Report on: Irrigation and Drainage Engineering
Title: Field Visit Report on Different Irrigation Project
SUBMITTED BY: SUBMITTED TO:
Sushrut Gautam KCE074BCE089 Department of Civil Engineering
Swarnima Shrestha KCE074BCE090 Khwopa College of Engineering
Ujjwal Acharya KCE074BCE091 Libali, Bhaktapur
Umesh Bhatta KCE074BCE092
Date of Submission: 2077/11/21
i
PREFACE
A 4 days and 3 nights field visit to different irrigation projects namely Bagmati Irrigation Project,
Khageri Irrigation Project, Narayani Lift Khageri Irrigation Project and Gandak Barrage, different
transportation structures and Hetauda Cement Factory was organized by Khwopa College of
Engineering. The field visit was from Falgun 11 to Falgun 14, 2077 B.S. as per the curriculum of
IOE, Tribhuvan University. We were able to visit and see the different components of Irrigation
projects which helped us to grab the knowledge about them visually. It is our belief that the report
will serve to introduce about different Irrigation Project. For this I would like to show my gratitude
to Er. Ramesh Bala, HOD, Department of Civil Engineering, Khwopa College of Engineering and
all other who helped us directly and indirectly during our trip and field visit. We would like to extend
our gratitude to our friends who helped us to prepare this report and made our field visit unforgettable.
Sincerely
Sushrut Gautam
Swarnima Shrestha
Ujjwal Acharya
Umesh Bhatta
“Civil 074 CD Batch”
ii
ACKNOWLEDGEMENT
We must express our sincere gratitude towards Department of Civil Engineering, Khwopa College
of Engineering for organizing the field trip for Irrigation and Drainage Engineering. We must express
our deep sense of gratitude towards Head of Department, Er. Ramesh Bala sir for organizing the
trip. We are deeply indebted to Er. Naresh Suwal sir for sharing a part of his brain and for proper
guidance during field trip. We should like to thank Mr. Nirmal Kafle, Er. Anil Kasula and Er.
Bibek Shahi for properly guiding us in our field trip.
We must acknowledge our deep sense of gratitude to the staffs of Bagmati Irrigation Project, Khageri
Narayani Lift Irrigation Project, Gandak Barrage and Hetauda Cement Factory for providing us the
opportunity to visit the respective places. We must acknowledge our obligation to all the non-
teaching staff of the Field trip for making our work a success. Also, we wish to record our
appreciation to our friends for providing the inexpressible amount of support and guidance. We are
highly obliged to all the people who supported us directly and indirectly throughout the duration of
the field visit to the submission of this report. Thanks are due to our family and friends who supported
us on our field visit.
iii
ABSTRACT
This report deals with different Irrigation projects and their components. Irrigation engineering is a
field of engineering which would discuss the uses of irrigation in crop production and how new
principles and technologies can be used and applied for irrigational practices.
This report encompasses the valuable information about the Bagmati, Khageri and Narayani lift
irrigation projects of Nepal being based on the four days long field visit to the respective areas. This
report presents the general information of those irrigation projects of Nepal and even a detailed
evaluation related to their history, background, and present status. On the other hand, this report is a
detailed description of the respective irrigation projects on the basis of their construction cost,
affected districts, problems, type of diversion head works, river training works adopted, regulating
structures provided as well methods being adopted to control and mitigate different problems that are
mainly responsible for the reduction in the efficiency of their performance.
Bagmati irrigation project was initially run as multipurpose project. Its construction was aided by
UNDP, Debt Relief Fund (Japan), and is now being in function by loan from Saudi Arabia. Major
headwork components include under sluice portion, divide wall, canal head regulator, canal portion,
and river training work such as earthen guide banks. Also, a provision of flood control is done by
construction of bypass. According to field survey of 1999, there has been increase in 34.98% of total
production in and around the irrigation project area which concludes that there is significantly good
impact of the project and effectively running very smoothly till date.
Khageri irrigation project, which is one of the oldest irrigation projects of Nepal, is located in
Chitwan district of Nepal and irrigates 3900 ha land. Major headwork includes under sluice portion,
divide wall, canal head regulator, canal portion, and river training work such as Chut blocks, stone
pitching in the banks. Initially it was designed to irrigate 3900ha but only 2400ha were being irrigated
before IMPT and main cause being lack of maintenance, lack of water sources, pollution degrading
quality of water in the river, etc. However, it is still working with efficiency of 30-36%.
Narayani lift irrigation project involves lifting of water to height of about 22m by two sets of pumps.
It was completed in 1985 at cost of NRs. 470,000,000 financed by ADB. Since this project is highly
costly with high power consumption of Rs. 10,800 per hour, operation and maintenance cost of
Rs.70-80 million, there is difficulty in maintaining balance in cost effectiveness. However, it plays
major role in rice production there.
Keywords: Irrigation, Lift, Mitigate, Headwork, Efficiency, Diversion
iv
Table of Contents
PREFACE .......................................................................................................................................... i
ACKNOWLEDGEMENT ............................................................................................................... ii
ABSTRACT...................................................................................................................................... iii
1. INTRODUCTION......................................................................................................................1
1.1 Background of Irrigation in Nepal....................................................................................1
2. OBJECTIVES.............................................................................................................................1
3. METHODOLOGY.....................................................................................................................2
4.STUDYAREA……………………………………………..………………………………………2
4.1 BAGMATI IRRIGATION PROJECT..........................................................................2
4.2 KHAGERI IRRIGATION SYSTEM............................................................................4
4.3 NARAYANI LIFT IRRIGATION......................................................................................5
4.4 GANDAK BARRAGE..........................................................................................................6
5. OBSERVATIONS AND ANALYSIS .......................................................................................8
5.1 OBSERVATIONS ON BAGMATI IRRIGATION PROJECT ..........................................8
5.2 OBSERVATIONS ON KHAGERI IRRIGATION PROJECT.........................................11
5.3 OBSERVATION ON NARAYANI LIFT IRRIGATION..................................................13
5.4 OBSERVATION ON GANDAK BARRAGE .....................................................................16
6. CONCLUSION AND DISCUSSION.........................................................................................19
7.RECOMMENDATION................................................................................................................20
8. REFERENCES ............................................................................................................................20
1
1. INTRODUCTION
1.1Background of Irrigation in Nepal
The adoption of irrigation of Nepal is not a new thing, as it appears to be, because sufficient proofs
are available in history of Nepal, which confirm that irrigation was being practiced not only during of
RANAS, SHAHI but even during the period of Lichhivi. The first national irrigation project in Nepal is
Chandra Nahar during period of Chandra Samsher in Saptari district (1965 B.S) irrigating command area
of 10000 hectare and still in operation. In field work various parts headworks, intake structures, canals,
cross drainage structures etc. were carefully observed, analyzed, and studied in detail.
More than 81% people are engaged in agriculture in Nepal. Agriculture is the main source of income in
Nepal. As per record of Government of Nepal, Ministry of Finance, 2054/55, more than 40% of national
income comes from agriculture in Nepal but the growth rate in agriculture is only 2.4%. Since the living
standard of people is directly related to the income of people in any country, there is an urgency to maintain
and enhance the income of country like Nepal. In case of our country, a major concern has to be given in
the field of agriculture because of the fact that major portion of the national income comes from agriculture.
In order to extract major yields from agriculture and in turn enhance the economy of our country, it is
important that we improve the agriculture system by a better and more scientific method of irrigation apart
from use of improved seeds, fertilizers etc.
The agriculture can be the source of employment to many people of our country that is currently jobless if
we can utilize almost all the available arable lands. It is believed that more than 50% of the land of our
country is used only for seasonal agricultural products. Agriculture Perspective Plan has stressed the role
of agriculture in generation of employment opportunities and improving the living standard of people. This
plan has also defined irrigation as a strategic input and has prescribed the conjunctive use of water in Terai
region. As the agricultural sector contributes a significant amount to the national income, the change in
national income is a direct reflection of the change in agricultural production.
If we can arrange better irrigation facilities in our country, the national income can be increased
significantly. When national income increases, the per capita income will also increase. This is an effective
indicator of economic growth. Thus, it is essential to analyze the parameter of agricultural growth. In this
connection, irrigation is one of the most important inputs to increase the agricultural product particularly
in the following two grounds. Firstly, we can increase the agricultural product in the cultivated land with
irrigation by enhancing the efficiency of rest auxiliary inputs. And, secondly, we can extensively cultivate
the uncultivated agricultural land providing irrigational national facilities.
However there has not been much significant steps taken place in Nepal. Out total 2.18-million-hectare
irrigable land in Nepal, 1.74 million ha is in the plains of Terai region and rest 0.44 million is situated in
the valleys of the hill. Out of these potential irrigable areas, just 1.766 million ha has been provided
irrigation and out of which some 1.06 million ha. are already developed (i.e., provided with infrastructure)
for irrigation. Of the latter figure, however, only about 71 percent is actually irrigated. That leaves some
29 percent of the developed command area that could be brought under irrigation with relative ease, in
addition to the nearly 700,000 ha, yet to be developed for irrigation. Areas covered by surface and ground
water irrigation are 854,000 and 206,000 ha respectively and representing 80.6 percent and 19.4 percent
respectively of the total irrigated area.
2. OBJECTIVES
i. To find out the type of diversion headwork
ii. To get familiar with the components from headwork to canal outlet
iii. To know about the provisions for high flooding
iv. To gather information about the regulating structures and cross drainage structures
v. To know about the water losses during conveyance
