CURRICULUM VITAE
MICHAEL GRANT SMITH
Tel nr : +27 16 960 5463 (Work)
Cell nr : +27 825641771 (Private)
Fax nr : +27 11 522 4574 (Work)
E-mail : michael.smith@sasol.com
michael.smith@telkomsa.net
PERSONAL DETAILS
Full Names Michael Smith
ID Number 680919 5039 084
Date of Birth 19 September 1968
Marital Status Married
Drivers license Code 08 – Motor vehicle with a trailer
QUALIFICATIONS
Qualification Main Subjects Year
National Diploma in Electrical
Engineering Heavy Current
Port Elizabeth Technikon.
Electrical Engineering
Industrial Electronics
Engineering Mathematics
Electrical Machines
Electric Protection Systems
Engineering Management
1989 – 1991
(3 years)
Sasol internal Electrical trade test Multi Skill training in the fields of
Electrical (Major), Mechanical, Process,
Instrumentation and Welding.
1992 – 1993
(2 years)
Safety Training
ISO 9001:2000; OHSAS 18001
ISO 14001
Sasol Safety system 2000
Mini – Apps Electrical Protection
Course
1 week course 2010
Behaviour Based Safety Committee
member
BBS - 1 week course 2002
Applied Fundamentals of Project
Management
1 week course 2012
WEG/Zest Motor VSD’s, Soft
Starters
Advanced MOC Course
4 Days
2 Days
2015
2015
COMPUTER SKILLS
Computer programs worked on
Windows operating systems, 2000, XP Pro, etc.
MS Word, MS Access, MS Excel, MS PowerPoint, MS Outlook
Omicron software, ABB software, Siemens software, Micro Station drawing package
CAREER SUMMARY
COMPANY SASOL 1, Sasolburg, South Africa.
DEPARTMENT Energy Generation and Distribution:
Projects
EMPLOYMENT DATE Started on 6 January 1992 to Present
(24 years relevant experience)
POSITION HELD Chief Electrical Technician
Main Responsibilities/Experience
Electrical control Room: 1994 – 1995 (Electrical Network Controller)
 Shift work - 8 hours rotation
 Monitor the operation of five 11kV Generators, including manual synchronizing onto network
(national grid) via a synch scope.
 Monitor CITECT Energy metering management system for the complete factory (approx. 120+
11kV incomers and feeders on the distribution network).
 Set up practical exams for electrical apprentices in their mid and final assessments to complete
their Final Sasol Internal Trade Test.
 Manage the Shutdown switching/isolation sequence to take out a section of the plant and return it
back to service after the work has been completed.
Electrical Metering: 1996 (Technician)
 Check existing metering equipment is functioning correctly and repair where needed.
 Monitor CITECT Energy metering management system for the complete factory (approx. 120 of
11kV incomers and feeders).
 Set exams for electricians in their mid and final assessments.
 Fault finding on electrical circuits, E/I interfacing, ACO boards, etc.
 Having a good working knowledge of wiring and schematic drawings.
 Team player.
Electrical Testing: 1997 – 2003 (Senior Technician)
 Test LV & MV Distribution Transformers.
 Test MV Distribution Reactors.
 Test LV & MV Cables taking into consideration any de-rating factors if applicable after the correct
cable has been identified. Using cable faultfinding equipment like TDR – Time Domain
Reflectometry Scope, Fault point Burn-down units, Thumping (Capacitor discharge) unit used with
or without the Cable scope.
 Fault finding on Power Factor correction equipment.
 Test Feeder, Motor and Generator relays in protection schemes and associated electrical control
equipment like oil-vacuum-water pumps, valves, alarms, indication lights, indication meters.
 Electrical Faultfinding, installation and commissioning of relays and updating of drawings
for LV & MV Protection schemes, Electrical panels and switchgear.
 Develop, write and update Electrical legal task observations and work procedures.
 Safety as well as a BBS Representative.
 After hours stand-by duty.
 Training of junior personnel.
 Using of measuring equipment (Insulation resistance meters(250Vdc to 5kVdc, 11kVac Phasing
sticks, Cable fault locating equipment, analogue and digital multi-meters, Event recorders to
measure motor start-up and trip signals, etc.)
 Project related test work.
 Installation and commissioning of new Protection Relays and updating of red-line drawings.
 Testing of distribution transformers, voltage transformers, current transformers.
 Testing of Large Motors.
 Fault-finding on generator excitation and protection.
 Fault-finding on control circuits.
 Fault-finding on Electrical panels, switchgear and protection equipment.
 Testing of feeder and motor protection relays.
 Testing of earthing networks.
 Writing and updating/revising of work procedures.
 Fault-finding and repair of electrical cables.
 Fault-finding on Power Factor correction equipment.
 Commissioning tests on 25MW generators with ABB.
 Do feeder maintenance.
 Control over projects as well as upgrading of old installations.
 Co-coordinating of projects, people and work to be carried out.
 Do investigations on the electrical integrity of a plant and make recommendations for
improvements.
 Training and mentoring of junior personnel.
Electrical Test Projects: 2004 – 2011 (Principal Technician)
 Generate, Interpret and implement new testing procedures.
 New Electrical equipment evaluations for “easy to use”, accuracy speed of operation,
maintainability and trustworthiness.
 Inspect/Maintain plant integrity.
 Investigations after a trip to find the Real cause and implement corrective actions.
 Cable Fault Location; underground and on cable racks. (LV and MV)
 New Electrical equipment evaluations for “easy to use”, accuracy speed of operation,
maintainability and trustworthiness.
 Doing Soil Resistivity Tests and tabulate the results.
 Test Earthing Systems like Earth spikes, earth mats, Safety and Instrumentation earths.
 Draw up a work/testing planning schedule and keep to it.
 Electrical LV & MV Switchgear Protection Testing.
 Commission new Electrical Protection Schemes; like ARC detection, inter-tripping, cable-, motor-,
generator-, transformer-, bus-bar differential schemes.
 Establish, generate and maintain data and records.
 Manage test procedures, communication to clients.
Electrical Renewal and Capital Projects: 2012 – present (Chief Technician)
Project Cost
management
Accountable for project cost management through:
Resource planning – provide input into the identification of required
resources.
Cost estimating and forecasting – accountable for the evaluation of
received quotes and approval for relevant project phase(s)
Cost budgeting – accountable for the development of and approve project
cost control base.
Cost control - manage project budget ,cost changes and cash/cost flow.
Project Quality
management
Ensure project management and quality by:
Standards are adhered to and satisfies requirements.
Quality assurance (QA) – evaluate overall project performance on a regular
basis to ensure project will satisfy the relevant quality standards.
Quality Control Plan (QCP) – develop and monitor quality standards and
identifying ways to eliminate causes of unsatisfactory performance.
Continuous Improvement – Ensure/implement identified quality
improvement best practices and share with peers to develop standard
project QCP documentation.
Project Resource
management
Team development – Support the development of individual and group
skills to enhance project performance.
Identify training needs and add value by personally getting involved with on
the job training as needed.
Manage the dynamics and cultural diversity of project teams.
Create a high performance work climate in the project environment.
Monitor & optimise performance of team members and resources.
Project
communications
management
Accountable and responsible for communication through:
Communication to determine the information and communication needs of
the stakeholders (who, what, when and how) and develop and implement
a system of communication) – set up organogram.
Information distribution – Ensure/provide required information to project
stakeholders in a timely manner.
Performance reporting – Ensure/collect and disseminate project
performance information (project matrix, status reporting, progress
measurement, and forecasting).
Administrative closure – Ensure/generate, gather, and disseminate
information to formalize phase or project completion.
Project finalization – Ensure/compile and solicit acceptance and End-of-Job
documentation (Engineering Management).
Change Management (MOC) - Ensure that the business owner has an
appropriate change management plan in place (people impact).
Project Risk
management
Accountable for the development and implementation of a risk
management plan through:
 Risk monitoring and control – Keep track of identified risks, monitor
residual risks, identify new risks, ensure the execution of risk plans and
evaluate their effect in reducing risks.
Project Contracts
& Procurement
management
 Procurement process – Assist with the procurement process such as
evaluation criteria, bidders list, bid evaluation and clarifications,
auditing, and selection of contractors/suppliers.
 Contract administration - Ensure conformance to requirements of the
contract in terms of change control, performance control, payment,
dispute resolution and close-out.
 Business ethics – Ensure/understand and comply to Corporate ethical
and commercial practices.
Project
Knowledge
Management
 Ensure/obtain and incorporate best practices and ‘lessons learnt’ from
previous related projects per each phase of the project.
 Ensure/conduct post mortem with stakeholders.
 Ensure/facilitate ‘lessons learnt’ session with project team and peers.
Project Integration
Management
Accountable for integration of business, technical, project and
sponsor tracks of BD&I as well as the delivery of contractors and
suppliers as an integrated team by:
 Owner representative – achieve objectives through leveraging
in/external resources.
 Ensure/develop Project Execution Plan (PEP) for current and
subsequent phases of the project in accordance with the Business
Development & Implementation Model (BD&I).
 Overall change control – Ensure/manage, coordinate and communicate
changes across the entire project.
 Stakeholders management through building and maintaining
relationships.

