  1. An auto parts supplier sells Hardy-brand batteries to car dealers and auto mechanics. The annual demand
     is approximately 1,200 batteries. The supplier pays $28 for each battery and estimates that the annual
     holding cost is 30 percent of the battery’s value. It costs approximately $20 to place an order (managerial
     and clerical costs). The supplier currently orders 100 batteries per month.

        a. Determine the ordering, holding, and total inventory costs for the current order quantity.
        b. Determine the economic order quantity (EOQ).
        c. How many orders will be placed per year using the EOQ?
        d. Determine the ordering, holding, and total inventory costs for the EOQ. How has ordering cost
           changed? Holding cost? Total inventory cost?


      Solution We are given the following information:

           annual demand: D = 1200 batteries per year
           item cost: c = $28 per battery
           holding cost: H = ic = 0.30(28) = $8.40 per battery per year
           order cost: S = $20 per order
           current order quantity: Q = 100 batteries

                                                               D        Q        1200            100
        a. The current ordering and holding costs are:         QS   +   2H   =    100 (20)   +    2 (8.40)    = 240 + 420 = $660.
                                2DS            2×1200×20
        b. The EOQ is Q∗ =       H    =           8.40     = 75.6 → 76 batteries.
                                      D        1200
        c. The company will place     Q∗   =    76    = 15.8 orders per year.
                                                                        ∗
        d. The new ordering and holding costs are: Q∗ S + Q H =
                                                    D
                                                            2
                                                                                  1200
                                                                                   76 (20)   +    76
                                                                                                   2 (8.40)   = 315.79 + 319.20 =
           $634.99. The company will save $25.01 by using the EOQ.


  2. Upon closer inspection, the supplier determines that the demand for batteries is normally distributed with
     mean 4 batteries per day and standard deviation 3 batteries per day. (The supplier is open 300 days per
     year.) It usually takes about 4 days to receive an order from the factory.

        a. What is the standard deviation of usage during the lead time?
        b. Determine the reorder point needed to achieve a service level of 95 percent.
        c. What is the safety stock? What is the holding cost associated with this safety stock?
        d. How would your analysis change if the service level changed to 98 percent?


      Solution In addition to the information from the problem above, we are told:

           average demand rate: d = 4 batteries per day
           standard deviation of demand: σd = 3 batteries per day
           lead time: L = 4 days
           300 operating days per year

                                                               1                                                           Spring 2007
√      √
    a. The standard deviation of demand during the lead time is σL = σd L = 3( 4) = 6 batteries.
    b. The reorder point is equal to the average demand expected during the lead time plus some safety stock.
       The service level is 95 percent. Examining the Table of Normal Demand Percentages (see the last page
       of this handout), we see that this corresponds to z = 1.65 (take the average of z = 1.6 and z = 1.7, since
       95 percent is between 94.5 and 95.5 percent). In other words, we need to keep 1.65 standard deviations
       worth of extra inventory on hand to ensure that the probability of running out is less than 5 percent.
       Now we can figure out the reorder point: R = dL + zσL = 4(4) + 1.65(6) = 16 + 9.9 = 25.9 → 26
       batteries. We place an order for 76 batteries when the inventory level drops to 26 batteries.
    c. The safety stock is the inventory in excess of the expected demand during the lead time. In other
       words, the safety stock is 26 − 16 = 10 batteries. The associated holding cost is simply 10 × H =
       10 × 8.40 = $84.00.
    d. If the service level changes to 98 percent, then we must go back and determine a new z. Consulting
       the table, we see that 98 percent is between 97.7 and 98.2 percent. Averaging the two corresponding
       z values gives us z = 2.05 for a service level of 98 percent. Thus, the reorder point will be: R =
       dL + zσL = 4(4) + 2.05(6) = 16 + 12.3 = 28.3 → 29 batteries. Place an order for 76 units when the
       inventory level drops to 29 units.


3. Foster Drugs, Inc., handles a variety of health and beauty aid products. A particular hair conditioner
   product costs Foster $2.95 per unit. The annual holding cost rate is 20 percent. Using an EOQ model,
   they determined that an order quantity of 300 units should be used. The lead time to receive an order
   is one week, and the demand is normally distributed with a mean of 150 units per week and a standard
   deviation of 40 units per week.

    a. What is the reorder point if the firm is willing to tolerate a 1-percent chance of a stockout during an
       order cycle?
    b. What safety stock and annual safety stock cost are associated with your recommendation in part a?
    c. Foster is considering making a transition to a periodic-review system in an attempt to coordinate
       ordering of some of its products. The review period would be two weeks and the delivery lead time
       would remain one week. What target inventory level would be needed to ensure the same 1-percent
       risk of stockout?
    d. What is the safety stock associated with your answer to part c? What is the annual cost associated
       with holding this safety stock?
    e. Compare your answers to parts b and d. If you were the manager of Foster Drugs, would you choose
       a continuous- or periodic-review system?




