This document summarizes an economic feasibility study of the Green Semanggi Mangrove housing development in Surabaya, Indonesia. It analyzes the investment using NPV, IRR, and BCR criteria. The methodology includes literature review, data collection, analysis and discussion. Cash flow analysis shows the investment costs, loan amounts, loan repayments, revenue and expenses. The investment is found to have a positive NPV of Rp6.5 billion, an IRR of 23% and a BCR above 1, indicating the project is economically feasible.
Perkerasan Jalan Raya Lentur dan Kaku, metode Analisis dan Manual
ANGGOTA KELOMPOK :
DHANES PRABASWARA ( I 0112029)
AYU ISMOYO SOFIANA ( I 0113021)
MUHAMMAD BUDI SANTOSO( I 0113080)
RAKE ADIUTO ( I 0113105)
SITI DWI RAHAYU ( I 0113124)
Pengenalan Bagian-Bagian Total Station TOPCON ES dan GMRega Surveyor
Rega
SALES
WA/TLP 085211828148
E. infoindosurta@yahoo.co.id
PT. Alat Ukur Indosurta bergerak di bidang penjualan, penyewaan dan service kalibrasi alat-alat survey. Kami hadir lebih luas dan lebih dekat untuk melayani kebutuhan pengukuran anda di bidang konstruksi, telekomunikasi, kehutanan, pertambangan, kelautan, dll.
Kantor Pusat :
Tangerang Selatan
Nusaloka Sektor XIV,5
Jln. Bangka Blok N2 No 03
BSD City – Serpong
Kantor Cabang :
-Surabaya
-Makassar
-Balikpapan
- Batam
-Palembang
-Cikarang
-Semarang
-Manado
-Jakarta
-Tangerang Selatan
“BAGI ANDA YANG BERADA DI DEKAT KANTOR PUSAT MAUPUN CABANG KAMI, KAMI MELAYANI SYSTEM ANTAR JEMPUT, DAN JANGAN KHAWATIR BAGI ANDA YANG BERADA DILUAR KOTA, KAMI SIAP MELAYANI VIA EXPEDISI SESUAI DENGAN YANG ANDA INGINKAN”
Perkerasan Jalan Raya Lentur dan Kaku, metode Analisis dan Manual
ANGGOTA KELOMPOK :
DHANES PRABASWARA ( I 0112029)
AYU ISMOYO SOFIANA ( I 0113021)
MUHAMMAD BUDI SANTOSO( I 0113080)
RAKE ADIUTO ( I 0113105)
SITI DWI RAHAYU ( I 0113124)
Pengenalan Bagian-Bagian Total Station TOPCON ES dan GMRega Surveyor
Rega
SALES
WA/TLP 085211828148
E. infoindosurta@yahoo.co.id
PT. Alat Ukur Indosurta bergerak di bidang penjualan, penyewaan dan service kalibrasi alat-alat survey. Kami hadir lebih luas dan lebih dekat untuk melayani kebutuhan pengukuran anda di bidang konstruksi, telekomunikasi, kehutanan, pertambangan, kelautan, dll.
Kantor Pusat :
Tangerang Selatan
Nusaloka Sektor XIV,5
Jln. Bangka Blok N2 No 03
BSD City – Serpong
Kantor Cabang :
-Surabaya
-Makassar
-Balikpapan
- Batam
-Palembang
-Cikarang
-Semarang
-Manado
-Jakarta
-Tangerang Selatan
“BAGI ANDA YANG BERADA DI DEKAT KANTOR PUSAT MAUPUN CABANG KAMI, KAMI MELAYANI SYSTEM ANTAR JEMPUT, DAN JANGAN KHAWATIR BAGI ANDA YANG BERADA DILUAR KOTA, KAMI SIAP MELAYANI VIA EXPEDISI SESUAI DENGAN YANG ANDA INGINKAN”
Geometrik Jalan Raya (Perencanaan)
Jalan Raya adalah suatu jalur tanah yang permukaannya dibentuk dengan kemiringan tertentu dan diberi perkerasan yang dipergunakan untuk lintasaan kendaraan maupun orang yang menghubungkan lalu lintas antara dua atau lebih tempat pemusatan kegiatan.
Geometrik Jalan Raya (Perencanaan)
Jalan Raya adalah suatu jalur tanah yang permukaannya dibentuk dengan kemiringan tertentu dan diberi perkerasan yang dipergunakan untuk lintasaan kendaraan maupun orang yang menghubungkan lalu lintas antara dua atau lebih tempat pemusatan kegiatan.