Strategic
Alignment
 Ensure compliance to Sasol strategy, philosophy, objectives, policies
and procedures.
During the project execution phase I fulfilled various roles as Factory Representative, Project Manager,
Construction manager, Commissioning Manager, QA/QC officer.
1. Switchgear Roles
SOW Write
Specifications Comply
Design and manufacture Consult (Review)
Factory Acceptance test Witness
Drawings and Manuals Consult (Review)
Installation Witness
Site Acceptance test Witness
Pre-Commission Consult (Review)
Commission Witness
Handover Approval
2 Installation
Cable Routes QA/QC, Consult (Review)
Cable installation design QA/QC, Consult (Review)
SOW & Specifications Consult (Review)
Cable installation QA/QC, Witness
Other Equipment Installation Witness
Handover Accept
3 Commission
Commissioning plan Consult (Review)
Commissioning schedule Consult (Review)
Final Commissioning Witness
4 EOJ DOCUMENTATION
Final documentation Approval
PERSONAL QUALITIES
• Self-motivated.
• Ability to work on own initiative with minimum supervision.
• Keep current with changes and new methods in electrical technology.
• Take actions that are consistent with ethical values.
• Take pride in being trustworthy.
• Eye for technical detail.
• Honest in customer relations.
• Accept responsibility for work assigned and honor commitments, retain
professionalism and objectivity.
• Passionate about Electrical Safety and ways to eliminate accidents and insisting on
following Lock out/tag out procedure having a ZERO tolerance attitude.
• Passionate about Electrical training up to the point where I expect junior people to look
at the big functional picture of the equipment on site and understand the whole task.
REFERENCES
Luiz Almeida
Electrical Projects
Sasol, Infrachem, Sasolburg
South Africa
Telephone: +27 16 960 3276
Cell: +27 78 458 3652
Colleague and former line manager for 3 years.
Kobus Pienaar
Electrical Projects
Sasol, Infrachem, Sasolburg
South Africa
Telephone: +2716 920 3216
Cell: +27 83 633 1719
Colleague and Mentor for the past 12 years.

