Advancing sustainability in infrastructure
planning, procurement, delivery and operation.
www.isca.org.au
Antony Sprigg
CEO
asprigg@isca.com.au
0414 454 723
Infrastructure Sustainability and the IS
Scheme
What is Infrastructure Sustainability
• Infrastructure sustainability
• Sustainable infrastructure
• Green infrastructure
Infrastructure sustainability (IS Technical Manual) ,” …
infrastructure that is planned, designed, constructed and
operated to optimise environmental, societal and economic
outcomes over the long term”.
2
BUILDINGS
• GBCA – Green Star
• Started 2003
• Over 500 rated + 500 registered
• NABERS
• LEED (USA)
• BREEAM (UK)
Global Trends
INFRASTRUCTURE
• CEEQUAL (UK)
• Started 2003
• Over 150 rated
• ISI - Envision (USA)
• Started 2012
• GreenRoads (USA)
• INVEST (USA)
Infrastructure Sustainability
4
ISCA Overview
The Infrastructure Sustainability Council of Australia (formerly the
Australian Green Infrastructure Council) is a member based, not-for-
profit industry (public & private) council.
Our vision:
Enhancing the liveability and productivity of our
major cities and our regional communities through
advancing sustainability in infrastructure planning,
procurement, delivery and operation.
5
ISCA then to now
• Bipartisan industry initiative
• 5 years old
• 70 members
• Australia and NZ
• $A 5M to develop
• IS globally benchmarked and locally tailored
• Emulation of governance and translation of technical
6
7
Business
Case
Procurement
DesignConstruction
Operations
Master
Planning
IS
Scheme
Why use the IS scheme (slide 1)
8
Why use the IS scheme (slide 2)
Master Planning
Inform/challenge master plan through TBL performance assessment of the proposed
underpinning infrastructure.
• Mitigate perverse outcomes
• Enhanced integration
• Appreciation of material impacts and opportunities
Business Case
Benchmark, evaluate and gap analyse for TBL aspects in the business case for a new
infrastructure project.
• Informs and articulates the ‘story’ underpinning the project need
• Establishes a TBL governance and performance framework which can be pulled
through each project phase
• Identifies and incorporates high value sustainability considerations early
• Informs procurement
• ‘Bottom up’ due diligence ESG assessment framework for investors
• Stream line approvals
9
Why use the IS scheme (slide 3)
Design
An integrated framework which encourages ‘centralising’ of sustainability ownership,
increasing the likelihood of unlocking design solutions which can meet both fit for
purpose, cost and sustainability whole of life expectations and outcomes.
• Facilitates continuous improvement and innovation
• Facilitates sustainability in design processes
• Provides a reporting platform
Procurement
A TBL performance framework to assess and identify sustainability objectives, targets
and innovations pretender by client and as part of tender response by tenderers.
• Consistent industry language and benchmarks, thus reducing costs and improving
outcomes
• Reduces risks for clients and increases certainty for tenderers
• Provides measureable and quantifiable targets
10
Why use the IS scheme (slide 4)
Construction
An industry developed best practise standard for applied sustainability in
construction associated with civil and infrastructure projects.
• Common industry sustainability language
• A framework which can be used to identify and value resource efficiency,
innovation and other environmental and community opportunities
• Centralises and maintains sustainability ownership during delivery
• Informs project KRA’s/KPIs and associated targets
• ‘Voluntary’ and outcomes based, therefore can be a project culture enhancer
Operation
A ‘bottom up’ applied sustainability tool and management framework which can be
used to benchmark asset performance and inform continuous improvement.