vi. To know about total command area, canal design discharge and major water sources
vii. To know about the past disasters if any
viii. To determine the socio-economic benefits of the projects in local and national scale
2
3. METHODOLOGY
The main methodology we followed for the accomplishment of our objectives of the field trip was
following the explanations made by the related personnel working on respective irrigation projects.
Similarly, for the study, the brochures and the information boards were used. Photographs of the location
were taken and the important points were noted. Similarly, the different literatures were also followed for
the reliability of data. In the same way, internet records were utilized to gather information regarding
different factors of the projects.
4. STUDY AREA
1) Bagmati Irrigation Project
2) Khageri irrigation project
3) Narayani lift irrigation
4) Gandak Barrage
4.1 BAGMATI IRRIGATION PROJECT
Location: Karmaiya, Sarlahi
Establishment: 2050/04/05
Geological Coordinates: 27° 07'53" N and 85° 28'59” E
Facilitated District: Sarlahi, Rautahat, Bara, Mahottari
Total Command Area: 122000 hectares
Canal Design Discharge: 8000m3
/sec
Design Flood: 100-year return period
Major Water Source: Bagmati River
Construction Cost: NRs. 37,809,610.25 (estimated)
Maintenance Cost: 1.5 to 2 crores yearly
Owner: Ministry of Water Resources, Department of Irrigation, Government of Nepal
Financier: Government of Nepal
Sedimentation Problem: Siltation problem is high due to Deforestation and Mobile Boundary.
Diversion Headwork: Barrage
Components from Headwork to Canal Outlet: Barrage, under sluices, Divide Wall, Fish ladder,
Canal Head Regulator, Silt ejector
Provision in case of High Flooding:
i. The system can withstand 10000 cumecs of water.
ii. Hydraulic and Structural Design is adopted.
River Training Work Adopted: Guide Banks, Marginal Bunds, Pitched Island, Bandalling
Regulating Structure provided: Head Regulators
Cross Drainage Structure: Syphon Super passage, Aqueduct
Major Causes of Water Losses:
i. Seepage losses
ii. High Percolation
iii. Not closing of gate properly
Major Crops in Command Area: Paddy, Rahar Dal
Future Project: Sunkoshi-Marine Diversion Project
3
Fig: Bagmati Irrigation Project
Bagmati irrigation project is located in the central region of Nepal and diverts water from Bagmati River
through diversion barrage structure located at Karmaiya, Sarlahi district. This project is initially
conceptualized as a multipurpose project to develop irrigation facilities over an irrigable area of 122000ha
of Bara, Rautahat, Sarlahi, and Mahottari district and to generate electricity of 140 MW by constructing a
117m high dam. Bagmati irrigation project was commenced as Sunkoshi terai project and the study was
conducted by UNDP and FAO FROM 1967 TO 1972 A.D. The government then started the construction
by the usage of self-resources and equipment’s after which the constructed was economically aided by
UNDP and Debt Relief Fund (Japan) and is now being in function by the loan from Saudi Development
Fund. The main objectives, the project carries are to provide the efficient irrigation facilities to 37000ha
agricultural lands which thereby work as the aid to the socio-economic uplifting of the living standard of
the farmers.
This irrigation project has the following properties:
Barrage
Design discharge=8000m3
/sec
By pass channel=2500m3
/sec
Total=10500m3
/sec
Length=403.50m
Duty=1.34lt/sec
No. of gate=30 nos. (9*3m)
No. of fish ladder=2nos. (1.5*4m)
No. of under sluice=6nos. (9*4m)
Eastern H/R
Maximum discharge=64.4m3/
sec
No. of gate=7nos.
Western H/R
Maximum discharge=48.4m3
/sec
No. of gate=5nos.(4x2m)
4
4.2 KHAGERI IRRIGATION SYSTEM
Location: Chitwan
Establishment: 2026B.S.
Geological Coordinates: 27°37'57"N and 84°29'21" E
Facilitated District: West Chitwan
Total Command Area: 3900 hectares
Canal Design Discharge: 9-14m3
/sec
Major Water Source: Khageri River
Construction Cost: NRs. 7465619 (estimated)
Maintenance Cost: 2 crores yearly
No. of gate: 2 nos.
Owner: Ministry of Water Resources, Department of Irrigation, Government of Nepal
Financier: Government of Nepal
Sedimentation Problem: Siltation problem is little.
Diversion Headwork: Barrage
Components from Headwork to Canal Outlet: Barrage, Divide Wall, Canal Head Regulator
River Training Work Adopted: Chute Blocks, Marginal Bunds
Regulating Structure provided: Head Regulators
Cross Drainage Structure: Aqueduct
Major Causes of Water Losses:
i. Seepage losses
ii. Not closing of gate properly
Major Crops in Command Area: Maize, Paddy
Length of main canal: 22+650km
Length of Branch canal: 55km
Length of tertiary canal: 100km
Fig: Khageri Irrigation Project
5
Khageri Irrigation System (KHIS) is one of the oldest agency managed irrigation systems located in
Chitwan District in Western Nepal. It provides irrigation to about 3,900 ha of land in the West Chitwan.
The construction of the system was initiated in 2017 B. S. and completed in 2024 B. S. at the cost of Rs
7.6 million. The physical structures of the system include a diversion barrage, 23-km long main canal, 55
km of branch canals and 100-km long tertiary canals. About 7 km of the main canal passes through the
buffer zone of Royal Chitwan National Park, where many lakes have been formed due to regular canal
flow. These lakes serve as water reservoirs and augment the water supply to the main canal besides regular
supply obtained from Khageri River.
4.3 NARAYANI LIFT IRRIGATION
Location: Narayangadh, Chitwan
Establishment: 2034B.S.
Geological Coordinates: 27°40'44"N and 84°26'12"E
Facilitated Areas: Bharatpur, Mangalpur, Phulbari, Shivanagar and Gitanagar VDC’s
Total Command Area: 4700 hectares
Canal Design Discharge: 240000lpm
Major Water Source: Narayani River
Construction Cost: NRs. 42500000 IGO
Financial Aid: ADB
Sedimentation Problem: Siltation problem is high.
Diversion Headwork: Barrage
Regulating Structure provided: Head Regulators
Major Crops in Command Area: Maize, Paddy
Reduced Level: 272m
Number of Pumps: A (5 nos.) + B (4 nos.) = 9 nos.
Working Month: Asar to Asoj
Working Hours: 16 hours
Electricity Consumption: 4000000 units = NRs. 15000000
Maintenance cost: NRs. 5crore yearly
Pump level: 40m above head: Pump A (22m) + Pump B (18m)
Gravity System: 70%
Lift System: 30%
The Narayani lift irrigation project is the second largest irrigation project after Eastern Rapti Irrigation
project (5,966 ha) of Chitwan district. This irrigation system was designed to irrigate 8,600 ha of land in
West Chitwan, including 3,900 ha by the Khageri Irrigation System. The area directly under the Narayani
irrigation scheme was 4,700 ha but now it is reduced to 3500 ha (Central irrigation development board,
Bharatpur, 2012). The lift was also supposed to augment the Panchakanya irrigation system (600 ha) of the
district. It directly pumps water from a reservoir built along the Narayani River.
6
Fig: Narayani Lift Khageri Irrigation Project
NLIP has two main canals i.e., B and C. Canal B covers 2400 ha of parts of Bharatpur, Mangalpur, Phulbari,
Shivanagar and Gitanagar VDCs. Its length is 19 km. It has 20 branch canals and 87 tertiaries, the total
length which is 17.95 km and 82.73 km respectively. Its maximum water flow capacity of canal B is 7.8
m3
/sec. Canal C covers 2,300 ha land of Bharatpur Municipality. But water is not sufficient for 2,300 ha of
land due to the low capacity of Pump house B. It is 10.5 km long. Day by day the areas of C canal are
reducing due to urbanization and low capacity of Pump house B. It has altogether 15 branches and 97
tertiaries. Total length of branch canals and tertiaries is 20.8 km and 61.50 km, respectively. Its maximum
water flow capacity is 3.2 m3
/sec. Total length of drain of B and C canal is 34.6 km.
4.4 GANDAK BARRAGE
Location: Nawalpur, Indo-Nepal Border
Establishment: 1969 A.D.
Facilitated District: Nawalpur, Parasi
Total Command Area: 14.04 lakh hectare (India) and 0.44 lakh hectare (Nepal)
Canal Design Discharge:
Major Water Source: Gandaki River
Owner: Government of India and Government of Nepal
Diversion Headwork: Barrage
No. of Gates: 36 (18 Nepal and 18 India)
7
Canals: NEC and WEC
Components from Headwork to Canal Outlet: Canal Head Regulator, Barrage, Silt ejector,
under sluices, Divide wall
River Training Work Adopted: Marginal Bund, Guide banks
Regulating Structure provided: Canal Head Regulator, Distributary Head Regulator
Cross Drainage Structure: Aqueduct, Syphon Super passage
Major Causes of Water Losses: Not closing of door properly, Seepage losses.
Major Crops in Command Area: Maize, Paddy, Wheat, Potatoes
Negative Impacts:
i. Regular Flooding
ii. Water logging
iii. Riverbank erosion
iv. Change in river course
Fig: Gandak Barrage
The Gandak Project at Valmikinagar intercepts water of a catchment area of 37,410 km, which is mostly
in Nepal and partly in India. An agreement was signed on 4 December 1959 between the governments of
Nepal and of India on the Gandak Irrigation and Power Project. It encompassed the construction of a
barrage, canal head regulators and other appurtenant works about 33 m (108 ft) below the existing Triveni
Canal Head Regulator. The agreement was modified in 1964 for the protection of Nepal’s riparian rights.
Basically, there is an agreed share of water for ‘western canal system including a power station in Nepal
and eastern canal system. As a part of this bilateral agreement, the Gandak Barrage, a part of Gandak
Project, was built in 1968-69 over the Gandak river for providing irrigation to Nepal, Uttar Pradesh and
Bihar. The Eastern Gandak Canal Project was taken up in 1960 and Main Canal system was completed in
1975.
8
5. OBSERVATIONS AND ANALYSIS
The different information that we have collected in order to meet our objectives of the trip are collected
and analyzed. The description of them is as follows:
5.1 OBSERVATIONS ON BAGMATI IRRIGATION PROJECT
5.1.1 Under Sluice Portion
The under sluices are the openings provided at the base of the weir or barrage. These openings are provided
with adjustable gates. Normally, the gates are kept closed. The crest of the under-under sluice portion of
the weir is kept at a lower level (1 ~ 1.5 m) than the crest of the normal portion of the weir. The suspended
silt goes on depositing in front of the canal head regulator. When the silt deposition becomes appreciable
the gates are opened and the deposited silt is loosened with an agitator mounting on a boat. The muddy
water flows towards the downstream through the scouring sluices. The gates are then closed. But, at the
period of flood, the gates are kept opened.
5.1.2 Divide Wall
Fig: Divide Wall
The divide wall is a masonry or concrete wall constructed at right angle to the axis of the weir. The divide
wall extends on the upstream side beyond the beginning of the canal head regulator, and on the downstream
side, it extends up to the end of the loose protection of the under-sluices. In this irrigation project, cement
concrete divide wall observed.
5.1.3 Canal Head Regulator
Fig: Canal Head Regulator
9
A structure which is constructed at the head of the canal to regulate flow of water is known as canal head
regulator. It consists of a number of piers which divide the total width of the canal into a number of spans
which are known as bays. The piers consist of number tiers on which the adjustable gates are placed. The
gates are operated form the top by suitable mechanical device. A platform is provided on the top of the
piers for the facility of operating the gates. Again, some piers are constructed on the downstream side of
the canal head to support the roadway.
5.1.4 Canal Portion
Fig: Main canal
The main canal is lined with cement concrete and was in functioning state. The distributary canal was not
working and the components of the canal were on the deteriorated state because of rusting.
5.1.5 Disaster history and risks
The highest flood was recorded on 4th
and 5th
Shrawan, 2050 which took the life of two Chinese workers
and destroyed the divide walls and other structures of the headwork. The upstream of this irrigation project
is prone to landslides and flood due to steep slopes and degraded watersheds. Also, there is the problem of
