CURRICULUM VITAE
Name: Li Zhihui Age: 34 Sex: male
Email: lzh9902@163.com (personal)
Mobile: 18930484335
Home Address: Zhengzhou,Henan province, China
EDUCATION & CERTIFICATION
Educational Attainment: Bachelor of Industry Electric Automation
Major: Relay & Power Supply&Motor operate
School Graduated: Liaoning Shihua University
SUMMARY
I have been an electrical engineer for 12 years, responsible for electrical
construction management. Include electrical construction technic support,
electrical drawings constructability review, raise the material delivery date to
meet the requirement of construction, electrical construction quality and
schedule control, coordinate with owner about electrical construction issues.
SKILL
Familiar with electrical installation construction codes and regulations, both
national and international.
Familiar with the principles and procedures of elecrtrical construction.
Skillful with Windows XP/7, Microsoft office, AutoCAD etc. .
Versed English level.
WORK EXPERIENCE
Duration: Sep. 2007—Now
Employed company: WISON Engineering Ltd.
Position held: Electrical engineer
Duration: Aug. 2003—Aug. 2007
Employed company: The Second Construction Company of SINOPEC
Position held: Electrical engineer
PROJECT EXPERIENCE
Duration: Mar. 2013-Aug. 2014
Project: Benzene Mitigation Project in Kingdom of Saudi Arabia
Employed company: WISON Engineering Ltd.
Position held: Electrical supervisor
Responsibilities: Electrical construction, design and material coordination
1. Coordination for electrical construction, design, material. Make sure the
delivery time of the material and drawings meet the requirement of
construction.
Focus on the schedule of drawing issuing. Prepare the required date of
construction drawings and send to design department. Review the drawings
and find out issues of it, then coordinate with designer to solve it.
2. Electrical technical support. Include electrical construction
schedule,quality,material drawings. Solve construction technical problems,
material problem, drawing issues in the jobsite.
3. Coordinate with the owner for electrical construction issues.
4. Check the type, quantity of electrical equipment and material. Prepare the
required date of equipment and material. Coordinate with procurement
department to make sure equipment and material delivery date meet the
requirement of construction schedule.
Duration: Feb. 2011-Feb. 2013
Project: 2700kt/year VGO HCU of Sichuan Petro Chemical Company
Employed company: WISON Engineering Ltd.
Position held: Electrical engineer
Responsibilities: Electrical technical guidance, deal with construction problems, schedule,
material and quality control
1. Make sure the applicable project specification, approved drawings,
standard codes and assembly process were correctly executed during
constructions. Review the electrical construction scheme.
2. Verify the quantity of electrical materials carefully to reduce the waste.
Make sure all the material delivery date meet the requirement of
construction.
3. Deal with electrical technical issues during construction.
4. Assist project manager for cost control by review the construction
workload carefully.
Duration: Dec. 2009-Apr. 2010
Project: CSPC DEBOTTLENECKING LOP cracking furnace
Employed company: WISON Engineering Ltd.
Position held: Electrical engineer
Responsibilities: Electrical technical guidance, deal with construction problem, schedule
and quality control
1. Make sure the applicable project specification, approved drawings,
standard codes and assembly process were correctly executed during
constructions. Review the electrical construction scheme.
2. Verify the quantity of electrical materials carefully to reduce the waste.
Make sure all the material delivery date meet the requirement of
construction.
3. Deal with electrical technical issues during construction.
4. Assist project manager for cost control by review the construction
workload carefully.
Duration: Apr. 2008-Nov. 2008
Project: Cracking Furnace Unit of 1000kt/a ethylene project, CNPC Dushanzi
Petrochemical Co.
Employed company: WISON Engineering Ltd.
Position held: Electrical engineer
Responsibilities: Electrical technical guidance, deal with construction problem, schedule
and quality control
1. Make sure the applicable project specification, approved drawings,
standard codes and assembly process were correctly executed during
constructions. Review the electrical construction scheme.
2. Verify the quantity of electrical materials carefully to reduce the waste.
Make sure all the material delivery date meet the requirement of
construction.
3. Deal with electrical technical issues during construction.
4. Assist project manager for cost control by review the construction
workload carefully.
Duration: Oct. 2006-Aug. 2007
Project: 400kt/year Polyethylene Project in KSA
Employed company: SCC (The Second Construction Company of SINOPEC)
Position held: Electrical engineer
Responsibilities: Electrical installation/debugging/pre-commissioning
1. To verify and ensure that applicable project specification, approved
drawings, standard codes and assembly process were correctly executed
during constructions.
2. Check the drawings and coordinate with designer.
3. Prepare electrical construction scheme which include installation and
testing technical/quality requirements and construction schedule. Then
make sure it is correctly executed during construction.
4. Coordinate with the EPC contractor about electrical construction issues.
Duration: Aug. 2005-Oct. 2006
Project: Hainan Refinery Project Tank Farm
Employed company: SCC (The Second Construction Company of SINOPEC)
Position held: Electrical engineer
Responsibilities: Electrical installation/debugging/pre-commissioning
1. To verify and ensure that applicable project specification, approved
drawings, standard codes and assembly process were correctly executed
during constructions.
2. Check the drawings and coordinate with designer.
3. Prepare electrical construction scheme which include installation and
testing technical/quality requirements and construction schedule. Then
make sure it is correctly executed during construction.
4. Coordinate with the EPC contractor about electrical construction issues.
Duration: Mar. 2004-Feb. 2005
Project: Zhejiang Yisheng Petrochemical 530 kt/year PTA Project
Employed company: SCC (The Second Construction Company of SINOPEC)
Position held: Assistant electrical engineer
Responsibilities: Electrical installation/debugging/pre-commissioning
1. To assist the electrical engineer for electrical installation and debugging
quality control.
2. Prepare weekly (monthly) construction information report and sent it to the
head office.
Duration: Sep. 2003-Mar. 2004
Project: BASF-YPC IPS Project, Nanjing, LDPE (Low Density Polyethylene
Project) Process Unit
Employed company: SCC (The Second Construction Company of SINOPEC)
Position held: Electrical debugging worker
Responsibilities: Electrical equipment debug
1. Electrical equipment testing such as grounding/lightning, lighting, local
control station, high/low voltage cabinet, cable, motor, no-load operation of
motor etc.
2. Complete test record after testing such as installation inspection and no-
load operation record of AC motor etc.
OBJECTIVE:
As an experienced electrical engineer, the vital quality I possess of is self-
confidence, self-possession and passion. Also I am a good team player. I am
looking for a new challenge and an opportunity to apply the knowledge
acquired.