• Value creation and risk identification for investors
• Baseline asset/network TBL performance for asset owner/operators
• Facilitates identification of risks and opportunities and informs continuous
improvement targets
• Informs corporate reporting
IS Themes and Categories
11
Themes Categories
Management and Governance
Management Systems
Procurement and Purchasing
Climate Change Adaptation
Using Resources
Energy and Carbon
Water
Materials
Emissions, Pollution and Waste
Discharges to Air, Land and Water
Land
Waste
Ecology Ecology
People and Place
Community Health, Well-being and Safety
Heritage
Stakeholder Participation
Urban and Landscape Design
Innovation Innovation
IS rating scheme
12
Benchmarking
13
Level 1
Good
Level 2
Excellent
Level 3
Leading
Beyond Compliance
Business
as Usual
Measurement
Implementing
Initiatives
No net impact Restoration &
Enhancement
Compliance
Level of
Performance
Tool Development a $5M industry
investment
Stakeholder Workshop Apr 2008
Project Manager appointed Oct 2008
CC Adaptation Category Apr-Sep 2010
Tool Development kick-off workshop Sep 2010
Draft tool for pilot Jun 2011
Pilot round 1 Aug - Sept 2011
Pilot round 2 Oct – Dec 2011
Introduce tool at ISCA conference Oct 2011
Tool launch Feb 2012
Tool Sponsors
• DIT
• DCCEE
• NSW DECCW
• Qld TMR
• BlueScope Steel
• PIPA
• Qld DERM
• Civil Constructors Federation
• GHD (Project Manager)
• NetBalance
Infrastructure Types
Transport
• Airports
• Cycleways & Footpaths
• Ports & Harbours
• Roads
• Railways
Communication
• Communication Networks
Water
• Sewerage & Drainage
• Storage & Supply
Energy
• Electricity Transmission &
Distribution
• Gas Pipelines
Development Team
AGIC Technical
Director
Tool Development
Project Manager
Global Review Panel
7 members
across industry
Category Author
Category Author
Category Author
Category Author
Category Author
Peer Reviewer
Peer Reviewer
Peer Reviewer
Peer Reviewer
Peer Reviewer
16 from 8
organisations
GHD- contracted
Stakeholder Input
IS Scheme Ratings and the Brand
18
Rating Types
19
Rating Type:
Project Phase:
Planning &
Design
Construction Operation
Design Rating
Operation
Rating
As Built Rating
Design – As Built - Operation
IS Training
Currently the primary training provided is the “IS Foundation
Training Course”. This is a 2 day course, which can be delivered
as in-house or externally, covers the following:
• Overview of the IS rating process
• Introduction to the content and sustainability performance
benchmarks associated with the 52 Credits which underpin
the 15 IS Sustainability Categories
• Involvement in interactive case studies
• An exam
Passing the exam qualifies the participant as an IS Accredited
Professional
20
21
Registered Projects
Project/Asset Location Rating Type Asset Status Capital
Value ($m)
Whitsunday STP
Upgrades
QLD Sewerage Certified rating
awarded
45
Great Eastern
Highway Upgrade
WA Road Certified rating
awarded
300
Enlarged Cotter Dam ACT As Built Water
Supply and
Storage
Verification
underway
300
Rous Head Industrial
Park
WA As Built Port Self-
assessment
underway
15
Gold Coast Light
Rail (Stage 1)
QLD As Built Light Rail Verification
underway
437
Elizabeth Quay WA As Built Roads,
wharfs and
utilities
Self-
assessment
underway
438
22
Registered Projects
Project/Asset Location Rating Type Asset Status Capital
Value ($m)
Gateway WA - Perth
Airport & Freight
Access
WA Design
As Built
Road Self-
assessment
underway
1,000
Googong Water
Treatment Plant
Chemical Facility
Upgrade
ACT Design Water
Supply
Self-
assessment
underway
9
North West Rail Link
- Early Works
NSW As Built Railway Self-
assessment
underway
80
Wynyard Walk NSW Design