sedimentation problem for which Bagmati River Basin improvement Programs are being conducted.
5.1.6 Provision for high flood
Bypass of capacity 2500m3
/sec is provided for the emergency case especially for high flood periods to
protect the barrage from effects of high discharge.
5.1.7 River protection
10
5.1.8 Socio-economic benefits of project: The irrigation has positive impact on agricultural
production, farm income and employment. But the extent of impact depends on various factors such as
cropping intensity, crop type, management of irrigation facilities, farming technology etc. Therefore, the
impact may vary by place to place and project to project. The primary data collected within the outside the
Bagmati Irrigation Project command area that could determine the impact of irrigation in following ways:
Table 1: Effect of Irrigation on Total Output
Crops
Total output (kg)
Without
Irrigation
With
Irrigation
Change in
Total
% Change
Paddy (Rain
Seasons Crops)
1542.40 2182.40 640.00 41.49
Wheat (Winter
Crops)
1323.00 1625.05 302.05 22.83
Maize (Winter
Crops)
673.75 887.81 214.06 31.77
Other (Winter
Crops)
248.36 417.22 168.86 67.99
Total 5112.48 1324.98 34.98
Source: Field Survey, 1999. Note: Other crops include Mustard, Dal etc.
From Table 1, we come to know that there is 34.98% increase in the total production with irrigation facility.
Among the four cultivated crops, mustard and oil-seeds have been found more affected by irrigation. The
productions of mustard and oil-seeds have increased by 67.99% in irrigated land compared to their
production in non-irrigated land. The production of paddy, on the other hand, has also increase by 41.49
percent. Because of the availability irrigation facility, there has been possible to cultivate some of the
agricultural lands three times a year. Thus, Bagmati Irrigation Project has increased the total production of
farmers significantly.
5.1.9 Effect of Irrigation on Farm Income
The agricultural production has been increased in irrigated land as reflected in Table 2. To get farm income,
the annual physical productions of both irrigation and non-irrigated lands have been converted into
monetary term.
Crops
Farm income
Without
Irrigation
With
Irrigation
Change in
Total
% Change
Paddy (Rain
Seasons Crops)
7021.00 14885.5 7864.50 112.014
Wheat (Winter
Crops)
7413.0 10783.5 3370.50 45.46
Maize (Winter
Crops)
5143.00 7742.00 2599.00 50.53
Other (Winter
Crops)
3769.00 7643.00 3874.00 102.78
Total 23346.00 41054.00 17708.00 75.85
Table 2: Effect of Irrigation on Farm Income
11
5.2 OBSERVATIONS ON KHAGERI IRRIGATION PROJECT
5.2.1 Under Sluice Structure
The under sluices are the openings provided at the base of the weir or barrage. These openings are provided
with adjustable gates. When the silt deposition becomes appreciable the gates are opened and the deposited
silt is loosened with an agitator mounting on a boat. The muddy water flows towards the downstream
through the scouring sluices. The gates are then closed. But, at the period of flood, the gates are kept
opened.
5.2.2 Divide Wall
Fig: Divide wall
5.2.3 Canal Head Regulator
Fig: Canal head regulator
5.2.4 Canal Portion
12
The canal is lined with cement concrete.
Fig: Main canal
5.2.5 River training works
Chut blocks: It is provided to reduce the water pressure
Fig: Chut blocks
Stone pitching of banks: It is provided for the protection of banks from the flow of river water
Fig: Stone pitching at banks
13
5.2.6 Impacts and achievements
Khageri Irrigation System was initially designed to irrigate 3,900 ha. However, the areas under irrigation
before IMTP intervention were only 2,400 ha in Khageri. The main reasons for lower irrigated areas in
these projects are:
-Reduction in the dependable water supply in the source due to the environmental degradation
-Lack of proper maintenance of canal
-Inequitable water distribution
-Poor on-farm water management practices
The available irrigation duty in Khageri is about 1.25 Vs per ha against the requirement of about 1.8
l/s/ha. It was therefore, decided to augment the supply in Khageri from Chitwan lift Irrigation system by
about 2.2 m3
/s. But it could not be done due to financial and technical reasons of the pumping systems.
Nevertheless, the irrigated areas upon management transfer have changed to 2,900 ha from existing 2,400
ha. The area under early paddy has increased from 350 to 600 ha. There is more equitable water
distribution in head, middle and tail portions of the system. Water distribution is being practiced in a
systematic way to make up the deficit in the canal system. However, the entire command area cannot be
fully irrigated unless the supply at the source is increased. With improved management, a total of 3,400
ha could be brought under irrigation. The changes observed so far in cropping intensity and efficiency are
given as below:
Table 2: Achievements in irrigation management
5.3 OBSERVATION ON NARAYANI LIFT IRRIGATION
Due to its fertile soils, Chitwan continued to be a major focus for irrigation development since 1960s. In
1972, Chitwan Irrigation Development Board (CIDB) was formed to direct the irrigation development in
the valley in recognition to its potential. Feasibility study begun on the same year. Under this board, an
executing agency, the Chitwan Irrigation Project (CIP) was set up to construct irrigation projects in the
district with the objectives of irrigating 10,400 ha of land thorough out the year and about 700 ha seasonally.
The CIP had three irrigation schemes namely; Narayani, Lothar and Khageri (MWR and CIDB, 1973).
The CIP initiated the NLIP in 1972, with the purpose of having year-round irrigation possibilities. The
project was completed in 1985 at the cost of NRs. 470,000,000 financed by the Asian Development Bank
(ADB). CIP was dissolved in 1994 and Narayani Lift Irrigation Office (NLIO) was established to look after
the O and M of the three irrigation systems previously operated under CIP.
In lift irrigation, lifting of water is done in two stages by two sets of Pumps i.e. pumping scheme “A” and
“B”. Pump house “A” is located in the bank of Narayani River and pump house “B” is located in
Chhatarpur, Narayangadh. There are five pumps in pumping scheme “A” (4+4+2+2+1=13m3
/sec) and four
pumps in Pumping scheme “B” (1.6+0.8+0.8+0.8=4m3
/ sec). But now only 4 m3
/sec water is available
S. N Details From To
1. Area under summer rice(ha) 2400 2900
2. Area under early paddy(ha) 350 600
3. Overall l efficiency (%) 30 36
4. Yield loss (%) 25 0
5. Irrigation turns(days) 11 11
6. Water share (l/s/ha) 3 1.25
14
during transplanting of rice which is much lower than the requirements. Respondents reported that at least
6m3
/sec water is needed for them in the command areas of “B” canal.
In the first stage, pumping scheme “A” lifts water at the rate of 11m3
/sec to the height of about 22m onto
a link canal (500m). About 70 percent of lifted water is diverted to B canal at a rate of 7.8 m3
/sec. In the
second stage, remaining 30 percent of water from this link canal is lifted to the height of about 20m and
discharged at the rate of 3.2 m3
/sec to canal C by pumping scheme “B”. The system B supplements the
Khageri system with a capacity of 4.3 m3
/sec. About the cost effectiveness of NLIP, the project was
launched with the cost of 470,000,000 NRs. For O and M of NLIP during 40 years, it is estimated about
240,000,000 NRs. For electricity, it is estimated to be 500,000,000 NRs. So, the total cost of operation is
1210,000,000 NRs. But the income from water charge (levy) is found to be only 100, 000, 00 NRs. So,
there is the vital problem of how making the balance in the cost effectiveness of NLIP (Lohanee, 2010).
5.3.1 Pump
Fig : Pump
5.3.2 Inlet
Fig: Inlet of water to pumping system
15
5.3.3 Outlet
Fig: Outlet to lifted water
This project has been proved a lot costlier clearly defined by the high-power consumption of about
Rs.10,800 per hour, repair and maintenance cost of 60,00,000-70,00,000 along with other charges of silt
repair and others. However, it is playing vital role in the rice production of the irrigated areas. Similarly, a
charge of RS.180 per bigha is being collected of which 40% goes to the government and 60% to the
committee from which earnings of about RS.10,50,000 is obtained. Thus, this project is also given a name
as “Seto hatti’’ as it has lesser earnings than the cost.
16
5.4 OBSERVATION ON GANDAK BARRAGE
5.4.1 Divide Walls
Fig: Divide Walls
5.4.2 Main Canals
Eight numbers of gate were present in the Canal Outlet.
Fig: Main Canal
17
5.4.3 Aqueduct
Aqueduct is constructed when bed level of the canal is sufficiently higher than the H.F.L. of the
drainage. It is the most commonly used cross drainage structure.
Fig: Aqueduct
5.4.4 Syphon Super passage
When the canal discharge is small in comparison to the drain and the canal bed level is lower than
the F.S.L. of canal, syphon is preferred structure to be adopted. In this case canal is syphoned
below drain.
Figure: Syphon Super passage
18
5.4.5 Silt ejector canal
A trap like structure is used to trap the silt in the main canal and is ejected by flushing towards the
Silt ejector canal.
Fig: Silt ejector canal
5.4.6 Head Regulator
Head regulator is used to maintain the certain level of head in the canal before the flow occurs.
Below figure is of Distributary Head Regulator.
Fig: Distributary Head Regulator
19
5.4.7 Distributary Channel
Distributary channel takes the water to the small portion of field from the main canal.
Fig: Distributary Channel
6. CONCLUSION AND DISCUSSION
In this way, our field visit was successfully completed with the proper achievement of all our objectives
that we were destined to accomplish. Hence the field visit was fruitfully terminated.
Nepal is landlocked agricultural country. Almost 80% of Nepalese depends upon agriculture. We had
concluded that such multi proposed irrigation projects should run effectively under systematic management
and maintenance for rising state of local people as well as to strengthen national economy. Local people as
well as Nepal government should monitor time to time these projects for efficient operation of irrigation
projects. The irrigation project plays an important role in the country's economy. The irrigation project is
directly and indirectly affecting the economy of the country and countrymen. Hence, proper operation of
every components of the system is vital and a small hurdle in the working can be proved a much
disadvantageous. Thus, proper care should be taken for proper functioning of the system. However, during
our field visit, we observed different problems like deposition of sediments in canal, stopping of working
of certain canal, silting and so on.
Thus, these problems need to be taken care of for which the related committee should be attentive and
active. All in all, the field visit is accomplished successfully from which we visualized the things we studied
in classroom.
20
7. RECOMMENDATION
The problems of sedimentation and silting should be taken care of. Similarly, the concerned authorities
should regularly monitor and maintain the working condition of the irrigation projects so as to ensure
continuous supplies to people. In other ways, the government should be able to attract foreign companies
to invest and to further expand the irrigation project and hence extend its approachability in terms of its
command area.
Similarly, I would like to recommend the related personnel to regularly check and balance the problems
of the project and the same that might occur in future in case if they are not properly maintained at present.
Also, some of the components of the projects are very worse in condition and most of them are rusted.
Hence, a due concern should be given by all.
8. REFERENCES
1. Singh, G. (2010). Irrigation Engineering. New Delhi: Rajsons Publications
2. Garg, S.K. (2011). Irrigation Engineering and Hydraulic Structures. New Delhi: Khanna
Publishers
3. https://agris.fao.org/agris-search/search.do?recordID=NP19800525511
4. https://en.wikipedia.org/wiki/Gandaki_River
5. https://potlightnepal.com/2019/05/26/narayani-gandak-agreement-benefit-or-burden

