Enabling and
sustaining performance
Learning | Development | Consulting
L&D design ....L&D design ....
an ART and a SCIENCE
Learning | Development | Consulting
At JSB we believe that L&D
design is both an art
Learning | Development | Consulting
At JSB we believe that L&D
design is both an art...
and a science
Learning | Development | Consulting
L&D designers therefore need
to demonstrate
innovation
Learning | Development | Consulting
innovation precision
L&D designers therefore need
to demonstrate
in all they do
So what exactly is the role
of the L&D designer?
Learning | Development | Consulting
And what are the
for fulfilling this role?
requirements
So what exactly is the role
of the L&D designer?
Learning | Development | Consulting
World of the L&D
designer
Welcome to the
Learning | Development | Consulting
The ART of L&D
design
Learning | Development | Consulting
The ART of L&D Design
Learning | Development | Consulting
The artistic side of designing an L&D
intervention comes in the form of
creating learning journeys that
• Combine creative
thinking in the design
and delivery process
creative
the design
y process
• Draw on
and tested
practice
• Blend complementary
and innovative learning
methodologies
The ART of L&D Design
Learning | Development | Consulting
The artistic side of designing an L&D
intervention comes in the form of
creating learning journeys that
plementary
ve learning
es
• Meet the
styles of al
• Draw on rigorous
and tested best
practice
The ART of L&D Design
Learning | Development | Consulting
The artistic side of designing an L&D
intervention comes in the form of
creating learning journeys that
rigorous
best
The ART of L&D Design
Learning | Development | Consulting
The artistic side of designing an L&D
intervention comes in the form of
creating learning journeys that
• Meet the learning
styles of all...
rigorous
best
The ART of L&D Design
Learning | Development | Consulting
The artistic side of designing an L&D
intervention comes in the form of
creating learning journeys that
including Generation Y and I
• Meet the learning
styles of all...
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Pre- and post-module
activity to build
momentum
and engage
1
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Action learning and
work-based projects
2
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Surgery practices &
discussions that have
direct relevance to
employees’ roles
3
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Make sure you
keep it real
4
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Experiential activities,
games and
simulations to
engage and have fun
5
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Ensure you make it
memorable
6
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Self-awareness
profiling –
‘ah ha’ moments
(THOSE CRITITAL INSIGHTS INTO
HOW YOU ARE PERCEIVED)
7
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Impact presentations
to focus the mind and
to embed the learning
8
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Practical real-life
activities
9
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Practical real-life
activities
9Case studies, exercises,
real-play practices, coaching
The ART of L&D Design
Learning | Development | Consulting
Innovative design will combine activities:
Practical toolkits to
take away and use
10
The ART of L&D Design
Learning | Development | Consulting
Last, but certainly not least,
innovative design will call upon
11 ?
The ART of L&D Design
Learning | Development | Consulting
11Technology
Enhanced
Learning
The ART of L&D Design
Learning | Development | Consulting
11Technology
Enhanced
Learning
The key
to our
future?
• We cannot escape technology –
we use it every day to communicate
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
• We cannot escape technology –
we use it every day to communicate
• Why should the design and delivery of
workplace learning be any different?
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
• We do not expect – or want – technology
to replace face to face learning
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
• We do not expect – or want – technology
to replace face to face learning
• But we could be integrating it more into
our learning solutions
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
• Leveraging social media – retaining connectivity
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
• Leveraging social media – retaining connectivity
• Accessing and integrating e-books
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
• Leveraging social media – retaining connectivity
• Accessing and integrating e-books
• Making use of compelling video
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
• Leveraging social media – retaining connectivity
• Accessing and integrating e-books
• Making use of compelling video
• Utilising apps
Learning | Development | Consulting
The learning experience can certainly be
enhanced by:
The ART of L&D Design
Technology enhanced learning – the key to our future?
• Creating e-learning
• Designing virtual classrooms
• Developing webinars
• Leveraging social media – retaining connectivity
• Accessing and integrating e-books
• Making use of compelling video
• Utilising apps
• Creating simulations
Learning | Development | Consulting
Here are some important points to consider in your
technology enhanced learning:
The ART of L&D Design
Technology enhanced learning – the key to our future?
Learning | Development | Consulting
Here are some important points to consider in your
technology enhanced learning:
The ART of L&D Design
Technology enhanced learning – the key to our future?
1. Choose the right tool for the learning context
Learning | Development | Consulting
Here are some important points to consider in your
technology enhanced learning:
The ART of L&D Design
Technology enhanced learning – the key to our future?
