ELECTRICAL AND INSTRUMENT SUPERVISOR
OBJECTIVE Seeking forchallenging postwhereexcellent working condition conductiveto character
working thefavors of organization and hopeforgood character
SUMMARY : Over 15 years of experience in Instrumentation field, with various reputed
companies. Continuous and diversified works in the field of Instrumentation has lead to learn the
various skills that are needed . Able to understand various aspects of Instrumentation Job loop
drawings, data sheets, instrument specifications including interlock logics, PID controllers.
Diligently plans the activities to expedite the different requirements of the job in compliance to
the company Specifications & requirements. Punch List & Clearance of the same in liaison with
PMT Team & Construction Contractor for various modifications works
PARTICIPATED TRAINING Company in house training for covering instrumentation, closed awareness
and understanding of Saudi Aramco engineering standard SAES,SMSS,SATIPand understanding of
industry codes and practice of NES,NFPA,IEEE,ANSI
CALIBRATION,MAINTENANCE,INSTALLATION,TROUBLESHOOTING,
EXPERIENCE DETAIL
COMPANY: ARCHEN ENGINEERING CONSULTING (KSA)
PROJECT: INFRASTRUCTURE PROJECT
DATE : DEC 2012 TO SEP 2016
POSITION: ELECTRICAL &INSTRUMENT SUPERVISOR
RESPONSIBILITIES AND ACTIVITIES
 supervision of Cable trays over the supports and verify the alignment before clamping, anchor
bolts and nuts requirement as pre IFC Drawing and final installation of cable tray
 installation of DCS panel and mother board installation with digital input, digital output,
analog input, analog output cord installation ,Inspection of panel earthling
 UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying ,
cable continuity on cable drum
 Worked on switch gear for the separation of grid supply and national supply that
interconnected With bus bar panel
 Inspection the installation of frequency drive, parameter checking and interlocking with fire
alarm honey well system
 Completed the precommissioning and commissioning procedure for the installation of flat
bus bar building standard and complete documentation according to project specification
 insulation resistance test of bus bar panel according to international standard
 Completed the documentation for the installation of solid state motorized electromechanical
breaker for the isolation of generator and national grid supply
 installation of DCS panel and mother board installation with digital input, digital output,
analog input, analog output cord installation ,Inspection of panel earthling
 Conduct activity and inspection in accordance to project Quality Assurance manual and
quality control inspection plan
 Prepare daily inspection document prior to project completion
 Take out the quantity of structured cabling networking system, fire alarm system, and cable
lengthen for used in project
 CCTV cameras and Fire alarm system, FM 200 control module, horn strobe, call point, cable
pulling from control room to JB,then JB to field instrument
 Inspection of main panel, sub panel, main breaker,ATS with termination of cable according to
RFI monitoring
 completed documents against construction complete jobs , meggaring continuity test, cable
insulation test
 UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying ,
cable continuity on cable drum
 inspection of Transformer according to specification ,VoIP structure network, security
network system , through Fiber optic cables
 ,prepared the (NCR) NON conformance report Inspection of Grounding cable jointing,
bonding conductor ,installation of Earthling rod ,check the resistance of earthling rod with
stack rod and meggar ,
 Inspection of UTP patch panel fiber optic patch panel
 completed documents against construction complete jobs ,continuity test, cable insulation
test
 UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying ,
cable continuity on cable drum according to project specification
 inspection of Transformer according to specification ,structured cabling networking system,
VoIP structure network, security network system , satellite network system ,CCTV cameras
through Fiber optic cables
CLIENT FARABI LAB (EXPANSION PROJECT)
DATE MAY 2012 TO OCT 2012
POSITION ELECTRICAL & INSTRUMENT SUPERVISOR
RESPONSIBILITIES & ACTIVITIES:
 loop checking of fire alarm making the plan of cable laying schedule inspection of
checking of motor control system in control building
 Review quality pack, loop folder and project drawing.
 Monitor completed document against construction completed jobs. Verify the
Location of Duct banks according to given IFC drawing
 Laying of conduits in U.G. Supervision of Conduit Size and Length of duct banks,
 loop checking from field instrument to marshaling cabinet and instrument
stanchions, Transmitter, Tubing from taping point to process instruments
including air supply leak testing according with standard and specification.
 Check and verified installation of field junction boxes, Analog & Digital cables
Thermocouple cable.
 Supervision of wire termination in field instrument, junction boxes and Marshaling
cabinet. Check and verified Remote instrument building grounding