                                                     2
Solution We are given the following information:

    item cost: c = $2.95 per unit
    carrying “interest rate”: i = 0.20 per unit per year
    lead time: L = 1 week
    average demand rate: d = 150 units per week
    standard deviation of demand: σd = 40 units per week
    current order quantity: Q = 300 units

 a. A 1-percent stockout risk corresponds to a service level of 99 percent. Consulting the table, we see
    that this service level corresponds to z = 2.3. First, compute the mean and standard deviation of
                                                                      √        √
    demand during the lead time: dL = 150(1) = 150 and σL = σd L = 40 1 = 40. Now we have
    all of the information necessary to determine the reorder point: R = dL + zσL = 150 + 2.3(40) =
    150 + 93.05 = 243.05 → 243 units.
 b. The safety stock is 93 units, and the holding cost associated with the safety stock is 93×H = 93×ic =
    93 × 0.20(2.95) = $54.87.
 c. We are told that the review period is two weeks so P = 2. Use this number, along with L = 1 to
    compute the mean and standard deviation of demand during the lead time and the review period:
                                                √           √
    d(P + L) = 150(2 + 1) = 450 and σP +L = σd P + L = 40 2 + 1 = 69.28. The z value remains the
    same. The target inventory level is: T = d(P + L) + zσP +L = 450 + 2.3(69.28) = 450 + 159.35 =
    609.35 → 610 units.
 d. The safety stock is 160 units (rounded up), and the holding cost associated with the safety stock is
    160 × H = 160 × ic = 160 × 0.20(2.95) = $94.40.
 e. The periodic review method requires a larger safety stock, so it costs more: 94.40 − 54.87 = $39.53.
    However, using a fixed-period method facilitates ordering multiple items from a single supplier, so it
    is probably worth the extra cost.




                                                 3
Formulas for Inventory Management Problems
Fixed-Quantity System (Q System)

                        2DS                     D   Q
         EOQ: Q∗ =                       TC =     S+ H                  H = ic
                         H                      Q   2
                                                √
         R = dL + zσL                    σL = σd L


Fixed-Period System (P System)

                                                               √
                 T = d(P + L) + zσP +L               σP +L = σd P + L




                      Table of Normal Demand Percentages
                                     Service          Stockout
                          z         Level (%)         Risk (%)
                         0.0          50.0              50.0
                         0.5          69.1              30.9
                         1.0          84.1              15.9
                         1.1          86.4              13.6
                         1.2          88.5              11.5
                         1.3          90.3               9.7
                         1.4          91.9               8.1
                         1.5          93.3               6.7
                         1.6          94.5               5.5
                         1.7          95.5               4.5
                         1.8          96.4               3.6
                         1.9          97.1               2.9
                         2.0          97.7               2.3
                         2.1          98.2               1.8
                         2.2          98.6               1.4
                         2.3          98.9               1.1
                         2.4          99.2               0.8
                         2.5          99.4               0.6
                         2.6          99.5               0.5
                         2.7          99.6               0.4
                         2.8          99.7               0.3
                         2.9          99.8               0.2
                         3.0          99.9               0.1



                                          4

More Related Content

What's hot

Supply chain resilience
Supply chain resilienceSupply chain resilience
Supply chain resilience
Implement Consulting Group
 
Logistic management
Logistic managementLogistic management
Logistic management
swargpatel283
 
Warehouse and Logistics Sessions 3 - 4 (Day 2)
Warehouse and Logistics Sessions 3 - 4 (Day 2)Warehouse and Logistics Sessions 3 - 4 (Day 2)
Warehouse and Logistics Sessions 3 - 4 (Day 2)
Abdullah AlGhamdi (CSCP)
 
7 agile supply chain
7 agile supply chain7 agile supply chain
7 agile supply chain
valerod2
 
Supply chain
Supply chainSupply chain
Supply chain
MOHD ARISH
 
Introduction to chanel
Introduction to chanelIntroduction to chanel
Introduction to chanel
vsistw
 