1. Choose the right tool for the learning contex
2.	 Engage participants – match the content
delivery method to suit learning styles
and preferences
Learning | Development | Consulting
Here are some important points to consider in your
technology enhanced learning:
The ART of L&D Design
Technology enhanced learning – the key to our future?
1. Choose the right tool for the learning contex
2.	 Engage participants – match the content
delivery method to suit learning styles
and preferences
3. Ensure a balance of challenge and support
The SCIENCE
of L&D design
Learning | Development | Consulting
The Science of L&D Design
Learning | Development | Consulting
If all that covers the innovative and engaging side
of L&D …
The Science of L&D Design
Learning | Development | Consulting
If all that covers the innovative and engaging side
of L&D …
we now need to focus on the ‘science’ behind
a successful learning and development
programme
The Science of L&D Design
Learning | Development | Consulting
Before design begins...
The Science of L&D Design
Learning | Development | Consulting
you need to work through the
DEFINE and DISCOVER
phase
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
• The scope
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
• The scope
• A clear project plan
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
• The scope
• A clear project plan
• Milestones
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
• The scope
• A clear project plan
• Milestones
• Outcomes
Learning | Development | Consulting
The Science of L&D Design
DEFINE...
• The scope
• A clear project plan
• Milestones
• Outcomes
• and measurements
Learning | Development | Consulting
The Science of L&D Design
DISCOVER...
Learning | Development | Consulting
The Science of L&D Design
DISCOVER...
Exactly what you want to achieve
Learning | Development | Consulting
The Science of L&D Design
DISCOVER...
Exactly what you want to achieve
Who your target group is, and what they
really need
Learning | Development | Consulting
The Science of L&D Design
DISCOVER...
Exactly what you want to achieve
Who your target group is, and what they
really need
... and what is the best way to engage them?
Learning | Development | Consulting
The Science of L&D Design
You can get these answers through
Learning | Development | Consulting
The Science of L&D Design
• Enquiry
You can get these answers through
Learning | Development | Consulting
The Science of L&D Design
• Enquiry
• Interview
You can get these answers through
Learning | Development | Consulting
The Science of L&D Design
• Enquiry
• Interview
• Psychometrics
You can get these answers through
Learning | Development | Consulting
The Science of L&D Design
• Enquiry
• Interview
• Psychometrics
• and discussion
You can get these answers through
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Align with and drive the
organisational strategy
•
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Align with and drive the
organisational strategy
Engage all stakeholders from the outset
•
•
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Align with and drive the
organisational strategy
Engage all stakeholders from the outset
Be of value to the client/stakeholders –
and drive their measures
•
•
•
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Drive immediate learning transfer•
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Drive immediate learning transfer
Be well planned and project managed
at every stage
•
•
The Science of L&D Design
Learning | Development | Consulting
L&D learning journeys need to:
Drive immediate learning transfer
Be well planned and project managed
at every stage
Deliver measurable and reportable
value
•
•
•
Blending the art
and the science
Learning | Development | Consulting
Blending the art and the science
Learning | Development | Consulting
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
Blending the art and the science
Learning | Development | Consulting
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
PracticalPracticalPractical
Blending the art and the science
Learning | Development | Consulting
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
- Practical
RelevantRelevantRelevant
Blending the art and the science
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
- Practical
- Relevant
MeasurableMeasurableMeasurable
Learning | Development | Consulting
Blending the art and the science
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
- Practical
- Relevant
Immediately
transferable
- Measurable
Immediately
transferable
Immediately
transferable
Learning | Development | Consulting
Blending the art and the science
If you deftly combine the art and science of
your Learning and Development, you will
have created a learning journey that is:
- Practical
- Relevant
- Measurable
- Immediately transferable
Learning | Development | Consulting
We have so much more
to share with you
Get in touch with JSB
for further insights
www.jsbonline.com/about/approach
Learning | Development | Consulting

L&D Design... and Art and a Science

  • 1.
    Enabling and sustaining performance Learning| Development | Consulting L&D design ....L&D design .... an ART and a SCIENCE
  • 2.
    Learning | Development| Consulting At JSB we believe that L&D design is both an art
  • 3.
    Learning | Development| Consulting At JSB we believe that L&D design is both an art... and a science
  • 4.
    Learning | Development| Consulting L&D designers therefore need to demonstrate innovation
  • 5.
    Learning | Development| Consulting innovation precision L&D designers therefore need to demonstrate in all they do
  • 6.
    So what exactlyis the role of the L&D designer? Learning | Development | Consulting
  • 7.