 Attend quality and construction meeting in weekly basis to discuss quality related
issue
 As per international standard and specification instrument calibration, method of
statement as per approved project drawing, inspected ad witnesses instrument
cable duct bank, cable pulling from rib to JB and control room and RGS conduit
and stanches of instrument devices
 Check to verify exact termination point of each cable as per approved wiring
diagram core marker and tightens of cable
COMPANY: FLOWTRONICS PVT LTD
CLIENT: PAK ARAB OIL REFINARY (PAKISTAN)
DATE: JULY 2009 TO JAN 2012
POSITION: ELECTRICAL & INSTRUMENT SUPERVISOR
 Worked on different kind of flow instrumentation, magnetic flow
meter(yokogawa,rosemount) and worked on velocity flow meter,corilis flow
meter(Siemens, emerson,endress) thermal mass flow meter (emerson,siera,magnetrol)
and vortex flow meter (siemens, endress, rosemount,yokogawa)
 Worked on different kind of flow transmitter (yokogawa,emerson,honeywell,endress) and
also worked on foundation field system transmitter and different kind of rotary and vane
disk type flow meter
 Bench test and calibration of control valve of different type (fisher,honeywell) and
different type of I/P positioner(abb,fisher,sampson,magnetrol,spirax,siemens,valtek)
 Worked on radar level transmitter (rosemount,siemens,strans) ultrasonic
transmitter(flowcorp,emerson,flow line,rosemount,siemens)and ultrasonic sensor
 Worked on the troubleshooting of instrumentation and replacement of instrumentation
 Worked on impulse line Mani folding valve and replacement
 Worked on pressure transmitter and pressure sensor (rosemount,yokogawa,siemens)
pressure switches, I/p convertor and pressure calibrating dead weight tester, tale tester
 Worked on temperature instrumentation j type, temperature data logger,and calibration
of temperature instrumentation
 Termination of digital and analog cable in field and marshaling cabinet
 Responsible for the routine maintenance such as preventive ,corrective and break down
maintenance and prepare report on work to be done
 Remove defective instrument ,decontaminate, disassemble and replaced defective part
and installation
 Precommissioning and commissioning and functional test of process loop by interpretation
of loop drawing, hook up drawing and cause and effective diagram
 Check to verify exact termination point of each cable as per approved wiring diagram core
marker and tightens of cable
 Anything noted as per standard or specification then making surveillance or non-
conformance report
 Checking the daily progress report and forwarding it to management
 Review quality pack, loop folder and project drawing.
 Monitor completed document against construction completed jobs
 Review the instrument specification sheet (ISS) and wiring diagram of marshaling cabinet
and field instrument Review the piping and instrument diagram(P&ID) and instrument loop
diagram and location
 plan of instrument and instrument hook up drawing
 Inspection test plan of instrumentation material
 Coordination with area superintendent ensure that all installation is carried out as per
drawing and specification
 Safe the record of inspection checklist (ICT) Check instrument cable segregation for above
and underground installation
 Witnesses leak testing of airline, impulse instruments installation for process field
instrument.
COMPANY: ICI SODA ASH PVT LTD
CONTRACT BASIS DURATION: APRIL 2006 TO MAY 2009
COMPANY: BEST WAY CEMENT L
EMPLOYEE: JULY 2004 TO MAR 2006
POSITION: ELECTRICAL & INSTRUMENT SUPERVISOR
RESPONSIBILITIES AND ACTIVITIES:
 Supervision field construction project related to instrumentation ,installation,
calibration,modification, troubleshooting,
 Responsible for preparation of instrumentation, take off material and drawing needed for
the project
 Preparation of instrument work procedure and inspection test plan material receiving,
inspection, inspected material
 Weekly basis calibration report of co,co2,o2,nox sox, gas analyzer
 Prepare the monthly and weekly test report for modification work
 Responsible for checking field instrumentation,replacment,calibration related to profibus
 Responsible for checking the modification work that submitted from Dcs programmer
 Responsible for routine checking of ph analyzer for the requirment of production
department
 Resposible for checking progress report of department for rectification of fault during shift
 Supervision of all area instrumentation on weekly basis and ISO 9001 documentation,
Prepared the report for(IMR) instrument maintenance report inspection of all area
(TCR)transmitter calibration report sheet , prepared the report for(MOVR) motorized control
valve sheet ,Prepared the report for instrument cleaning report (ICR),
 supervision and check the parameter of Frequency drive(.5 ,1.5 ,3, 5 ,10,60kw) (ABB ,
SIEMENS, TELEMECHANIQUE) induction motor power and control circuit
 Thyristor control unit for (EP) ,weighing feeder of lime stone ,clay ,laterite , bauxite
,gypsum ,clinker And motor control unit control with profibus for DCS System, Supervision
of Conduit Size and Length of duct banks, U.G Conduits as per the give IFC drawing,
Supervision of Cable trays over the supports and verify the alignment, clamping, anchor