More Related Content

What's hot

Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIAbrony mc
 
Mechanical electrical-engineering-2 (2)
Mechanical electrical-engineering-2 (2)Mechanical electrical-engineering-2 (2)
Mechanical electrical-engineering-2 (2)
Zheng Chee Cham
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady CENGADAM
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copyup dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - CopyAruna Subbu
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016Ahmed Maamoun
 
Building act 2006 presentation english version
Building act 2006 presentation english versionBuilding act 2006 presentation english version
Building act 2006 presentation english version
sitomise
 
rays new resume
rays new resumerays new resume
rays new resumeRay Gomez
 
Jonathan Pope Curriculum Vitae
Jonathan Pope Curriculum VitaeJonathan Pope Curriculum Vitae
Jonathan Pope Curriculum VitaeJonathan pope
 
Raniah c.v sep 2018
Raniah c.v sep  2018Raniah c.v sep  2018
Raniah c.v sep 2018
RANIAH ALAM ELDIN
 

What's hot (20)

Brian Johnson 2015
Brian Johnson 2015Brian Johnson 2015
Brian Johnson 2015
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
 
RTrongco Resume
RTrongco ResumeRTrongco Resume
RTrongco Resume
 
Resume Dax Roque C.
Resume Dax Roque C.Resume Dax Roque C.
Resume Dax Roque C.
 