Estimating - Depreciation method - sum of the years' digits ZHIYUNLEONG
We are QS students of INTI International University. Depreciation method basically have 3 methods, which are sum-of-the-years'-digit, straight line method and declining balance method.
Sum-of-the-years'-digit method is used to accelerate the recognition of depreciation. This method can also being called as SYD method. This method uses the assest's expected life and adds the digits together for each year.
Capital Budgeting in Local Government Bodies in Indiaijtsrd
Public infrastructure plays a prominent role in any economy. Among them, road construction and their maintenance is very crucial for the local government within their jurisdiction. A study says that nearly 30.98 is spent by the local government as capital expenditure. This study is to describe various techniques that the local government bodies use, for the implementation of capital budgeting. This study also describes the various packages that can be used for the calculation of techniques of the capital budgeting. Akhileshwari Asamani ""Capital Budgeting in Local Government Bodies in India"" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-2 , February 2020,
URL: https://www.ijtsrd.com/papers/ijtsrd30189.pdf
Paper Url : https://www.ijtsrd.com/management/accounting-and-finance/30189/capital-budgeting-in-local-government-bodies-in-india/akhileshwari-asamani
A Study on Financial Statement Analysis at Siflon Drugs Anantapurijtsrd
The process of Financial Statement Analysis includes various steps like ratio analysis, trend analysis, comparative statement analysis, schedule of changes in working capital, common size percentages, fund analysis, etc. Financial statement analysis refers to an assessment of the viability, stability and profitability of a business, sub business or project. The main objective of any financial analysis or financial statement analysis will be assessing corporate excellence, judging creditworthiness, forecasting bond ratings, predicting bankruptcy, and assessing market risk. M. Priyanka | Dr. P. Basaiah "A Study on Financial Statement Analysis at Siflon Drugs Anantapur" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-6 | Issue-6 , October 2022, URL: https://www.ijtsrd.com/papers/ijtsrd51894.pdf Paper URL: https://www.ijtsrd.com/management/accounting-and-finance/51894/a-study-on-financial-statement-analysis-at-siflon-drugs-anantapur/m-priyanka
Schneider, Arnold, (2012) Managerial Accounting, United States, .docxanhlodge
Schneider, Arnold, (2012) Managerial Accounting, United States, Bridgepoint Education Inc
The Evaluation Methods
The evaluation methods discussed here are:
1.
Present value methods (also called discounted cash-flow methods).
(a)
Net present value method (NPV).
(b)
Internal rate of return method (IRR).
2.
Payback period method.
3.
Accounting rate of return method.
Nearly all managerial accountants agree that methods using present value (Methods 1a and 1b) give the best assessment of long-terminvestments. Methods that do not involve the time value of money (Methods 2 and 3) have serious flaws; however, since they are commonlyused for investment evaluation, their strengths and weaknesses are discussed.
Net Present Value Method
The net present value (NPV) method includes the time value of money by using an interest rate that represents the desired rate of return or, atleast, sets a minimum acceptable rate of return. The decision rule is:
If the present value of incremental net cash inflows is greater than the incremental
investment net cash outflow, approve the project.
Using Tables 1 and 2 found at the end of this chapter, the net cash flows for each year are brought back (i.e., discounted) to Year 0 andsummed for all years. An interest rate must be specified. This rate is often viewed as the cost of funds needed to finance the project and is theminimum acceptable rate of return. To discount the cash flows, we use the interest rate and the years that the cash flows occur to obtain theappropriate present value factors from the present value tables. A portion of Table 1 appears below showing the present value factors (theshaded numbers), corresponding to an interest rate of 12 percent, for each year during the Clairmont Timepieces project's life.
