. -------------------

12,317.96

Balance sheet for aas c&t
In crores

Sources Of Funds

Reserves

Balance Sheet of AAS

Revaluation Reserves

29,019.64
0.00

0.00

0.00

23.29

24.59

29,142.72

25,223.02

21,846.26

18,311.64

12,459.69

Secured Loans

1,234.01

1,453.34

1,063.04

955.73

1,102.38

Unsecured Loans

6,771.55

6,813.44

5,268.54

5,845.10

5,453.65

Total Debt

8,005.56

8,266.78

6,331.58

6,800.83

6,556.03

37,148.28

33,489.80

28,177.84

25,112.47

19,015.72

Mar '13

Mar '12

Mar '11

Mar '10

Mar '09

Networth

Total Liabilities
Quotation for this Project

 10% profit of the approximate project
cost.
 Contract type – EPC contract Final
quotation will be negotiable.
In Station Planning our company AAS C & T is core competent.
 The Stations being windows to the metro service are

tastefully designed reflecting local culture and flavour,
functional aesthetics, user friendly, energy efficient and with a
station architecture that is site specific and environmentally
compatible.
 The design identifies significant architectural features
which should be taken into account. Along with a responsive
design stations offer various facilities for the passengers.
 Stations will be covered by an overlapping roofing system,
open at sides, covering the platform, staircases & escalators
designed based on architectural elements and functional
aspects.
 The

layout of the stations is influenced by the track
geometry, operational requirements, predicted passenger flows,
ROW availability and electrical & mechanical requirements.
 The station is divided into public & non-public areas (areas
where access is restricted).
 Architectural planning, also indicates, State of art, Railway
engineering equipment's installations at station concourse level
for smooth Metro Rail operations and Passenger Safety.

 Station Manager is located at convenient place with ease of
access, if any passenger desire instant helps.
 Security of the commuter is a major concern and focus has been to
provide advanced equipment for security of commuters shall be
provided at each station like baggage screening devices, hand held
devises, CCTV monitoring, access control system etc.
 First aid medical assistance is being provided at concourse level at all
stations.
 Station planning is influenced by normal passenger flow and
emergency evacuation scenario.
 All required lifesaving facilities are being provided at stations, viz.,
fire protection, emergency lighting and signages, PA and PIDS, auto
opening of ticketing gates, sizing of the staircases etc., as per relevant
standards
Signages are designed, with instant message transfer
to passengers, from street level guiding at concourse
level to platform level.
 Ticketing Counters/Booths have been provided at all Stations along
with Ticket Vending Machines making ticketing process simpler and
faster.
 Pedestrian facilities from the road to the concourse/car park and/or
to the ticket counters and back shall have been provided to enable
unhindered smooth flow of pedestrians using the Metro and making
the commuting experience comfortable.
 Toilets are provided separate for male and female and for disabled
and normal passengers.
 Facilities for disabled are provided.

 Facility of vending mineral water, cool drinks, coffee and tea shall be
provided at all Stations.
 Our Company AAS_C & T Ltd. Is core competent
enough in this section of metro railway projects.
 Company is interested to take the project given
by client.
Metro project

More Related Content

What's hot

Mattuthavani bus terminal case study
Mattuthavani bus terminal  case studyMattuthavani bus terminal  case study
Mattuthavani bus terminal case study
Abinaya Ramakrishnan
 
INDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETINGINDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETING
AMAR ID
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Asitha Jagoda Arachchi
 
vaithilingam RESUME (1)
vaithilingam RESUME (1)vaithilingam RESUME (1)
vaithilingam RESUME (1)
Vaithi Lingam
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9
simrc
 
Chennai mofussil bus terminal
Chennai mofussil bus terminalChennai mofussil bus terminal
Chennai mofussil bus terminal
Shivang Madaan
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
hrudai11
 
Vihar Inauguration
Vihar InaugurationVihar Inauguration
Vihar Inauguration
Scott Rains
 
Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
Palak Khandelwal
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
Akshey Sharma
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
Sumit Ranjan
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
IRJET Journal
 
Ici final project
Ici final projectIci final project
Ici final project
Lee Jian Ru
 