As Built
Cycleways
and
Footpaths
Self-
assessment
underway
286
North West Rail Link
- Tunnel and Station
Civils
NSW Design
As Built
Railways Self-
assessment
underway
1,100
CBD and South East
Light Rail
NSW Design
As Built
Operation
Light Rail Planning and
Procurement
1,600
23
Registered Projects
Project/Asset Location Rating Type Asset Status Capital
Value ($m)
NorthLink WA WA Design
As Built
Road Self-
assessment
underway
1,000
Whitsunday STP
Upgrades
QLD As Built Water
Supply
Self-
assessment
underway
45
Confidential Road
Asset Management
NSW Operation
Pilot
Road Registration 700
Capital Metro ACT Design
As Built
Operation
Light Rail Self-
assessment
underway
614
Confidential NSW Design
As Built
Road Registration 2,700
Madden and
Pakenham St Road
Upgrade
NZ NZ Design
Pilot
Road Self-
assessment
underway
13
North West Rail Link
– Surface and
Viaducts Civil
NSW Design
As Built
Railway Self-
assessment
underway
340
City Rail Link NZ NZ Design
Pilot
As Built
Railway Registration 2,800
24
Whitsunday STP Upgrades
Proponent: Whitsunday Regional Council
Contractor: Tenix
Infrastructure Type: Sewerage
Rating Type: Design
Location: Whitsundays, QLD
Capital Value: $45m
Start Date: May 2012
Practical Completion: May 2014
The upgrade of two treatment plants at Proserpine and
Cannonvale are to serve growing communities and meet the
most stringent effluent discharge requirements to protect
the Great Barrier Reef. They will also provide benefits to the
local community by reducing sewage overflows, and
improving noise and odour.
25
Whitsunday STP Upgrades – Highlights
Category/
Credit
Score Achievements
Management
Systems
7.3/10.5
• Good management systems integrating the IS rating tool
into practices
• Knowledge sharing clearly demonstrated.
Procurement
and Purchasing
4.2/5.0
• Strong commitment to and application of sustainable
procurement including local procurement:
• 50% of total spend in the Whitsunday region
• 30% of total spend in greater Queensland
Climate
Change
Adaptation
4.2/5.0
• Did a thorough, formal climate change risk assessment
and implemented controls to reduce 22 ‘high’ or ‘very
high’ risks to a ‘moderate’ or ‘low’ rating
Energy and
Carbon
5.1/10.5
• 305 MWh electricity saved over operational life – thus a
14% reduction equating to $75,000 saving/year
• 14,000 tCO2-e avoided over lifecycle
• Use of B20 Biodiesel avoiding 272 tCO2-e (cost neutral)
26
Whitsunday STP Upgrades – Highlights
Category/
Credit
Score Achievements
Water 3.9/7.0
• 15% reduction in water use over lifecycle, with
associated cost benefit
Materials 7.0/7.0
• Reduced the materials footprint by 25%:
• Used 4,329 tonnes less concrete
• Used 298 tonnes less steel
• Used eco-cement with 30% fly ash
• Eliminated asphalt from the design
Receiving
Water Quality
2.9/2.9
• >75% reduction in N and >90% reduction in P (44
tonnes less nutrients annually) to the Great Barrier Reef
Marine Park
Ecological
Value
2.0/2.0
• Ecological value enhanced through >5,000 m2 of
regenerated native habitat and 1000 m2 of wetland
27
Whitsunday STP Upgrades – Highlights
Category/
Credit
Score Achievements
Innovation 5.0/5.0
• World’s-first trial of Parallel Nitrification & De-
Nitrification (PND):
• Significantly improves nitrogen removal
• More compact
• Less construction materials
• More energy efficient
Great Eastern Highway Upgrade
A 4.2km section of the Great Eastern Highway between Kooyong Road and
Tonkin Highway widened from four to six lanes with a number of ancillary
improvements including central medians, upgraded intersections, on road
cycling facilities, bus priority lanes and continuous paths for pedestrians.
