MOHAMMED AKBAR 
Mobile: +971-50-9287865/+971-55-3798934 
Specialisation : Building Services (M.E.P) 
Position in Group : Senior Mechanical/ MEP Engineer 
Professional Experience : 16+ Years 
Key Strengths 
· Experienced in the design, can liaise and coordinate with involvement in project 
management of building services 
· Responsible for programming, resource allocation and deliverables, project financial 
management, fee proposals, concept and detailed design 
· A wide range of buildings such as Multi-storey, Hotels, offices, schools, colleges, 
residential premises, shopping centres, banks, restaurants and mosques. 
· Areas of particular interest include conservation of energy in the built environment by 
the use of structural mass and complementary passive systems. 
· Conversant with heat load calculation as per ASHRAE, rules and regulations of Dubai 
Municipality,H.A.P-CARIER, TRANE, Preparing DB-Schedules Villas and shops and 
getting approval from Authority and consultants. 
EDUCATION AND PROFESSIONAL STATUS: 
B.E ( Mechanical) : - Osmania university. Year of Gradation 1997 
Membership : - UAE Society of Engineers 
Additional Technical Skills : - Primavera P-5, AutoCAD & MS Office. 
EXPERIENCE RECORD: 
Employer : - National Engineering Bureau, Dubai, UAE. (From 2009) 
Position : - Senior Mechanical Engineer 
Projects : - Presently working for Intercontenental hotel at Fujairah Al-aqqa’(G+7) 
Worked at Ajman phase-1 for Aqaar Properties for (2B+4P+32) Ten 
Residential Towers until handing over for seven towers. 
· Making meetings with Clients and Contractors and solving the 
problems independently. 
· Making Heat load calculations, Selecting Fcus, Ahus, Getting 
Approval from Authority, Making the Duct design and Chilled water 
Pipe design, Calculating Pump Head. 
· Selection of primary, secondary & tertiary Pumps, 
· Making water calculations, Complete Plumbing design as per Dubai 
Municipality Regulations, Selection of Booster and Transfer Pumps.
· Checking shop drawings for HVAC, Plumbing, Fire fighting, Water 
Supply, FM-200, Pre Action system, Foam system BMS and giving 
approval for shop drawings. 
· Giving Material approval for Chillers, Cooling Tower and Fire fighting 
Pumps. 
Employer : - National Engineering Bureau, Dubai, UAE. 
Position : - Senior Mechanical Engineer 
Projects : - SELECT GROUP FOR 3-RESIDENTIAL TOWERS (5B+G+60) AT 
JUMEIRA 
Responsibilities: 
· Site and design up to hand over 
· Making meetings with Clients and Contractors and solving the 
problems independently 
· Making Heat load calculations, Selecting Fcus, Ahus, Getting 
Approval from Authority, Making the Duct design and Chilled water 
Pipe design, Calculating Pump Head. 
· Selection of primary, secondary & tertiary Pumps, 
· Making water calculations, Complete Plumbing design as per Dubai 
Municipality Regulations. 
· Checking shop drawings for HVAC, Plumbing, Fire fighting, Water 
Supply, FM-200, Pre Action system, Foam system BMS and giving 
approval for shop drawings. 
· Giving Material approval for Chillers, Cooling Tower and Fire fighting 
Pumps. 
· Giving Material Approval HVAC, PLUMBING, FIREFIGHTING 
Materials. 
· Witnessing Air balancing, Chilled water balancing, Pump Head. Bms 
works. Commissioning of Pumps and Chillers. 
· Checking the payments of contactor monthly and approving the Bills 
for HVAC, PLUMBING and FIREFIGHTING as per work done at Site. 
· Checking the Variations. 
· Replying the RFIS made by Contractor. 
· Making Inspection at Site. 
· Making Monthly Progress report. 
Employer :- Siemens, Dubai, UAE. 
Duration :- 2007-2008 
Projects :- 132kv and 400kv substations 
Responsibilities: 
· Making meeting with Authority, Contractors and Consultant. 
· Getting shop drawings and Material Approval from Client and 
Consultants. 
· Inspecting the Site works for HVAC, Plumbing, EOT Crane, Fire 
fighting, Lighting, Fire alarm, Nitrogen system and BMS works 
Related to MEP. 