More Related Content

What's hot

Spillway
Spillway Spillway
Spillway
Naval Bandawar
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
bhalinder singh
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
Bilal Mirani
 
types of canals
types of canals types of canals
types of canals
number113
 
Canal Fall
Canal FallCanal Fall
Canal Fall
GAURAV. H .TANDON
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
Sunny Agarwal
 
Dams and spillways
Dams and spillwaysDams and spillways
theory of seepage
theory of seepagetheory of seepage
theory of seepage
SANJEEV Wazir
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
Raj Daxini
 
Flood routing
Flood routingFlood routing
Flood routing
vivek gami
 
Diversion head works
Diversion head worksDiversion head works
river training work
river training workriver training work
river training work
Vishal Chaudhari
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
Bibhabasu Mohanty
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptx
Waqas Khan
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
Rajkumar G
 
Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
Latif Hyder Wadho
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
SAGAR RAUT
 
Introduction to irrigation and hydrology
Introduction to irrigation and hydrologyIntroduction to irrigation and hydrology
Introduction to irrigation and hydrology
DKTE'S YASHWANTRAO CHAVAN POLYTECHNIC, ICHALKARANJI
 
Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)
Latif Hyder Wadho
 
Canal structures
Canal structuresCanal structures
Canal structures
MANJUNATH BORAKANAVAR
 

What's hot (20)

Spillway
Spillway Spillway
Spillway
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
types of canals
types of canals types of canals
types of canals
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
theory of seepage
theory of seepagetheory of seepage
theory of seepage
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Flood routing
Flood routingFlood routing
Flood routing
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
river training work
river training workriver training work
river training work
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptx
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
 
Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Introduction to irrigation and hydrology
Introduction to irrigation and hydrologyIntroduction to irrigation and hydrology
Introduction to irrigation and hydrology
 
Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)
 
Canal structures
Canal structuresCanal structures
Canal structures
 

Similar to Irrigation field report

Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice  at Tana Bales Sugar project by Hunda TolinaIrrigation scheduling practice  at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
Tana Bales sugar Factory
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
'Denish Makvana'
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET Journal
 
Proceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation WorkshopProceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation Workshop
FRANK Water
 
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
IWRS Society
 
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior CityIRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
IRJET Journal
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
IRJET Journal
 
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
NaqashTareen
 
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
ijtsrd
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET Journal
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
India-EU Water Partnership
 
V130402139143
V130402139143V130402139143
V130402139143
IOSR Journals
 
An Innovative Model to Create a Sustainable Farming Community
An Innovative Model to Create a Sustainable Farming CommunityAn Innovative Model to Create a Sustainable Farming Community
An Innovative Model to Create a Sustainable Farming Community
Netafim Irrigation India Pvt Ltd
 