More Related Content

What's hot

Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
Arun Das
 
Basim resume (3)
Basim resume (3)Basim resume (3)
Basim resume (3)
Basim Almomen
 
Rajeswaran_CV_04042016
Rajeswaran_CV_04042016Rajeswaran_CV_04042016
Rajeswaran_CV_04042016
Rajeswaran Rajendran
 
John Parcon Resume with reference
John Parcon Resume with reference John Parcon Resume with reference
John Parcon Resume with reference
John Parcon
 
KahsayResume (1)
KahsayResume (1)KahsayResume (1)
KahsayResume (1)
Kahsay Kiross
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
Vladimir Nikitin
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Mobin Ilahi Shaikh
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
Chiranjib Bera
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
Arif Nusyirwan
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
Roshan Xavier
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
Owen Powell
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
Sherif Gharib, MBA
 
RSSaguidCV
RSSaguidCVRSSaguidCV
RSSaguidCV
rodel saguid
 
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
Christopher White
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
Geoff Rowling
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
S.Silambu Selva Siddharthan
 
CV
CVCV
JKliethermesResume20171 (1)
JKliethermesResume20171 (1)JKliethermesResume20171 (1)
JKliethermesResume20171 (1)
Joseph Kliethermes
 
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
Jeffrey Ross
 

What's hot (20)

Latest resume
Latest resumeLatest resume
Latest resume
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Basim resume (3)
Basim resume (3)Basim resume (3)
Basim resume (3)
 