bolts and nuts requirement as pre IFC Drawing
 Magnetic flow trasmitter8742 (Rosemount), positive oval gear flow transmitter (omega),
flow transmitter PDS-III (SIEMENS), flow transmitter ST 3000 (SERIES 924) HONEYWELL) flow
 switches F61 series SPDT (Johnson & control) flow control Valve (china) digital display
 control valve (china) flow control valve electro pneumatic positioner 3582(FISHER) flow
 control valve 1200 hart positioner(VALTEK INT) DVC 6000 SERIES flow control valve(FISHER)
 Temperature data logger with pan drive(Germany) temp gauges and digital with switches
option(AMETEK) temperature transmitter STT850 ,STT170 (HONEYWELL )
 Smart absolute pressure transmitter ST700 (HONEYWELL) bottom stem mounted pressure
gauges ,diaphragm seal assembly gauges differential Pressure transmitter series 100
(Honeywell) remote seal diaphragm transmitter series100
(STD1200)(STR13D)[HONEYWELL) miniature explosion proof pressure switches Pressure
switches(china ,Germany) Ultrasonic level sensor Magnetic level gauge contact type
submersible level sensor, Magnetic level gauge (Magnetron) , level transmitter.
 PH analyzer202 (yokogawa) portable ph. meter (HANNA) PH analyzer (HONEY WELL), PH
transmitter (HONEY WELL).Vibration transmitter with controller vibration transmitter with
controller meter Displacement LVDT sensor(NATIONAL INT) , Displacement LVDT sensor
(CHINA) ,Capacitive type proximity sensor (OMRON ,OMEGA), Inductive type proximity
sensor(OMRON , OMEGA) Reed switches , limit switches (CHINA)
 Gas analyzer, CO, CO2, NO, for monitoring kiln, EP, COAL PLANT, (ABB, YOKOGAWA),
ELECTRICAL EXPERIENCE :
 Cooler fan induction motor control frequency drive with relay switching command
through DCS server ,All area Dust collecting motor power and control circuit from
electrostatic precipitator control card , clay hopper control motor with circuit with DCS
Control with frequency drive and instrumentation and Motorized operated valve power
and control circuit, coal firing fan induction motor with completely coal hopper purging
control system for pc and kiln ,Raw mill hydraulic system induction motor pump control
through frequency drive with profibus system for DScs server, inspection of parameter of
Kiln DC drive.
ELECTRONICS EXPERIENCE:
 welding plant current control cord, motor control profibus card,4-20 ma current control
cord ,diesel generator card ,vibration controller ,Temperature controller, pressure
controller, flow controller, level controller, magnetic flow meter power supply cord ,dust
controller (EP) cord, fire alarm cord, temperature recorder, lift operated control cord,
different types of ups, different types of weighing scale cord, plc. cpu module, high
temperature camera (kiln view) moving control cord, camera Dvr repairing,
C0MPANY: PAK AMERICAN FERTILIZER
CONTRACT: YEARLY OUTAGE ONLY
INCLUSIVE DATE DEC 2002 TO APRIL 2003
POSITION: INSTRUMENT TECHNICIAN
COMPANY: OLYMPIA CHEMICAL (PVT) LIMITED
EMPLOYEE: OCT 2003 TO MAY 2004
POSITION: INSTRUMENT &ELECTRONICS SUPERVISOR
RESPONCIBILITIES AND ACTIVITIES
 Commissioning ,installation ,of induction motor fan , induction motor pump , and making
the inputs and output ,analog output , analog input, power and control circuit
 Monitoring through DCS system, Commissioning , calibration of all area process control
instrumentation Worked as loop check coordinator on DCS ESD, SYSTEM , perform motor
 Pump and inputs (Local, remote, start, run, stop) Coordinate with DCS operator. K type
Thermocouple with indicator (uk) infrared temp sensor (OMEGA) ,temperature recorder,
Universal process controller 703750 (JUMO) ,PT 100 , PT 50 (china ,Germany Low pressure
and high pressure switch low vacuum pressure switch, Pressure transmitter (honey well )
 ultra-sonic level sensor (IR COMPANY) ,level sensor (china) level transmitter (ZHYQ) ,level
sensor (MOSH GROUP) ,level transmitter (HONEY WELL) ,level transmitter Gas analyzer O2,
CO2. (ABB) Inductive type proximity, Capacitive type proximity sensor (OMRON, OMEGA)
LVDT displacement sensor
AES LAL PIR THERMAL POWER STATION (yearly outage)
(SEP 1999 TO DEC 1999) (SEP 2002 TO NOV 2002)
INSTALLATION, MAINTENANCE, CALIBRATION
Worked on co , co2,nox sox , gas analyzer, maintenance of pump, calibration of analyzer,
maintenance of analyzer probe, and changing of o2 sensor, calibration of all pneumatic
temperature controller, maintenance of boiler camera , maintenance of mov control valve
WORKED ON CALIBRATION EQUIPMENT: Hart communicator (275,375,475),Low pressure hand
pump (Druck),Single Dc power supply(MCP),Hand held infrared temperature detector,
Temperature calibrators DBC (JUFFRA, DRUCK),Temperature, calibrator,(TRX),DC power
supply(MATRIX),SFC Communicator(HONEYWELL),DP calibrator (TRX), Dead weight tester
(Buden Berg), hand held dew point meter , Digital Pressure indicator (DP1706), Digital
pressure calibrator (DP601016 FLUKE) ,Pressure calibrator (FC31 FLUKE, DRUCK), Resistance
decade box , low pressure hand pump (FLUKE), temperature bath junior (TEMPCAL) , clamp
meter, Multimeter(FLUKE), Earth meggar ,fluke hart communicator, fluke multimeter,
FATHER NAME: HAJI QURBAN HUSSAIN RELIGION: ISLAM
ELECTRICAL AND INSTRUMENT SUPERVISOR