Periods
(n)
1%
2%
4%
5%
6%
8%
10%
12%
14%
15%
16%
0
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1
0.990
0.980
0.962
0.952
0.943
0.926
0.909
0.893
0.877
0.870
0.862
2
0.980
0.961
0.925
0.907
0.890
0.857
0.826
0.797
0.769
0.756
0.743
3
0.971
0.942
0.889
0.864
0.840
0.794
0.751
0.712
0.675
0.658
0.641
4
0.961
0.924
0.855
0.823
0.792
0.735
0.683
0.636
0.592
0.572
0.552
5
0.951
0.906
0.822
0.784
0.747
0.681
0.621
0.567
0.519
0.497
0.476
6
0.942
0.888
0.790
0.746
0.705
0.630
0.564
0.507
0.456
0.432
0.410
7
0.933
0.871
0.760
0.711
0.665
0.583
0.513
0.452
0.400
0.376
0.354
8
0.923
0.853
0.731
0.677
0.627
0.540
0.467
0.404
0.351
0.327
0.305
9
0.914
0.837
0.703
0.645
0.592
0.500
0.424
0.361
0.308
0.284
0.263
10
0.905
0.820
0.676
0.614
0.558
0.463
0.386
0.322
0.270
0.247
0.227
These present value factors are used in Figure 10.2 to discount the yearly cash flows to their present values. In Figure 10.2, the net cashinvestment ($95,000) is subtracted from the sum of cash-inflow present values ($137,331). When the residual is positive, the project's rate ofreturn (ROR) is greater than the minimum acceptable ROR. If:
Present value of incremental net cash inflows ≥ Incremental investment cash outf.
Similar to Laporan Ekonomi Rekayasa Teknik Sipil (20)
PPT Sidang Tugas Akhir "Analisis Kinerja Struktur Rangka Beton Bertulang deng...laura aulia
Penelitian ini bertujuan untuk merencanakan dan mengetahui kinerja dari struktur menggunakan metode pushover analysis. Bresing di tempatkan pada sisi terluar bangunan pada keseluruhan lantainya. Pemodelan struktur gedung dilakukan pada gedung perkantoran 8 lantai yang didesain berdasarkan SNI 1726:2012, SNI 2847:2013 dan SNI 1727:2013. Hasil perancangan ini diperoleh dimensi elemen struktur balok, kolom dan pelat. Berdasarkan hasil pushover analysis diketahui bahwa pada titik kinerja struktur arah-x simpangan maksimum (maximum drift) diperoleh sebesar 0,00278 sehingga level kinerja struktur berdasarkan batas simpangan menurut metode ATC-40 dan FEMA-356 termasuk pada level Immediate Occupancy (IO).
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Laporan Ekonomi Rekayasa Teknik Sipil
1. LAPORAN STUDI KASUS
EKONOMI REKAYASA
ANALISA INVESTASI PERUMAHAN GREEEN SEMANGGI
MANGROVE SURABAYA
Oleh :
Syifa Nurhaliza R 105117009
Laura Aulia 104117023
Albi Prinenditya S 104117026
FAKULTAS PERENCANAAN INFRASTRUKTUR
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS PERTAMINA
JUNI 2021
2. Universitas Pertamina - 1
BAB I
PENDAHULUAN
Deskripsi Kegiatan
Penduduk Indonesia semakin bertambah setiap tahunnya. Menurut Badan Pusat
Statistik (BPS) Surabaya jumlah penduduk Kota Surabaya pada tahun 2020 mencapai
2.874.314 jiwa. Dengan bertambahnya jumlah penduduk, maka semakin bertambah
pula kebutuhan sandang pangan papan untuk para penduduk. Untuk memenuhi
kebutuhan papan atau tempat tinggal penduduk, pemerintah Kota Surabaya
membangun suatu perumahan yang dekat dengan ekowisata mangrove.
Lokasi Perumahan Green Semanggi Mangrove yang dekat dengan ekowisata
mangrove Surabaya menjadikan daya tarik tersendiri untuk pembeli dan juga sebagai
sarana investasi untuk para developer. Akan tetapi, terdapat tantangan yang dialami
oleh pembangunan perumahan ini, yaitu lokasi yang kurang strategis dibandingkan
dengan perumahan lainnya. Oleh karena itu, diperlukan adanya penelitian dan
analisis terkait layak atau tidak pembangunan Perumahan Green Semanggi Mangrove
yang dilihat dari sisi ekonomi. Analisis tersebut difokuskan dengan kriteria kelayakan
investasi NPV, IRR, dan PI.
Tujuan
Tujuan diadakan analisis mengenai investasi perumahan green semanggi mangrove
Surabaya adalah untuk mengetahui layak atau tidak perumahan tersbeut dibangun,
analisis ini difokuskan dari sisi ekonomi dengan kriteria kelayakan investasi, yaitu
NPV, IRR dan PI.