BIMI Overview
BIMI OverviewBIMI Overview
BIMI Overview
Lael OLAYINKA
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
Ar. Prerna Chouhan
 
Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016
Mohamed Yasser
 
Bus priority lane and transportation hub at Moratuwa
Bus priority lane and transportation hub at MoratuwaBus priority lane and transportation hub at Moratuwa
Bus priority lane and transportation hub at Moratuwa
Praneeth Prabodha Dissanayaka, MILT
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
Avtansh Ghai
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
Tuhina Chatterjee
 
Bus terminal
Bus terminal Bus terminal
Bus terminal
Self-employed
 

What's hot (20)

Mattuthavani bus terminal case study
Mattuthavani bus terminal  case studyMattuthavani bus terminal  case study
Mattuthavani bus terminal case study
 
INDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETINGINDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETING
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
 
vaithilingam RESUME (1)
vaithilingam RESUME (1)vaithilingam RESUME (1)
vaithilingam RESUME (1)
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9
 
Chennai mofussil bus terminal
Chennai mofussil bus terminalChennai mofussil bus terminal
Chennai mofussil bus terminal
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
 
Vihar Inauguration
Vihar InaugurationVihar Inauguration
Vihar Inauguration
 
Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
 
Ici final project
Ici final projectIci final project
Ici final project
 
BIMI Overview
BIMI OverviewBIMI Overview
BIMI Overview
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016
 
Bus priority lane and transportation hub at Moratuwa
Bus priority lane and transportation hub at MoratuwaBus priority lane and transportation hub at Moratuwa
Bus priority lane and transportation hub at Moratuwa
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
Bus terminal
Bus terminal Bus terminal
Bus terminal
 

Similar to Metro project

IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations   IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET Journal
 
About SakiNaka Elevated Metro Station in Mumbai.pdf
About SakiNaka Elevated Metro Station in Mumbai.pdfAbout SakiNaka Elevated Metro Station in Mumbai.pdf
About SakiNaka Elevated Metro Station in Mumbai.pdf
yamunaNMH
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
Shiv Mohan CEng, PMP, PGDBA ,MIRSE,MIEEE,MIET
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
Rohit kumar nagar
 
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
IRJET Journal
 
Its
ItsIts
Autonomous bus
Autonomous busAutonomous bus
Autonomous bus
Jun Steed Huang
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
IRJET Journal
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET Journal
 
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLESPROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
ijiert bestjournal
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
Kunal Bhadane
 
Metro Infrastructure Design Consulting Company in India
Metro Infrastructure Design Consulting Company in IndiaMetro Infrastructure Design Consulting Company in India
Metro Infrastructure Design Consulting Company in India
Consulting Engineers Group Ltd
 
RDSO CHAHAT.pdf
RDSO CHAHAT.pdfRDSO CHAHAT.pdf
RDSO CHAHAT.pdf
AbhishekChauhan510107
 
AUTOMATED RAILWAY MONITORING SYSTEM
AUTOMATED RAILWAY MONITORING SYSTEMAUTOMATED RAILWAY MONITORING SYSTEM
AUTOMATED RAILWAY MONITORING SYSTEM
IRJET Journal
 
Dubai metro
Dubai metroDubai metro
Dubai metro
Zulfiqar Ali
 
Introduction
IntroductionIntroduction
Introduction
Laxmi Reddy
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
Himanshu Garg
 
Feetf
FeetfFeetf
Feetf
Sid Art
 
Esert the complete system design to make railway traffic effective, safer a...
Esert   the complete system design to make railway traffic effective, safer a...Esert   the complete system design to make railway traffic effective, safer a...
Esert the complete system design to make railway traffic effective, safer a...
eSAT Journals
 
IRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway PlatformIRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway Platform
IRJET Journal
 

Similar to Metro project (20)

IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations   IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations
 
About SakiNaka Elevated Metro Station in Mumbai.pdf
About SakiNaka Elevated Metro Station in Mumbai.pdfAbout SakiNaka Elevated Metro Station in Mumbai.pdf
About SakiNaka Elevated Metro Station in Mumbai.pdf
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
IRJET- Railway Platform based on PLC Circuit for Physically Challenged People...
 