More Related Content

What's hot

Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
dhiresh kumar
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
Subhash +966535838322
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)PIYUSHKUMAR PRAJAPATI
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
Sanad Samir
 

What's hot (20)

Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 

Viewers also liked

旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
旅の設計図会
 
m5dwe
m5dwem5dwe
m5dwe
cacheiroml
 
Gost r 53917 2010
Gost r 53917 2010Gost r 53917 2010
Gost r 53917 2010hplei83
 
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
旅の設計図会
 
Integracion It&Finanzas 2008
Integracion It&Finanzas 2008Integracion It&Finanzas 2008
Integracion It&Finanzas 2008
Carlos Juarez
 
Gost r mek 60173 99
Gost r mek 60173 99Gost r mek 60173 99
Gost r mek 60173 99hplei83
 
Fotolog Mylo
Fotolog MyloFotolog Mylo
Fotolog Mylopzx
 
SALATOU RABBI
SALATOU RABBISALATOU RABBI
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
Project Controls Expo
 
Bloqueos psicológicos en la toma de decisiones
Bloqueos psicológicos en la toma de decisionesBloqueos psicológicos en la toma de decisiones
Bloqueos psicológicos en la toma de decisionesLily Colfo
 
Gost r 53912 2010
Gost r 53912 2010Gost r 53912 2010
Gost r 53912 2010hplei83
 
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
Project Controls Expo
 
Repaso (seminario)
Repaso (seminario)Repaso (seminario)
Repaso (seminario)
macampos
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016Hugh McKellar
 

Viewers also liked (20)

旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
旅の設計図 45.ラスベガス / Las Vegas,US(by 竹山/takeyama) - 旅の設計図会
 
m5dwe
m5dwem5dwe
m5dwe
 
Presentation for wayne
Presentation for waynePresentation for wayne
Presentation for wayne
 
Gost r 53917 2010
Gost r 53917 2010Gost r 53917 2010
Gost r 53917 2010
 
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
旅の設計図 4.九寨溝,中国四川省 / Jiuzhaigou,China (by 井上/inoue) - 旅の設計図会
 
Integracion It&Finanzas 2008
Integracion It&Finanzas 2008Integracion It&Finanzas 2008
Integracion It&Finanzas 2008
 