· Approving Sub contractor’s payments. 
· Witnessing FAT and SAT. 
Employer :- H.O.K. CANADA 
Durations :- 2006-2007
Project : - QATAR 5-HOTELS PROJECT SHANGRILLA, MERWEB, ROTANA, 
MARRIOT, RENASSIANCE(4B+G+45) AT SITE FOR HOTEL 
Position Held: - PROJECT ENGINEER. 
Responsibilities: 
· Making Meeting with Operator, and Contractors. 
· Checking the HVAC, Plumbing Installations at site. 
· Replying to RFIS. 
· Giving shop drawing approvals for HVAC and Plumbing. 
· Checking The BMS Points for HVAC and Plumbing services. 
· Giving Material Approvals. 
· Witnessing Air Balancing, Chilled Water balancing & Pump head. 
Employer :- Burt Hill Kosar and Rittlemans Engineering Consultants,.Dubai, UAE 
Duration :- 2005-2006. 
Position :- MEP Design Engineer 
Project :- Office-Building and hotel of 5B+G+ 60 ,Show room of 1/2km. 
Responsibilities:- Involved in Infrastructure, cooling load calculations, preparing the A/C 
sections equivalent U value calculations and A/C drawings as per 
Dubai Municipality rules and regulations for Auto mall Showroom- 
1/2km, -floors and Selection of Fcus, Ahus, Heat Exchanger Chilled 
water pumps selection, Chilled water piping, Duct-design. Approving 
shop drawings of HVAC, Plumbing and Water supply. 
Employer : - Future Design Consultants, Dubai, UAE. 
Duration : - 2002 – 2005 
Position Held: - Design and Site Engineer 
Projects : - Involved Buildings Division, Dubai, United Arab Emirates. 
Responsibilities: 
· Calculating heat load calculations for 2B+12 Buildings, Villas, 
Substations (132-33kv) and Making single line drawings for HVAC, 
Plumbing, and water supply. 
· Checking Contractors Shop Drawings for HVAC, Plumbing, Water 
supply, Fire Fighting and giving Approvals 
· Inspecting Works at Site for HVAC, Plumbing, Fire fighting services 
· Giving Material approval to contractors. 
· Clearing the payments of Contractors as per site works. 
· Getting Approval from authorities for HVAC, PLUMBING services. 
Employer :- ELAF-CONTRACTING COMPANY, Al Madina Al Munawara, 
SAUDI ARABIA. 
Duration : - 1997 – 2002 
Position Held:- Site Engineer 
Responsibilities: 
· Inspecting the plumbing, HVAC works at site. 
· Getting Material approval from Consultants 
· Preparing monthly progress report. 
· Getting approvals of work from consultants. 
Duties & Responsibilities:-
· Liaison with Clients, Architects, Municipality, Contractors and getting the drawing 
approved from Municipality & DEWA 
· Equipment selection, HVAC controls Testing and Commissioning. 
· Duct system design, duct design and installation of split package and all other 
accessories units. 
· Calculation of static pressure and selection of blowers, calculation of pump head, 
design of chilled water pipes, Transfer pump calculation, Booster pump 
calculation, Sump pump calculation. 
· Selection of FCU’s, AHU’s, chillers, chilled water pipes, and chilled water pumps. 
· Complete Knowledge of relevant services HVAC, Plumbing, Fire fighting, 
Electrical, and giving approval for materials for HVAC, Plumbing and Firefighting 
systems. 
· Conversant with BMS applicable for the HVAC industry. 
· Conversant with Auto cad 2005, Ms Office ,Ms Excel. 
SITE Capabilities :- 
· To inspect as per the specification, drawing and design criteria of all 
mechanical services. 
· To update the work progress and clarify any technical problem if there is any, 
to the client or their representative. 
· To ensure perfect co-ordination of all services and to make sure that the 
specified material is being used. 
· Taking full care of progress, ensuring that work gets completed within the 
stipulated time. 
· Attending weekly MEP meetings with client, Main contractor’s and Sub 
contractor’s representative regarding work progress, workmanship, quality 
checking, co-ordination and safety of men, material and machinery. 
· To witness Testing and Commissioning done by the contractor according to 
manufacturer’s checklist. 
· Checking & Certifying Monthly Progressive payments for Mechanical & HVAC 
works of the project. 