Its
ItsIts
Its
 
Autonomous bus
Autonomous busAutonomous bus
Autonomous bus
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLESPROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
Metro Infrastructure Design Consulting Company in India
Metro Infrastructure Design Consulting Company in IndiaMetro Infrastructure Design Consulting Company in India
Metro Infrastructure Design Consulting Company in India
 
RDSO CHAHAT.pdf
RDSO CHAHAT.pdfRDSO CHAHAT.pdf
RDSO CHAHAT.pdf
 
AUTOMATED RAILWAY MONITORING SYSTEM
AUTOMATED RAILWAY MONITORING SYSTEMAUTOMATED RAILWAY MONITORING SYSTEM
AUTOMATED RAILWAY MONITORING SYSTEM
 
Dubai metro
Dubai metroDubai metro
Dubai metro
 
Introduction
IntroductionIntroduction
Introduction
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
Feetf
FeetfFeetf
Feetf
 
Esert the complete system design to make railway traffic effective, safer a...
Esert   the complete system design to make railway traffic effective, safer a...Esert   the complete system design to make railway traffic effective, safer a...
Esert the complete system design to make railway traffic effective, safer a...
 
IRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway PlatformIRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway Platform
 

More from Awanish Shukla

Case study on small firm
Case study on small firmCase study on small firm
Case study on small firm
Awanish Shukla
 
Mass housing
Mass housingMass housing
Mass housing
Awanish Shukla
 
Green building challenges
Green building challengesGreen building challenges
Green building challenges
Awanish Shukla
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Awanish Shukla
 
Water auditing
Water auditingWater auditing
Water auditing
Awanish Shukla
 
Kuwait oil field
Kuwait oil fieldKuwait oil field
Kuwait oil field
Awanish Shukla
 
Global warming
Global warmingGlobal warming
Global warming
Awanish Shukla
 
Swot analysis of delhi cwg project & melbourne
Swot analysis of delhi cwg project & melbourneSwot analysis of delhi cwg project & melbourne
Swot analysis of delhi cwg project & melbourne
Awanish Shukla
 
Concrete bag selling consept....
Concrete bag selling consept....Concrete bag selling consept....
Concrete bag selling consept....
Awanish Shukla
 
Project ppt guide shri a.n.dabhade sir 1
Project ppt guide  shri a.n.dabhade sir 1Project ppt guide  shri a.n.dabhade sir 1
Project ppt guide shri a.n.dabhade sir 1
Awanish Shukla
 

More from Awanish Shukla (10)

Case study on small firm
Case study on small firmCase study on small firm
Case study on small firm
 
Mass housing
Mass housingMass housing
Mass housing
 
Green building challenges
Green building challengesGreen building challenges
Green building challenges
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Water auditing
Water auditingWater auditing
Water auditing
 
Kuwait oil field
Kuwait oil fieldKuwait oil field
Kuwait oil field
 
Global warming
Global warmingGlobal warming
Global warming
 
Swot analysis of delhi cwg project & melbourne
Swot analysis of delhi cwg project & melbourneSwot analysis of delhi cwg project & melbourne
Swot analysis of delhi cwg project & melbourne
 
Concrete bag selling consept....
Concrete bag selling consept....Concrete bag selling consept....
Concrete bag selling consept....
 
Project ppt guide shri a.n.dabhade sir 1
Project ppt guide  shri a.n.dabhade sir 1Project ppt guide  shri a.n.dabhade sir 1
Project ppt guide shri a.n.dabhade sir 1
 

Recently uploaded

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
sayalidalavi006
 

Recently uploaded (20)