I Aim series
I Aim seriesI Aim series
I Aim series
 
Gost r mek 60173 99
Gost r mek 60173 99Gost r mek 60173 99
Gost r mek 60173 99
 
Undiajod
UndiajodUndiajod
Undiajod
 
Paper
PaperPaper
Paper
 
Fotolog Mylo
Fotolog MyloFotolog Mylo
Fotolog Mylo
 
Trabajo Rudy
Trabajo RudyTrabajo Rudy
Trabajo Rudy
 
SALATOU RABBI
SALATOU RABBISALATOU RABBI
SALATOU RABBI
 
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
Project Controls Expo, 18th Nov 2014 - "The 6 Key Elements for Improving Proj...
 
Bloqueos psicológicos en la toma de decisiones
Bloqueos psicológicos en la toma de decisionesBloqueos psicológicos en la toma de decisiones
Bloqueos psicológicos en la toma de decisiones
 
Gost r 53912 2010
Gost r 53912 2010Gost r 53912 2010
Gost r 53912 2010
 
DJ Blackmore - CV 2015
DJ Blackmore - CV 2015DJ Blackmore - CV 2015
DJ Blackmore - CV 2015
 
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
Project Controls Expo 09/10 Nov London 2011 - "The Earned Value Compass and ...
 
Repaso (seminario)
Repaso (seminario)Repaso (seminario)
Repaso (seminario)
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016
 

Similar to ELECTRICAL AND INSTRUMENT SUPERVISOR

M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CVMuhammad Nouman
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
Instrumentation Construction Pre- CommnEngineer RESUME
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUMEMohammed Y. Ahmed Nilangakar
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resumenoli donez
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISORMOHAMMAD MAZID
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Resume-Instrumentation engineer
Resume-Instrumentation engineerResume-Instrumentation engineer
Resume-Instrumentation engineer
upendra prasad
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 

Similar to ELECTRICAL AND INSTRUMENT SUPERVISOR (20)

asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
Instrumentation Construction Pre- CommnEngineer RESUME
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUME
 
M Imran
M ImranM Imran
M Imran
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
vinodh
vinodhvinodh
vinodh
 
Resume-Instrumentation engineer
Resume-Instrumentation engineerResume-Instrumentation engineer
Resume-Instrumentation engineer
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 