Proposal
ProposalProposal
Proposal
prabinzoc
 
Web Based Tool for Managing Paddy Irrigation Water User Group
Web Based Tool for Managing Paddy Irrigation Water User GroupWeb Based Tool for Managing Paddy Irrigation Water User Group
Web Based Tool for Managing Paddy Irrigation Water User Group
ijtsrd
 
Water civilisation_mp
Water civilisation_mpWater civilisation_mp
Water civilisation_mp
manjuprakashpatil
 
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNAANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
Vj NiroSh
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
IRJET Journal
 
Busiki Project.
Busiki Project.Busiki Project.
Busiki Project.
beroya
 

Similar to Irrigation field report (20)

Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice  at Tana Bales Sugar project by Hunda TolinaIrrigation scheduling practice  at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
 
Proceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation WorkshopProceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation Workshop
 
UTFI B2
UTFI B2UTFI B2
UTFI B2
 
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
EFFICIENCY OF WATER RESOURCES SYSTEM WRD - 2004
 
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior CityIRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
IRJET- Rejuvenation and Utilization of Surface Water Sources in Gwalior City
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
 
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
 
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
Web Based Tool to Determine Water Productivity Index and Ph for Managing Padd...
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
 
V130402139143
V130402139143V130402139143
V130402139143
 
An Innovative Model to Create a Sustainable Farming Community
An Innovative Model to Create a Sustainable Farming CommunityAn Innovative Model to Create a Sustainable Farming Community
An Innovative Model to Create a Sustainable Farming Community
 
Proposal
ProposalProposal
Proposal
 
Web Based Tool for Managing Paddy Irrigation Water User Group
Web Based Tool for Managing Paddy Irrigation Water User GroupWeb Based Tool for Managing Paddy Irrigation Water User Group
Web Based Tool for Managing Paddy Irrigation Water User Group
 
Water civilisation_mp
Water civilisation_mpWater civilisation_mp
Water civilisation_mp
 
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNAANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
 
Busiki Project.
Busiki Project.Busiki Project.
Busiki Project.
 

More from Sushrut Gautam

FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
Sushrut Gautam
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
Sushrut Gautam
 
Risk management
Risk management Risk management
Risk management
Sushrut Gautam
 
Case Study on Lightning in Nepal
Case Study on Lightning in NepalCase Study on Lightning in Nepal
Case Study on Lightning in Nepal
Sushrut Gautam
 
Lab reports transportation engineering i
Lab reports transportation engineering iLab reports transportation engineering i
Lab reports transportation engineering i
Sushrut Gautam
 
Transportation field report
Transportation field reportTransportation field report
Transportation field report
Sushrut Gautam
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCE
Sushrut Gautam
 
Enviromental pollution
Enviromental  pollutionEnviromental  pollution
Enviromental pollution
Sushrut Gautam
 
Animals acc to food
Animals acc to foodAnimals acc to food
Animals acc to food
Sushrut Gautam
 

More from Sushrut Gautam (9)

FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Risk management
Risk management Risk management
Risk management
 
Case Study on Lightning in Nepal
Case Study on Lightning in NepalCase Study on Lightning in Nepal
Case Study on Lightning in Nepal
 
Lab reports transportation engineering i
Lab reports transportation engineering iLab reports transportation engineering i
Lab reports transportation engineering i
 
Transportation field report
Transportation field reportTransportation field report
Transportation field report
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCE
 
Enviromental pollution
Enviromental  pollutionEnviromental  pollution
Enviromental pollution
 