Proponent: Main Roads WA (MRWA)
Contractor:
City East Alliance (MRWA,
Leighton Cont., GHD, NRW)
Infrastructure Type: Road
Rating Type: As Built
Location: Perth, WA
Capital Value: $350 million
Start Date: July 2011
Practical Completion: March 2013
Great Eastern Highway Upgrade – Highlights
29
Category/
Credit
Score Achievements
Management
Systems
6.3/10.5
• Commitment to mitigating negative environmental,
social and economic impacts
• Accredited management systems
• Thorough risk and opportunity assessment
• Knowledge sharing clearly demonstrated
• Strong decision making approach incorporating
sustainability aspects
Water 2.9/7.0
• Opportunities to reduce water use identified and
implemented
• Instead of using high-value potable water, the project
installed groundwater bores and constructed a weir
which, on completion, was handed to the local council
to irrigate parks.
Great Eastern Highway Upgrade – Highlights
30
Category/
Credit
Score Achievements
Materials 6.2/7.0
• Significant reduction in materials lifecycle impacts
through extensive use of recycled materials, reducing
the use of non-renewable resources of limestone, sand
and bitumen
• The highway now has the largest use of recycled
material on any WA State road with 43 per cent of
imported material being recycled
Previous Land
Use
3.3/3.3
• >75% of land used for the project was previously
disturbed
Heritage 2.3/5.0
• Thorough approach to heritage assessment and
management
• Monitoring overseen by appropriately qualified persons
Great Eastern Highway Upgrade – Highlights
31
Category/
Credit
Score Achievements
Innovation 1.7/5.0
• Warm mix asphalt was used on the project, applying
innovative foaming technology to mix the bitumen into
the asphalt mix
• This was a first for Western Australia, reducing energy
use and GHG emissions
IS Rating Tool – Continuous Improvement
Review and
Feedback
IS Rating tool V1
Use of Design and As Built V1
IS Rating Tool - Design and As Built V2
Tool Consolidation
Launch Preparation
OperationPilot
(IPWEA)
Economic
Workforce
IS Operation V1
Operation
Pilot
(Others)
2012
2015 H1
2013 H1
2013 H2
Review and Feedback
2014 H1
2014 H2
New Themes
Proposed
Operational
Priority
Review
Key
ScopingScoping
33
ISCA Members
34
ISCA Members (cont’d)

SMART Seminar: Infrastructure Sustainability and the IS Scheme

  • 1.
    Advancing sustainability ininfrastructure planning, procurement, delivery and operation. www.isca.org.au Antony Sprigg CEO asprigg@isca.com.au 0414 454 723 Infrastructure Sustainability and the IS Scheme
  • 2.
    What is InfrastructureSustainability • Infrastructure sustainability • Sustainable infrastructure • Green infrastructure Infrastructure sustainability (IS Technical Manual) ,” … infrastructure that is planned, designed, constructed and operated to optimise environmental, societal and economic outcomes over the long term”. 2
  • 3.
    BUILDINGS • GBCA –Green Star • Started 2003 • Over 500 rated + 500 registered • NABERS • LEED (USA) • BREEAM (UK) Global Trends INFRASTRUCTURE • CEEQUAL (UK) • Started 2003 • Over 150 rated • ISI - Envision (USA) • Started 2012 • GreenRoads (USA) • INVEST (USA)
  • 4.
  • 5.
    ISCA Overview The InfrastructureSustainability Council of Australia (formerly the Australian Green Infrastructure Council) is a member based, not-for- profit industry (public & private) council. Our vision: Enhancing the liveability and productivity of our major cities and our regional communities through advancing sustainability in infrastructure planning, procurement, delivery and operation. 5
  • 6.
    ISCA then tonow • Bipartisan industry initiative • 5 years old • 70 members • Australia and NZ • $A 5M to develop • IS globally benchmarked and locally tailored • Emulation of governance and translation of technical 6
  • 7.
  • 8.
