The document discusses product lifecycle management (PLM) and compares it to enterprise resource planning (ERP), noting that PLM focuses on the early phases of a product's lifecycle from conception through release to manufacturing, and optimizing product development processes is critical. It provides examples of typical processes supported by PLM and a practical example of how different roles interact using PLM tools throughout the product development process.
TZ is an consulting firm in product development, focused on the fields of motorized transport, motorcycle and electric vehicle development. We are a small team of experienced engineers with extensive international experience in product engineering and project management. Our professional record includes leading engineering and development consulting roles at some of the largest European automotive OEMs companies
Follow us at @TraZeless // Visit us at www.TraZeless.com
Eliminate latency between engineering and manufacturing to drive lean holistically. Drive engineer intent to the shop floor with 3D images. Speed is a competitive advantage
Geometric's interoperability solution offers greater efficiencies through Business Process Integration in the product realization value stream, enabling speeding up, our customer's business processes across desperate PLM systems.
TZ is a consulting firm in product development, focused on the fields of motorized transport, motorcycle and electric vehicle development.
We are a small team of experienced engineers with extensive international experience in product engineering and project management.
Our professional record includes leading engineering and development consulting roles at some of the largest European automotive OEMs companies
Follow us at @TraZeless
Visit us at www.TraZeless.com
TZ is an consulting firm in product development, focused on the fields of motorized transport, motorcycle and electric vehicle development. We are a small team of experienced engineers with extensive international experience in product engineering and project management. Our professional record includes leading engineering and development consulting roles at some of the largest European automotive OEMs companies
Follow us at @TraZeless // Visit us at www.TraZeless.com
Eliminate latency between engineering and manufacturing to drive lean holistically. Drive engineer intent to the shop floor with 3D images. Speed is a competitive advantage
Geometric's interoperability solution offers greater efficiencies through Business Process Integration in the product realization value stream, enabling speeding up, our customer's business processes across desperate PLM systems.
TZ is a consulting firm in product development, focused on the fields of motorized transport, motorcycle and electric vehicle development.
We are a small team of experienced engineers with extensive international experience in product engineering and project management.
Our professional record includes leading engineering and development consulting roles at some of the largest European automotive OEMs companies
Follow us at @TraZeless
Visit us at www.TraZeless.com
<p>
[데브멘토 동영상] Meego for Intel Atom Processor and AppUp Center 1부(총2부)</p>
<p>
이진용 Intel Korea 차장(Application Engineer)</p>
<p>
전LG전자 소프트웨어센터 책임연구원</p>
<p>
전PalmPalm Technology 신임연구원</p>
<p>
전Nexen 선임연구원</p>
<p>
중앙대학교 컴퓨터공학과 대학원 분산 및 운영체제 전공</p>
PLM (Product Lifecycle Management) Solutions from Geometric enable customers to integrate product data across the complete value chain with effective collaboration across multiple sites, suppliers and vendors.
Oracle soa and e2.0 partner community forum bpm léon smiers shareLeon Smiers
Oracle SOA & Enterprise2.0 Partner Community Forum, presentation by Léon Smiers on Capgemini view on (Oracle) BPM and cases based upon Oracle BPM technology.
Presenting this set of slides with name - Product Lifecycle Management Powerpoint Presentation Slides. This deck consists of total of twenty four slides. It has PPT slides highlighting important topics of Product Lifecycle Management Powerpoint Presentation Slides. This deck comprises of amazing visuals with thoroughly researched content. Each template is well crafted and designed by our PowerPoint experts. Our designers have included all the necessary PowerPoint layouts in this deck. From icons to graphs, this PPT deck has it all. The best part is that these templates are easily customizable. Just click the DOWNLOAD button shown below. Edit the colour, text, font size, add or delete the content as per the requirement. Download this deck now and engage your audience with this ready made presentation.
Mr. Chris Decubber from EFFRA presented the role his association, gave an overview of its activities and outlined the future directions envisioned.
(FInES Cluster Meeting, December 2012)
<p>
[데브멘토 동영상] Meego for Intel Atom Processor and AppUp Center 1부(총2부)</p>
<p>
이진용 Intel Korea 차장(Application Engineer)</p>
<p>
전LG전자 소프트웨어센터 책임연구원</p>
<p>
전PalmPalm Technology 신임연구원</p>
<p>
전Nexen 선임연구원</p>
<p>
중앙대학교 컴퓨터공학과 대학원 분산 및 운영체제 전공</p>
PLM (Product Lifecycle Management) Solutions from Geometric enable customers to integrate product data across the complete value chain with effective collaboration across multiple sites, suppliers and vendors.
Oracle soa and e2.0 partner community forum bpm léon smiers shareLeon Smiers
Oracle SOA & Enterprise2.0 Partner Community Forum, presentation by Léon Smiers on Capgemini view on (Oracle) BPM and cases based upon Oracle BPM technology.