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
 

Metro project

  • 1. ACM-27 Section-IV | Group- IX Awanish Shukla
  • 2. Vision To construct the nations’ metro rail services in most efficient manner with the aim to be the largest company to do such. Mission Providing construction in the metro rail arena with quality assurance and with the economic construction aim; the company seeks to be specialized in metro rail services.
  • 4.  Company Started : Year 1980  Current situation : EPC company  Specialized in : Metro Rails construction  Total Company value : INR 2000 crores  Assets status : 500 crores (Highest in India)  Head office : Mumbai
  • 5. Human Resources  15000 permanent employee.  6000 qualified Engineers.  200 Registered supplier, subcontractor, labour contractors.
  • 6. Projects completed  Phase 1 & 2 of Delhi Metro rail (Dec. 2002).  Kolkata Metro (Oct.1984). Projects in progress  Riyadh Metro.  Hyderabad Metro.  Banglore Metro.
  • 7.
  • 8.
  • 9. Balance sheet for last five years NSE 52 WK BSE LOW/HIGH 677.15/1138.33 LOW/HIGH 678.10/1138.33 Mar '13 Mar '12 Mar '11 Mar '10 Mar '09 12 mths 12 mths 12 mths 12 mths 12 mths Total Share Capital 123.08 122.48 121.77 120.44 117.14 Equity Share Capital 123.08 122.48 121.77 120.44 117.14 Share Application Money 0.00 0.00 0.00 25.09 0.00 Preference Share Capital 0.00 0.00 0.00 0.00 0.00 25,100.54 21,724.49 18,142.82 ------------------- in Rs. Cr. ------------------- 12,317.96 Balance sheet for aas c&t In crores Sources Of Funds Reserves Balance Sheet of AAS Revaluation Reserves 29,019.64 0.00 0.00 0.00 23.29 24.59 29,142.72 25,223.02 21,846.26 18,311.64 12,459.69 Secured Loans 1,234.01 1,453.34 1,063.04 955.73 1,102.38 Unsecured Loans 6,771.55 6,813.44 5,268.54 5,845.10 5,453.65 Total Debt 8,005.56 8,266.78 6,331.58 6,800.83 6,556.03 37,148.28 33,489.80 28,177.84 25,112.47 19,015.72 Mar '13 Mar '12 Mar '11 Mar '10 Mar '09 Networth Total Liabilities
  • 10. Quotation for this Project  10% profit of the approximate project cost.  Contract type – EPC contract Final quotation will be negotiable.
  • 11. In Station Planning our company AAS C & T is core competent.  The Stations being windows to the metro service are tastefully designed reflecting local culture and flavour, functional aesthetics, user friendly, energy efficient and with a station architecture that is site specific and environmentally compatible.  The design identifies significant architectural features which should be taken into account. Along with a responsive design stations offer various facilities for the passengers.  Stations will be covered by an overlapping roofing system, open at sides, covering the platform, staircases & escalators designed based on architectural elements and functional aspects.
  • 12.  The layout of the stations is influenced by the track geometry, operational requirements, predicted passenger flows, ROW availability and electrical & mechanical requirements.  The station is divided into public & non-public areas (areas where access is restricted).  Architectural planning, also indicates, State of art, Railway engineering equipment's installations at station concourse level for smooth Metro Rail operations and Passenger Safety.  Station Manager is located at convenient place with ease of access, if any passenger desire instant helps.
  • 13.  Security of the commuter is a major concern and focus has been to provide advanced equipment for security of commuters shall be provided at each station like baggage screening devices, hand held devises, CCTV monitoring, access control system etc.  First aid medical assistance is being provided at concourse level at all stations.  Station planning is influenced by normal passenger flow and emergency evacuation scenario.  All required lifesaving facilities are being provided at stations, viz., fire protection, emergency lighting and signages, PA and PIDS, auto opening of ticketing gates, sizing of the staircases etc., as per relevant standards
  • 14. Signages are designed, with instant message transfer to passengers, from street level guiding at concourse level to platform level.
  • 15.  Ticketing Counters/Booths have been provided at all Stations along with Ticket Vending Machines making ticketing process simpler and faster.  Pedestrian facilities from the road to the concourse/car park and/or to the ticket counters and back shall have been provided to enable unhindered smooth flow of pedestrians using the Metro and making the commuting experience comfortable.  Toilets are provided separate for male and female and for disabled and normal passengers.  Facilities for disabled are provided.  Facility of vending mineral water, cool drinks, coffee and tea shall be provided at all Stations.
  • 16.  Our Company AAS_C & T Ltd. Is core competent enough in this section of metro railway projects.  Company is interested to take the project given by client.