ELECTRICAL AND INSTRUMENT SUPERVISOR

  • 1. IKRAM HUSSAIN E-Mail:ikraam.hussain999@gmail.co MOB: 00966547214531 00966594797477 EDUCATION QUALIFICATION: : DAE ELECTRICAL AND INSTRUMENTATION : BACHELOR OF SCIENCE (B.SC PHYSICS) NATIONALITY : : PAKISTANI IQAMA : : TRANSFERABLE (2330736105) ELECTRICAL AND INSTRUMENT SUPERVISOR OBJECTIVE Seeking forchallenging postwhereexcellent working condition conductiveto character working thefavors of organization and hopeforgood character SUMMARY : Over 15 years of experience in Instrumentation field, with various reputed companies. Continuous and diversified works in the field of Instrumentation has lead to learn the various skills that are needed . Able to understand various aspects of Instrumentation Job loop drawings, data sheets, instrument specifications including interlock logics, PID controllers. Diligently plans the activities to expedite the different requirements of the job in compliance to the company Specifications & requirements. Punch List & Clearance of the same in liaison with PMT Team & Construction Contractor for various modifications works PARTICIPATED TRAINING Company in house training for covering instrumentation, closed awareness and understanding of Saudi Aramco engineering standard SAES,SMSS,SATIPand understanding of industry codes and practice of NES,NFPA,IEEE,ANSI CALIBRATION,MAINTENANCE,INSTALLATION,TROUBLESHOOTING, EXPERIENCE DETAIL COMPANY: ARCHEN ENGINEERING CONSULTING (KSA) PROJECT: INFRASTRUCTURE PROJECT DATE : DEC 2012 TO SEP 2016 POSITION: ELECTRICAL &INSTRUMENT SUPERVISOR RESPONSIBILITIES AND ACTIVITIES  supervision of Cable trays over the supports and verify the alignment before clamping, anchor bolts and nuts requirement as pre IFC Drawing and final installation of cable tray  installation of DCS panel and mother board installation with digital input, digital output, analog input, analog output cord installation ,Inspection of panel earthling  UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying , cable continuity on cable drum  Worked on switch gear for the separation of grid supply and national supply that interconnected With bus bar panel  Inspection the installation of frequency drive, parameter checking and interlocking with fire alarm honey well system
  • 2.  Completed the precommissioning and commissioning procedure for the installation of flat bus bar building standard and complete documentation according to project specification  insulation resistance test of bus bar panel according to international standard  Completed the documentation for the installation of solid state motorized electromechanical breaker for the isolation of generator and national grid supply  installation of DCS panel and mother board installation with digital input, digital output, analog input, analog output cord installation ,Inspection of panel earthling  Conduct activity and inspection in accordance to project Quality Assurance manual and quality control inspection plan  Prepare daily inspection document prior to project completion  Take out the quantity of structured cabling networking system, fire alarm system, and cable lengthen for used in project  CCTV cameras and Fire alarm system, FM 200 control module, horn strobe, call point, cable pulling from control room to JB,then JB to field instrument  Inspection of main panel, sub panel, main breaker,ATS with termination of cable according to RFI monitoring  completed documents against construction complete jobs , meggaring continuity test, cable insulation test  UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying , cable continuity on cable drum  inspection of Transformer according to specification ,VoIP structure network, security network system , through Fiber optic cables  ,prepared the (NCR) NON conformance report Inspection of Grounding cable jointing, bonding conductor ,installation of Earthling rod ,check the resistance of earthling rod with stack rod and meggar ,  Inspection of UTP patch panel fiber optic patch panel  completed documents against construction complete jobs ,continuity test, cable insulation test  UPS installation , loop checking from field to Marshaling cabinet inspection of cable laying , cable continuity on cable drum according to project specification  inspection of Transformer according to specification ,structured cabling networking system, VoIP structure network, security network system , satellite network system ,CCTV cameras through Fiber optic cables CLIENT FARABI LAB (EXPANSION PROJECT) DATE MAY 2012 TO OCT 2012 POSITION ELECTRICAL & INSTRUMENT SUPERVISOR RESPONSIBILITIES & ACTIVITIES:  loop checking of fire alarm making the plan of cable laying schedule inspection of checking of motor control system in control building  Review quality pack, loop folder and project drawing.