Rajeswaran_CV_04042016
Rajeswaran_CV_04042016Rajeswaran_CV_04042016
Rajeswaran_CV_04042016
 
John Parcon Resume with reference
John Parcon Resume with reference John Parcon Resume with reference
John Parcon Resume with reference
 
KahsayResume (1)
KahsayResume (1)KahsayResume (1)
KahsayResume (1)
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
RSSaguidCV
RSSaguidCVRSSaguidCV
RSSaguidCV
 
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
CV
CVCV
CV
 
JKliethermesResume20171 (1)
JKliethermesResume20171 (1)JKliethermesResume20171 (1)
JKliethermesResume20171 (1)
 
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
 

Similar to MGS CV 11 Feb 2016 pdf

CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
Nagashiva Gaadhamsetti
 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
Suhas Bhosale
 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
Suhas Bhosale
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
MANNANNATARAJAN
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
MAHMOOD AHMED
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
usman ahmed
 
My final resume
My final resumeMy final resume
My final resume
salahuddin sabir khan
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
Syed Raza
 
HASSAN CV
HASSAN CVHASSAN CV
C V
C V C V
SRao_cv
SRao_cvSRao_cv
SRao_cv
Sanmukh Rao
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
lateefur rahman
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
Mohammed Athar Malik
 
Stephen Nagy Resume Final1
Stephen Nagy Resume Final1Stephen Nagy Resume Final1
Stephen Nagy Resume Final1
Stephen Nagy
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
sanjay yadav
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey Ahmed
Ahmed Refaey
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey Ahmed
Ahmed Refaey
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
Mahboob Iqbal
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
Muhammad Yesrub Iqbal
 

Similar to MGS CV 11 Feb 2016 pdf (20)

CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
My final resume
My final resumeMy final resume
My final resume
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
C V
C V C V
C V
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Stephen Nagy Resume Final1
Stephen Nagy Resume Final1Stephen Nagy Resume Final1
Stephen Nagy Resume Final1
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey Ahmed
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey Ahmed
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 