3. Universitas Pertamina - 2
BAB II
TORI DASAR
Net Present Value (NPV)
Net Present Value (NPV) atau sering juga disebut sebagai “Present Value”
merupakan suatu metode yang didasarkan pada konsep bahwa aliran kas yang masuk
dan keluar selama investasi berlangsung dihitung nilai bersihnya dan dikethaui selisih
nilai menggunakan nilai kas di masa sekarang (Prastiwi & Utomo, 2013). NPV
dihitung menggunakan rumus pada persamaan dibawah ini.
𝑁𝑃𝑉 = −𝑘𝑡 +
𝑏1−𝑐1
(1+𝑖)
+
𝑏2−𝑐2
(1+𝑖)2
+ ⋯ +
𝑏𝑛−𝑐𝑛
(1+𝑖)𝑛
2.1
Keterangan:
NPV : Nilai bersih sekarang
𝑘𝑡 : capital yang digunakan pada periode investasi
𝑏1, 𝑏2, 𝑏𝑛 : penerimaan pada tahun pertama hingga ke-n
𝑐1, 𝑐2, 𝑐𝑛 : pengeluaran pada tahun pertama hingga ke-n
𝑖 : tingkay discount rate
Jika nilai NPV >0 maka suatu poryek dapat dikatakan layak.dan jika sebaliknya
NPV<0 maka investasi dikatakan tidak layak.
Internal Rate of Return (IRR)
Internal Rate of Return (IRR) merupakan metode yang menjadikan jumlah nilai pada
masa sekarang dan aliran kas yang akan diterima sama dengan jumlah nilai sekarang
dan penerima modal untuk mengetahui apakah suatu investasi layak atau tidak
(Hidayat, 2019). IRR dihitung menggunakan rumus pada persamaan dibawah ini.
𝐼𝑅𝑅 = ∑
(𝑐)𝑡
(1+𝑖)𝑡 −
𝑛
𝑡=0 ∑
(𝑐0)𝑡
(1+𝑖)𝑡 = 0
𝑛
𝑡=0 2.2
Keterangan:
IRR : arus pengembalian internal
(𝑐)𝑡 : aliran kas masuk tahun ke-t
(𝑐0)𝑡 : aliran kas keluar tahun ke-t
𝑛 : umur investasi
𝑖 : tahun
4. Universitas Pertamina - 3
Jika nilai IRR >0 maka suatu poryek dapat dikatakan layak.dan jika sebaliknya
IRR<0 maka investasi dikatakan tidak layak.
Benefit Cost Ratio (BCR)
Benefit/Cost Ratio (BCR) merupakan rasio dari nilai ekivalen manfaat-manfaat
teradap nilai ekivalen biaya-biaya. Ukuran dari nilai ekivalen yang digunakan dapar
berupa nilai sekarang, nilai tahunan, atau nilai masa depan (Priyo, 2011). BCR dapat
dihitung menggunakan rumus pada persamaan dibawah ini.
𝐵𝐶𝑅 =
𝑃𝑊 (𝑚𝑎𝑛𝑓𝑎𝑎𝑡 𝑝𝑟𝑜𝑦𝑒𝑘 𝑦𝑎𝑛𝑔 𝑑𝑖𝑢𝑠𝑢𝑙𝑘𝑎𝑛)
𝑃𝑊 (𝑏𝑖𝑎𝑦𝑎 𝑝𝑟𝑜𝑦𝑒𝑘 𝑦𝑎𝑛𝑔 𝑑𝑖𝑢𝑠𝑢𝑙𝑘𝑎𝑛)
=
𝑃𝑊(𝐵)
𝐼+𝑃𝑊(𝑂&𝑀)
2.3
Keterangan:
B : manfaat proyek yang diusulkan
𝐼 : investasi awal dalam proyek yang diusulkan
𝑂&𝑀 : biaya-biaya operasi dan perawatan
BAB III
PEMBAHASAN
Metodologi
Pada jurnal studi kasus yang ditinjau, keseluruhan metodologi dapat dilihat pada
diagram berikut.