Mechanical electrical-engineering-2 (2)
Mechanical electrical-engineering-2 (2)Mechanical electrical-engineering-2 (2)
Mechanical electrical-engineering-2 (2)
 
CV_Poliarco,Romeo
CV_Poliarco,RomeoCV_Poliarco,Romeo
CV_Poliarco,Romeo
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Zackary Ajuoga CV-1
Zackary Ajuoga CV-1Zackary Ajuoga CV-1
Zackary Ajuoga CV-1
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copyup dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
 
Building act 2006 presentation english version
Building act 2006 presentation english versionBuilding act 2006 presentation english version
Building act 2006 presentation english version
 
rays new resume
rays new resumerays new resume
rays new resume
 
Jonathan Pope Curriculum Vitae
Jonathan Pope Curriculum VitaeJonathan Pope Curriculum Vitae
Jonathan Pope Curriculum Vitae
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Raniah c.v sep 2018
Raniah c.v sep  2018Raniah c.v sep  2018
Raniah c.v sep 2018
 

Similar to CV-lizhihui

asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 DecemberSyed Asif Ali
 
CV-TrinhthanhHa(Dec-05-2015)
CV-TrinhthanhHa(Dec-05-2015)CV-TrinhthanhHa(Dec-05-2015)
CV-TrinhthanhHa(Dec-05-2015)Tr?nh Thanh H
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]Komthorn Sing
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vhen Atienza
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath Thikekar
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
jayabalan kandasamy
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015RAHUL P
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur ResumeRita Thakur
 

Similar to CV-lizhihui (20)

CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
Jeya CV - updated
Jeya CV - updatedJeya CV - updated
Jeya CV - updated
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
CV-TrinhthanhHa(Dec-05-2015)
CV-TrinhthanhHa(Dec-05-2015)CV-TrinhthanhHa(Dec-05-2015)
CV-TrinhthanhHa(Dec-05-2015)
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
CV ( Muzamil)
CV ( Muzamil)  CV ( Muzamil)
CV ( Muzamil)
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
kkalema
kkalemakkalema
kkalema
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CV
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
CV Siriwan J.
CV Siriwan J.CV Siriwan J.
CV Siriwan J.
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur Resume
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
update
updateupdate
update
 