Presenting this set of slides with name - Product Lifecycle Management Powerpoint Presentation Slides. This deck consists of total of twenty four slides. It has PPT slides highlighting important topics of Product Lifecycle Management Powerpoint Presentation Slides. This deck comprises of amazing visuals with thoroughly researched content. Each template is well crafted and designed by our PowerPoint experts. Our designers have included all the necessary PowerPoint layouts in this deck. From icons to graphs, this PPT deck has it all. The best part is that these templates are easily customizable. Just click the DOWNLOAD button shown below. Edit the colour, text, font size, add or delete the content as per the requirement. Download this deck now and engage your audience with this ready made presentation.
Mr. Chris Decubber from EFFRA presented the role his association, gave an overview of its activities and outlined the future directions envisioned.
(FInES Cluster Meeting, December 2012)
PLM-Seminar at Gardermoen: How the idea of single BoM can fit variant and con...Oleg Shilovitsky
The slides from PLM-seminar at Gardermoen: Product Configuration and Variant Management
http://www.infuseit.com/no/Hovedmeny/Arrangementer/SubPages/Oslo2015/
This informative presentation on integration of PLM and ERP comes to you from Barry-Wehmiller International resources (BWIR), global services & solutions partner to SolidWorks Enterprise PDM, This was made at SolidWorks World 2010 in specific context to integration of various ERP systems to Enterprise PDM . This presentation covers:
1. Role of PDM & ERP in Product Lifecycle
2. Need for integration between PDM/PLM and ERP
3. Understanding Industry-specific demands
4. SolidWorks Enterprise PDM and ERP integration
5. Case Study 1 : SolidWorks EPDM – Infor XA Integration
6. Case Study 2 : SolidWorks EPDM – SAP Integration
One of the secrets of successful technology companies is the capability and capacity of their product management function. Awareness for product management need arises from signs such as disconnect between the strategic vision of the CEO and day-to-day product development activities, lack of communication and coordination between engineering, marketing, sales, finance and legal groups. missed launch dates, or lost opportunities in competitive situations with large accounts. This Technology Multipliers webinar provides a comprehensive overview of product lifecycle management concepts, process, and keys to success for technology companies.
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...Kathy (Kat) Mandelstein
Track Keynote for the Process, Project and Portfolio Management Track at the IBM Rational Software Conference 2009
Software and systems delivery has become a fundamental business process in the global economy, and the ability to adapt to changing market conditions requires that information technology is fully integrated into the business strategy and operations to ensure consistent alignment with business priorities, and better execution.
Executives require visibility and real-time decision support to keep the enterprise focused on solutions to high-priority problems, supported by the ability to measure the performance of current and future IT activities and assets. IT leaders must deliver significant business value and ensure constant alignment of project investments with evolving business objectives. Project leaders must be able to identify, implement and drive adoption of repeatable best-practice approaches for successful execution, and be able to more proactively identify and resolve issues, to reduce risks associated with project failure. All stakeholders must be involved and informed in addressing the changing business needs, especially when variations in project health threaten outcomes.
This track explores topics across several domains that support organizational change and iterative software and systems delivery. Hear and learn from actual experiences across the spectrum of process adoption, portfolio planning and oversight, and execution of major initiatives, programs, and projects. This track is for executives, IT leaders, program managers, project managers, portfolio managers, process engineers, business analysts, and other stakeholders concerned with optimizing IT investments with industry best practices and team unifying tools for more predictability, adaptability, and visibility.
Keynote delivered at the 6th International Workshop on Business Process Intelligence (BPI'10), September 13, 2010, in conjunction with the BPM 2010 conference, Hoboken, NJ
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
I have heard many times that architecture is not important for the front-end. Also, many times I have seen how developers implement features on the front-end just following the standard rules for a framework and think that this is enough to successfully launch the project, and then the project fails. How to prevent this and what approach to choose? I have launched dozens of complex projects and during the talk we will analyze which approaches have worked for me and which have not.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
4. Understanding PLM
Introduced at the turn of the century, PLM still lacks a common, definitive definition
PTC defines PLM as:
A solution that enables manufacturers to
optimize the management and evolution of
all aspects of the product’s definition
(bill-of-materials such as eBOM, mBOM, sBOM,
bill-of-processes such as Process Plans, Bill of
Resources) throughout the product’s entire
lifecycle – from conception to retirement – in a
single environment
PLM typically focuses for 90% on the phases before
‘Release To Manufacturing’
4
5. PLM versus ERP
Physical
SUPPLIERS Product
Digital
Product
MANUFACTURING
Digital Physical CUSTOMERS
ENGINEERING
Product Product
PROCUREMENT
Release to
Manufacturing
MARKETING
Digital SALES Digital
Product
Product
SERVICE
5
6. What are their focus points?
ERP (Enterprise Resource Planning)
Execution of
Manufacturing, repeated Planning &
Sourcing and transactions Control
Distribution BOM to procured
processes Inventory / part/assembly
order lifecycles level
PLM (Product Lifecycle Management)
Innovation - Controlled
Managed change
Design Complete BOM management
Creativity
Processes Management
(spanning as-designed BOM, as-
Visibility across planned BOM, as-serviced BOM, and
as-built BOM)
the entire product
lifecycle
6
7. Is PLM more important than ERP?
Where is the cost of a product determined?