Logistics and supply chain management
Logistics and supply chain managementLogistics and supply chain management
Logistics and supply chain management
snbagh1008
 
SUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIESSUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIES
Acharya Institute of Graduate Studies
 
Logistics Operations
Logistics OperationsLogistics Operations
Logistics Operations
Elfadil Ibrahim
 
Process view of scm & value chain analysis
Process view of scm & value chain analysisProcess view of scm & value chain analysis
Process view of scm & value chain analysis
MD SALMAN ANJUM
 
The features of the global marketing of luxury products (on the example of lo...
The features of the global marketing of luxury products (on the example of lo...The features of the global marketing of luxury products (on the example of lo...
The features of the global marketing of luxury products (on the example of lo...
diana_vardanyan
 
Logistics of transportation & distribution
Logistics of transportation & distributionLogistics of transportation & distribution
Logistics of transportation & distribution
Navindu Munidasa
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
Oni Sharma
 
Supply chain management Understanding the Supply Chain
Supply chain management Understanding the Supply ChainSupply chain management Understanding the Supply Chain
Supply chain management Understanding the Supply Chain
Osama Yousaf
 
What is strategic fit
What is strategic fitWhat is strategic fit
What is strategic fit
Anu Vanu
 
Marketing - Louis Vuitton case presentation
Marketing - Louis Vuitton case presentationMarketing - Louis Vuitton case presentation
Marketing - Louis Vuitton case presentation
MayankAgrawal205
 
Blockchain in Supply Chain Management
Blockchain in Supply Chain ManagementBlockchain in Supply Chain Management
Blockchain in Supply Chain Management
101 Blockchains
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
Gohar Saeed
 
The four-supply-chain-enablers
The four-supply-chain-enablersThe four-supply-chain-enablers
The four-supply-chain-enablers
Soumitra Chakraborty
 
Li & fung
Li & fungLi & fung
Li & fung
Annie Reed
 

What's hot (20)

Supply chain resilience
Supply chain resilienceSupply chain resilience
Supply chain resilience
 
Logistic management
Logistic managementLogistic management
Logistic management
 
Warehouse and Logistics Sessions 3 - 4 (Day 2)
Warehouse and Logistics Sessions 3 - 4 (Day 2)Warehouse and Logistics Sessions 3 - 4 (Day 2)
Warehouse and Logistics Sessions 3 - 4 (Day 2)
 
7 agile supply chain
7 agile supply chain7 agile supply chain
7 agile supply chain
 
Supply chain
Supply chainSupply chain
Supply chain
 
Introduction to chanel
Introduction to chanelIntroduction to chanel
Introduction to chanel
 
Logistics and supply chain management
Logistics and supply chain managementLogistics and supply chain management
Logistics and supply chain management
 
SUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIESSUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIES
 
Logistics Operations
Logistics OperationsLogistics Operations
Logistics Operations
 
Process view of scm & value chain analysis
Process view of scm & value chain analysisProcess view of scm & value chain analysis
Process view of scm & value chain analysis
 
The features of the global marketing of luxury products (on the example of lo...
The features of the global marketing of luxury products (on the example of lo...The features of the global marketing of luxury products (on the example of lo...
The features of the global marketing of luxury products (on the example of lo...
 
Logistics of transportation & distribution
Logistics of transportation & distributionLogistics of transportation & distribution
Logistics of transportation & distribution
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Supply chain management Understanding the Supply Chain
Supply chain management Understanding the Supply ChainSupply chain management Understanding the Supply Chain
Supply chain management Understanding the Supply Chain
 
What is strategic fit
What is strategic fitWhat is strategic fit
What is strategic fit
 
Marketing - Louis Vuitton case presentation
Marketing - Louis Vuitton case presentationMarketing - Louis Vuitton case presentation
Marketing - Louis Vuitton case presentation
 
Blockchain in Supply Chain Management
Blockchain in Supply Chain ManagementBlockchain in Supply Chain Management
Blockchain in Supply Chain Management
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
The four-supply-chain-enablers
The four-supply-chain-enablersThe four-supply-chain-enablers
The four-supply-chain-enablers
 
Li & fung
Li & fungLi & fung
Li & fung
 

Viewers also liked

Performance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World BankPerformance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World Bank
OECD Governance
 
Fin man 5 break even point and leverage analysis
Fin man 5   break even point and leverage analysisFin man 5   break even point and leverage analysis
Fin man 5 break even point and leverage analysis
Jimmi Sinton
 