Gambar 3. 1 Diagram Alir Metodologi Perencanaan
5. Universitas Pertamina - 4
Penjelasan dari langkah-langkah penyelesaian yang terdapat pada diagram tersebut dapat
dilihat sebagai berikut.
a. Studi Pustaka
Studi Pustaka digunakan sebagai dasar analisis penyelesaian suatu studi kasus.
b. Pengumpulan Data
Data yang digunakan berupa data primer dan sekunder. Data primer berupa data-
data langsung dari lapangan yang digunakan sebagai parameter utama sedangkan
data sekunder berupa data-data yang tidak didapatkan langsung dilapangan untuk
membantu proses analisis.
c. Analisis dan Pembahasan
Analisis untuk menentukan parameter-parameter baru yang digunakan dalam
menentukan kelayakan dari investasi pada studi kasus.
d. Kesimpulan dan Saran
Kesimpulan digunakan untuk menjawab tujuan penulis dan saran sebagai
masukan terhadap studi kasus yang ditinjau apabila terdapat kekurangan.
Hasil Studi kasus
a. Cashflow
Cashflow atau aliran kas pada studi kasus yang ditinjau dapat dilihat pada tabel
3.1 dan untuk contoh perhitungannya dapat dilihat sebagai berikut.
• Biaya Investasi
Biaya investasi disini total nya bernilai Rp.77.097.749.601,- dengan masa
investasi 5 tahun yang dapat dilihat pada tabel 3.5.
• Pinjaman
Pihak pengembang perumahan menerima dana dari pinjaman namun disini
tidak tertera rincian kepada siapa pinjaman tersebut diajukan. Total pinjaman
yang didapatkan bernilai Rp.50.113.537.240,- dengan rincian yang dapat
dilihat pada tabel 3.1.
• Pembayaran Pinjaman
Pembayaran pinjaman dilakukan pertahunnya dengan nilai sebesar
Rp.13.219.951.124,- yang dibayarkan secara rata selama lima tahun. Total
dana yang dikeluarkan untuk membayar pinjaman yaitu sebesar Rp.
6. Universitas Pertamina - 5
66.099.755.620, nilai tersebut lebih besar dibandingkan total dana yang
didapatkan dari pinjaman karena adanya bunga.
• Pendapatan
Pendapatan didapatkan dari perkiraan penjualan tiap tahunnya dan nilai
pendapatan pertahunnya pada tabel 3.1 Pada studi kasus ini tidak dijelaskan
berapa harga dari unit rumah dan hanya dijelaskan mekanisme
pembayarannya yaitu 30% harga sebagai uang muka dan dibayarkan pada
tahun awal dan 70% sisanya akan dilunasi pada tahun berikutnya 4 tahun.
• Pengeluaran
Pengeluaran terdiri dari beberapa jenis pembiayaan yaitu biaya listrik, biaya
kebutuhan air, biaya gaji, biaya pemasaran, dan biaya estate management.
Tabel 3. 1 Cashflow 2013 – 2018
Tahun ke-
2013 2014 2015 2016 2017 2018
0 1 2 3 4 5
Kebutuhan
Listrik
- 19.008.000 19.008.000 19.008.000 19.008.000 19.008.000
Kebutuhan
Air
- 4.275.000 4.275.000 4.275.000 4.275.000 4.275.000
Gaji - 186.600.000 186.600.000 186.600.000 186.600.000 186.600.000
Pemasaran
(5% dari
pendapatan)
- 350.250.000 1.338.125.000 1.736.20.000 1.561.125.000
- (Target
penjualan
telah
terpenuhi di
tahun 2017)
Estate
Management
- 17.512.500 66.906.250 86.812.500 78.056.250 40.337.500
Total 0 577.645.500 1.614.914.250 2.032.045.500 1.849.064.250 250.220.500
Satuan: Rupiah
Tabel 3. 2 Net Cash Flow.
Tahun ke-
2013 2014 2015 2016 2017 2018
0 1 2 3 4 5
Biaya
Investasi -32.551.960.701 -8.909.157.779 -13.363.736.670 -13.363.736.670 -8.909.157.780
Pinjaman 21.158.774.456 5.790.952.557 8.686.428.835 8.686.428.835 5.790.952.557
Pembayaran
Pinjaman -13.219.951.124 -13.219.951.124 -13.219.951.124 -13.219.951.124 -13.219.951.124
Pendapatan
7.005.000.000 26.762.500.000 34.725.000.000 31.222.500.000 16.135.000.000
Pengeluaran
-577.645.500 -1.614.914.250 -2.032.045.500 -1.849.064.250 -250.220.500
Net Cash
Flow
-11.393.186.245 -9.910.801.847 7.250.326.792 14.794.795.542 13.035.279.403 2.664.828.376
Satuan: Rupiah
7. Universitas Pertamina - 6
b. Penentuan parameter kelayakan investasi
Nilai NPV, IRR, dan BCR disesuaikan dengan ketentuan-ketentuan yang telah
dijelaskan di studi pustaka. Untuk mendapatkan nilai yang konservatif, maka data
net cash flow yang didapatkan harus dikalikan dengan Discount Factor untuk
mengetahui nilai Discounted Cash Flow yang merupakan nilai ini saat ini dari
cash flow di masa yang akan datang. Contoh perhitungan Discount Factor sebagai
berikut:
MARR: 11 %
Tahun 0 → 𝐷𝑓0 =
1
(1+0.11)0
= 1
Tahun 1 → 𝐷𝑓1 =
1
(1+0.11)1
= 0.9009 …… Seterusnya hingga tahun ke-5
Nilai Discounted Cash Flow dapat dilihat pada tabel berikut.