  • 3.  Monitor completed document against construction completed jobs. Verify the Location of Duct banks according to given IFC drawing  Laying of conduits in U.G. Supervision of Conduit Size and Length of duct banks,  loop checking from field instrument to marshaling cabinet and instrument stanchions, Transmitter, Tubing from taping point to process instruments including air supply leak testing according with standard and specification.  Check and verified installation of field junction boxes, Analog & Digital cables Thermocouple cable.  Supervision of wire termination in field instrument, junction boxes and Marshaling cabinet. Check and verified Remote instrument building grounding  Attend quality and construction meeting in weekly basis to discuss quality related issue  As per international standard and specification instrument calibration, method of statement as per approved project drawing, inspected ad witnesses instrument cable duct bank, cable pulling from rib to JB and control room and RGS conduit and stanches of instrument devices  Check to verify exact termination point of each cable as per approved wiring diagram core marker and tightens of cable COMPANY: FLOWTRONICS PVT LTD CLIENT: PAK ARAB OIL REFINARY (PAKISTAN) DATE: JULY 2009 TO JAN 2012 POSITION: ELECTRICAL & INSTRUMENT SUPERVISOR  Worked on different kind of flow instrumentation, magnetic flow meter(yokogawa,rosemount) and worked on velocity flow meter,corilis flow meter(Siemens, emerson,endress) thermal mass flow meter (emerson,siera,magnetrol) and vortex flow meter (siemens, endress, rosemount,yokogawa)  Worked on different kind of flow transmitter (yokogawa,emerson,honeywell,endress) and also worked on foundation field system transmitter and different kind of rotary and vane disk type flow meter  Bench test and calibration of control valve of different type (fisher,honeywell) and different type of I/P positioner(abb,fisher,sampson,magnetrol,spirax,siemens,valtek)  Worked on radar level transmitter (rosemount,siemens,strans) ultrasonic transmitter(flowcorp,emerson,flow line,rosemount,siemens)and ultrasonic sensor  Worked on the troubleshooting of instrumentation and replacement of instrumentation  Worked on impulse line Mani folding valve and replacement  Worked on pressure transmitter and pressure sensor (rosemount,yokogawa,siemens) pressure switches, I/p convertor and pressure calibrating dead weight tester, tale tester  Worked on temperature instrumentation j type, temperature data logger,and calibration of temperature instrumentation  Termination of digital and analog cable in field and marshaling cabinet  Responsible for the routine maintenance such as preventive ,corrective and break down maintenance and prepare report on work to be done
  • 4.  Remove defective instrument ,decontaminate, disassemble and replaced defective part and installation  Precommissioning and commissioning and functional test of process loop by interpretation of loop drawing, hook up drawing and cause and effective diagram  Check to verify exact termination point of each cable as per approved wiring diagram core marker and tightens of cable  Anything noted as per standard or specification then making surveillance or non- conformance report  Checking the daily progress report and forwarding it to management  Review quality pack, loop folder and project drawing.  Monitor completed document against construction completed jobs  Review the instrument specification sheet (ISS) and wiring diagram of marshaling cabinet and field instrument Review the piping and instrument diagram(P&ID) and instrument loop diagram and location  plan of instrument and instrument hook up drawing  Inspection test plan of instrumentation material  Coordination with area superintendent ensure that all installation is carried out as per drawing and specification  Safe the record of inspection checklist (ICT) Check instrument cable segregation for above and underground installation  Witnesses leak testing of airline, impulse instruments installation for process field instrument. COMPANY: ICI SODA ASH PVT LTD CONTRACT BASIS DURATION: APRIL 2006 TO MAY 2009 COMPANY: BEST WAY CEMENT L EMPLOYEE: JULY 2004 TO MAR 2006 POSITION: ELECTRICAL & INSTRUMENT SUPERVISOR RESPONSIBILITIES AND ACTIVITIES:  Supervision field construction project related to instrumentation ,installation, calibration,modification, troubleshooting,  Responsible for preparation of instrumentation, take off material and drawing needed for the project  Preparation of instrument work procedure and inspection test plan material receiving, inspection, inspected material  Weekly basis calibration report of co,co2,o2,nox sox, gas analyzer  Prepare the monthly and weekly test report for modification work  Responsible for checking field instrumentation,replacment,calibration related to profibus  Responsible for checking the modification work that submitted from Dcs programmer  Responsible for routine checking of ph analyzer for the requirment of production department  Resposible for checking progress report of department for rectification of fault during shift