Break Even Point Analisis
Break Even Point AnalisisBreak Even Point Analisis
Break Even Point Analisis
Willy Putra Pramono
 
Analysis & interpretation of fs
Analysis & interpretation of fsAnalysis & interpretation of fs
Analysis & interpretation of fs
Adil Shaikh
 
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgetingAnaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan
 
Comparitive and common size
Comparitive and common sizeComparitive and common size
Comparitive and common size
Jaswinder Singh
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSIS
Asrar Mohd
 
PPT on break even analysis
PPT on break even analysisPPT on break even analysis
PPT on break even analysis
ITC Limited
 
Break Even Analysis
Break Even AnalysisBreak Even Analysis
Break Even Analysis
yogesh raghuwanshi
 
Zero Based Budgeting
Zero Based BudgetingZero Based Budgeting
Zero Based Budgeting
Hari Kumar
 
Zero based and performance based budgeting
Zero based and performance based budgetingZero based and performance based budgeting
Zero based and performance based budgeting
Vineet Aggarwal
 
Zero Base Budgeting
Zero Base BudgetingZero Base Budgeting
Zero Base Budgeting
drkulrajat
 

Viewers also liked (12)

Performance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World BankPerformance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World Bank
 
Fin man 5 break even point and leverage analysis
Fin man 5   break even point and leverage analysisFin man 5   break even point and leverage analysis
Fin man 5 break even point and leverage analysis
 
Break Even Point Analisis
Break Even Point AnalisisBreak Even Point Analisis
Break Even Point Analisis
 
Analysis & interpretation of fs
Analysis & interpretation of fsAnalysis & interpretation of fs
Analysis & interpretation of fs
 
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgetingAnaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
 
Comparitive and common size
Comparitive and common sizeComparitive and common size
Comparitive and common size
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSIS
 
PPT on break even analysis
PPT on break even analysisPPT on break even analysis
PPT on break even analysis
 
Break Even Analysis
Break Even AnalysisBreak Even Analysis
Break Even Analysis
 
Zero Based Budgeting
Zero Based BudgetingZero Based Budgeting
Zero Based Budgeting
 
Zero based and performance based budgeting
Zero based and performance based budgetingZero based and performance based budgeting
Zero based and performance based budgeting
 
Zero Base Budgeting
Zero Base BudgetingZero Base Budgeting
Zero Base Budgeting
 

Similar to Inventory probs-solns-s07

Home Work; Chapter 9; Inventory Policy Decisions
Home Work; Chapter 9; Inventory Policy DecisionsHome Work; Chapter 9; Inventory Policy Decisions
Home Work; Chapter 9; Inventory Policy Decisions
Shaheen Sardar
 
Inventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptxInventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptx
FarhatHossain3
 
Level demand1
Level demand1Level demand1
Level demand1
Anand Ellur
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
mianmohsinmumtazshb
 
Reorder point
Reorder pointReorder point
Reorder point
Don Paul
 
Inventry..
Inventry..Inventry..
Inventry..
VIBHASH SINGH
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
ajithsrc
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
Maysa Farron
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
Maysa Farron
 
Operations Analytics using R Software.pptx
Operations Analytics using R Software.pptxOperations Analytics using R Software.pptx
Operations Analytics using R Software.pptx
Sanjay Chaudhary
 
Inventory
InventoryInventory
Inventory
Soim Ahmad
 
Inventory management
Inventory managementInventory management
Inventory management
May Farrah Detuya - Vidal
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
Rashedur Rahman
 
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
ijsc
 
AGIFORS1995-EPIM-QUILLINAN
AGIFORS1995-EPIM-QUILLINANAGIFORS1995-EPIM-QUILLINAN
AGIFORS1995-EPIM-QUILLINAN
John Quillinan
 
Eoq model
Eoq modelEoq model
Eoq model
kahogan62
 
Topic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptxTopic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptx
HassanHani5
 
chap014.ppt
chap014.pptchap014.ppt
chap014.ppt
AgungTriPamungkas1
 
Inventory control
Inventory controlInventory control
Inventory control
Kinshook Chaturvedi
 
Inventory notes
Inventory notesInventory notes
Inventory notes
Chinnannan Periasamy
 

Similar to Inventory probs-solns-s07 (20)

Home Work; Chapter 9; Inventory Policy Decisions
Home Work; Chapter 9; Inventory Policy DecisionsHome Work; Chapter 9; Inventory Policy Decisions
Home Work; Chapter 9; Inventory Policy Decisions
 
Inventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptxInventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptx
 
Level demand1
Level demand1Level demand1
Level demand1
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
 
Reorder point
Reorder pointReorder point
Reorder point
 
Inventry..
Inventry..Inventry..
Inventry..
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
 
Operations Analytics using R Software.pptx
Operations Analytics using R Software.pptxOperations Analytics using R Software.pptx
Operations Analytics using R Software.pptx
 
Inventory
InventoryInventory
Inventory
 
Inventory management
Inventory managementInventory management
Inventory management
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
 
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
 
AGIFORS1995-EPIM-QUILLINAN
AGIFORS1995-EPIM-QUILLINANAGIFORS1995-EPIM-QUILLINAN
AGIFORS1995-EPIM-QUILLINAN
 
Eoq model
Eoq modelEoq model
Eoq model
 
Topic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptxTopic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptx
 
chap014.ppt
chap014.pptchap014.ppt
chap014.ppt
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory notes
Inventory notesInventory notes
Inventory notes
 

Recently uploaded

NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
National Information Standards Organization (NISO)
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
Steve Thomason
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
ssuser13ffe4
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDFLifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
Vivekanand Anglo Vedic Academy
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
deepaannamalai16
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
giancarloi8888
 

Recently uploaded (20)

NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDFLifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
Lifelines of National Economy chapter for Class 10 STUDY MATERIAL PDF
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
 