Animals acc to food
Animals acc to foodAnimals acc to food
Animals acc to food
 

Recently uploaded

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Irrigation field report

  • 1. TRIBHUVAN UNIVERSITY KHWOPA COLLEGE OF ENGINEERING An undertaking of Bhaktapur Municipality Libali, Bhaktapur A Report on: Irrigation and Drainage Engineering Title: Field Visit Report on Different Irrigation Project SUBMITTED BY: SUBMITTED TO: Sushrut Gautam KCE074BCE089 Department of Civil Engineering Swarnima Shrestha KCE074BCE090 Khwopa College of Engineering Ujjwal Acharya KCE074BCE091 Libali, Bhaktapur Umesh Bhatta KCE074BCE092 Date of Submission: 2077/11/21
  • 2. i PREFACE A 4 days and 3 nights field visit to different irrigation projects namely Bagmati Irrigation Project, Khageri Irrigation Project, Narayani Lift Khageri Irrigation Project and Gandak Barrage, different transportation structures and Hetauda Cement Factory was organized by Khwopa College of Engineering. The field visit was from Falgun 11 to Falgun 14, 2077 B.S. as per the curriculum of IOE, Tribhuvan University. We were able to visit and see the different components of Irrigation projects which helped us to grab the knowledge about them visually. It is our belief that the report will serve to introduce about different Irrigation Project. For this I would like to show my gratitude to Er. Ramesh Bala, HOD, Department of Civil Engineering, Khwopa College of Engineering and all other who helped us directly and indirectly during our trip and field visit. We would like to extend our gratitude to our friends who helped us to prepare this report and made our field visit unforgettable. Sincerely Sushrut Gautam Swarnima Shrestha Ujjwal Acharya Umesh Bhatta “Civil 074 CD Batch”
  • 3. ii ACKNOWLEDGEMENT We must express our sincere gratitude towards Department of Civil Engineering, Khwopa College of Engineering for organizing the field trip for Irrigation and Drainage Engineering. We must express our deep sense of gratitude towards Head of Department, Er. Ramesh Bala sir for organizing the trip. We are deeply indebted to Er. Naresh Suwal sir for sharing a part of his brain and for proper guidance during field trip. We should like to thank Mr. Nirmal Kafle, Er. Anil Kasula and Er. Bibek Shahi for properly guiding us in our field trip. We must acknowledge our deep sense of gratitude to the staffs of Bagmati Irrigation Project, Khageri Narayani Lift Irrigation Project, Gandak Barrage and Hetauda Cement Factory for providing us the opportunity to visit the respective places. We must acknowledge our obligation to all the non- teaching staff of the Field trip for making our work a success. Also, we wish to record our appreciation to our friends for providing the inexpressible amount of support and guidance. We are highly obliged to all the people who supported us directly and indirectly throughout the duration of the field visit to the submission of this report. Thanks are due to our family and friends who supported us on our field visit.
  • 4. iii ABSTRACT This report deals with different Irrigation projects and their components. Irrigation engineering is a field of engineering which would discuss the uses of irrigation in crop production and how new principles and technologies can be used and applied for irrigational practices. This report encompasses the valuable information about the Bagmati, Khageri and Narayani lift irrigation projects of Nepal being based on the four days long field visit to the respective areas. This report presents the general information of those irrigation projects of Nepal and even a detailed evaluation related to their history, background, and present status. On the other hand, this report is a detailed description of the respective irrigation projects on the basis of their construction cost, affected districts, problems, type of diversion head works, river training works adopted, regulating structures provided as well methods being adopted to control and mitigate different problems that are mainly responsible for the reduction in the efficiency of their performance. Bagmati irrigation project was initially run as multipurpose project. Its construction was aided by UNDP, Debt Relief Fund (Japan), and is now being in function by loan from Saudi Arabia. Major headwork components include under sluice portion, divide wall, canal head regulator, canal portion, and river training work such as earthen guide banks. Also, a provision of flood control is done by construction of bypass. According to field survey of 1999, there has been increase in 34.98% of total production in and around the irrigation project area which concludes that there is significantly good impact of the project and effectively running very smoothly till date. Khageri irrigation project, which is one of the oldest irrigation projects of Nepal, is located in Chitwan district of Nepal and irrigates 3900 ha land. Major headwork includes under sluice portion, divide wall, canal head regulator, canal portion, and river training work such as Chut blocks, stone pitching in the banks. Initially it was designed to irrigate 3900ha but only 2400ha were being irrigated before IMPT and main cause being lack of maintenance, lack of water sources, pollution degrading quality of water in the river, etc. However, it is still working with efficiency of 30-36%. Narayani lift irrigation project involves lifting of water to height of about 22m by two sets of pumps. It was completed in 1985 at cost of NRs. 470,000,000 financed by ADB. Since this project is highly costly with high power consumption of Rs. 10,800 per hour, operation and maintenance cost of Rs.70-80 million, there is difficulty in maintaining balance in cost effectiveness. However, it plays major role in rice production there. Keywords: Irrigation, Lift, Mitigate, Headwork, Efficiency, Diversion
  • 5. iv Table of Contents PREFACE .......................................................................................................................................... i ACKNOWLEDGEMENT ............................................................................................................... ii ABSTRACT...................................................................................................................................... iii 1. INTRODUCTION......................................................................................................................1 1.1 Background of Irrigation in Nepal....................................................................................1 2. OBJECTIVES.............................................................................................................................1 3. METHODOLOGY.....................................................................................................................2 4.STUDYAREA……………………………………………..………………………………………2 4.1 BAGMATI IRRIGATION PROJECT..........................................................................2 4.2 KHAGERI IRRIGATION SYSTEM............................................................................4 4.3 NARAYANI LIFT IRRIGATION......................................................................................5 4.4 GANDAK BARRAGE..........................................................................................................6 5. OBSERVATIONS AND ANALYSIS .......................................................................................8 5.1 OBSERVATIONS ON BAGMATI IRRIGATION PROJECT ..........................................8 5.2 OBSERVATIONS ON KHAGERI IRRIGATION PROJECT.........................................11 5.3 OBSERVATION ON NARAYANI LIFT IRRIGATION..................................................13 5.4 OBSERVATION ON GANDAK BARRAGE .....................................................................16 6. CONCLUSION AND DISCUSSION.........................................................................................19 7.RECOMMENDATION................................................................................................................20 8. REFERENCES ............................................................................................................................20
  • 6. 1 1. INTRODUCTION 1.1Background of Irrigation in Nepal The adoption of irrigation of Nepal is not a new thing, as it appears to be, because sufficient proofs are available in history of Nepal, which confirm that irrigation was being practiced not only during of RANAS, SHAHI but even during the period of Lichhivi. The first national irrigation project in Nepal is Chandra Nahar during period of Chandra Samsher in Saptari district (1965 B.S) irrigating command area of 10000 hectare and still in operation. In field work various parts headworks, intake structures, canals, cross drainage structures etc. were carefully observed, analyzed, and studied in detail. More than 81% people are engaged in agriculture in Nepal. Agriculture is the main source of income in Nepal. As per record of Government of Nepal, Ministry of Finance, 2054/55, more than 40% of national income comes from agriculture in Nepal but the growth rate in agriculture is only 2.4%. Since the living standard of people is directly related to the income of people in any country, there is an urgency to maintain and enhance the income of country like Nepal. In case of our country, a major concern has to be given in the field of agriculture because of the fact that major portion of the national income comes from agriculture. In order to extract major yields from agriculture and in turn enhance the economy of our country, it is important that we improve the agriculture system by a better and more scientific method of irrigation apart from use of improved seeds, fertilizers etc. The agriculture can be the source of employment to many people of our country that is currently jobless if we can utilize almost all the available arable lands. It is believed that more than 50% of the land of our country is used only for seasonal agricultural products. Agriculture Perspective Plan has stressed the role of agriculture in generation of employment opportunities and improving the living standard of people. This plan has also defined irrigation as a strategic input and has prescribed the conjunctive use of water in Terai region. As the agricultural sector contributes a significant amount to the national income, the change in national income is a direct reflection of the change in agricultural production. If we can arrange better irrigation facilities in our country, the national income can be increased significantly. When national income increases, the per capita income will also increase. This is an effective indicator of economic growth. Thus, it is essential to analyze the parameter of agricultural growth. In this connection, irrigation is one of the most important inputs to increase the agricultural product particularly in the following two grounds. Firstly, we can increase the agricultural product in the cultivated land with irrigation by enhancing the efficiency of rest auxiliary inputs. And, secondly, we can extensively cultivate the uncultivated agricultural land providing irrigational national facilities. However there has not been much significant steps taken place in Nepal. Out total 2.18-million-hectare irrigable land in Nepal, 1.74 million ha is in the plains of Terai region and rest 0.44 million is situated in the valleys of the hill. Out of these potential irrigable areas, just 1.766 million ha has been provided irrigation and out of which some 1.06 million ha. are already developed (i.e., provided with infrastructure) for irrigation. Of the latter figure, however, only about 71 percent is actually irrigated. That leaves some 29 percent of the developed command area that could be brought under irrigation with relative ease, in addition to the nearly 700,000 ha, yet to be developed for irrigation. Areas covered by surface and ground water irrigation are 854,000 and 206,000 ha respectively and representing 80.6 percent and 19.4 percent respectively of the total irrigated area. 2. OBJECTIVES i. To find out the type of diversion headwork ii. To get familiar with the components from headwork to canal outlet iii. To know about the provisions for high flooding iv. To gather information about the regulating structures and cross drainage structures v. To know about the water losses during conveyance vi. To know about total command area, canal design discharge and major water sources vii. To know about the past disasters if any viii. To determine the socio-economic benefits of the projects in local and national scale