Tabel 3. 3 Nilai Discounted Cash Flow.
Tahun ke- 2013 2014 2015 2016 2017 2018
0 1 2 3 4 5
Net Cash
Flow
-11.393.186.245 -9.910.801.847 7.250.326.792 14.794.795.542 13.035.279.403 2.664.828.376
Discount
Factor
1 0.900900901 0.811622433 0.731191381 0.658730974 0.593451328
Discounted
Cash Flow
-11.393.186.245 -8.928.650.313 5.884.527.872 10.817.826.988 8.586.742.299 1.581.445.939
Satuan: Rupiah
Discounted Cash Flow digunakan sebagai data perhitungan NPV, IRR, dan
BCR. Perhitungan parameter tersebut dapat dilihat sebagai berikut.
• Net Present Value/ NPV
Untuk mendapatkan nilai NPV tinggal menjumlahkan nilai Discounted Cash
Flow. Perhitungan tersebut dapat dilihat sebagai berikut:
𝑁𝑃𝑉 = (−11.393.186.245) + (−8.928.650.313) + (5.884.527.872)
+(10.817.826.988) + (8.586.742.299) + (1.581.445.939)
𝑁𝑃𝑉 = 𝑅𝑝. 6.548.706.541
• Internal Rate of Return (IRR)
𝑁𝑃𝑉 = −11.393.186.245 +
−9.910.801.847
(1 + 𝑖)1
+
7.250.326.792
(1 + 𝑖)2
+
14.794.795.542
(1 + 𝑖)3
+
13.035.279.403
(1 + 𝑖)4
+
2.664.828.376
(1 + 𝑖)2
= 0
8. Universitas Pertamina - 7
Dengan menggunakan trial error, maka i (IRR) yang didapatkan yaitu 23%.
Karena hanya terjadi 1 kali perubahan tanda maka IRR hanya ada 1 IRR.
• Benefit Cost Ratio (BCR)
Perhitungan nilai BCR dapat dilihat pada tabel berikut.
Tabel 3. 4 Perhitungan Benefit Cost Ratio (BCR).
Tahun ke- 2013 2014 2015 2016 2017 2018
0 1 2 3 4 5
Inflow 21.158.774.456 12.795.952.557 35.448.928.835 43.411.428.835 37.013.452.557 16.135.000.000
Outflow 32.551.960.701 22.706.754.404 28.198.602.044 28.616.633.294 23.978.173.154 13.470.171.624
Discount
Factor
1 0.900900901 0.811622433 0.731191381 0.658730974 0.593451328
PV Inflow 21.158.774.456 11.527.885.187 28.771.145.877 31.742.062.614 24.381.907.659 9.575.337.178
PV Outflow 32.551.960.701 20.456.535.499 22.886.618.005 20.924.235.626 15.795.165.360 7.993.891.239
Total PV
Inflow
127.157.112.971
Total PV
Outflow
120.608.406.430
BCR 1.0543
Satuan: Rupiah
1. Pembahasan
Dari perhitungan sebelumnya, secara ekonomi maka investasi layak karena nilai NPV >
0, IRR > MARR, dan BCR > 1. Nilai yang didapatkan merupakan hasil dari penggunaan
data rencana yaitu, unit rumah yang terjual tiap tahunnya didapatkan dari hasil perkiraan.
