The document outlines plans for the construction of the Kyiv Ring Road project in Ukraine. It details that the ring road will be 214.6 km in length and include 3 large bridges totaling 14,648 meters. It will be categorized as a 1A road and include 7 overhead roads, 50 viaducts, and 35 two-level interchanges. The total projected costs are UAH 77 billion and the project will be financed through loans, concessions/public-private partnerships, and the state budget. Construction of the ring road will help address the 15% annual growth in traffic and need for new roads and bridges around Kyiv.
IWMW 2002: Legislation, Disabilities and Education Web Sites.pptIWMW
Plenary talk on "Legislation, Disabilities and Education Web Sites" talk given by Lawrie Phipps at IWMW 2002 held at the University of Strathclyde on 18-20 June 2002.
See http://www.ukoln.ac.uk/web-focus/events/workshops/webmaster-2002/sessions.html#talk-phipps
IWMW 2002: Legislation, Disabilities and Education Web Sites.pptIWMW
Plenary talk on "Legislation, Disabilities and Education Web Sites" talk given by Lawrie Phipps at IWMW 2002 held at the University of Strathclyde on 18-20 June 2002.
See http://www.ukoln.ac.uk/web-focus/events/workshops/webmaster-2002/sessions.html#talk-phipps
Пілотний проєкт е-ТТН - процес розробки та впровадження електронної товарно-транспортної накладної (е-ТТН) з
подальшою безоплатною передачею державі
працездатної інформаційної системи реєстрації
та обліку е-ТТН на перевезення вантажів
автомобільним транспортом в Україні
Пілотний проєкт е-ТТН - процес розробки та впровадження електронної товарно-транспортної накладної (е-ТТН) з
подальшою безоплатною передачею державі
працездатної інформаційної системи реєстрації
та обліку е-ТТН на перевезення вантажів
автомобільним транспортом в Україні
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
2. Kyiv-Chop
М06
М05
Київ-Одеса
М03
Kyiv-Kharkiv-
Dovzhanskiy
М07
Kyiv-Kovel-Yagotyn
Н01
Kyiv-Znamyanka
М01
Kyiv-Chernigiv-
N.Yarylovychi
Р02
Kyiv-Ivankiv-
Ovruch
KYIV
Section from М 06 Kyiv-Chop
till М 05 Kyiv-Odessa
Length – 35.2 km
Section from М05 Kyiv-Odessa till
Н01 yiv-Znamyanka
Length – 22.9 km
Section from М 0 Kyiv-Kovel-
Yagotyn till М06 Kyiv-Chop
Length -18.1 km
Section from М 07 Kyiv-Kovel-
Yagotyn till Р02 Kyiv-Ivankiv-
Ovruch
Length -27.4 km
Construction of the bridge over the
Dnieper
with paths to Р 02 Kyiv-Ovruch and Kyiv-
Chernigiv-N.Yarylovychi
Length -35.9 km
Reconstruction of the ring road on
the section from Northern-eastern
byroad of Kyiv city, km26+085 till
М01 Kyiv-Chernigiv-N.Yarylovychi
Length– 18.5 km
Reconstruction of Northern-
eastern byroad of Kyiv city on
the section Ivankiv-
Bezuglivka
Length– 20.7 km
Section from Gora-Rogoziv
till М03 Kyiv-Kharkiv-
Dovzhanskiy
Length – 9.7 km
Construction of the bridge over the
Dnieper with paths to Н 01 Kyiv-
Znamyanka
та Gora-Rogoziv
Length – 25.7 km
CONSTRUCTION OF KYIV RING ROAD
3. KYIV RING ROAD: KEY HIGHLIGHTS
+ 15% of annual traffic growth provides the need for
construction of new roads and bridges
• Length: overall – 214.6 km (including 66.2 km of the existing road)
• Category: 1A
• Big bridges: 3 bridges with the total length of 14 648 m
• Overhead roads: 7 pieces with the total length of 8 910m
• Viaduct: 50 pieces
• Interchange of two levels: 35 pcs.
• Land area: 1 415 ha
• Road surface: 3.6 million m2
UAH 77 bn
total costs
Financing sources:
Loans Concession/PPP State budget