The document describes steps for constructing a process flowchart: 1) Determine boundaries by identifying the start and end of the process. 2) List the steps using verbs. 3) Sequence the steps. 4) Draw symbols including ovals, boxes, arrows, and diamonds. 5) Take a system model approach by including inputs, processes, outputs, controls, and feedback. 6) Include pertinent information and use titles/dates. 7) Finalize the flowchart by checking for completeness and consensus.