MGS CV 11 Feb 2016 pdf

  • 1. CURRICULUM VITAE MICHAEL GRANT SMITH Tel nr : +27 16 960 5463 (Work) Cell nr : +27 825641771 (Private) Fax nr : +27 11 522 4574 (Work) E-mail : michael.smith@sasol.com michael.smith@telkomsa.net
  • 2. PERSONAL DETAILS Full Names Michael Smith ID Number 680919 5039 084 Date of Birth 19 September 1968 Marital Status Married Drivers license Code 08 – Motor vehicle with a trailer QUALIFICATIONS Qualification Main Subjects Year National Diploma in Electrical Engineering Heavy Current Port Elizabeth Technikon. Electrical Engineering Industrial Electronics Engineering Mathematics Electrical Machines Electric Protection Systems Engineering Management 1989 – 1991 (3 years) Sasol internal Electrical trade test Multi Skill training in the fields of Electrical (Major), Mechanical, Process, Instrumentation and Welding. 1992 – 1993 (2 years) Safety Training ISO 9001:2000; OHSAS 18001 ISO 14001 Sasol Safety system 2000 Mini – Apps Electrical Protection Course 1 week course 2010 Behaviour Based Safety Committee member BBS - 1 week course 2002 Applied Fundamentals of Project Management 1 week course 2012 WEG/Zest Motor VSD’s, Soft Starters Advanced MOC Course 4 Days 2 Days 2015 2015 COMPUTER SKILLS Computer programs worked on Windows operating systems, 2000, XP Pro, etc. MS Word, MS Access, MS Excel, MS PowerPoint, MS Outlook Omicron software, ABB software, Siemens software, Micro Station drawing package
  • 3. CAREER SUMMARY COMPANY SASOL 1, Sasolburg, South Africa. DEPARTMENT Energy Generation and Distribution: Projects EMPLOYMENT DATE Started on 6 January 1992 to Present (24 years relevant experience) POSITION HELD Chief Electrical Technician Main Responsibilities/Experience Electrical control Room: 1994 – 1995 (Electrical Network Controller)  Shift work - 8 hours rotation  Monitor the operation of five 11kV Generators, including manual synchronizing onto network (national grid) via a synch scope.  Monitor CITECT Energy metering management system for the complete factory (approx. 120+ 11kV incomers and feeders on the distribution network).  Set up practical exams for electrical apprentices in their mid and final assessments to complete their Final Sasol Internal Trade Test.  Manage the Shutdown switching/isolation sequence to take out a section of the plant and return it back to service after the work has been completed. Electrical Metering: 1996 (Technician)  Check existing metering equipment is functioning correctly and repair where needed.  Monitor CITECT Energy metering management system for the complete factory (approx. 120 of 11kV incomers and feeders).  Set exams for electricians in their mid and final assessments.  Fault finding on electrical circuits, E/I interfacing, ACO boards, etc.  Having a good working knowledge of wiring and schematic drawings.  Team player. Electrical Testing: 1997 – 2003 (Senior Technician)  Test LV & MV Distribution Transformers.  Test MV Distribution Reactors.  Test LV & MV Cables taking into consideration any de-rating factors if applicable after the correct cable has been identified. Using cable faultfinding equipment like TDR – Time Domain Reflectometry Scope, Fault point Burn-down units, Thumping (Capacitor discharge) unit used with or without the Cable scope.  Fault finding on Power Factor correction equipment.  Test Feeder, Motor and Generator relays in protection schemes and associated electrical control equipment like oil-vacuum-water pumps, valves, alarms, indication lights, indication meters.  Electrical Faultfinding, installation and commissioning of relays and updating of drawings for LV & MV Protection schemes, Electrical panels and switchgear.  Develop, write and update Electrical legal task observations and work procedures.  Safety as well as a BBS Representative.  After hours stand-by duty.  Training of junior personnel.  Using of measuring equipment (Insulation resistance meters(250Vdc to 5kVdc, 11kVac Phasing sticks, Cable fault locating equipment, analogue and digital multi-meters, Event recorders to measure motor start-up and trip signals, etc.)  Project related test work.  Installation and commissioning of new Protection Relays and updating of red-line drawings.  Testing of distribution transformers, voltage transformers, current transformers.
  • 4.  Testing of Large Motors.  Fault-finding on generator excitation and protection.  Fault-finding on control circuits.  Fault-finding on Electrical panels, switchgear and protection equipment.  Testing of feeder and motor protection relays.  Testing of earthing networks.  Writing and updating/revising of work procedures.  Fault-finding and repair of electrical cables.  Fault-finding on Power Factor correction equipment.  Commissioning tests on 25MW generators with ABB.  Do feeder maintenance.  Control over projects as well as upgrading of old installations.  Co-coordinating of projects, people and work to be carried out.  Do investigations on the electrical integrity of a plant and make recommendations for improvements.  Training and mentoring of junior personnel. Electrical Test Projects: 2004 – 2011 (Principal Technician)  Generate, Interpret and implement new testing procedures.  New Electrical equipment evaluations for “easy to use”, accuracy speed of operation, maintainability and trustworthiness.  Inspect/Maintain plant integrity.  Investigations after a trip to find the Real cause and implement corrective actions.  Cable Fault Location; underground and on cable racks. (LV and MV)  New Electrical equipment evaluations for “easy to use”, accuracy speed of operation, maintainability and trustworthiness.  Doing Soil Resistivity Tests and tabulate the results.  Test Earthing Systems like Earth spikes, earth mats, Safety and Instrumentation earths.  Draw up a work/testing planning schedule and keep to it.  Electrical LV & MV Switchgear Protection Testing.  Commission new Electrical Protection Schemes; like ARC detection, inter-tripping, cable-, motor-, generator-, transformer-, bus-bar differential schemes.  Establish, generate and maintain data and records.  