CV-lizhihui

  • 1. CURRICULUM VITAE Name: Li Zhihui Age: 34 Sex: male Email: lzh9902@163.com (personal) Mobile: 18930484335 Home Address: Zhengzhou,Henan province, China EDUCATION & CERTIFICATION Educational Attainment: Bachelor of Industry Electric Automation Major: Relay & Power Supply&Motor operate School Graduated: Liaoning Shihua University SUMMARY I have been an electrical engineer for 12 years, responsible for electrical construction management. Include electrical construction technic support, electrical drawings constructability review, raise the material delivery date to meet the requirement of construction, electrical construction quality and schedule control, coordinate with owner about electrical construction issues. SKILL Familiar with electrical installation construction codes and regulations, both national and international. Familiar with the principles and procedures of elecrtrical construction. Skillful with Windows XP/7, Microsoft office, AutoCAD etc. . Versed English level. WORK EXPERIENCE Duration: Sep. 2007—Now Employed company: WISON Engineering Ltd. Position held: Electrical engineer Duration: Aug. 2003—Aug. 2007 Employed company: The Second Construction Company of SINOPEC Position held: Electrical engineer PROJECT EXPERIENCE Duration: Mar. 2013-Aug. 2014 Project: Benzene Mitigation Project in Kingdom of Saudi Arabia Employed company: WISON Engineering Ltd. Position held: Electrical supervisor Responsibilities: Electrical construction, design and material coordination 1. Coordination for electrical construction, design, material. Make sure the delivery time of the material and drawings meet the requirement of
  • 2. construction. Focus on the schedule of drawing issuing. Prepare the required date of construction drawings and send to design department. Review the drawings and find out issues of it, then coordinate with designer to solve it. 2. Electrical technical support. Include electrical construction schedule,quality,material drawings. Solve construction technical problems, material problem, drawing issues in the jobsite. 3. Coordinate with the owner for electrical construction issues. 4. Check the type, quantity of electrical equipment and material. Prepare the required date of equipment and material. Coordinate with procurement department to make sure equipment and material delivery date meet the requirement of construction schedule. Duration: Feb. 2011-Feb. 2013 Project: 2700kt/year VGO HCU of Sichuan Petro Chemical Company Employed company: WISON Engineering Ltd. Position held: Electrical engineer Responsibilities: Electrical technical guidance, deal with construction problems, schedule, material and quality control 1. Make sure the applicable project specification, approved drawings, standard codes and assembly process were correctly executed during constructions. Review the electrical construction scheme. 2. Verify the quantity of electrical materials carefully to reduce the waste. Make sure all the material delivery date meet the requirement of construction. 3. Deal with electrical technical issues during construction. 4. Assist project manager for cost control by review the construction workload carefully. Duration: Dec. 2009-Apr. 2010 Project: CSPC DEBOTTLENECKING LOP cracking furnace Employed company: WISON Engineering Ltd. Position held: Electrical engineer Responsibilities: Electrical technical guidance, deal with construction problem, schedule and quality control
  • 3. 1. Make sure the applicable project specification, approved drawings, standard codes and assembly process were correctly executed during constructions. Review the electrical construction scheme. 2. Verify the quantity of electrical materials carefully to reduce the waste. Make sure all the material delivery date meet the requirement of construction. 3. Deal with electrical technical issues during construction. 4. Assist project manager for cost control by review the construction workload carefully. Duration: Apr. 2008-Nov. 2008 Project: Cracking Furnace Unit of 1000kt/a ethylene project, CNPC Dushanzi Petrochemical Co. Employed company: WISON Engineering Ltd. Position held: Electrical engineer Responsibilities: Electrical technical guidance, deal with construction problem, schedule and quality control 1. Make sure the applicable project specification, approved drawings, standard codes and assembly process were correctly executed during constructions. Review the electrical construction scheme. 2. Verify the quantity of electrical materials carefully to reduce the waste. Make sure all the material delivery date meet the requirement of construction. 3. Deal with electrical technical issues during construction. 4. Assist project manager for cost control by review the construction workload carefully. Duration: Oct. 2006-Aug. 2007 Project: 400kt/year Polyethylene Project in KSA Employed company: SCC (The Second Construction Company of SINOPEC) Position held: Electrical engineer Responsibilities: Electrical installation/debugging/pre-commissioning 1. To verify and ensure that applicable project specification, approved drawings, standard codes and assembly process were correctly executed during constructions. 2. Check the drawings and coordinate with designer. 3. Prepare electrical construction scheme which include installation and testing technical/quality requirements and construction schedule. Then make sure it is correctly executed during construction. 4. Coordinate with the EPC contractor about electrical construction issues. Duration: Aug. 2005-Oct. 2006
  • 4. Project: Hainan Refinery Project Tank Farm Employed company: SCC (The Second Construction Company of SINOPEC) Position held: Electrical engineer Responsibilities: Electrical installation/debugging/pre-commissioning 1. To verify and ensure that applicable project specification, approved drawings, standard codes and assembly process were correctly executed during constructions. 2. Check the drawings and coordinate with designer. 3. Prepare electrical construction scheme which include installation and testing technical/quality requirements and construction schedule. Then make sure it is correctly executed during construction. 4. Coordinate with the EPC contractor about electrical construction issues. Duration: Mar. 2004-Feb. 2005 Project: Zhejiang Yisheng Petrochemical 530 kt/year PTA Project Employed company: SCC (The Second Construction Company of SINOPEC) Position held: Assistant electrical engineer Responsibilities: Electrical installation/debugging/pre-commissioning 1. To assist the electrical engineer for electrical installation and debugging quality control. 2. Prepare weekly (monthly) construction information report and sent it to the head office. Duration: Sep. 2003-Mar. 2004 Project: BASF-YPC IPS Project, Nanjing, LDPE (Low Density Polyethylene Project) Process Unit Employed company: SCC (The Second Construction Company of SINOPEC) Position held: Electrical debugging worker Responsibilities: Electrical equipment debug 1. Electrical equipment testing such as grounding/lightning, lighting, local control station, high/low voltage cabinet, cable, motor, no-load operation of motor etc. 2. Complete test record after testing such as installation inspection and no- load operation record of AC motor etc. OBJECTIVE: As an experienced electrical engineer, the vital quality I possess of is self- confidence, self-possession and passion. Also I am a good team player. I am looking for a new challenge and an opportunity to apply the knowledge acquired.