  • 7. 2 3. METHODOLOGY The main methodology we followed for the accomplishment of our objectives of the field trip was following the explanations made by the related personnel working on respective irrigation projects. Similarly, for the study, the brochures and the information boards were used. Photographs of the location were taken and the important points were noted. Similarly, the different literatures were also followed for the reliability of data. In the same way, internet records were utilized to gather information regarding different factors of the projects. 4. STUDY AREA 1) Bagmati Irrigation Project 2) Khageri irrigation project 3) Narayani lift irrigation 4) Gandak Barrage 4.1 BAGMATI IRRIGATION PROJECT Location: Karmaiya, Sarlahi Establishment: 2050/04/05 Geological Coordinates: 27° 07'53" N and 85° 28'59” E Facilitated District: Sarlahi, Rautahat, Bara, Mahottari Total Command Area: 122000 hectares Canal Design Discharge: 8000m3 /sec Design Flood: 100-year return period Major Water Source: Bagmati River Construction Cost: NRs. 37,809,610.25 (estimated) Maintenance Cost: 1.5 to 2 crores yearly Owner: Ministry of Water Resources, Department of Irrigation, Government of Nepal Financier: Government of Nepal Sedimentation Problem: Siltation problem is high due to Deforestation and Mobile Boundary. Diversion Headwork: Barrage Components from Headwork to Canal Outlet: Barrage, under sluices, Divide Wall, Fish ladder, Canal Head Regulator, Silt ejector Provision in case of High Flooding: i. The system can withstand 10000 cumecs of water. ii. Hydraulic and Structural Design is adopted. River Training Work Adopted: Guide Banks, Marginal Bunds, Pitched Island, Bandalling Regulating Structure provided: Head Regulators Cross Drainage Structure: Syphon Super passage, Aqueduct Major Causes of Water Losses: i. Seepage losses ii. High Percolation iii. Not closing of gate properly Major Crops in Command Area: Paddy, Rahar Dal Future Project: Sunkoshi-Marine Diversion Project
  • 8. 3 Fig: Bagmati Irrigation Project Bagmati irrigation project is located in the central region of Nepal and diverts water from Bagmati River through diversion barrage structure located at Karmaiya, Sarlahi district. This project is initially conceptualized as a multipurpose project to develop irrigation facilities over an irrigable area of 122000ha of Bara, Rautahat, Sarlahi, and Mahottari district and to generate electricity of 140 MW by constructing a 117m high dam. Bagmati irrigation project was commenced as Sunkoshi terai project and the study was conducted by UNDP and FAO FROM 1967 TO 1972 A.D. The government then started the construction by the usage of self-resources and equipment’s after which the constructed was economically aided by UNDP and Debt Relief Fund (Japan) and is now being in function by the loan from Saudi Development Fund. The main objectives, the project carries are to provide the efficient irrigation facilities to 37000ha agricultural lands which thereby work as the aid to the socio-economic uplifting of the living standard of the farmers. This irrigation project has the following properties: Barrage Design discharge=8000m3 /sec By pass channel=2500m3 /sec Total=10500m3 /sec Length=403.50m Duty=1.34lt/sec No. of gate=30 nos. (9*3m) No. of fish ladder=2nos. (1.5*4m) No. of under sluice=6nos. (9*4m) Eastern H/R Maximum discharge=64.4m3/ sec No. of gate=7nos. Western H/R Maximum discharge=48.4m3 /sec No. of gate=5nos.(4x2m)
  • 9. 4 4.2 KHAGERI IRRIGATION SYSTEM Location: Chitwan Establishment: 2026B.S. Geological Coordinates: 27°37'57"N and 84°29'21" E Facilitated District: West Chitwan Total Command Area: 3900 hectares Canal Design Discharge: 9-14m3 /sec Major Water Source: Khageri River Construction Cost: NRs. 7465619 (estimated) Maintenance Cost: 2 crores yearly No. of gate: 2 nos. Owner: Ministry of Water Resources, Department of Irrigation, Government of Nepal Financier: Government of Nepal Sedimentation Problem: Siltation problem is little. Diversion Headwork: Barrage Components from Headwork to Canal Outlet: Barrage, Divide Wall, Canal Head Regulator River Training Work Adopted: Chute Blocks, Marginal Bunds Regulating Structure provided: Head Regulators Cross Drainage Structure: Aqueduct Major Causes of Water Losses: i. Seepage losses ii. Not closing of gate properly Major Crops in Command Area: Maize, Paddy Length of main canal: 22+650km Length of Branch canal: 55km Length of tertiary canal: 100km Fig: Khageri Irrigation Project
  • 10. 5 Khageri Irrigation System (KHIS) is one of the oldest agency managed irrigation systems located in Chitwan District in Western Nepal. It provides irrigation to about 3,900 ha of land in the West Chitwan. The construction of the system was initiated in 2017 B. S. and completed in 2024 B. S. at the cost of Rs 7.6 million. The physical structures of the system include a diversion barrage, 23-km long main canal, 55 km of branch canals and 100-km long tertiary canals. About 7 km of the main canal passes through the buffer zone of Royal Chitwan National Park, where many lakes have been formed due to regular canal flow. These lakes serve as water reservoirs and augment the water supply to the main canal besides regular supply obtained from Khageri River. 4.3 NARAYANI LIFT IRRIGATION Location: Narayangadh, Chitwan Establishment: 2034B.S. Geological Coordinates: 27°40'44"N and 84°26'12"E Facilitated Areas: Bharatpur, Mangalpur, Phulbari, Shivanagar and Gitanagar VDC’s Total Command Area: 4700 hectares Canal Design Discharge: 240000lpm Major Water Source: Narayani River Construction Cost: NRs. 42500000 IGO Financial Aid: ADB Sedimentation Problem: Siltation problem is high. Diversion Headwork: Barrage Regulating Structure provided: Head Regulators Major Crops in Command Area: Maize, Paddy Reduced Level: 272m Number of Pumps: A (5 nos.) + B (4 nos.) = 9 nos. Working Month: Asar to Asoj Working Hours: 16 hours Electricity Consumption: 4000000 units = NRs. 15000000 Maintenance cost: NRs. 5crore yearly Pump level: 40m above head: Pump A (22m) + Pump B (18m) Gravity System: 70% Lift System: 30% The Narayani lift irrigation project is the second largest irrigation project after Eastern Rapti Irrigation project (5,966 ha) of Chitwan district. This irrigation system was designed to irrigate 8,600 ha of land in West Chitwan, including 3,900 ha by the Khageri Irrigation System. The area directly under the Narayani irrigation scheme was 4,700 ha but now it is reduced to 3500 ha (Central irrigation development board, Bharatpur, 2012). The lift was also supposed to augment the Panchakanya irrigation system (600 ha) of the district. It directly pumps water from a reservoir built along the Narayani River.
  • 11. 6 Fig: Narayani Lift Khageri Irrigation Project NLIP has two main canals i.e., B and C. Canal B covers 2400 ha of parts of Bharatpur, Mangalpur, Phulbari, Shivanagar and Gitanagar VDCs. Its length is 19 km. It has 20 branch canals and 87 tertiaries, the total length which is 17.95 km and 82.73 km respectively. Its maximum water flow capacity of canal B is 7.8 m3 /sec. Canal C covers 2,300 ha land of Bharatpur Municipality. But water is not sufficient for 2,300 ha of land due to the low capacity of Pump house B. It is 10.5 km long. Day by day the areas of C canal are reducing due to urbanization and low capacity of Pump house B. It has altogether 15 branches and 97 tertiaries. Total length of branch canals and tertiaries is 20.8 km and 61.50 km, respectively. Its maximum water flow capacity is 3.2 m3 /sec. Total length of drain of B and C canal is 34.6 km. 4.4 GANDAK BARRAGE Location: Nawalpur, Indo-Nepal Border Establishment: 1969 A.D. Facilitated District: Nawalpur, Parasi Total Command Area: 14.04 lakh hectare (India) and 0.44 lakh hectare (Nepal) Canal Design Discharge: Major Water Source: Gandaki River Owner: Government of India and Government of Nepal Diversion Headwork: Barrage No. of Gates: 36 (18 Nepal and 18 India)
  • 12. 7 Canals: NEC and WEC Components from Headwork to Canal Outlet: Canal Head Regulator, Barrage, Silt ejector, under sluices, Divide wall River Training Work Adopted: Marginal Bund, Guide banks Regulating Structure provided: Canal Head Regulator, Distributary Head Regulator Cross Drainage Structure: Aqueduct, Syphon Super passage Major Causes of Water Losses: Not closing of door properly, Seepage losses. Major Crops in Command Area: Maize, Paddy, Wheat, Potatoes Negative Impacts: i. Regular Flooding ii. Water logging iii. Riverbank erosion iv. Change in river course Fig: Gandak Barrage The Gandak Project at Valmikinagar intercepts water of a catchment area of 37,410 km, which is mostly in Nepal and partly in India. An agreement was signed on 4 December 1959 between the governments of Nepal and of India on the Gandak Irrigation and Power Project. It encompassed the construction of a barrage, canal head regulators and other appurtenant works about 33 m (108 ft) below the existing Triveni Canal Head Regulator. The agreement was modified in 1964 for the protection of Nepal’s riparian rights. Basically, there is an agreed share of water for ‘western canal system including a power station in Nepal and eastern canal system. As a part of this bilateral agreement, the Gandak Barrage, a part of Gandak Project, was built in 1968-69 over the Gandak river for providing irrigation to Nepal, Uttar Pradesh and Bihar. The Eastern Gandak Canal Project was taken up in 1960 and Main Canal system was completed in 1975.
  • 13. 8 5. OBSERVATIONS AND ANALYSIS The different information that we have collected in order to meet our objectives of the trip are collected and analyzed. The description of them is as follows: 5.1 OBSERVATIONS ON BAGMATI IRRIGATION PROJECT 5.1.1 Under Sluice Portion The under sluices are the openings provided at the base of the weir or barrage. These openings are provided with adjustable gates. Normally, the gates are kept closed. The crest of the under-under sluice portion of the weir is kept at a lower level (1 ~ 1.5 m) than the crest of the normal portion of the weir. The suspended silt goes on depositing in front of the canal head regulator. When the silt deposition becomes appreciable the gates are opened and the deposited silt is loosened with an agitator mounting on a boat. The muddy water flows towards the downstream through the scouring sluices. The gates are then closed. But, at the period of flood, the gates are kept opened. 5.1.2 Divide Wall Fig: Divide Wall The divide wall is a masonry or concrete wall constructed at right angle to the axis of the weir. The divide wall extends on the upstream side beyond the beginning of the canal head regulator, and on the downstream side, it extends up to the end of the loose protection of the under-sluices. In this irrigation project, cement concrete divide wall observed. 5.1.3 Canal Head Regulator Fig: Canal Head Regulator
  • 14. 9 A structure which is constructed at the head of the canal to regulate flow of water is known as canal head regulator. It consists of a number of piers which divide the total width of the canal into a number of spans which are known as bays. The piers consist of number tiers on which the adjustable gates are placed. The gates are operated form the top by suitable mechanical device. A platform is provided on the top of the piers for the facility of operating the gates. Again, some piers are constructed on the downstream side of the canal head to support the roadway. 5.1.4 Canal Portion Fig: Main canal The main canal is lined with cement concrete and was in functioning state. The distributary canal was not working and the components of the canal were on the deteriorated state because of rusting. 5.1.5 Disaster history and risks The highest flood was recorded on 4th and 5th Shrawan, 2050 which took the life of two Chinese workers and destroyed the divide walls and other structures of the headwork. The upstream of this irrigation project is prone to landslides and flood due to steep slopes and degraded watersheds. Also, there is the problem of sedimentation problem for which Bagmati River Basin improvement Programs are being conducted. 5.1.6 Provision for high flood Bypass of capacity 2500m3 /sec is provided for the emergency case especially for high flood periods to protect the barrage from effects of high discharge. 5.1.7 River protection