Analisis tambahan dilakukan untuk meminimalisir terjadinya ketidaklayakan dari
investasi tersebut. analisis tambahan berupa perubahan biaya investasi yang digunakan
sebagai biaya pengembangan perumahan, terjadinya perubahan tingkat suku bunga, dan
perubahan pendapatan. Analisis tambahan tersebut disebut sebagai analisis sensitivitas.
a. Perubahan biaya investasi
Biaya investasi awal merupakan salah satu komponen yang akan mempengaruhi
nilai parameter kelayakan investasi. Pada perhitungan digunakan beberapa tingkat
perubahan dari biaya investasi seperti yang ditunjukkan pada tabel berikut.
Tabel 3. 5 Perhitungan Biaya Investasi Menggunakan Beberapa Perubahan Biaya Investasi.
NPV (Rp) Biaya Investasi Keterangan
-22.384.186.091 107.936.849.441 Bertambah 40%
-11.534.351.354 96.372.187.001 Bertambah 25%
0 84.077.909.428 Bertambah 9 %
6.548.706.541 77.097.749.601 Biaya investasi awal
24.631.764.435 57.823.312.200 Berkurang 25%
31.960.701.125 46.258.649.760 Berkurang 40%
9. Universitas Pertamina - 8
Dari tabel diatas, diketahui bahwa investasi menjadi tidak layak (NPV<0) apabila
biaya investasi awal naik > 9% dari estimasi investasi awal yang sebesar Rp.
77.097.749.601.- atau melebihi Rp.84.077.909.428,- .
b. Perubahan tingkat suku bunga
Tingkat suku bunga juga akan mempengaruhi nilai parameter kelayakan
investasi, karena perhitungan disesuaikan dengan tingkat suku bunga. Menurut
perhitungan yang telah dilakukan, nilai IRR yang didapatkan 23% menjadi
patokan kelayakan suatu investasi apabila tingkat suku bunga melebihi nilai IRR
tersebut maka investasi tersebut menjadi tidak layak, sehingga pada investasi ini,
tingkat suku bunga tidak boleh melebihi 23% atau melebihi 109% dari estimasi
tingkat suku bunga yang digunakan yaitu 11%.
Tabel 3. 6 Perhitungan Biaya Investasi Menggunakan Perubahan Suku Bunga.
NPV (Rp) Tingkat Suku Bunga Keterangan
-849.221.853 25% Bertambah 109%
0 23% Nilai IRR
6.548.706.541 11% Tingkat suku bunga awal
8.587.955.186 8% Berkurang 25%
9.933.935.849 7% Berkurang 40%
c. Perubahan pendapatan
Analisis terhadap perubahan pendapatan hanya mengambil satu contoh
pendapatan pada tahun pertama. Perhitungan perubahan pendapatan tersebut
dapat dilihat pada tabel berikut.
Tabel 3. 7 Perhitungan Biaya Investasi Menggunakan Perubahan Pendapatan.
NPV (Rp) Pendapatan Keterangan
12.761.063.372 9.807.000.000 Bertambah 40%
10.431.429.560 8.756.250.000 Bertambah 25%
6.548.706.541 7.005.000.000 Pendapatan awal
2.665.983.521 5.253.750.000 Berkurang 25%
336.349.706 4.203.000.000 Berkurang 40%
0 4.071.554.216 Berkurang 42%
-1.456.122.928 3.502.500.000 Berkurang 50%
Dari tabel tersebut, dapat dilihat bahwa pendapatan tidak boleh berkurang
melebihi 42% karena nilai npv yang dihasilkan akan bernilai kurang dari nol akan
membuat investasi tersebut menjadi tidak layak.
10. Universitas Pertamina - 9
DAFTAR PUSTAKA
Hidayat, W. W. (2019). Konsep Dasar Investasi Dan Pasar Modal. Jawa Timur: Uwais
Inspirasi Indonesia.
Prastiwi, A., & Utomo, C. (2013). Analisa Investasi Perumahan Green Semanggi Mangrove
Surabaya. Jurnal Teknik POMITS Vol.2.
Priyo, M. (2011). Ekonomi Teknik. Yogyakarta: LP3M UMY.
PEMBAGIAN TUGAS
NO Nama Tugas
1 Syifa Nurhaliza
Membuat deskripsi kegiatan, membuat tujuan
dalam studi kasus yang dipilih, mencari referensi
studi kasus, membantu merapikan laporan
2 Laura Aulia
Membuat laporan teori dasar, mencari referensi
laporan, membuat metodologi perencanaan,
merapihkan format laporan.
3 Albi Prinenditya Mengerjakan BAB 3