    8 Why use theIS scheme (slide 2) Master Planning Inform/challenge master plan through TBL performance assessment of the proposed underpinning infrastructure. • Mitigate perverse outcomes • Enhanced integration • Appreciation of material impacts and opportunities Business Case Benchmark, evaluate and gap analyse for TBL aspects in the business case for a new infrastructure project. • Informs and articulates the ‘story’ underpinning the project need • Establishes a TBL governance and performance framework which can be pulled through each project phase • Identifies and incorporates high value sustainability considerations early • Informs procurement • ‘Bottom up’ due diligence ESG assessment framework for investors • Stream line approvals
  • 9.
    9 Why use theIS scheme (slide 3) Design An integrated framework which encourages ‘centralising’ of sustainability ownership, increasing the likelihood of unlocking design solutions which can meet both fit for purpose, cost and sustainability whole of life expectations and outcomes. • Facilitates continuous improvement and innovation • Facilitates sustainability in design processes • Provides a reporting platform Procurement A TBL performance framework to assess and identify sustainability objectives, targets and innovations pretender by client and as part of tender response by tenderers. • Consistent industry language and benchmarks, thus reducing costs and improving outcomes • Reduces risks for clients and increases certainty for tenderers • Provides measureable and quantifiable targets
  • 10.
    10 Why use theIS scheme (slide 4) Construction An industry developed best practise standard for applied sustainability in construction associated with civil and infrastructure projects. • Common industry sustainability language • A framework which can be used to identify and value resource efficiency, innovation and other environmental and community opportunities • Centralises and maintains sustainability ownership during delivery • Informs project KRA’s/KPIs and associated targets • ‘Voluntary’ and outcomes based, therefore can be a project culture enhancer Operation A ‘bottom up’ applied sustainability tool and management framework which can be used to benchmark asset performance and inform continuous improvement. • Value creation and risk identification for investors • Baseline asset/network TBL performance for asset owner/operators • Facilitates identification of risks and opportunities and informs continuous improvement targets • Informs corporate reporting
  • 11.
    IS Themes andCategories 11 Themes Categories Management and Governance Management Systems Procurement and Purchasing Climate Change Adaptation Using Resources Energy and Carbon Water Materials Emissions, Pollution and Waste Discharges to Air, Land and Water Land Waste Ecology Ecology People and Place Community Health, Well-being and Safety Heritage Stakeholder Participation Urban and Landscape Design Innovation Innovation
  • 12.
  • 13.
    Benchmarking 13 Level 1 Good Level 2 Excellent Level3 Leading Beyond Compliance Business as Usual Measurement Implementing Initiatives No net impact Restoration & Enhancement Compliance Level of Performance
  • 14.
    Tool Development a$5M industry investment Stakeholder Workshop Apr 2008 Project Manager appointed Oct 2008 CC Adaptation Category Apr-Sep 2010 Tool Development kick-off workshop Sep 2010 Draft tool for pilot Jun 2011 Pilot round 1 Aug - Sept 2011 Pilot round 2 Oct – Dec 2011 Introduce tool at ISCA conference Oct 2011 Tool launch Feb 2012
  • 15.
    Tool Sponsors • DIT •DCCEE • NSW DECCW • Qld TMR • BlueScope Steel • PIPA • Qld DERM • Civil Constructors Federation • GHD (Project Manager) • NetBalance
  • 16.
    Infrastructure Types Transport • Airports •Cycleways & Footpaths • Ports & Harbours • Roads • Railways Communication • Communication Networks Water • Sewerage & Drainage • Storage & Supply Energy • Electricity Transmission & Distribution • Gas Pipelines
  • 17.
    Development Team AGIC Technical Director ToolDevelopment Project Manager Global Review Panel 7 members across industry Category Author Category Author Category Author Category Author Category Author Peer Reviewer Peer Reviewer Peer Reviewer Peer Reviewer Peer Reviewer 16 from 8 organisations GHD- contracted Stakeholder Input
  • 18.