  • 15. 10 5.1.8 Socio-economic benefits of project: The irrigation has positive impact on agricultural production, farm income and employment. But the extent of impact depends on various factors such as cropping intensity, crop type, management of irrigation facilities, farming technology etc. Therefore, the impact may vary by place to place and project to project. The primary data collected within the outside the Bagmati Irrigation Project command area that could determine the impact of irrigation in following ways: Table 1: Effect of Irrigation on Total Output Crops Total output (kg) Without Irrigation With Irrigation Change in Total % Change Paddy (Rain Seasons Crops) 1542.40 2182.40 640.00 41.49 Wheat (Winter Crops) 1323.00 1625.05 302.05 22.83 Maize (Winter Crops) 673.75 887.81 214.06 31.77 Other (Winter Crops) 248.36 417.22 168.86 67.99 Total 5112.48 1324.98 34.98 Source: Field Survey, 1999. Note: Other crops include Mustard, Dal etc. From Table 1, we come to know that there is 34.98% increase in the total production with irrigation facility. Among the four cultivated crops, mustard and oil-seeds have been found more affected by irrigation. The productions of mustard and oil-seeds have increased by 67.99% in irrigated land compared to their production in non-irrigated land. The production of paddy, on the other hand, has also increase by 41.49 percent. Because of the availability irrigation facility, there has been possible to cultivate some of the agricultural lands three times a year. Thus, Bagmati Irrigation Project has increased the total production of farmers significantly. 5.1.9 Effect of Irrigation on Farm Income The agricultural production has been increased in irrigated land as reflected in Table 2. To get farm income, the annual physical productions of both irrigation and non-irrigated lands have been converted into monetary term. Crops Farm income Without Irrigation With Irrigation Change in Total % Change Paddy (Rain Seasons Crops) 7021.00 14885.5 7864.50 112.014 Wheat (Winter Crops) 7413.0 10783.5 3370.50 45.46 Maize (Winter Crops) 5143.00 7742.00 2599.00 50.53 Other (Winter Crops) 3769.00 7643.00 3874.00 102.78 Total 23346.00 41054.00 17708.00 75.85 Table 2: Effect of Irrigation on Farm Income
  • 16. 11 5.2 OBSERVATIONS ON KHAGERI IRRIGATION PROJECT 5.2.1 Under Sluice Structure The under sluices are the openings provided at the base of the weir or barrage. These openings are provided with adjustable gates. When the silt deposition becomes appreciable the gates are opened and the deposited silt is loosened with an agitator mounting on a boat. The muddy water flows towards the downstream through the scouring sluices. The gates are then closed. But, at the period of flood, the gates are kept opened. 5.2.2 Divide Wall Fig: Divide wall 5.2.3 Canal Head Regulator Fig: Canal head regulator 5.2.4 Canal Portion
  • 17. 12 The canal is lined with cement concrete. Fig: Main canal 5.2.5 River training works Chut blocks: It is provided to reduce the water pressure Fig: Chut blocks Stone pitching of banks: It is provided for the protection of banks from the flow of river water Fig: Stone pitching at banks
  • 18. 13 5.2.6 Impacts and achievements Khageri Irrigation System was initially designed to irrigate 3,900 ha. However, the areas under irrigation before IMTP intervention were only 2,400 ha in Khageri. The main reasons for lower irrigated areas in these projects are: -Reduction in the dependable water supply in the source due to the environmental degradation -Lack of proper maintenance of canal -Inequitable water distribution -Poor on-farm water management practices The available irrigation duty in Khageri is about 1.25 Vs per ha against the requirement of about 1.8 l/s/ha. It was therefore, decided to augment the supply in Khageri from Chitwan lift Irrigation system by about 2.2 m3 /s. But it could not be done due to financial and technical reasons of the pumping systems. Nevertheless, the irrigated areas upon management transfer have changed to 2,900 ha from existing 2,400 ha. The area under early paddy has increased from 350 to 600 ha. There is more equitable water distribution in head, middle and tail portions of the system. Water distribution is being practiced in a systematic way to make up the deficit in the canal system. However, the entire command area cannot be fully irrigated unless the supply at the source is increased. With improved management, a total of 3,400 ha could be brought under irrigation. The changes observed so far in cropping intensity and efficiency are given as below: Table 2: Achievements in irrigation management 5.3 OBSERVATION ON NARAYANI LIFT IRRIGATION Due to its fertile soils, Chitwan continued to be a major focus for irrigation development since 1960s. In 1972, Chitwan Irrigation Development Board (CIDB) was formed to direct the irrigation development in the valley in recognition to its potential. Feasibility study begun on the same year. Under this board, an executing agency, the Chitwan Irrigation Project (CIP) was set up to construct irrigation projects in the district with the objectives of irrigating 10,400 ha of land thorough out the year and about 700 ha seasonally. The CIP had three irrigation schemes namely; Narayani, Lothar and Khageri (MWR and CIDB, 1973). The CIP initiated the NLIP in 1972, with the purpose of having year-round irrigation possibilities. The project was completed in 1985 at the cost of NRs. 470,000,000 financed by the Asian Development Bank (ADB). CIP was dissolved in 1994 and Narayani Lift Irrigation Office (NLIO) was established to look after the O and M of the three irrigation systems previously operated under CIP. In lift irrigation, lifting of water is done in two stages by two sets of Pumps i.e. pumping scheme “A” and “B”. Pump house “A” is located in the bank of Narayani River and pump house “B” is located in Chhatarpur, Narayangadh. There are five pumps in pumping scheme “A” (4+4+2+2+1=13m3 /sec) and four pumps in Pumping scheme “B” (1.6+0.8+0.8+0.8=4m3 / sec). But now only 4 m3 /sec water is available S. N Details From To 1. Area under summer rice(ha) 2400 2900 2. Area under early paddy(ha) 350 600 3. Overall l efficiency (%) 30 36 4. Yield loss (%) 25 0 5. Irrigation turns(days) 11 11 6. Water share (l/s/ha) 3 1.25
  • 19. 14 during transplanting of rice which is much lower than the requirements. Respondents reported that at least 6m3 /sec water is needed for them in the command areas of “B” canal. In the first stage, pumping scheme “A” lifts water at the rate of 11m3 /sec to the height of about 22m onto a link canal (500m). About 70 percent of lifted water is diverted to B canal at a rate of 7.8 m3 /sec. In the second stage, remaining 30 percent of water from this link canal is lifted to the height of about 20m and discharged at the rate of 3.2 m3 /sec to canal C by pumping scheme “B”. The system B supplements the Khageri system with a capacity of 4.3 m3 /sec. About the cost effectiveness of NLIP, the project was launched with the cost of 470,000,000 NRs. For O and M of NLIP during 40 years, it is estimated about 240,000,000 NRs. For electricity, it is estimated to be 500,000,000 NRs. So, the total cost of operation is 1210,000,000 NRs. But the income from water charge (levy) is found to be only 100, 000, 00 NRs. So, there is the vital problem of how making the balance in the cost effectiveness of NLIP (Lohanee, 2010). 5.3.1 Pump Fig : Pump 5.3.2 Inlet Fig: Inlet of water to pumping system
  • 20. 15 5.3.3 Outlet Fig: Outlet to lifted water This project has been proved a lot costlier clearly defined by the high-power consumption of about Rs.10,800 per hour, repair and maintenance cost of 60,00,000-70,00,000 along with other charges of silt repair and others. However, it is playing vital role in the rice production of the irrigated areas. Similarly, a charge of RS.180 per bigha is being collected of which 40% goes to the government and 60% to the committee from which earnings of about RS.10,50,000 is obtained. Thus, this project is also given a name as “Seto hatti’’ as it has lesser earnings than the cost.
  • 21. 16 5.4 OBSERVATION ON GANDAK BARRAGE 5.4.1 Divide Walls Fig: Divide Walls 5.4.2 Main Canals Eight numbers of gate were present in the Canal Outlet. Fig: Main Canal
  • 22. 17 5.4.3 Aqueduct Aqueduct is constructed when bed level of the canal is sufficiently higher than the H.F.L. of the drainage. It is the most commonly used cross drainage structure. Fig: Aqueduct 5.4.4 Syphon Super passage When the canal discharge is small in comparison to the drain and the canal bed level is lower than the F.S.L. of canal, syphon is preferred structure to be adopted. In this case canal is syphoned below drain. Figure: Syphon Super passage
  • 23. 18 5.4.5 Silt ejector canal A trap like structure is used to trap the silt in the main canal and is ejected by flushing towards the Silt ejector canal. Fig: Silt ejector canal 5.4.6 Head Regulator Head regulator is used to maintain the certain level of head in the canal before the flow occurs. Below figure is of Distributary Head Regulator. Fig: Distributary Head Regulator
  • 24. 19 5.4.7 Distributary Channel Distributary channel takes the water to the small portion of field from the main canal. Fig: Distributary Channel 6. CONCLUSION AND DISCUSSION In this way, our field visit was successfully completed with the proper achievement of all our objectives that we were destined to accomplish. Hence the field visit was fruitfully terminated. Nepal is landlocked agricultural country. Almost 80% of Nepalese depends upon agriculture. We had concluded that such multi proposed irrigation projects should run effectively under systematic management and maintenance for rising state of local people as well as to strengthen national economy. Local people as well as Nepal government should monitor time to time these projects for efficient operation of irrigation projects. The irrigation project plays an important role in the country's economy. The irrigation project is directly and indirectly affecting the economy of the country and countrymen. Hence, proper operation of every components of the system is vital and a small hurdle in the working can be proved a much disadvantageous. Thus, proper care should be taken for proper functioning of the system. However, during our field visit, we observed different problems like deposition of sediments in canal, stopping of working of certain canal, silting and so on. Thus, these problems need to be taken care of for which the related committee should be attentive and active. All in all, the field visit is accomplished successfully from which we visualized the things we studied in classroom.
  • 25. 20 7. RECOMMENDATION The problems of sedimentation and silting should be taken care of. Similarly, the concerned authorities should regularly monitor and maintain the working condition of the irrigation projects so as to ensure continuous supplies to people. In other ways, the government should be able to attract foreign companies to invest and to further expand the irrigation project and hence extend its approachability in terms of its command area. Similarly, I would like to recommend the related personnel to regularly check and balance the problems of the project and the same that might occur in future in case if they are not properly maintained at present. Also, some of the components of the projects are very worse in condition and most of them are rusted. Hence, a due concern should be given by all. 8. REFERENCES 1. Singh, G. (2010). Irrigation Engineering. New Delhi: Rajsons Publications 2. Garg, S.K. (2011). Irrigation Engineering and Hydraulic Structures. New Delhi: Khanna Publishers 3. https://agris.fao.org/agris-search/search.do?recordID=NP19800525511 4. https://en.wikipedia.org/wiki/Gandaki_River 5. https://potlightnepal.com/2019/05/26/narayani-gandak-agreement-benefit-or-burden