Committed Cost vs. Lifecycle
“Total Product Confidence”
100 85%
Digital Physical
70%
Product Life Cycle Cost Product
80 Determination
60
35%
40
22%
20 Cost Reduction
Opportunities
Conceptual Design Detailed Design Production Operations Support
Release to Manufacturing
Source: DARPA RaDEO Project
7
9. Optimizing Product Development Processes is Critical
PRODUCT DEVELOPMENT LIFECYCLE
Organization Plan Concept Design Validate Production Support
Portfolio Management
Program Management
Project Management
Management Environmental Performance Management
Regulatory Compliance
Quality & Reliability Management
Change and Configuration Management
Proposal Response
Sales & Marketing
Requirements Capture and Management Release to
Concept Development
Manufacturing
System Design
Detailed Design
Engineering
Verification and Validation
Variant Design & Generation
Design Outsourcing
Early Sourcing
Sourcing
Component and Supplier Management
Manufacturing Process Management
Manufacturing Tooling Design and Manufacture
Manufacturing Outsourcing
Product Support Analysis & Planning
Service Technical Information Creation & Delivery
Main PLM Focus Performance Analysis & Feedback
9
43. PLM and Production Systems are Complementary
54% “ Best in class companies
are 1.5 times more likely
to have process that span
PLM and ERP systems.”
35%
Aberdeen
“Integrating the PLM Ecosystem”
Best in Class All Others
43
44. Key Applications Groups
Range of Processes Covered
What How Where and When
Process Design Production Production
CAD Product Design
- Bridging the Gap – Planning Execution
MBOM
Process Plan (routing)
Workinstructions
Processes
Supporting applications
PLM Solution
?
ERP Solution
MES MES Solution
Where?
Where should we draw the line between PLM and ERP/MES?
How do we implement a business process across two value chains?
44
45. Concurrent Product and Manufacturing Process Design
is Key to Drive Profitable Growth
Concept Development
System Design Reduce
Cycle time
Detailed Design
Limited opportunity
for Manufacturing to
influence design and Manufacturing Process Production Full scale
Management Ramp-up Production
reduce cost
Reduce Cost of Change
Reduce
MFG Cost
“ [Manufacturing companies] identified that the need to reduce manufacturing costs was driving their
need to improve their manufacturing planning process at practically the same rate as compressed
development schedules.”
Aberdeen Group, Digital Manufacturing Planning – Concurrent Development of Product and Process, 11/2007
45
46. PD Processes span PLM and ERP systems
PLM ERP
Requirements Capture and Management
Configuration Management
System Design
Detailed Design
Variant Design and Generation
Manufacturing Process Management
Change Management
Production Scheduling
Inventory Management
Sourcing and Procurement
Sales and Order Management
Shipping Logistics
Accounting and Financial Reporting
46
47. Use case 1
PLM ERP
Requirements Capture and Management
Configuration Management
System Design
Detailed Design
Variant Design and Generation
Manufacturing Process Management
Change Management
Production Scheduling
Inventory Management
Sourcing and Procurement
Sales and Order Management
Shipping Logistics
Accounting and Financial Reporting
47
48. Example Use Cases linked to the Development Process
Typical Development Work
PLM - Stocklevel
- LeadTime
- Cost
- Stocklevel
- LeadTime
- Cost
- Stocklevel
- LeadTime
- Cost
TOPLEVEL
Partial Release Subassy 10 Subassy 20 Subassy 30
Part 11 Part 21 Part 31
Part 12 Part 22 Part 32
Long Lead Items Part 23
48
49. Use case 2
PLM ERP
Requirements Capture and Management
Configuration Management
System Design
Detailed Design
Variant Design and Generation
Manufacturing Process Management
Change Management
Production Scheduling
Inventory Management
Sourcing and Procurement
Sales and Order Management
Shipping Logistics
Accounting and Financial Reporting
49
50. Example Use Cases linked to Release To Manufacturing
Release To Manufacturing
PLM TOPLEVEL Subassy 10
TOPLEVEL
Subassy 20 Subassy 30
TOPLEVEL
Subassy 10 Subassy 20 Subassy 30 Part 11 Part 21 Part 31
Subassy 10 Subassy 20 Subassy 30
Part 11 Part 21 Part 31 Part 12 Part 22 Part 32
Part 11 Part 21 Part 31
Part 12 Part 22 Part 32 Part 23
Part 12 Part 22 Part 32
Part 23
Part 23
EBOM MBOM
RTM
ERRORS
50