    And what arethe for fulfilling this role? requirements So what exactly is the role of the L&D designer? Learning | Development | Consulting
  • 8.
    World of theL&D designer Welcome to the Learning | Development | Consulting
  • 9.
    The ART ofL&D design Learning | Development | Consulting
  • 10.
    The ART ofL&D Design Learning | Development | Consulting The artistic side of designing an L&D intervention comes in the form of creating learning journeys that • Combine creative thinking in the design and delivery process
  • 11.
    creative the design y process •Draw on and tested practice • Blend complementary and innovative learning methodologies The ART of L&D Design Learning | Development | Consulting The artistic side of designing an L&D intervention comes in the form of creating learning journeys that
  • 12.
    plementary ve learning es • Meetthe styles of al • Draw on rigorous and tested best practice The ART of L&D Design Learning | Development | Consulting The artistic side of designing an L&D intervention comes in the form of creating learning journeys that
  • 13.
    rigorous best The ART ofL&D Design Learning | Development | Consulting The artistic side of designing an L&D intervention comes in the form of creating learning journeys that • Meet the learning styles of all...
  • 14.
    rigorous best The ART ofL&D Design Learning | Development | Consulting The artistic side of designing an L&D intervention comes in the form of creating learning journeys that including Generation Y and I • Meet the learning styles of all...
  • 15.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Pre- and post-module activity to build momentum and engage 1
  • 16.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Action learning and work-based projects 2
  • 17.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Surgery practices & discussions that have direct relevance to employees’ roles 3
  • 18.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Make sure you keep it real 4
  • 19.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Experiential activities, games and simulations to engage and have fun 5
  • 20.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Ensure you make it memorable 6
  • 21.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Self-awareness profiling – ‘ah ha’ moments (THOSE CRITITAL INSIGHTS INTO HOW YOU ARE PERCEIVED) 7
  • 22.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Impact presentations to focus the mind and to embed the learning 8
  • 23.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Practical real-life activities 9
  • 24.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Practical real-life activities 9Case studies, exercises, real-play practices, coaching
  • 25.
    The ART ofL&D Design Learning | Development | Consulting Innovative design will combine activities: Practical toolkits to take away and use 10
  • 26.
    The ART ofL&D Design Learning | Development | Consulting Last, but certainly not least, innovative design will call upon 11 ?
  • 27.
    The ART ofL&D Design Learning | Development | Consulting 11Technology Enhanced Learning
  • 28.
    The ART ofL&D Design Learning | Development | Consulting 11Technology Enhanced Learning The key to our future?
  • 29.
    • We cannotescape technology – we use it every day to communicate The ART of L&D Design Technology enhanced learning – the key to our future? Learning | Development | Consulting
  • 30.
    The ART ofL&D Design Technology enhanced learning – the key to our future? Learning | Development | Consulting • We cannot escape technology – we use it every day to communicate • Why should the design and delivery of workplace learning be any different?
  • 31.
    The ART ofL&D Design Technology enhanced learning – the key to our future? Learning | Development | Consulting • We do not expect – or want – technology to replace face to face learning
  • 32.
    The ART ofL&D Design Technology enhanced learning – the key to our future? Learning | Development | Consulting • We do not expect – or want – technology to replace face to face learning • But we could be integrating it more into our learning solutions
  • 33.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future?
  • 34.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning
  • 35.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms
  • 36.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars
  • 37.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars • Leveraging social media – retaining connectivity
  • 38.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars • Leveraging social media – retaining connectivity • Accessing and integrating e-books
  • 39.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars • Leveraging social media – retaining connectivity • Accessing and integrating e-books • Making use of compelling video
  • 40.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars • Leveraging social media – retaining connectivity • Accessing and integrating e-books • Making use of compelling video • Utilising apps
  • 41.
    Learning | Development| Consulting The learning experience can certainly be enhanced by: The ART of L&D Design Technology enhanced learning – the key to our future? • Creating e-learning • Designing virtual classrooms • Developing webinars • Leveraging social media – retaining connectivity • Accessing and integrating e-books • Making use of compelling video • Utilising apps • Creating simulations
  • 42.
    Learning | Development| Consulting Here are some important points to consider in your technology enhanced learning: The ART of L&D Design Technology enhanced learning – the key to our future?
  • 43.
    Learning | Development| Consulting Here are some important points to consider in your technology enhanced learning: The ART of L&D Design Technology enhanced learning – the key to our future? 1. Choose the right tool for the learning context
  • 44.