    IS Scheme Ratingsand the Brand 18
  • 19.
    Rating Types 19 Rating Type: ProjectPhase: Planning & Design Construction Operation Design Rating Operation Rating As Built Rating Design – As Built - Operation
  • 20.
    IS Training Currently theprimary training provided is the “IS Foundation Training Course”. This is a 2 day course, which can be delivered as in-house or externally, covers the following: • Overview of the IS rating process • Introduction to the content and sustainability performance benchmarks associated with the 52 Credits which underpin the 15 IS Sustainability Categories • Involvement in interactive case studies • An exam Passing the exam qualifies the participant as an IS Accredited Professional 20
  • 21.
    21 Registered Projects Project/Asset LocationRating Type Asset Status Capital Value ($m) Whitsunday STP Upgrades QLD Sewerage Certified rating awarded 45 Great Eastern Highway Upgrade WA Road Certified rating awarded 300 Enlarged Cotter Dam ACT As Built Water Supply and Storage Verification underway 300 Rous Head Industrial Park WA As Built Port Self- assessment underway 15 Gold Coast Light Rail (Stage 1) QLD As Built Light Rail Verification underway 437 Elizabeth Quay WA As Built Roads, wharfs and utilities Self- assessment underway 438
  • 22.
    22 Registered Projects Project/Asset LocationRating Type Asset Status Capital Value ($m) Gateway WA - Perth Airport & Freight Access WA Design As Built Road Self- assessment underway 1,000 Googong Water Treatment Plant Chemical Facility Upgrade ACT Design Water Supply Self- assessment underway 9 North West Rail Link - Early Works NSW As Built Railway Self- assessment underway 80 Wynyard Walk NSW Design As Built Cycleways and Footpaths Self- assessment underway 286 North West Rail Link - Tunnel and Station Civils NSW Design As Built Railways Self- assessment underway 1,100 CBD and South East Light Rail NSW Design As Built Operation Light Rail Planning and Procurement 1,600
  • 23.
    23 Registered Projects Project/Asset LocationRating Type Asset Status Capital Value ($m) NorthLink WA WA Design As Built Road Self- assessment underway 1,000 Whitsunday STP Upgrades QLD As Built Water Supply Self- assessment underway 45 Confidential Road Asset Management NSW Operation Pilot Road Registration 700 Capital Metro ACT Design As Built Operation Light Rail Self- assessment underway 614 Confidential NSW Design As Built Road Registration 2,700 Madden and Pakenham St Road Upgrade NZ NZ Design Pilot Road Self- assessment underway 13 North West Rail Link – Surface and Viaducts Civil NSW Design As Built Railway Self- assessment underway 340 City Rail Link NZ NZ Design Pilot As Built Railway Registration 2,800
  • 24.
    24 Whitsunday STP Upgrades Proponent:Whitsunday Regional Council Contractor: Tenix Infrastructure Type: Sewerage Rating Type: Design Location: Whitsundays, QLD Capital Value: $45m Start Date: May 2012 Practical Completion: May 2014 The upgrade of two treatment plants at Proserpine and Cannonvale are to serve growing communities and meet the most stringent effluent discharge requirements to protect the Great Barrier Reef. They will also provide benefits to the local community by reducing sewage overflows, and improving noise and odour.
  • 25.
    25 Whitsunday STP Upgrades– Highlights Category/ Credit Score Achievements Management Systems 7.3/10.5 • Good management systems integrating the IS rating tool into practices • Knowledge sharing clearly demonstrated. Procurement and Purchasing 4.2/5.0 • Strong commitment to and application of sustainable procurement including local procurement: • 50% of total spend in the Whitsunday region • 30% of total spend in greater Queensland Climate Change Adaptation 4.2/5.0 • Did a thorough, formal climate change risk assessment and implemented controls to reduce 22 ‘high’ or ‘very high’ risks to a ‘moderate’ or ‘low’ rating Energy and Carbon 5.1/10.5 • 305 MWh electricity saved over operational life – thus a 14% reduction equating to $75,000 saving/year • 14,000 tCO2-e avoided over lifecycle • Use of B20 Biodiesel avoiding 272 tCO2-e (cost neutral)
  • 26.