Manage test procedures, communication to clients. Electrical Renewal and Capital Projects: 2012 – present (Chief Technician) Project Cost management Accountable for project cost management through: Resource planning – provide input into the identification of required resources. Cost estimating and forecasting – accountable for the evaluation of received quotes and approval for relevant project phase(s) Cost budgeting – accountable for the development of and approve project cost control base. Cost control - manage project budget ,cost changes and cash/cost flow. Project Quality management Ensure project management and quality by: Standards are adhered to and satisfies requirements. Quality assurance (QA) – evaluate overall project performance on a regular basis to ensure project will satisfy the relevant quality standards. Quality Control Plan (QCP) – develop and monitor quality standards and identifying ways to eliminate causes of unsatisfactory performance. Continuous Improvement – Ensure/implement identified quality improvement best practices and share with peers to develop standard project QCP documentation.
  • 5. Project Resource management Team development – Support the development of individual and group skills to enhance project performance. Identify training needs and add value by personally getting involved with on the job training as needed. Manage the dynamics and cultural diversity of project teams. Create a high performance work climate in the project environment. Monitor & optimise performance of team members and resources. Project communications management Accountable and responsible for communication through: Communication to determine the information and communication needs of the stakeholders (who, what, when and how) and develop and implement a system of communication) – set up organogram. Information distribution – Ensure/provide required information to project stakeholders in a timely manner. Performance reporting – Ensure/collect and disseminate project performance information (project matrix, status reporting, progress measurement, and forecasting). Administrative closure – Ensure/generate, gather, and disseminate information to formalize phase or project completion. Project finalization – Ensure/compile and solicit acceptance and End-of-Job documentation (Engineering Management). Change Management (MOC) - Ensure that the business owner has an appropriate change management plan in place (people impact). Project Risk management Accountable for the development and implementation of a risk management plan through:  Risk monitoring and control – Keep track of identified risks, monitor residual risks, identify new risks, ensure the execution of risk plans and evaluate their effect in reducing risks. Project Contracts & Procurement management  Procurement process – Assist with the procurement process such as evaluation criteria, bidders list, bid evaluation and clarifications, auditing, and selection of contractors/suppliers.  Contract administration - Ensure conformance to requirements of the contract in terms of change control, performance control, payment, dispute resolution and close-out.  Business ethics – Ensure/understand and comply to Corporate ethical and commercial practices. Project Knowledge Management  Ensure/obtain and incorporate best practices and ‘lessons learnt’ from previous related projects per each phase of the project.  Ensure/conduct post mortem with stakeholders.  Ensure/facilitate ‘lessons learnt’ session with project team and peers. Project Integration Management Accountable for integration of business, technical, project and sponsor tracks of BD&I as well as the delivery of contractors and suppliers as an integrated team by:  Owner representative – achieve objectives through leveraging in/external resources.  Ensure/develop Project Execution Plan (PEP) for current and subsequent phases of the project in accordance with the Business Development & Implementation Model (BD&I).  Overall change control – Ensure/manage, coordinate and communicate changes across the entire project.  Stakeholders management through building and maintaining relationships. 
  • 6. Strategic Alignment  Ensure compliance to Sasol strategy, philosophy, objectives, policies and procedures. During the project execution phase I fulfilled various roles as Factory Representative, Project Manager, Construction manager, Commissioning Manager, QA/QC officer. 1. Switchgear Roles SOW Write Specifications Comply Design and manufacture Consult (Review) Factory Acceptance test Witness Drawings and Manuals Consult (Review) Installation Witness Site Acceptance test Witness Pre-Commission Consult (Review) Commission Witness Handover Approval 2 Installation Cable Routes QA/QC, Consult (Review) Cable installation design QA/QC, Consult (Review) SOW & Specifications Consult (Review) Cable installation QA/QC, Witness Other Equipment Installation Witness Handover Accept 3 Commission Commissioning plan Consult (Review) Commissioning schedule Consult (Review) Final Commissioning Witness 4 EOJ DOCUMENTATION Final documentation Approval PERSONAL QUALITIES • Self-motivated. • Ability to work on own initiative with minimum supervision. • Keep current with changes and new methods in electrical technology. • Take actions that are consistent with ethical values. • Take pride in being trustworthy. • Eye for technical detail. • Honest in customer relations. • Accept responsibility for work assigned and honor commitments, retain professionalism and objectivity. • Passionate about Electrical Safety and ways to eliminate accidents and insisting on following Lock out/tag out procedure having a ZERO tolerance attitude. • Passionate about Electrical training up to the point where I expect junior people to look at the big functional picture of the equipment on site and understand the whole task.
  • 7. REFERENCES Luiz Almeida Electrical Projects Sasol, Infrachem, Sasolburg South Africa Telephone: +27 16 960 3276 Cell: +27 78 458 3652 Colleague and former line manager for 3 years. Kobus Pienaar Electrical Projects Sasol, Infrachem, Sasolburg South Africa Telephone: +2716 920 3216 Cell: +27 83 633 1719 Colleague and Mentor for the past 12 years.