    Learning | Development| Consulting Here are some important points to consider in your technology enhanced learning: The ART of L&D Design Technology enhanced learning – the key to our future? 1. Choose the right tool for the learning contex 2. Engage participants – match the content delivery method to suit learning styles and preferences
  • 45.
    Learning | Development| Consulting Here are some important points to consider in your technology enhanced learning: The ART of L&D Design Technology enhanced learning – the key to our future? 1. Choose the right tool for the learning contex 2. Engage participants – match the content delivery method to suit learning styles and preferences 3. Ensure a balance of challenge and support
  • 46.
    The SCIENCE of L&Ddesign Learning | Development | Consulting
  • 47.
    The Science ofL&D Design Learning | Development | Consulting If all that covers the innovative and engaging side of L&D …
  • 48.
    The Science ofL&D Design Learning | Development | Consulting If all that covers the innovative and engaging side of L&D … we now need to focus on the ‘science’ behind a successful learning and development programme
  • 49.
    The Science ofL&D Design Learning | Development | Consulting Before design begins...
  • 50.
    The Science ofL&D Design Learning | Development | Consulting you need to work through the DEFINE and DISCOVER phase
  • 51.
    Learning | Development| Consulting The Science of L&D Design DEFINE...
  • 52.
    Learning | Development| Consulting The Science of L&D Design DEFINE... • The scope
  • 53.
    Learning | Development| Consulting The Science of L&D Design DEFINE... • The scope • A clear project plan
  • 54.
    Learning | Development| Consulting The Science of L&D Design DEFINE... • The scope • A clear project plan • Milestones
  • 55.
    Learning | Development| Consulting The Science of L&D Design DEFINE... • The scope • A clear project plan • Milestones • Outcomes
  • 56.
    Learning | Development| Consulting The Science of L&D Design DEFINE... • The scope • A clear project plan • Milestones • Outcomes • and measurements
  • 57.
    Learning | Development| Consulting The Science of L&D Design DISCOVER...
  • 58.
    Learning | Development| Consulting The Science of L&D Design DISCOVER... Exactly what you want to achieve
  • 59.
    Learning | Development| Consulting The Science of L&D Design DISCOVER... Exactly what you want to achieve Who your target group is, and what they really need
  • 60.
    Learning | Development| Consulting The Science of L&D Design DISCOVER... Exactly what you want to achieve Who your target group is, and what they really need ... and what is the best way to engage them?
  • 61.
    Learning | Development| Consulting The Science of L&D Design You can get these answers through
  • 62.
    Learning | Development| Consulting The Science of L&D Design • Enquiry You can get these answers through
  • 63.
    Learning | Development| Consulting The Science of L&D Design • Enquiry • Interview You can get these answers through
  • 64.
    Learning | Development| Consulting The Science of L&D Design • Enquiry • Interview • Psychometrics You can get these answers through
  • 65.
    Learning | Development| Consulting The Science of L&D Design • Enquiry • Interview • Psychometrics • and discussion You can get these answers through
  • 66.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to:
  • 67.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Align with and drive the organisational strategy •
  • 68.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Align with and drive the organisational strategy Engage all stakeholders from the outset • •
  • 69.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Align with and drive the organisational strategy Engage all stakeholders from the outset Be of value to the client/stakeholders – and drive their measures • • •
  • 70.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Drive immediate learning transfer•
  • 71.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Drive immediate learning transfer Be well planned and project managed at every stage • •
  • 72.
    The Science ofL&D Design Learning | Development | Consulting L&D learning journeys need to: Drive immediate learning transfer Be well planned and project managed at every stage Deliver measurable and reportable value • • •
  • 73.
    Blending the art andthe science Learning | Development | Consulting
  • 74.
    Blending the artand the science Learning | Development | Consulting If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is:
  • 75.
    Blending the artand the science Learning | Development | Consulting If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is: PracticalPracticalPractical
  • 76.
    Blending the artand the science Learning | Development | Consulting If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is: - Practical RelevantRelevantRelevant
  • 77.
    Blending the artand the science If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is: - Practical - Relevant MeasurableMeasurableMeasurable Learning | Development | Consulting
  • 78.
    Blending the artand the science If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is: - Practical - Relevant Immediately transferable - Measurable Immediately transferable Immediately transferable Learning | Development | Consulting
  • 79.
    Blending the artand the science If you deftly combine the art and science of your Learning and Development, you will have created a learning journey that is: - Practical - Relevant - Measurable - Immediately transferable Learning | Development | Consulting
  • 80.
    We have somuch more to share with you Get in touch with JSB for further insights www.jsbonline.com/about/approach Learning | Development | Consulting