PERSONAL DETAILS: 
Date of Birth : 11/02/1970 
Faith : Islam 
Nationality : Indian 
Marital status : Married 
PASSPORT DETAILS: 
Valid Until : 2016 
Place of Issue : Dubai, U.A.E 
Visa Status : Employment 
Driving License : Light Vehicle UAE
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr

MOHAMMED AKBAR Sr MEP Mech_Engr

  • 1.
    MOHAMMED AKBAR Mobile:+971-50-9287865/+971-55-3798934 Specialisation : Building Services (M.E.P) Position in Group : Senior Mechanical/ MEP Engineer Professional Experience : 16+ Years Key Strengths · Experienced in the design, can liaise and coordinate with involvement in project management of building services · Responsible for programming, resource allocation and deliverables, project financial management, fee proposals, concept and detailed design · A wide range of buildings such as Multi-storey, Hotels, offices, schools, colleges, residential premises, shopping centres, banks, restaurants and mosques. · Areas of particular interest include conservation of energy in the built environment by the use of structural mass and complementary passive systems. · Conversant with heat load calculation as per ASHRAE, rules and regulations of Dubai Municipality,H.A.P-CARIER, TRANE, Preparing DB-Schedules Villas and shops and getting approval from Authority and consultants. EDUCATION AND PROFESSIONAL STATUS: B.E ( Mechanical) : - Osmania university. Year of Gradation 1997 Membership : - UAE Society of Engineers Additional Technical Skills : - Primavera P-5, AutoCAD & MS Office. EXPERIENCE RECORD: Employer : - National Engineering Bureau, Dubai, UAE. (From 2009) Position : - Senior Mechanical Engineer Projects : - Presently working for Intercontenental hotel at Fujairah Al-aqqa’(G+7) Worked at Ajman phase-1 for Aqaar Properties for (2B+4P+32) Ten Residential Towers until handing over for seven towers. · Making meetings with Clients and Contractors and solving the problems independently. · Making Heat load calculations, Selecting Fcus, Ahus, Getting Approval from Authority, Making the Duct design and Chilled water Pipe design, Calculating Pump Head. · Selection of primary, secondary & tertiary Pumps, · Making water calculations, Complete Plumbing design as per Dubai Municipality Regulations, Selection of Booster and Transfer Pumps.
  • 2.
    · Checking shopdrawings for HVAC, Plumbing, Fire fighting, Water Supply, FM-200, Pre Action system, Foam system BMS and giving approval for shop drawings. · Giving Material approval for Chillers, Cooling Tower and Fire fighting Pumps. Employer : - National Engineering Bureau, Dubai, UAE. Position : - Senior Mechanical Engineer Projects : - SELECT GROUP FOR 3-RESIDENTIAL TOWERS (5B+G+60) AT JUMEIRA Responsibilities: · Site and design up to hand over · Making meetings with Clients and Contractors and solving the problems independently · Making Heat load calculations, Selecting Fcus, Ahus, Getting Approval from Authority, Making the Duct design and Chilled water Pipe design, Calculating Pump Head. · Selection of primary, secondary & tertiary Pumps, · Making water calculations, Complete Plumbing design as per Dubai Municipality Regulations. · Checking shop drawings for HVAC, Plumbing, Fire fighting, Water Supply, FM-200, Pre Action system, Foam system BMS and giving approval for shop drawings. · Giving Material approval for Chillers, Cooling Tower and Fire fighting Pumps. · Giving Material Approval HVAC, PLUMBING, FIREFIGHTING Materials. · Witnessing Air balancing, Chilled water balancing, Pump Head. Bms works. Commissioning of Pumps and Chillers. · Checking the payments of contactor monthly and approving the Bills for HVAC, PLUMBING and FIREFIGHTING as per work done at Site. · Checking the Variations. · Replying the RFIS made by Contractor. · Making Inspection at Site. · Making Monthly Progress report. Employer :- Siemens, Dubai, UAE. Duration :- 2007-2008 Projects :- 132kv and 400kv substations Responsibilities: · Making meeting with Authority, Contractors and Consultant. · Getting shop drawings and Material Approval from Client and Consultants. · Inspecting the Site works for HVAC, Plumbing, EOT Crane, Fire fighting, Lighting, Fire alarm, Nitrogen system and BMS works Related to MEP. · Approving Sub contractor’s payments. · Witnessing FAT and SAT. Employer :- H.O.K. CANADA Durations :- 2006-2007
  • 3.