    26 Whitsunday STP Upgrades– Highlights Category/ Credit Score Achievements Water 3.9/7.0 • 15% reduction in water use over lifecycle, with associated cost benefit Materials 7.0/7.0 • Reduced the materials footprint by 25%: • Used 4,329 tonnes less concrete • Used 298 tonnes less steel • Used eco-cement with 30% fly ash • Eliminated asphalt from the design Receiving Water Quality 2.9/2.9 • >75% reduction in N and >90% reduction in P (44 tonnes less nutrients annually) to the Great Barrier Reef Marine Park Ecological Value 2.0/2.0 • Ecological value enhanced through >5,000 m2 of regenerated native habitat and 1000 m2 of wetland
  • 27.
    27 Whitsunday STP Upgrades– Highlights Category/ Credit Score Achievements Innovation 5.0/5.0 • World’s-first trial of Parallel Nitrification & De- Nitrification (PND): • Significantly improves nitrogen removal • More compact • Less construction materials • More energy efficient
  • 28.
    Great Eastern HighwayUpgrade A 4.2km section of the Great Eastern Highway between Kooyong Road and Tonkin Highway widened from four to six lanes with a number of ancillary improvements including central medians, upgraded intersections, on road cycling facilities, bus priority lanes and continuous paths for pedestrians. Proponent: Main Roads WA (MRWA) Contractor: City East Alliance (MRWA, Leighton Cont., GHD, NRW) Infrastructure Type: Road Rating Type: As Built Location: Perth, WA Capital Value: $350 million Start Date: July 2011 Practical Completion: March 2013
  • 29.
    Great Eastern HighwayUpgrade – Highlights 29 Category/ Credit Score Achievements Management Systems 6.3/10.5 • Commitment to mitigating negative environmental, social and economic impacts • Accredited management systems • Thorough risk and opportunity assessment • Knowledge sharing clearly demonstrated • Strong decision making approach incorporating sustainability aspects Water 2.9/7.0 • Opportunities to reduce water use identified and implemented • Instead of using high-value potable water, the project installed groundwater bores and constructed a weir which, on completion, was handed to the local council to irrigate parks.
  • 30.
    Great Eastern HighwayUpgrade – Highlights 30 Category/ Credit Score Achievements Materials 6.2/7.0 • Significant reduction in materials lifecycle impacts through extensive use of recycled materials, reducing the use of non-renewable resources of limestone, sand and bitumen • The highway now has the largest use of recycled material on any WA State road with 43 per cent of imported material being recycled Previous Land Use 3.3/3.3 • >75% of land used for the project was previously disturbed Heritage 2.3/5.0 • Thorough approach to heritage assessment and management • Monitoring overseen by appropriately qualified persons
  • 31.
    Great Eastern HighwayUpgrade – Highlights 31 Category/ Credit Score Achievements Innovation 1.7/5.0 • Warm mix asphalt was used on the project, applying innovative foaming technology to mix the bitumen into the asphalt mix • This was a first for Western Australia, reducing energy use and GHG emissions
  • 32.
    IS Rating Tool– Continuous Improvement Review and Feedback IS Rating tool V1 Use of Design and As Built V1 IS Rating Tool - Design and As Built V2 Tool Consolidation Launch Preparation OperationPilot (IPWEA) Economic Workforce IS Operation V1 Operation Pilot (Others) 2012 2015 H1 2013 H1 2013 H2 Review and Feedback 2014 H1 2014 H2 New Themes Proposed Operational Priority Review Key ScopingScoping
  • 33.
  • 34.