Inventory probs-solns-s07

  • 1. UMass Lowell 63.371 College of Management T. Sloan Inventory Management Example Problems with Solutions 1. An auto parts supplier sells Hardy-brand batteries to car dealers and auto mechanics. The annual demand is approximately 1,200 batteries. The supplier pays $28 for each battery and estimates that the annual holding cost is 30 percent of the battery’s value. It costs approximately $20 to place an order (managerial and clerical costs). The supplier currently orders 100 batteries per month. a. Determine the ordering, holding, and total inventory costs for the current order quantity. b. Determine the economic order quantity (EOQ). c. How many orders will be placed per year using the EOQ? d. Determine the ordering, holding, and total inventory costs for the EOQ. How has ordering cost changed? Holding cost? Total inventory cost? Solution We are given the following information: annual demand: D = 1200 batteries per year item cost: c = $28 per battery holding cost: H = ic = 0.30(28) = $8.40 per battery per year order cost: S = $20 per order current order quantity: Q = 100 batteries D Q 1200 100 a. The current ordering and holding costs are: QS + 2H = 100 (20) + 2 (8.40) = 240 + 420 = $660. 2DS 2×1200×20 b. The EOQ is Q∗ = H = 8.40 = 75.6 → 76 batteries. D 1200 c. The company will place Q∗ = 76 = 15.8 orders per year. ∗ d. The new ordering and holding costs are: Q∗ S + Q H = D 2 1200 76 (20) + 76 2 (8.40) = 315.79 + 319.20 = $634.99. The company will save $25.01 by using the EOQ. 2. Upon closer inspection, the supplier determines that the demand for batteries is normally distributed with mean 4 batteries per day and standard deviation 3 batteries per day. (The supplier is open 300 days per year.) It usually takes about 4 days to receive an order from the factory. a. What is the standard deviation of usage during the lead time? b. Determine the reorder point needed to achieve a service level of 95 percent. c. What is the safety stock? What is the holding cost associated with this safety stock? d. How would your analysis change if the service level changed to 98 percent? Solution In addition to the information from the problem above, we are told: average demand rate: d = 4 batteries per day standard deviation of demand: σd = 3 batteries per day lead time: L = 4 days 300 operating days per year 1 Spring 2007
  • 2. √ a. The standard deviation of demand during the lead time is σL = σd L = 3( 4) = 6 batteries. b. The reorder point is equal to the average demand expected during the lead time plus some safety stock. The service level is 95 percent. Examining the Table of Normal Demand Percentages (see the last page of this handout), we see that this corresponds to z = 1.65 (take the average of z = 1.6 and z = 1.7, since 95 percent is between 94.5 and 95.5 percent). In other words, we need to keep 1.65 standard deviations worth of extra inventory on hand to ensure that the probability of running out is less than 5 percent. Now we can figure out the reorder point: R = dL + zσL = 4(4) + 1.65(6) = 16 + 9.9 = 25.9 → 26 batteries. We place an order for 76 batteries when the inventory level drops to 26 batteries. c. The safety stock is the inventory in excess of the expected demand during the lead time. In other words, the safety stock is 26 − 16 = 10 batteries. The associated holding cost is simply 10 × H = 10 × 8.40 = $84.00. d. If the service level changes to 98 percent, then we must go back and determine a new z. Consulting the table, we see that 98 percent is between 97.7 and 98.2 percent. Averaging the two corresponding z values gives us z = 2.05 for a service level of 98 percent. Thus, the reorder point will be: R = dL + zσL = 4(4) + 2.05(6) = 16 + 12.3 = 28.3 → 29 batteries. Place an order for 76 units when the inventory level drops to 29 units. 3. Foster Drugs, Inc., handles a variety of health and beauty aid products. A particular hair conditioner product costs Foster $2.95 per unit. The annual holding cost rate is 20 percent. Using an EOQ model, they determined that an order quantity of 300 units should be used. The lead time to receive an order is one week, and the demand is normally distributed with a mean of 150 units per week and a standard deviation of 40 units per week. a. What is the reorder point if the firm is willing to tolerate a 1-percent chance of a stockout during an order cycle? b. What safety stock and annual safety stock cost are associated with your recommendation in part a? c. Foster is considering making a transition to a periodic-review system in an attempt to coordinate ordering of some of its products. The review period would be two weeks and the delivery lead time would remain one week. What target inventory level would be needed to ensure the same 1-percent risk of stockout? d. What is the safety stock associated with your answer to part c? What is the annual cost associated with holding this safety stock? e. Compare your answers to parts b and d. If you were the manager of Foster Drugs, would you choose a continuous- or periodic-review system? 2
  • 3. Solution We are given the following information: item cost: c = $2.95 per unit carrying “interest rate”: i = 0.20 per unit per year lead time: L = 1 week average demand rate: d = 150 units per week standard deviation of demand: σd = 40 units per week current order quantity: Q = 300 units a. A 1-percent stockout risk corresponds to a service level of 99 percent. Consulting the table, we see that this service level corresponds to z = 2.3. First, compute the mean and standard deviation of √ √ demand during the lead time: dL = 150(1) = 150 and σL = σd L = 40 1 = 40. Now we have all of the information necessary to determine the reorder point: R = dL + zσL = 150 + 2.3(40) = 150 + 93.05 = 243.05 → 243 units. b. The safety stock is 93 units, and the holding cost associated with the safety stock is 93×H = 93×ic = 93 × 0.20(2.95) = $54.87. c. We are told that the review period is two weeks so P = 2. Use this number, along with L = 1 to compute the mean and standard deviation of demand during the lead time and the review period: √ √ d(P + L) = 150(2 + 1) = 450 and σP +L = σd P + L = 40 2 + 1 = 69.28. The z value remains the same. The target inventory level is: T = d(P + L) + zσP +L = 450 + 2.3(69.28) = 450 + 159.35 = 609.35 → 610 units. d. The safety stock is 160 units (rounded up), and the holding cost associated with the safety stock is 160 × H = 160 × ic = 160 × 0.20(2.95) = $94.40. e. The periodic review method requires a larger safety stock, so it costs more: 94.40 − 54.87 = $39.53. However, using a fixed-period method facilitates ordering multiple items from a single supplier, so it is probably worth the extra cost. 3
  • 4. Formulas for Inventory Management Problems Fixed-Quantity System (Q System) 2DS D Q EOQ: Q∗ = TC = S+ H H = ic H Q 2 √ R = dL + zσL σL = σd L Fixed-Period System (P System) √ T = d(P + L) + zσP +L σP +L = σd P + L Table of Normal Demand Percentages Service Stockout z Level (%) Risk (%) 0.0 50.0 50.0 0.5 69.1 30.9 1.0 84.1 15.9 1.1 86.4 13.6 1.2 88.5 11.5 1.3 90.3 9.7 1.4 91.9 8.1 1.5 93.3 6.7 1.6 94.5 5.5 1.7 95.5 4.5 1.8 96.4 3.6 1.9 97.1 2.9 2.0 97.7 2.3 2.1 98.2 1.8 2.2 98.6 1.4 2.3 98.9 1.1 2.4 99.2 0.8 2.5 99.4 0.6 2.6 99.5 0.5 2.7 99.6 0.4 2.8 99.7 0.3 2.9 99.8 0.2 3.0 99.9 0.1 4