    Project : -QATAR 5-HOTELS PROJECT SHANGRILLA, MERWEB, ROTANA, MARRIOT, RENASSIANCE(4B+G+45) AT SITE FOR HOTEL Position Held: - PROJECT ENGINEER. Responsibilities: · Making Meeting with Operator, and Contractors. · Checking the HVAC, Plumbing Installations at site. · Replying to RFIS. · Giving shop drawing approvals for HVAC and Plumbing. · Checking The BMS Points for HVAC and Plumbing services. · Giving Material Approvals. · Witnessing Air Balancing, Chilled Water balancing & Pump head. Employer :- Burt Hill Kosar and Rittlemans Engineering Consultants,.Dubai, UAE Duration :- 2005-2006. Position :- MEP Design Engineer Project :- Office-Building and hotel of 5B+G+ 60 ,Show room of 1/2km. Responsibilities:- Involved in Infrastructure, cooling load calculations, preparing the A/C sections equivalent U value calculations and A/C drawings as per Dubai Municipality rules and regulations for Auto mall Showroom- 1/2km, -floors and Selection of Fcus, Ahus, Heat Exchanger Chilled water pumps selection, Chilled water piping, Duct-design. Approving shop drawings of HVAC, Plumbing and Water supply. Employer : - Future Design Consultants, Dubai, UAE. Duration : - 2002 – 2005 Position Held: - Design and Site Engineer Projects : - Involved Buildings Division, Dubai, United Arab Emirates. Responsibilities: · Calculating heat load calculations for 2B+12 Buildings, Villas, Substations (132-33kv) and Making single line drawings for HVAC, Plumbing, and water supply. · Checking Contractors Shop Drawings for HVAC, Plumbing, Water supply, Fire Fighting and giving Approvals · Inspecting Works at Site for HVAC, Plumbing, Fire fighting services · Giving Material approval to contractors. · Clearing the payments of Contractors as per site works. · Getting Approval from authorities for HVAC, PLUMBING services. Employer :- ELAF-CONTRACTING COMPANY, Al Madina Al Munawara, SAUDI ARABIA. Duration : - 1997 – 2002 Position Held:- Site Engineer Responsibilities: · Inspecting the plumbing, HVAC works at site. · Getting Material approval from Consultants · Preparing monthly progress report. · Getting approvals of work from consultants. Duties & Responsibilities:-
  • 4.
    · Liaison withClients, Architects, Municipality, Contractors and getting the drawing approved from Municipality & DEWA · Equipment selection, HVAC controls Testing and Commissioning. · Duct system design, duct design and installation of split package and all other accessories units. · Calculation of static pressure and selection of blowers, calculation of pump head, design of chilled water pipes, Transfer pump calculation, Booster pump calculation, Sump pump calculation. · Selection of FCU’s, AHU’s, chillers, chilled water pipes, and chilled water pumps. · Complete Knowledge of relevant services HVAC, Plumbing, Fire fighting, Electrical, and giving approval for materials for HVAC, Plumbing and Firefighting systems. · Conversant with BMS applicable for the HVAC industry. · Conversant with Auto cad 2005, Ms Office ,Ms Excel. SITE Capabilities :- · To inspect as per the specification, drawing and design criteria of all mechanical services. · To update the work progress and clarify any technical problem if there is any, to the client or their representative. · To ensure perfect co-ordination of all services and to make sure that the specified material is being used. · Taking full care of progress, ensuring that work gets completed within the stipulated time. · Attending weekly MEP meetings with client, Main contractor’s and Sub contractor’s representative regarding work progress, workmanship, quality checking, co-ordination and safety of men, material and machinery. · To witness Testing and Commissioning done by the contractor according to manufacturer’s checklist. · Checking & Certifying Monthly Progressive payments for Mechanical & HVAC works of the project. PERSONAL DETAILS: Date of Birth : 11/02/1970 Faith : Islam Nationality : Indian Marital status : Married PASSPORT DETAILS: Valid Until : 2016 Place of Issue : Dubai, U.A.E Visa Status : Employment Driving License : Light Vehicle UAE