  • 5.  Supervision of all area instrumentation on weekly basis and ISO 9001 documentation, Prepared the report for(IMR) instrument maintenance report inspection of all area (TCR)transmitter calibration report sheet , prepared the report for(MOVR) motorized control valve sheet ,Prepared the report for instrument cleaning report (ICR),  supervision and check the parameter of Frequency drive(.5 ,1.5 ,3, 5 ,10,60kw) (ABB , SIEMENS, TELEMECHANIQUE) induction motor power and control circuit  Thyristor control unit for (EP) ,weighing feeder of lime stone ,clay ,laterite , bauxite ,gypsum ,clinker And motor control unit control with profibus for DCS System, Supervision of Conduit Size and Length of duct banks, U.G Conduits as per the give IFC drawing, Supervision of Cable trays over the supports and verify the alignment, clamping, anchor bolts and nuts requirement as pre IFC Drawing  Magnetic flow trasmitter8742 (Rosemount), positive oval gear flow transmitter (omega), flow transmitter PDS-III (SIEMENS), flow transmitter ST 3000 (SERIES 924) HONEYWELL) flow  switches F61 series SPDT (Johnson & control) flow control Valve (china) digital display  control valve (china) flow control valve electro pneumatic positioner 3582(FISHER) flow  control valve 1200 hart positioner(VALTEK INT) DVC 6000 SERIES flow control valve(FISHER)  Temperature data logger with pan drive(Germany) temp gauges and digital with switches option(AMETEK) temperature transmitter STT850 ,STT170 (HONEYWELL )  Smart absolute pressure transmitter ST700 (HONEYWELL) bottom stem mounted pressure gauges ,diaphragm seal assembly gauges differential Pressure transmitter series 100 (Honeywell) remote seal diaphragm transmitter series100 (STD1200)(STR13D)[HONEYWELL) miniature explosion proof pressure switches Pressure switches(china ,Germany) Ultrasonic level sensor Magnetic level gauge contact type submersible level sensor, Magnetic level gauge (Magnetron) , level transmitter.  PH analyzer202 (yokogawa) portable ph. meter (HANNA) PH analyzer (HONEY WELL), PH transmitter (HONEY WELL).Vibration transmitter with controller vibration transmitter with controller meter Displacement LVDT sensor(NATIONAL INT) , Displacement LVDT sensor (CHINA) ,Capacitive type proximity sensor (OMRON ,OMEGA), Inductive type proximity sensor(OMRON , OMEGA) Reed switches , limit switches (CHINA)  Gas analyzer, CO, CO2, NO, for monitoring kiln, EP, COAL PLANT, (ABB, YOKOGAWA), ELECTRICAL EXPERIENCE :  Cooler fan induction motor control frequency drive with relay switching command through DCS server ,All area Dust collecting motor power and control circuit from electrostatic precipitator control card , clay hopper control motor with circuit with DCS Control with frequency drive and instrumentation and Motorized operated valve power and control circuit, coal firing fan induction motor with completely coal hopper purging control system for pc and kiln ,Raw mill hydraulic system induction motor pump control through frequency drive with profibus system for DScs server, inspection of parameter of Kiln DC drive. ELECTRONICS EXPERIENCE:
  • 6.  welding plant current control cord, motor control profibus card,4-20 ma current control cord ,diesel generator card ,vibration controller ,Temperature controller, pressure controller, flow controller, level controller, magnetic flow meter power supply cord ,dust controller (EP) cord, fire alarm cord, temperature recorder, lift operated control cord, different types of ups, different types of weighing scale cord, plc. cpu module, high temperature camera (kiln view) moving control cord, camera Dvr repairing, C0MPANY: PAK AMERICAN FERTILIZER CONTRACT: YEARLY OUTAGE ONLY INCLUSIVE DATE DEC 2002 TO APRIL 2003 POSITION: INSTRUMENT TECHNICIAN COMPANY: OLYMPIA CHEMICAL (PVT) LIMITED EMPLOYEE: OCT 2003 TO MAY 2004 POSITION: INSTRUMENT &ELECTRONICS SUPERVISOR RESPONCIBILITIES AND ACTIVITIES  Commissioning ,installation ,of induction motor fan , induction motor pump , and making the inputs and output ,analog output , analog input, power and control circuit  Monitoring through DCS system, Commissioning , calibration of all area process control instrumentation Worked as loop check coordinator on DCS ESD, SYSTEM , perform motor  Pump and inputs (Local, remote, start, run, stop) Coordinate with DCS operator. K type Thermocouple with indicator (uk) infrared temp sensor (OMEGA) ,temperature recorder, Universal process controller 703750 (JUMO) ,PT 100 , PT 50 (china ,Germany Low pressure and high pressure switch low vacuum pressure switch, Pressure transmitter (honey well )  ultra-sonic level sensor (IR COMPANY) ,level sensor (china) level transmitter (ZHYQ) ,level sensor (MOSH GROUP) ,level transmitter (HONEY WELL) ,level transmitter Gas analyzer O2, CO2. (ABB) Inductive type proximity, Capacitive type proximity sensor (OMRON, OMEGA) LVDT displacement sensor AES LAL PIR THERMAL POWER STATION (yearly outage) (SEP 1999 TO DEC 1999) (SEP 2002 TO NOV 2002) INSTALLATION, MAINTENANCE, CALIBRATION Worked on co , co2,nox sox , gas analyzer, maintenance of pump, calibration of analyzer, maintenance of analyzer probe, and changing of o2 sensor, calibration of all pneumatic temperature controller, maintenance of boiler camera , maintenance of mov control valve WORKED ON CALIBRATION EQUIPMENT: Hart communicator (275,375,475),Low pressure hand pump (Druck),Single Dc power supply(MCP),Hand held infrared temperature detector, Temperature calibrators DBC (JUFFRA, DRUCK),Temperature, calibrator,(TRX),DC power supply(MATRIX),SFC Communicator(HONEYWELL),DP calibrator (TRX), Dead weight tester (Buden Berg), hand held dew point meter , Digital Pressure indicator (DP1706), Digital pressure calibrator (DP601016 FLUKE) ,Pressure calibrator (FC31 FLUKE, DRUCK), Resistance decade box , low pressure hand pump (FLUKE), temperature bath junior (TEMPCAL) , clamp meter, Multimeter(FLUKE), Earth meggar ,fluke hart communicator, fluke multimeter, FATHER NAME: HAJI QURBAN HUSSAIN RELIGION: ISLAM